12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

Bob Rettig Construction and Consulting

Exhibit "A" Date: 1/27/2011

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

DOCUMENTATION WORKBOOK FY 2018

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

CONTRACTOR'S ESTIMATE PACKAGE

Designed by. Preparation Date 6/22/2018 Effective Date of Pricing 3/1/2019 Estimated Construction Time 400 Days

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Critchfield Rd / SR-129

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project

PROGRAMMING CPM. Network Analysis. Goal:

CITY OF PUYALLUP TOSCANOS SINKHOLE EVALUATION

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

PROPACIFIC BUILDERS CORPORATION

GIS Streamlines Carlton s Sewer Improvement Process Presented by: John M. Langhans, PE Jared W. DeMaster, PE MSA Professional Services, Inc.

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate

Appendix C Benchmarking Cost Estimates

Prime6400 Software. Furnish and Install: Architectural Metalwork. SS Counter Tops Metal Brackets Metal Tops Metal Wall Panels

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Gasketed Sewer Fittings SDR 35 Injection Molded in Sizes 4 12 Fabricated in Sizes 15 36

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox

Allo Fiber City Checklist

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:


CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

Bob Rettig Construction and Consulting

CASE STUDIES. Introduction

Simplex tableau CE 377K. April 2, 2015

Ottumwa Schafer Stadium 8-Lane Track BIDS RECEIVED AT: OTTUMWA COMMUNITY SCHOOL DISTRICT OFFICE 1112 N. VAN BUREN OTTUMWA, IOWA 52501

Barrier Free Accessibility

White River Update. Jeanne Stypula, Supervising Engineer. Advisory Committee Meeting April 26, 2016

TABULATION OF TENDERS

MAJOR REHABILITATION REPORT: BASELINE COST ESTIMATE FOR RECOMMENDED PLAN

DRAFT. Fort Worth Central City Preliminary Design. Current Working Estimate. Appendix E. January 2005 Updated April 2005

Trinity Construction S. Main St. #250 Aurora, CO (720) LAKEWOOD, CO 80226

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

Restraining Thrust Forces. DIPRA Member Companies. DIPRA Website ( DIPRA Computer Programs. AWWA Standards

HomeWorks Construction

CROA Road Maintenance Log

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

BUILDING HOME CONSTRUCTION

ADDENDUM NO. 4. Date: February 22, 2018 for Wireless Access Points Installation South Orange County Community College District BID No.

Tap Stand Construction

SAN ANTONIO WATER SYSTEM

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

Technical Report COASTAL ENGINEERING ANALYSIS, REMEDIATION CONCEPT DESIGN AND IMPACT ANALYSIS PORT OF SAN FRANCISCO CENTRAL BASIN, CALIFORNIA

Materials. Use materials meeting the following.

APPENDIX B DRAINAGE REPORT

Saganashkee Slough - McMahon Woods Section 506 Great Lakes Fishery & Ecosystem Restoration Study

Fast and Furious Rebuilding and Widening the I-90 West Corridor

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

Salt Reduction using Innovative

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

AGGREGATES BID DATE: 11/6/08 CONTRACT PERIOD: 1/1/09 12/31/09

Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio

Geosynthetics Applications and Performance Reviews Select Case Histories

INVITATION TO BID CITY OF CAPE CORAL SW 6&7 UTILITIES EXTENSION PROJECT CONTRACT VII CENTRAL AREA 6 AND CENTRAL AREA 8 ITB UT13-02/TM-G

GEOTECHNICAL BASELINE REPORT (GBR) COWMIRE AND COLDWATER STORMWATER TUNNELS

ADDENDUM NO. 3 SEWER CLEANING AND TELEVISING PROGRAM CITY OF HOWELL LIVINGSTON COUNTY, MICHIGAN. ONLINE ONLY

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

BID PROPOSAL FOR TERMINAL APRON RECONSTRUCTION

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

Purchase of Two (2) Snow Plows and Two (2) Plow Sub-frames.

