Status of the CWE Flow Based Market Coupling Project

Similar documents
Flow- based Market Coupling: Implementa9on of the CWE FB Project. Andrew Claxton APX Co- Chair, CWE Steering Commi5ee

The Nordic Capacity Calculation Methodology (CCM) project. CCM Stakeholder Forum Stockholm 8 February

The Nordic Capacity Calculation Methodology (CCM) project Stakeholder Forum. Arlanda Stockholm Airport 11 December 2018

SYSTEM BRIEF DAILY SUMMARY

Public data underlying the figures of Annual Report on the Results of Monitoring the Internal Electricity and Natural Gas Markets in 2015

EUROPEAN EXPERIENCE: Large-scale cross-country forecasting with the help of Ensemble Forecasts

Winter Season Resource Adequacy Analysis Status Report

SYSTEM BRIEF DAILY SUMMARY

GAMINGRE 8/1/ of 7

2018 Annual Review of Availability Assessment Hours

Transmission capacity allocation in zonal electricity markets

ENGINE SERIAL NUMBERS

elgian energ imports are managed using forecasting software to increase overall network e 칁 cienc.

Determine the trend for time series data

= observed volume on day l for bin j = base volume in jth bin, and = residual error, assumed independent with mean zero.

Project Appraisal Guidelines

The World Bank Haiti Business Development and Investment Project (P123974)

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement

Monthly Trading Report Trading Date: Dec Monthly Trading Report December 2017

Published by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products

2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT

Astrological Calendar. for Central Time

Mountain View Community Shuttle Monthly Operations Report

Chapter 5. Transmission networks and electricity markets

Wind Power Capacity Assessment

2018 Project Prioritization and Budgeting Process

Forecasting the Canadian Dollar Exchange Rate Wissam Saleh & Pablo Navarro

Weekly price report on Pig carcass (Class S, E and R) and Piglet prices in the EU. Carcass Class S % + 0.3% % 98.

GRIPs. Overview Andrea Ćirlićová Business Area Manager, System Development

Monthly Trading Report July 2018

Short-term forecasts of GDP from dynamic factor models

Alberto Troccoli, Head of Weather and Energy Research Unit, CSIRO, Australia ICCS 2013 Jamaica, 5 December 2013 (remotely, unfortunately)

Derogation Criteria for the Requirements for Generators Network Code

JANUARY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY

Table 01A. End of Period End of Period End of Period Period Average Period Average Period Average

CIMA Professional

Power situation Sweden, english text

CIMA Professional

Multivariate Regression Model Results

January 2009 Videmus Stellae

Approximating Fixed-Horizon Forecasts Using Fixed-Event Forecasts

NEGST. New generation of solar thermal systems. Advanced applications ENEA. Comparison of solar cooling technologies. Vincenzo Sabatelli

CIMA Professional 2018

March 5, British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

Virginia Basis Tables for Corn, Soybeans, and Wheat

CIMA Professional 2018

SOLAR POWER FORECASTING BASED ON NUMERICAL WEATHER PREDICTION, SATELLITE DATA, AND POWER MEASUREMENTS

Dates and Prices ICAEW - Manchester In Centre Programme Prices

Implementation Status & Results Niger Niger - Competitiveness & Growth Support (P127204)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Welcome Survey getting to know you Collect & log Supplies received Classroom Rules Curriculum overview. 1 : Aug 810. (3 days) 2nd: Aug (5 days)

Impacts of climate change on flooding in the river Meuse

Energy System Modelling Summer Semester 2018, Lecture 7

Efficient Monitoring Algorithm for Fast News Alert

W E E K L Y P U B L I C AT I O N. Commodities Weekly

Motion to Review the Academic Calendar Passed by Admissions and Standards, September 24, 2009

Public Disclosure Copy

Non-uniform pricing and thermal orders for the day-ahead Market

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities

peak half-hourly New South Wales

CAISO Participating Intermittent Resource Program for Wind Generation

peak half-hourly South Australia

Monitoring on Subsidence Claims. John Parvin Subsidence Claims Manager

Public Disclosure Copy

Terms of Reference for the Comparative Environmental Review (CER) of. Options for the Mactaquac Project, Mactaquac, New Brunswick

Calculations Equation of Time. EQUATION OF TIME = apparent solar time - mean solar time

Implementation Status & Results Africa RCIP3 - Regional Communications Infrastructure Program - Phase 3 (P111432)

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

The European Union Emissions Trading Scheme: What can we expect?

