Florida Department of Environmental Protection Inspection Checklist N. SIDE OF HWY. 20-W.OF FREEPT

Similar documents
October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

Seeley Burn Scar SR-31, Region 4 UDOT Weather Response Summer 2013

FOREST FIRE. News August 15, :00am. Great progress continues to be made extinguishing hot spots on Parry Sound Fire 033.

SITUATION REPORT #7 September 8 th, 2017

FOREST FIRE. News July 27, :30

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:

Preliminary Summary Report of Serious or Near Serious CAL FIRE Injuries, Illnesses and Accidents GREEN SHEET. Near Serious Accident 12/9/2017

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

FOREST FIRE. News August 14, :00am. Parry Sound 33 Fire Update

GREEN SHEET. California Department of Forestry and Fire Protection (CAL FIRE)

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

X X X X X X X X. Montgomery Associates, Resource Solutions Construction Site Inspection Report/Erosion Control Checklist

May 22, Mr. Tim Tyler TRWME Properties, LLC 240 Hwy. 65 N Conway, AR RE: Royal Oaks Vista Subdivision Site. Dear Mr.

REQUEST FOR PROPOSALS

NEEDLES S STREET LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #

TROPICAL STORM HARVEY BRIEFING

Fort McClellan Calhoun County, Alabama. Prepared for: U.S. Army Corps of Engineers, Mobile District 109 St. Joseph Street Mobile, Alabama 36602

SONOMA COUNTY FIRE TIMELINE. November 1, 2017

CALIFORNIA GOVERNOR'S OFFICE OF EMERGENCY SERVICES CAL OES CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION CAL FIRE

Daily Operations Briefing Tuesday, March 28, :30 a.m. EDT

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

Request for Tenders. Community Development, Parks & Recreation Facility Snow Removal

Tropical Update. 5 PM EDT Sunday, September 10, 2017 Hurricane Irma, Hurricane Jose, Tropical Wave (60%)

2011 Year in Review TORNADOES

Daily Operations Briefing. Tuesday, January 9, :30 a.m. EST

Florida Department of Environmental Protection

County of San Diego, Planning & Development Services

Tropical Update. 11 AM EDT Wednesday, October 10, 2018 Hurricane Michael, Hurricane Leslie & Tropical Storm Nadine, Caribbean Low (40%)

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Daily Operations Briefing Monday, March 21, :30 a.m. EDT

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)

PROJECT TITLE: Northwest Straits Project: Jefferson County Marine Resources Committee (Operations and Projects)

CHEMICAL MANAGEMENT PLAN

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

Responsibilities: Effective Date: November Revision Date: February 8, VP, Facilities and Construction Management. Issuing Authority:

SNOW CONTROL OPERATIONS

SITE SUMMARY REPORT Candor Dump NONCD Montgomery County

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

Tropical Update. 12 PM EDT Friday, October 7, 2016 Hurricane Matthew & Tropical Storm Nicole

Build a Spectroscope 2005, 2004, 1994 by David A. Katz. All rights reserved. Permission for classroom use provided original copyright is included.

CASE STUDY #9 - Brushy Fork Dam, Sugar Grove, West Virginia

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

CUMO INSPECTION REPORT #6 Page 1

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016.

CCR Rule Annual Inspection Report (cont.) 2

Parish of Ascension. ASCENSION PARISH SITUATIONAL REPORT 06 August 2008 As of: 1600 Hours

NOAA s National Weather Service Philadelphia/Mt. Holly NJ

Standard Operating Procedure

Bid Specifications Release Date: October 18, 2017 DESCRIPTION: Snow Plow Services

Experiment #5. Empirical Formula

Application for Radioactive Material Use

The hydrologic service area (HSA) for this office covers Central Kentucky and South Central Indiana.