CADASTRAL DELIMITATION OF ADMINISTRATIVE TERRITORY IN ROMANIA IN ORDER TO ACHIEVE GENERAL URBAN PLANS

City of Grand Island Tuesday, October 13, 2015 Council Session

ADDENDUM NO. 1. PROJECT NAME: Surf Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB #

REQUEST FOR QUALIFICATIONS ENGINEERING SERVICES

BID SUMMARY. CCR Hilb & Bldg C Renovation 10:00AM Wednesday, April 4, 2018 COD Bid #: CCR01 General Construction. General Construction

9/12/2014 O V E RV I E W

Bramley Grange, Horsham Road, Bramley, Surrey

HDD PA-IN RD (W-N57 and W-N56)

SFI Electronics Technology APPROVAL SHEET. Customer Information. Customer : Part Name : Part No. : Model No. : COMPANY PURCHASE R&D

twist turn siting instructions and considerations

The Preliminary Study of the Impact of Liquefaction on Water Pipes

Business: Address, City, State, zip code

Nature and Detection of Void-Induced Pavement Failures

Sample Preliminary Cost Estimate Solana Consultants

404 Nationwide Permit: File No. SPL PKK FWS-LA-14B F0556 Streambed Alteration Agreement Notification No.

Transcription:

Summary of Bids Received For Mt. Carmel Road, Vicbarb Lane & Apple Blossom Lane Local Sewer MSD ID: 10370045 Firm Name Bid Total $ $1,074,100.00 Howell Contractors Inc. $1,083,694.00 Sunesis Construction $1,221,333.75 Fields Excavating, Inc. $1,290,066.00 Ford Development Corp $1,335,095.00 $1,371,270.00 Bray Construction $1,453,150.00, Inc. $1,490,731.00 $1,671,955.00 Bid Sale Start Date 2/17/2015 Bid Opening Date 3/25/2015 Estimated Cost of Construction $1,429,000.00 amount read at bid opening $1,375,085.00 Bid Item Quantity Unit Bidders Firm Labor (UP)$ Materials (UP)$ 1 Special Excavation 25 CY Bray Construction Combined Unit $ Bid Item Total $ 40.00 0.00 40.00 1,000.00 Fields Excavating, Inc. 5.00 20.00 25.00 625.00 Ford Development Corp 10.00 0.00 10.00 250.00 10.00 10.00 20.00 500.00 Howell Contractors Inc. 5.00 5.00 10.00 250.00 25.00 0.00 25.00 625.00 3/24/2015 MSD_BT_Summary.rdl 1 of 8

5.00 5.00 10.00 250.00 Sunesis Construction 10.00 10.00 20.00 500.00 2 Special Fill Material(Bank Run Gravel), Inc. 25 TON Bray Construction 50.00 10.00 60.00 1,500.00 20.00 20.00 40.00 1,000.00 Fields Excavating, Inc. 5.00 20.00 25.00 625.00 Ford Development Corp 0.00 10.00 10.00 250.00 15.00 10.00 25.00 625.00 Howell Contractors Inc. 5.00 10.00 15.00 375.00 0.00 15.00 15.00 375.00 3.00 9.00 12.00 300.00 Sunesis Construction 10.00 22.00 32.00 800.00 3 Special Fill Material(No. 2 Gravel Bedding), Inc. 25 TON Bray Construction 20.00 25.00 45.00 1,125.00 25.00 25.00 50.00 1,250.00 Fields Excavating, Inc. 5.00 20.00 25.00 625.00 Ford Development Corp 0.00 15.00 15.00 375.00 30.00 20.00 50.00 1,250.00 Howell Contractors Inc. 5.00 20.00 25.00 625.00 0.00 25.00 25.00 625.00 3.00 12.00 15.00 375.00 Sunesis Construction 10.00 24.00 34.00 850.00 20.00 25.00 45.00 1,125.00 3/24/2015 MSD_BT_Summary.rdl 2 of 8