YACT (Yet Another Climate Tool)? The SPI Explorer

Working Group Balancing. Monday 10 th September 2018

Joint procurement of natural gas for grid operation

EVALUATION OF ALGORITHM PERFORMANCE 2012/13 GAS YEAR SCALING FACTOR AND WEATHER CORRECTION FACTOR

Cost of Inflow Forecast Uncertainty for Day Ahead Hydropower Production Scheduling

Renewables and the Smart Grid. Trip Doggett President & CEO Electric Reliability Council of Texas

The Energy Markets. Use and interpretation of medium to extended range products. ECMWF, Reading, 14 th of November 2005

DROUGHT INDICES BEING USED FOR THE GREATER HORN OF AFRICA (GHA)

Florida Courts E-Filing Authority Board. Service Desk Report March 2019

Outage Coordination and Business Practices

Weather Trends & Climate Normals

Day Ahead Hourly Load and Price Forecast in ISO New England Market using ANN

Safety effects of lower speed limits during winter months

DAILY QUESTIONS 28 TH JUNE 18 REASONING - CALENDAR

Life Cycle of Convective Systems over Western Colombia

In Centre, Online Classroom Live and Online Classroom Programme Prices

Implementation Status & Results Burundi Burundi - Emergency Energy Project from IDA CRW (P122217)

EBS IT Meeting July 2016

Technical note on seasonal adjustment for M0

Forecasting the electricity consumption by aggregating specialized experts

SMART GRID FORECASTING

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

The World Bank Haiti Business Development and Investment Project (P123974)

Weekly Operational Constraints Update

peak half-hourly Tasmania

ACCA Interactive Timetable & Fees

Project No India Basin Shadow Study San Francisco, California, USA

YEAR 10 GENERAL MATHEMATICS 2017 STRAND: BIVARIATE DATA PART II CHAPTER 12 RESIDUAL ANALYSIS, LINEARITY AND TIME SERIES

ACCA Interactive Timetable

Summary of Seasonal Normal Review Investigations CWV Review

2017 Autumn Courses. Spanish Elementary. September - December Elementary 1 - A1.1 Complete beginner

Transcription:

Commissie voor de Regulering van de Elektriciteit en het Gas Commission pour la Régulation de l Electricité et du Gaz Status of the CWE Flow Based Market Coupling Project Joint NordREG / Nordic TSO workshop on Flow-Based capacity calculation 11 December 2014 Patrick Luickx Advisor CREG Technical Operation of the Markets

Overview History and future outlook Welfare & other indicators Regulatory Issues FBMC parameters Regulatory Issues Flow Competition Stakeholder issues Zones impact Technical Aspects 2

History and future outlook Welfare & other indicators Regulatory Issues FBMC parameters Regulatory Issues Flow Competition Stakeholder issues Zones impact Technical Aspects HISTORY AND FUTURE OUTLOOK

History 7 June 2007: CWE Memorandum of Understanding implementation of a flow-based market coupling between the five countries June 2008: Decision to start with ATC MC in CWE End of 2010: Start of CWE FBMC market impact analysis First CWE FBMC technical meeting Go-live was foreseen end of 2012 15 March 2011: First Enhanced Flow-based MC feasibility report 4

History Early 2013: start of weekly // runs 7 March 2013: Market Forum 15 April 2013: NRA workshop on FBMC 2 May 2013: Project-led Public consultation February 2014: Start of daily publication of // run results June 2014: NRA-led Public consultation 23 June 2014: Market Forum Summer-Autumn 2014: submission of approval packages to NRAs 30 September 2014: FB User Group 5

Future outlook Between now and launch of FBMC List of NRA conditions Testing Flow competition - adequacy discussion (market consultation +) approval FBMC 2.0 after FBMC 1.0 6

History and future outlook Welfare & other indicators Regulatory Issues FBMC parameters Regulatory Issues Flow Competition Stakeholder issues Zones impact Technical Aspects WELFARE & OTHER INDICATORS

Weekly day ahead welfare 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 Development of welfare (XX - ATC) - daily average Daily average welfare ( ) Thousands 1000 ATC higher FB higher 800 600 FB FBI 400 200 0-200 -400-600 start daily parallel run Week 8