City of Brainerd, Minnesota Snowplowing Policy

Daily Operations Briefing December 25, 2012 As of 6:30 a.m. EST

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

Daily Operations Briefing Saturday, October 1, :30 a.m. EDT

Hurricane Harvey: SE Texas Impacts. 10 AM CDT UPDATE Saturday, August 26, 2017 Prepared by: Dan Reilly, Brian Kyle

Tropical Update. 11 AM EDT Tuesday, October 9, 2018 Hurricane Michael, Tropical Storm Leslie, Tropical Storm Nadine

Daily Operations Briefing Tuesday, November 1, :30 a.m. EDT

WEATHER SYSTEMS IMPACTING THE CAYMAN ISLANDS Prepared by the staff of the Cayman Islands National Weather Service

Friday, September 28, :30 a.m. EDT

CHEMICAL INVENTORY ENTRY GUIDE

NATIONAL WEATHER SERVICE

Weather and Climate Summary and Forecast August 2018 Report

IWT Scenario 1 Integrated Warning Team Workshop National Weather Service Albany, NY October 31, 2014

RE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H

BEFORE THE HEARING EXAMINER IN AND FOR THE COUNTY OF THURSTON

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Prepared for: U.S. Army Corps of Engineers, Mobile District 109 St. Joseph Street, Mobile, Alabama Prepared by:

Daily Operations Briefing Friday, January 20, :30 a.m. EST

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CHEMICAL SAFETY. 2.1 DOE O 231.1, Environment, Safety, and Health Reporting

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal

Tropical Update. 5 PM EDT Sunday, October 7, 2018 Tropical Storm Michael, Tropical Storm Leslie, & Invest 92L (30%)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

TROPICAL STORM HARVEY BRIEFING

Woodford County Erosion Prevention Plan and Permit. Application #

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY RE.GION BROADWAY NEW YORK, NEW YORK

Initial Report. North Central Texas Initial Attack. Hildreth Road Dozer Accident. February 9, 2006

CITY OF PAPILLION PLANNING COMMISSION STAFF REPORT MAY 27, 2015 AGENDA 2015 ANNEXATION MISC

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

Tropical Update. 5 AM EDT Monday, October 8, 2018 Tropical Storm Michael, Tropical Storm Leslie, Invest 92L (10%) & African Tropical Wave (50%)

TEXAS FIREFIGHTER POCKET CARDS

NEW YORK CENTRAL SYSTEM HOT BOX DETECTORS JUNE 1, 1959

Lower 8.3 Miles of the Lower Passaic River Operable Unit 2 Presentation to The Passaic River Community Advisory Group. September 14, 2017

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

NOAA s National Weather Service Philadelphia/Mt. Holly NJ

Daily Operations Briefing Friday, November 11, :30 a.m. EST

A Unique, Educational SELL-OUT EVENT. September 15, 2018 Convention Center 10am-3pm at the Empire State Plaza 2018 EXHIBITOR INFORMATION

Daily Operations Briefing Monday, March 7, :30 a.m. EST

National Situation Report As of 3:00 a.m. EDT, Thursday, September 21, 2017 Table of Contents Current Operations Monitoring Recovery

Tropical Update 11 AM EDT Thursday, September 6, 2018 Tropical Depression Gordon, Hurricane Florence, Invest 92L (90%) & African Tropical Wave (50%)

TROPICAL STORM HARVEY COE Navigation Call - Update

Evaluation of Storm Tide Measurements at Panama City Beach, FL

Daily Operations Briefing Sunday, January 8, :30 a.m. EST

ECMS STORMWATER COMPLIANCE GROUP: WET CONDITION OBSERVATION REPORT DISCHARGE POINT (D/P) LOCATIONS

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Transcription:

Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: On-Site Inspection Start Date: On-Site Inspection End Date: 10/08/2015 WACS No.: 15091 Facility Street Address: City: FREEPORT County Name: Zip: 32439 WALTON INSPECTION PARTICIPANTS: Principal Inspector: N. SIDE OF HWY. 20-W.OF FREEPT (Include ALL Landfill and Department Personnel with Corresponding Titles) Other Participants: INSPECTION TYPE: Mike Stephen, Inspector Shawn Hamilton, Northwest District Director; Andy Joslyn, Compliance Assistance Progam Administrator; Mark Cannady, Landfill Operations Manager Follow-up Operation Inspection for C&D Debris Disposal Facility ATTACHMENTS TO THE INSPECTION CHECK LIST: This Cover Page to the Inspection Checklist may include any or all of the following attachments as appropriate.