, Inc. 4 Concrete Masonry Cl. "C" 5 CY Bray Construction 75.00 125.00 200.00 1,000.00 Fields Excavating, Inc. 175.00 125.00 300.00 1,500.00 Ford Development Corp 10.00 10.00 20.00 100.00 100.00 100.00 200.00 1,000.00 Howell Contractors Inc. 100.00 100.00 200.00 1,000.00 0.00 0.00 0.00 0.00 20.00 80.00 100.00 500.00 Sunesis Construction 64.00 100.00 164.00 820.00 5 Concrete Masonry Cl. "C" (Encasement, Cradles, Key Blocks), Inc. 50.00 125.00 175.00 875.00 10 CY Bray Construction 75.00 125.00 200.00 2,000.00 Fields Excavating, Inc. 175.00 125.00 300.00 3,000.00 Ford Development Corp 10.00 10.00 20.00 200.00 75.00 75.00 150.00 1,500.00 Howell Contractors Inc. 100.00 100.00 200.00 2,000.00 150.00 150.00 300.00 3,000.00 20.00 80.00 100.00 1,000.00 Sunesis Construction 100.00 102.00 202.00 2,020.00 50.00 125.00 175.00 1,750.00, Inc. 6 6" Conduit, Type "I" 1,484 LF Bray Construction 95.00 95.00 190.00 281,960.00 Fields Excavating, Inc. 51.00 83.00 134.00 198,856.00 Ford Development Corp 75.00 75.00 150.00 222,600.00 3/24/2015 MSD_BT_Summary.rdl 3 of 8

75.00 75.00 150.00 222,600.00 Howell Contractors Inc. 50.00 50.00 100.00 148,400.00 65.00 65.00 130.00 192,920.00 40.00 110.00 150.00 222,600.00 Sunesis Construction 50.00 158.00 208.00 308,672.00 60.50 56.50 117.00 173,628.00, Inc. 7 8" Conduit, Type "B" 2,910 LF Bray Construction 150.00 150.00 300.00 873,000.00 Fields Excavating, Inc. 98.00 192.00 290.00 843,900.00 Ford Development Corp 140.00 133.00 273.00 794,430.00 200.00 200.00 400.00 1,164,000.00 Howell Contractors Inc. 75.00 138.00 213.00 619,830.00 150.00 150.00 300.00 873,000.00 40.00 115.00 155.00 451,050.00 Sunesis Construction 100.00 136.00 236.00 686,760.00 170.00 175.00 345.00 1,003,950.00, Inc. 8 8" Conduit, Type "G" 599 LF Bray Construction 100.00 100.00 200.00 119,800.00 Fields Excavating, Inc. 117.50 47.50 165.00 98,835.00 Ford Development Corp 160.00 150.00 310.00 185,690.00 100.00 120.00 220.00 131,780.00 Howell Contractors Inc. 75.00 145.00 220.00 131,780.00 117.00 118.00 235.00 140,765.00 3/24/2015 MSD_BT_Summary.rdl 4 of 8

40.00 125.00 165.00 98,835.00 Sunesis Construction 67.25 100.00 167.25 100,182.75 122.00 138.00 260.00 155,740.00, Inc. 9 6" Conduit, Type "G" 46 LF Bray Construction 95.00 95.00 190.00 8,740.00 Fields Excavating, Inc. 60.00 90.00 150.00 6,900.00 Ford Development Corp 100.00 100.00 200.00 9,200.00 100.00 100.00 200.00 9,200.00 Howell Contractors Inc. 50.00 54.00 104.00 4,784.00 117.00 143.00 260.00 11,960.00 40.00 125.00 165.00 7,590.00 Sunesis Construction 85.50 100.00 185.50 8,533.00 10 6" T-Branches on 8" Conduit, Including Bends, Inc. 104.50 73.50 178.00 8,188.00 55 EA Bray Construction 200.00 200.00 400.00 22,000.00 Fields Excavating, Inc. 150.00 250.00 400.00 22,000.00 Ford Development Corp 100.00 100.00 200.00 11,000.00 100.00 100.00 200.00 11,000.00 Howell Contractors Inc. 200.00 200.00 400.00 22,000.00 75.00 75.00 150.00 8,250.00 2,000.00 445.00 2,445.00 134,475.00 Sunesis Construction 75.00 150.00 225.00 12,375.00, Inc. 150.00 125.00 275.00 15,125.00 3/24/2015 MSD_BT_Summary.rdl 5 of 8