12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 5224 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 ΔWelfare ( ) Millions Change in average welfare 1.5 1 ΔCR Δmarket surplus 0.5 0-0.5-1 0 24 6 8 10 6 8 10 start daily parallel run week 9

10 Price convergence 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 0 123 4 567 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52123 4 567 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Price convergence Week ATC FB FBI start daily parallel run

Jan 13 Feb 13 Mar 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13 Sep 13 Oct 13 Nov 13 Dec 13 Jan 14 Feb 14 Mar 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14 Sep 14 Oct 14 35% Intuitiveness non-intuitive hours (as percentage of congested hours) 30% 25% 20% 15% 14.4% 10% 5% 0% *experimental cycles reported 14.4% non-intuitive of congested hours Post NWE 11

Import Export potential 12

Import Export potential 13

Import Export potential 14

Import Export potential 15

History and future outlook Welfare & other indicators Regulatory Issues FBMC parameters Regulatory Issues Flow Competition Stakeholder issues Zones impact Technical Aspects REGULATORY ISSUES FBMC PARAMETERS

Critical Branches (CB) FB allocation = Optimisation under constraints corresponding to thermal line capacities of CB Capacity on the CB, given to the FBMC : RAM = F max - F ref - FRM FAV RAM = remaining available margin capacity for market coupling F max = maximum allowable flow F ref = physical flow resulting from base case needs to be adjusted for LT nominations FRM = flow reliability margin FAV = Final adjustment value 17

Critical Branches (CB) General rule: threshold value to include as CB Maximum zone-to-line PTDF-factor is larger than a certain threshold include line as CB: Regional crossborder trade (between two zones) with largest impact on a certain existing line needs to have impact larger than 5% for the line to be considered a CB However, individual TSO has final say in inclusion of CB 19

Critical Branches (CB) Exchange A C Active constraint Security Domain Market clearing point Exchange A B Binding Critical Branches Physical constraints Critical Branches (chosen by TSOs) 20

Critical Branches (CB) CB determines constraints in the Market Coupling algorithm Constraints impact welfare and prices Choice of CB influences the prices 21

Capacity Calculation Power Transfer Distribution Factor (PTDF) matrix: PTDF node-to-line Transactions Line 1 1 2 1 3 1 4 1 L12 0-0,75-0,5-0,25 L23 0 0,25-0,5-0,25 L34 0 0,25 0,5-0,25 L41 0 0,25 0,5 0,75 Interpretation: a 1 MW transaction from node 2 to 1 results in a 0,25 MW additional flow on line L34 Calculation: PTDF 2 3 = PTDF 2 1 PTDF(3 1) 23

Generation Shift Key (GSK) From node-to-line to zone-to-line PTDF Example for trades between zones A, B and C Under different GSK assumptions PTDF zone-to-line constructed Different impacts on lines analysed Lines are CBs GSK: x% GSK: (100-x) % 24

Generation Shift Key (GSK) Interpretation of highlighted PTDF: A 1 MW commercial exchange from zone B to zone A with uniform repartition of GSKs leads to 0,625 MW additional physical flow on line L12 (in direction node 2 to node 1) PTDF zone to line Line B A B C C A L12-0,625-0,375-0,25 L23-0,125 0,125-0,25 L34 0,375 0,625-0,25 L41 0,375-0,375 0,75 GSK: 50% GSK: 50% 25

Generation Shift Key (GSK) PTDF zone to line Line B A B C C A L12-0,5-0,25-0,25 L23-0,5-0,25-0,25 L34 0,5 0,75-0,25 L41 0,5-0,25 0,75 GSK: 0% GSK: 100% Notice important difference in PTDF due to GSK choice of TSO in zone B PTDF zone to line Line B A B C C A L12-0,75-0,5-0,25 L23 0,25 0,5-0,25 L34 0,25 0,5-0,25 L41 0,25-0,5 0,75 GSK: 100% GSK: 0% 26

Generation Shift Key (GSK) The selection of GSKs made by TSO B has a large impact on the profitability of A to C exchanges TSO GSK choice greatly impacts PTDF zone-to-line which in turn impacts CB, prices and congestion rents 27