Page 2 of 7 Pre-existing Violations: Rule: 62-701.300(3) Question Number: 5.5 Explanation: On July 29, 2015 smoke was observed from subterranean fire on the west side of the disposal area. Seven smoking areas were flagged with orange wire flags where smoke was rising through the dirt/clay cover. On August 6, 2015 two areas were observed smoking on the southwest corner of the facility's disposal area. Corrective Action: Apply additional dirt/clay cover or whatever steps are necessary to immediately extinguish the fire. COMMENTS: 10/01/2015 On October 1, 2015, Brad Hartshorn and I visited the Waste Pro Freeport C&D Disposal Facility to check the status of the fire. Per Dara at the entrance building, they had approximately 7 inches of rain in the last two days. Most of the dirt stayed on the slopes during the rain. No smoke or flames were observed today, however we could smell smoke as we walked around on the haul road. We did not walk on the slopes for safety reasons. We did find one hot spot near the unauthorized waste dumpsters on the flat area of the the top west slope. We suggested to Kevin to move the dumpsters and apply a thick layer of dirt cover material in that area. He stated that he would do that. Approximately ½ of the west slope including the southwest corner has been covered with on-site sand and import clay material. There are still many subsidence s on the west and north slopes. I called Mark Cannady and we discussed the inspection. He stated that he will have another man out there tomorrow and they will continue to place dirt on the slopes. I asked him if they were going to get additional clay dirt from offsite and he stated No. Photo Attachments: -Photo 9 shows the north slope with some sand and some clay cover. -Photo 10 shows the west slope with sand and clay cover. -Photo 11 shows a small area of erosion on the west slope (near SW corner) from recent heavy rains. Note thickness of cover dirt in this area is roughly 5 inches. -Photo 12 shows the slope at the SW corner with cover dirt and subsidence areas near toe of slope. -Photo 13 shows a hotspot area near the unauthorized waste dumpster near west slope. -Photo 14 shows overview of unauthorized waste dumpsters and proximity to west slope in background of photo. The area next to the dumpsters is where a hot spot was located during this inspection. -Photo 15 shows areas of subsidence near the center of the west slope, close to toe of slope. 10/12/2015 On October 8, 2015 a follow-up inspection was conducted at the Waste Pro Freeport C&D Disposal Facility to check the status of the fire. I could smell a little bit of a smoke odor near the north slope and the southwest corner, but saw no smoking areas or flames. I walked on both the upper access road and along the toe of the slope, staying off of the primary slope. Wind was out of the northeast at about 10+ mph. Hydrogen sulfide odor was strong near the top of the west slope by the large wire spools staged there. Many truckloads of waste came into the facility while I was there. Kerrell Johnson (Tater) stated that he thought 80 truckloads had come through the gate by 2pm,.