11 Standard Two-Way Cleanout 55 EA Bray Construction 400.00 400.00 800.00 44,000.00 Fields Excavating, Inc. 150.00 350.00 500.00 27,500.00 Ford Development Corp 250.00 250.00 500.00 27,500.00 300.00 200.00 500.00 27,500.00 Howell Contractors Inc. 200.00 350.00 550.00 30,250.00 250.00 250.00 500.00 27,500.00 200.00 400.00 600.00 33,000.00 Sunesis Construction 183.00 400.00 583.00 32,065.00 12 Video Taping of Installed Sewers, Inc. 250.00 325.00 575.00 31,625.00 1 LS Bray Construction 18,200.00 0.00 18,200.00 18,200.00 Fields Excavating, Inc. 5,000.00 0.00 5,000.00 5,000.00 Ford Development Corp 2,500.00 2,500.00 5,000.00 5,000.00 3,000.00 2,000.00 5,000.00 5,000.00 Howell Contractors Inc. 7,000.00 500.00 7,500.00 7,500.00 7,500.00 0.00 7,500.00 7,500.00 5,300.00 0.00 5,300.00 5,300.00 Sunesis Construction 3,000.00 7,600.00 10,600.00 10,600.00 13 Remodel Bottom of Existing Manhole, Inc. 7,100.00 250.00 7,350.00 7,350.00 2 EA Bray Construction 4,700.00 2,000.00 6,700.00 13,400.00 Fields Excavating, Inc. 675.00 125.00 800.00 1,600.00 Ford Development Corp 500.00 500.00 1,000.00 2,000.00 500.00 500.00 1,000.00 2,000.00 3/24/2015 MSD_BT_Summary.rdl 6 of 8

Howell Contractors Inc. 3,000.00 1,700.00 4,700.00 9,400.00 1,250.00 1,250.00 2,500.00 5,000.00 3,500.00 500.00 4,000.00 8,000.00 Sunesis Construction 263.00 1,000.00 1,263.00 2,526.00 14 Standard Type "S" Manhole, Inc. 12 EA Bray Construction 750.00 500.00 1,250.00 2,500.00 1,700.00 1,700.00 3,400.00 40,800.00 Fields Excavating, Inc. 1,250.00 2,675.00 3,925.00 47,100.00 Ford Development Corp 2,500.00 2,500.00 5,000.00 60,000.00 3,000.00 2,500.00 5,500.00 66,000.00 Howell Contractors Inc. 3,000.00 4,250.00 7,250.00 87,000.00 2,250.00 2,250.00 4,500.00 54,000.00 4,000.00 3,830.00 7,830.00 93,960.00 Sunesis Construction 735.00 2,000.00 2,735.00 32,820.00 15 Ductile Iron Water Main and Fittings, Inc. 1 LS Bray Construction 2,650.00 2,500.00 5,150.00 61,800.00 4,950.00 4,950.00 9,900.00 9,900.00 Fields Excavating, Inc. 3,500.00 2,500.00 6,000.00 6,000.00 Ford Development Corp 500.00 500.00 1,000.00 1,000.00 5,000.00 5,000.00 10,000.00 10,000.00 Howell Contractors Inc. 5,000.00 2,500.00 7,500.00 7,500.00 9,500.00 9,500.00 19,000.00 19,000.00 3,000.00 2,500.00 5,500.00 5,500.00 3/24/2015 MSD_BT_Summary.rdl 7 of 8

Sunesis Construction 3,050.00 10,000.00 13,050.00 13,050.00, Inc. 16 Project Sign 1 EA Bray Construction 6,000.00 2,600.00 8,600.00 8,600.00 400.00 400.00 800.00 800.00 Fields Excavating, Inc. 750.00 250.00 1,000.00 1,000.00 Ford Development Corp 500.00 500.00 1,000.00 1,000.00 500.00 2,500.00 3,000.00 3,000.00 Howell Contractors Inc. 500.00 500.00 1,000.00 1,000.00 375.00 375.00 750.00 750.00 225.00 400.00 625.00 625.00 Sunesis Construction 100.00 500.00 600.00 600.00, Inc. 17 Performance Bond 1 LS Bray Construction 550.00 550.00 1,100.00 1,100.00 0.00 14,300.00 14,300.00 14,300.00 Fields Excavating, Inc. 5,000.00 20,000.00 25,000.00 25,000.00 Ford Development Corp 7,250.00 7,250.00 14,500.00 14,500.00 7,500.00 7,500.00 15,000.00 15,000.00 Howell Contractors Inc. 0.00 10,000.00 10,000.00 10,000.00 13,000.00 13,000.00 26,000.00 26,000.00 5,000.00 5,740.00 10,740.00 10,740.00 Sunesis Construction 160.00 8,000.00 8,160.00 8,160.00, Inc. 14,750.00 0.00 14,750.00 14,750.00 3/24/2015 MSD_BT_Summary.rdl 8 of 8