Generation Shift Key (GSK) PTDF zone-to-line is GSK-dependent (see above) Electricity prices are PTDF zone-to-line -dependent P( C) PTDF P( B) P( C) PTDF P( A) B C on L34 A C on L34 Shadow price With a given P(C) and P(B), P(A) will depend on PTDF B C on L34 Electricity prices are GSK-dependent 29

Generation Shift Key (GSK) Two issues for GSK determination in CWE 1. Which power plants participate? Market driven & flexible plants Gas/oil, hydro, pumped-storage & hard coal Exception: nuclear units if not enough flexible generation 2. How to estimate output level of these plants? Which % of output attributed to power plant Plain method for FR & DE Uniform for Amprion, TenneT GE According to base case % for RTE Linear interpolation method for BE & NL (see next slide) 30

Margins on the CB RAM = F max - F ref - FRM FAV Margins: Flow Reliability Margin (FRM) Final Adjustment Value (FAV) Special critical branches Explicit additional constraints in the algorithm Reflect uncertainty 31

Margins on the CB Special critical branches External constraints Additional constraints that are not normal CBs E.g.: import / export limitation for entire zone To guarantee secure grid operation Avoid market results with stability problems Voltage stability Avoid market results too far away from reference flows 34

Intuitiveness NL 73 974 MW DE 81 2791 MW Intuitive example 761 MW 213 MW BE 111-761 MW FR 96-3004 MW 2791 MW * Source: CWE TSOs, Intuitiveness pedagogical presentation, 22 November 2011 (Results of simulation of FBMC on December 2 st, 2010 at 20:00) 37

Intuitiveness 666 MW r NL 50.6 2458 MW 1792 MW DE 51.5 3091 MW Non-intuitive example BE 48.9-666 MW ² 3091 MW * Source: CWE TSOs, Intuitiveness pedagogical presentation, 22 November 2011 FR 59.1-4883 MW (Results of simulation of FBMC on December 1 st, 2010 at 07:00) 38

Intuitiveness FBMC is welfare optimising Price minimization Frequency and importance of non-intuitive results seems higher for smaller zones when there is a mix of large and small zones. CWE FBMC will start with FB intuitive Following the results of the Market Consultation, 39

Monitoring Monitoring: completion of the template of periodic data for regulators Type & frequency of monitoring reports Important monitoring work of NRAs TSOs have direct impact on prices / market operation Data collection and analysis 40

History and future outlook Welfare & other indicators Regulatory Issues FBMC parameters Regulatory Issues Flow Competition Stakeholder issues Zones impact Technical Aspects REGULATORY ISSUES FLOW COMPETITION

Flow competition in FB FBMC improves market outcome when no congestion FBMC induces flow competition between large and small countries / zones in case of congestion Competition issue under normal circumstances Security of Supply / adequacy issue under scarcity circumstances 42

Security of supply with FB FBMC worsens security of supply issues in small countries when competing with large countries in congested situations Link to PTDF advantage for larger countries 43

Security of supply with FB PTDFs Nl-B/Nl-F ratios for a congestion on the Nl-B border vary between 1,18 to 2,14 Ratio weighted average = 1,58 (data 1/1/2014 31/9/2014) BE market players bid 3000 (= price cap) If FR market player bids above a threshold of 1900 independently of their location in France Requests for imports for France will have full priority on imports for Belgium + 4000 Scarcity No congestion in Be & Fr & congestion - 1500 2000-2000 2500 4000 If ask > 1900 44

Security of supply with FB In scarcity conditions: if Belgium competes with France for imports from the Netherlands and Germany risk that import volume in Belgium goes to zero even when bidding 3000 All or nothing behaviour above a given threshold observed in the current design Current design lets countries that do not bid max price get all capacity mitigation measures 45

History and future outlook Welfare & other indicators Regulatory Issues FBMC parameters Regulatory Issues Flow Competition Stakeholder issues Zones impact Technical Aspects STAKEHOLDER ISSUES

Market forums and consultation 7 March 2013: Market Forum 2 May 2013: Project-led Public consultation June 2014: NRA-led Public consultation 23 June 2014: Market Forum 30 September 2014: 1 st FB User Group 47

Market forums and consultation Recognition of improvements with FBMC welfare Market has intermediate understanding of FBMC Improvements before go-live or in FBMC 2.0 Concerns of losing welfare gains from Day ahead FBMC in intraday afterwards Impact on ID market unclear 48

Market forums and consultation Market wants much transparency To reap all benefits from FBMC Robustness FB intuitive More studies before go-live to better understand 49