Page 3 of 7 Several subsided areas still exist. Cover dirt has been placed on the upper tier of the west slope, where the unauthorized waste dumpsters were staged. Photos taken this week look virtually the same as last week with the exception of dirt placed in the hot spot area after dumpsters were moved (1st photo) and they had a few truckloads of dirt staged at the top of the west slope for cover placement (2nd photo). I called Mark Cannady after I left the facility and he stated that they will continue to place dirt on the slopes. An additional man will be on site tomorrow to push dirt and cover various areas. He assured me that they are in this for the long haul and will do what it takes to put the fire out. Photo Attachments: -Photo 16 shows cover dirt staged on the top of the west slope. -Photo 17 shows where cover dirt was placed on the hot spot area notice during last inspection. -Photo 18 shows a portion of the north slope. Photo was taken from the toe of the north slope. 09/28/2015 On September 24, 2015 a follow-up inspection was conducted at the Waste Pro Freeport C&D Debris Disposal Facility to primarily check the status of the recent fire in the disposal area. Shawn Hamilton, Andy Joslyn, Mark Cannady and I walked the facility. Several of the slopes (west, north and southwest corner) have recently been covered with dirt of various thickness. However, 5 separate areas of smoke and several other hot spot areas were observed during the inspection. One area close to the center of the west slope had a cavern-like opening and flaming, burning wood could be seen down inside the hole. Some of the hottest areas are located on the southwest corner of the facility and on the north slope near the haul road. Mark instructed workers to place additional dirt in these areas. We discussed the need to place additional dirt and possibly put additional workers on site that strictly deal with the fire and covering the smoking areas. Orange wire flags were placed at all smoking areas. Mark called me later in the day and informed me that there will be an additional man on site 9/25, 9/26 and 9/27 if needed, to place cover dirt on the disposal areas that have been smoking/burning. He also stated that Gulf Coast Utility Contractors will be hauling in a clay type dirt to be used as cover. Photo Attachments: -Photo 1 shows an open hole with burning debris inside. This area was located near the middle of the west slope, toward the toe of slope. -Photo 2 shows workers placing dirt on the area noted in Photo 1. -Photo 3 shows Mark Cannady pulling out a piece of plywood from an area on the west slope that was smoking. -Photo 4 shows a smoking area located on the north slope. -Photos 5 and 6 show dirt cover that was recently placed on upper tier waste of the north slope. -Photo 7 shows a smoking area located on the north slope near then upper tier of waste. -Photo 8 shows workers (dozer on left side of photo) placing dirt on the area mentioned in Photo 7.

Page 4 of 7 ATTACHMENTS: Photo 1 - taken Sept. 24, 2015 Photo 2 - taken Sept. 24, 2015 Photo 3 - taken Sept. 24, 2015 Photo 4 - taken Sept. 24, 2015 Photo 5 - taken Sept. 24, 2015 Photo 6 - taken Sept. 24, 2015

Page 5 of 7 Photo 7 - taken Sept. 24, 2015 Photo 8 - taken Sept. 24, 2015 Photo 9 - taken Oct. 1, 2015 Photo 10 - taken Oct. 1, 2015 Photo 11 - taken Oct. 1, 2015 Photo 12 - taken Oct 1, 2015

Page 6 of 7 Photo 13 - taken Oct. 1, 2015 Photo 14 - taken Oct. 1, 2015 Photo 15 - taken Oct. 1, 2015 Photo 16 - taken Oct. 8, 2015 Photo 17 - taken Oct. 8, 2015 Photo 18 - taken Oct. 8, 2015

Page 7 of 7 Signed: Mike Stephen PRINCIPAL INSPECTOR NAME Inspector PRINCIPAL INSPECTOR TITLE PRINCIPAL INSPECTOR SIGNATURE FDEP 9/28/2015 DATE Shawn Hamilton INSPECTOR NAME Northwest District Director INSPECTOR TITLE NO SIGNATURE INSPECTOR SIGNATURE FDEP Mark Cannady REPRESENTATIVE NAME Landfill Operations Manager REPRESENTATIVE TITLE NO SIGNATURE REPRESENTATIVE SIGNATURE Waste Pro Report Approvers: Andy Joslyn SUPERVISOR NAME Compliance Assistance Progam Administrator SUPERVISOR TITLE NO SIGNATURE SUPERVISOR SIGNATURE FDEP Supervisor: Brad T Hartshorn NOTE: By signing this document, the Site Representative only acknowledges receipt of this Inspection Report and is not admitting to the accuracy of any of the items identified by the Department as "Not Ok" or areas of concern.