Conditions after consultation Conditions from NRAs towards TSOs on: Intuitiveness / Euphemia Fallback mechanism Typical winter days and impact of long-term evolutions LTA inclusion Impact on Intraday Welfare analysis generation/demand adequacy 50

Transparency Level of transparency towards market players needs to be sufficient for market to understand the process and implications of FBMC Importance of market consultation 51

History and future outlook Welfare & other indicators Regulatory Issues FBMC parameters Regulatory Issues Flow Competition Stakeholder issues Zones impact Technical Aspects ZONES IMPACT

Zone impact Better understand the impact of a mix of small and larges zones on FBMC results A. Marien, P. Luickx, A. Tirez, and D. Woitrin, Importance of design parameters on flow-based market coupling implementation, in 2013 10th International Conference on the European Energy Market (EEM), 2013, pp. 1 8 Synthetic example with 12 lines, 16 nodes & 4 countries represented here 53

Zones impact FRM (in MW) for several zones delimitations FRM should be taken into account in zones delimitation studies FRMs decrease with the number of zones Uncertainty decreases with increasing number of zones 54

Zones impact Impact of mix of small and large zones A. Marien, P. Luickx, A. Tirez, and D. Woitrin, Importance of design parameters on flowbased market coupling implementation, in 2013 10th International Conference on the European Energy Market (EEM), 2013, pp. 1 8 55

Zones impact Impact of a mix of small and large zones Averaging mechanism On average, cross-border exchanges between large zones have the smallest PTDF and make the smallest use of the transmission lines (rows at the bottom of the table) Cf. zones B & C in example Compensation mechanism On average, PTDF corresponding to internal lines are lower than PTDF corresponding to cross-zonal lines Important characteristic when two trades compete on a same congested CB since trade with lowest PTDF gets the deal Grey area in example 56

History and future outlook Welfare & other indicators Regulatory Issues FBMC parameters Regulatory Issues Flow Competition Stakeholder issues Zones impact Technical Aspects TECHNICAL ASPECTS

Robustness «Missing days» Parallel runs without results via the regular FBMC process Published on CASC website http://www.casc.eu/en/resource-center/cwe-flow- Based-MC/Parallel-Run-Results Reasons for missing days: (IT) tools learning curves (of operators) improvement of method 58

2013 2014 Robustness Year wk Wed Thu Fri Sat Sun Mon Tue 0 01 Jan 1 02 Jan 03 Jan 04 Jan 05 Jan 06 Jan 07 Jan 08 Jan 2 09 Jan 10 Jan 11 Jan 12 Jan 13 Jan 14 Jan 15 Jan 3 16 Jan 17 Jan 18 Jan 19 Jan 20 Jan 21 Jan 22 Jan 4 23 Jan 24 Jan 25 Jan 26 Jan 27 Jan 28 Jan 29 Jan 5 30 Jan 31 Jan 01 Feb 02 Feb 03 Feb 04 Feb 05 Feb 6 06 Feb 07 Feb 08 Feb 09 Feb 10 Feb 11 Feb 12 Feb 7 13 Feb 14 Feb 15 Feb 16 Feb 17 Feb 18 Feb 19 Feb 8 20 Feb 21 Feb 22 Feb 23 Feb 24 Feb 25 Feb 26 Feb 9 27 Feb 28 Feb 01 Mar 02 Mar 03 Mar 04 Mar 05 Mar 10 06 Mar 07 Mar 08 Mar 09 Mar 10 Mar 11 Mar 12 Mar 11 13 Mar 14 Mar 15 Mar 16 Mar 17 Mar 18 Mar 19 Mar 12 20 Mar 21 Mar 22 Mar 23 Mar 24 Mar 25 Mar 26 Mar 13 27 Mar 28 Mar 29 Mar 30 Mar 31 Mar 01 Apr 02 Apr 14 03 Apr 04 Apr 05 Apr 06 Apr 07 Apr 08 Apr 09 Apr 15 10 Apr 11 Apr 12 Apr 13 Apr 14 Apr 15 Apr 16 Apr 16 17 Apr 18 Apr 19 Apr 20 Apr 21 Apr 22 Apr 23 Apr 17 24 Apr 25 Apr 26 Apr 27 Apr 28 Apr 29 Apr 30 Apr 18 01 May 02 May 03 May 04 May 05 May 06 May 07 May 19 08 May 09 May 10 May 11 May 12 May 13 May 14 May 20 15 May 16 May 17 May 18 May 19 May 20 May 21 May 21 22 May 23 May 24 May 25 May 26 May 27 May 28 May 22 29 May 30 May 31 May 01 Jun 02 Jun 03 Jun 04 Jun 23 05 Jun 06 Jun 07 Jun 08 Jun 09 Jun 10 Jun 11 Jun 24 12 Jun 13 Jun 14 Jun 15 Jun 16 Jun 17 Jun 18 Jun 25 19 Jun 20 Jun 21 Jun 22 Jun 23 Jun 24 Jun 25 Jun 26 26 Jun 27 Jun 28 Jun 29 Jun 30 Jun 01 Jul 02 Jul 27 03 Jul 04 Jul 05 Jul 06 Jul 07 Jul 08 Jul 09 Jul 28 10 Jul 11 Jul 12 Jul 13 Jul 14 Jul 15 Jul 16 Jul 29 17 Jul 18 Jul 19 Jul 20 Jul 21 Jul 22 Jul 23 Jul 30 24 Jul 25 Jul 26 Jul 27 Jul 28 Jul 29 Jul 30 Jul 31 31 Jul 01 Aug 02 Aug 03 Aug 04 Aug 05 Aug 06 Aug 32 07 Aug 08 Aug 09 Aug 10 Aug 11 Aug 12 Aug 13 Aug 33 14 Aug 15 Aug 16 Aug 17 Aug 18 Aug 19 Aug 20 Aug 34 21 Aug 22 Aug 23 Aug 24 Aug 25 Aug 26 Aug 27 Aug 35 28 Aug 29 Aug 30 Aug 31 Aug 01 Sep 02 Sep 03 Sep 36 04 Sep 05 Sep 06 Sep 07 Sep 08 Sep 09 Sep 10 Sep 37 11 Sep 12 Sep 13 Sep 14 Sep 15 Sep 16 Sep 17 Sep 38 18 Sep 19 Sep 20 Sep 21 Sep 22 Sep 23 Sep 24 Sep 39 25 Sep 26 Sep 27 Sep 28 Sep 29 Sep 30 Sep 01 Oct 40 02 Oct 03 Oct 04 Oct 05 Oct 06 Oct 07 Oct 08 Oct 41 09 Oct 10 Oct 11 Oct 12 Oct 13 Oct 14 Oct 15 Oct 42 16 Oct 17 Oct 18 Oct 19 Oct 20 Oct 21 Oct 22 Oct 43 23 Oct 24 Oct 25 Oct 26 Oct 27 Oct 28 Oct 29 Oct 44 30 Oct 31 Oct 01 Nov 02 Nov 03 Nov 04 Nov 05 Nov 45 06 Nov 07 Nov 08 Nov 09 Nov 10 Nov 11 Nov 12 Nov 46 13 Nov 14 Nov 15 Nov 16 Nov 17 Nov 18 Nov 19 Nov 47 20 Nov 21 Nov 22 Nov 23 Nov 24 Nov 25 Nov 26 Nov 48 27 Nov 28 Nov 29 Nov 30 Nov 01 Dec 02 Dec 03 Dec 49 04 Dec 05 Dec 06 Dec 07 Dec 08 Dec 09 Dec 10 Dec 50 11 Dec 12 Dec 13 Dec 14 Dec 15 Dec 16 Dec 17 Dec 51 18 Dec 19 Dec 20 Dec 21 Dec 22 Dec 23 Dec 24 Dec 52 25 Dec 26 Dec 27 Dec 28 Dec 29 Dec 30 Dec 31 Dec Year wk Wed Thu Fri Sat Sun Mon Tue 1 01 Jan 02 Jan 03 Jan 04 Jan 05 Jan 06 Jan 07 Jan 2 08 Jan 09 Jan 10 Jan 11 Jan 12 Jan 13 Jan 14 Jan 3 15 Jan 16 Jan 17 Jan 18 Jan 19 Jan 20 Jan 21 Jan 4 22 Jan 23 Jan 24 Jan 25 Jan 26 Jan 27 Jan 28 Jan 5 29 Jan 30 Jan 31 Jan 01 Feb 02 Feb 03 Feb 04 Feb 6 05 Feb 06 Feb 07 Feb 08 Feb 09 Feb 10 Feb 11 Feb 7 12 Feb 13 Feb 14 Feb 15 Feb 16 Feb 17 Feb 18 Feb 8 19 Feb 20 Feb 21 Feb 22 Feb 23 Feb 24 Feb 25 Feb 9 26 Feb 27 Feb 28 Feb 01 Mar 02 Mar 03 Mar 04 Mar 10 05 Mar 06 Mar 07 Mar 08 Mar 09 Mar 10 Mar 11 Mar 11 12 Mar 13 Mar 14 Mar 15 Mar 16 Mar 17 Mar 18 Mar 12 19 Mar 20 Mar 21 Mar 22 Mar 23 Mar 24 Mar 25 Mar 13 26 Mar 27 Mar 28 Mar 29 Mar 30 Mar 31 Mar 01 Apr 14 02 Apr 03 Apr 04 Apr 05 Apr 06 Apr 07 Apr 08 Apr 15 09 Apr 10 Apr 11 Apr 12 Apr 13 Apr 14 Apr 15 Apr 16 16 Apr 17 Apr 18 Apr 19 Apr 20 Apr 21 Apr 22 Apr 17 23 Apr 24 Apr 25 Apr 26 Apr 27 Apr 28 Apr 29 Apr 18 30 Apr 01 May 02 May 03 May 04 May 05 May 06 May 19 07 May 08 May 09 May 10 May 11 May 12 May 13 May 20 14 May 15 May 16 May 17 May 18 May 19 May 20 May 21 21 May 22 May 23 May 24 May 25 May 26 May 27 May 22 28 May 29 May 30 May 31 May 01 Jun 02 Jun 03 Jun 23 04 Jun 05 Jun 06 Jun 07 Jun 08 Jun 09 Jun 10 Jun 24 11 Jun 12 Jun 13 Jun 14 Jun 15 Jun 16 Jun 17 Jun 25 18 Jun 19 Jun 20 Jun 21 Jun 22 Jun 23 Jun 24 Jun 26 25 Jun 26 Jun 27 Jun 28 Jun 29 Jun 30 Jun 01 Jul 27 02 Jul 03 Jul 04 Jul 05 Jul 06 Jul 07 Jul 08 Jul 28 09 Jul 10 Jul 11 Jul 12 Jul 13 Jul 14 Jul 15 Jul 29 16 Jul 17 Jul 18 Jul 19 Jul 20 Jul 21 Jul 22 Jul 30 23 Jul 24 Jul 25 Jul 26 Jul 27 Jul 28 Jul 29 Jul 31 30 Jul 31 Jul 01 Aug 02 Aug 03 Aug 04 Aug 05 Aug 32 06 Aug 07 Aug 08 Aug 09 Aug 10 Aug 11 Aug 12 Aug 33 13 Aug 14 Aug 15 Aug 16 Aug 17 Aug 18 Aug 19 Aug 34 20 Aug 21 Aug 22 Aug 23 Aug 24 Aug 25 Aug 26 Aug 35 27 Aug 28 Aug 29 Aug 30 Aug 31 Aug 01 Sep 02 Sep 36 03 Sep 04 Sep 05 Sep 06 Sep 07 Sep 08 Sep 09 Sep 37 10 Sep 11 Sep 12 Sep 13 Sep 14 Sep 15 Sep 16 Sep 38 17 Sep 18 Sep 19 Sep 20 Sep 21 Sep 22 Sep 23 Sep 39 24 Sep 25 Sep 26 Sep 27 Sep 28 Sep 29 Sep 30 Sep 40 01 Oct 02 Oct 03 Oct 04 Oct 05 Oct 06 Oct 07 Oct 41 08 Oct 09 Oct 10 Oct 11 Oct 12 Oct 13 Oct 14 Oct 42 15 Oct 16 Oct 17 Oct 18 Oct 19 Oct 20 Oct 21 Oct 43 22 Oct 23 Oct 24 Oct 25 Oct 26 Oct 27 Oct 28 Oct 44 45 46 47 48 49 50 51 52 59

Robustness Final Industrialized Tool With fallback mechanism Being implemented Testing of fallback mechanism When fallback is needed, the quality of the results needs to be high [2 fallback systems: TSO fallback FIT PX fallback Shadow auctions on CASC] 60