Municipal Act, 2001 Loi de 2001 sur les municipalités

Similar documents
Municipality of Grey Highlands Policy

ENHANCING AND ENCOURAGING ACTIVE MODES OF TRANSPORTATION. The proposed 2016 amendments and additions to O.Reg 239/02 under the Municipal Act, 2001.

CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY

Snow and Ice Removal

The Reporting of Winter Road Conditions A panel discussion of how and the implications of reporting road status and conditions

H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016

CITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

OGRA Managing Winter Operations Workshop. Winter Service Response to Sidewalks in the City of Toronto

TOWN OF GRAND FALLS WINDSOR

COUNCIL POLICY MANUAL

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES

Annual Collision Report

Town of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY

Schedule C By-Law Snow and Ice Control Services - Project Specifications for Various Parking Lots

Resolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution

POLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced.

Maintenance Standards Plan and Policies for Winter Control of Roads Within The Township of Georgian Bluffs

CEDAR COUNTY ORDINANCE NO. 6

DELAWARE COUNTY ORDINANCE NO. 3

THE CORPORATION OF THE TOWN OF COBALT BY-LAW NO Being a by-law to Winter Operations Plan

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal

NEWS RELEASE. Province boosts winter highway safety measures

WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING

Monitoring Scour Critical Bridges During Floods For Local Bridge Owners. Presented by

John A. Carlson Snow and Ice Removal

MUNICIPALITY OF TRENT HILLS WINTER CONTROL QUALITY STANDARDS

CUSTER COUNTY SNOW REMOVAL PROCEDURES

IOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY

CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION

of the street when facing south and all even numbers south of Railroad Avenue shall be on the righthand side of the street when facing south.

Weather Responsive Traffic Management. WYDOT VSL Project. October 2011

City of Camrose Winter Road Maintenance Policy

Dunn County Snow Removal Policy

Town of Windsor. Department of Public Works

Winter Maintenance on Ontario s Highways

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

RESOLUTION NO INTRODUCTION

Chapter 3 Snow & Ice Training Program Annual Review Checklist Wing Plow Operational Guidelines

Policy Title: Snow Removal & Ice Control Policy #: PW

SNOW CONTROL OPERATIONS

Town of Pelham Public Works: Solutions Manual Operating Guidelines

CITY OF MINOT SNOW REMOVAL PLAN October 2018

City of Brainerd, Minnesota Snowplowing Policy

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT

City of Laramie, Wyoming SNOW AND ICE POLICY

MONTGOMERY COUNTY SNOW PLAN

Weather Responsive Traffic Management. Wyoming DOT Variable Speed Limit (VSL) Project. March 2012

BOONE COUNTY Snow Removal Program and Policy SECTION 1, INTRODUCTION:

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

Public Works Operations Procedure Report FY 2016 Snow Plan

City Policy POLICY ON SNOW CLEARING AND ICE CONTROL

AUTHORITY: Town Council POLICY NUMBER:

City of Pittsfield. Snow and Ice Control Plan

COUNCIL POLICY BACKGROUND

Town of Oconomowoc Snow & Ice Control Policy

Snow Plow Safety Quick Reference Guide

CITY OF LONSDALE SNOW PLOWING POLICY

REQUEST FOR PROPOSALS

Maintenance Office Provincial Highways Management Division Ministry of Transportation. Winter Highway Maintenance Action Plan

Re-Establishing a Brand

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

Severe Weather Watches, Advisories & Warnings

CHALLENGE #1: ROAD CONDITIONS

Understand FORWARD COLLISION WARNING WHAT IS IT? HOW DOES IT WORK? HOW TO USE IT?

CITY OF OSHKOSH SNOW & ICE REMOVAL POLICY. Revised

City of Rhinelander Snow and Ice Policy

THE CORPORATION OF THE TOWN OF IROQUOIS FALLS ISSUE REPORT

WINTER MAINTENANCE DECISIONS SUPPORT SYSTEMS IN POLAND Paweł Sobiesiak

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Temporary College Closure Due to Inclement Weather or Other Adverse Conditions.

Winter Maintenance on Provincial Highways

Winter Maintenance Policy Plan

Facilities Operations Procedure for the Management of Snow and Ice

Winter Operations Plan

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION

SNOW AND ICE REMOVAL. Policy i

SNOW REMOVAL - REQUEST FOR PROPOSAL. Snow Removal/Clearing and Sanding/Salting for Winter Fundy Ocean Research Center for Energy

WINTER STORM Annex II

SNOW REMOVAL & ICE CONTROL POLICY

Winter Operations Plan

Winter Weather Safety Tips. From your friends at South Brunswick Township Department of Public Works

MEDIA RELEASE FOR IMMEDIATE RELEASE March 17, 2014 Preparing for the Spring Thaw

ADMINISTRATIVE PROCEDURES

MTO s Road Weather Information System (RWIS)

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)

Responsive Traffic Management Through Short-Term Weather and Collision Prediction

SAMPLE LIGHTING MANAGEMENT PLAN FOR INTERNATIONAL DARK SKY PARKS/RESERVES/SANCTUARIES

SNOW AND ICE REMOVAL PROCEDURES

UDOT Weather Program Traffic Operations Center

AOP 16 Winter Operations (Aerodrome Operating Procedure)

1 City of Edmonton Quesnell Bridge, Roads and Associated Structures Assessment

City of Hailey Public Works - Street Division

SNOW AND ICE CONTROL POLICY

Locating Slippery Highway Sites by Accident Analysis

SNOW CREW CALL IN SHEET

Transcription:

Municipal Act, 2001 Loi de 2001 sur les municipalités ONTARIO REGULATION 239/02 MINIMUM MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS Consolidation Period: From January 25, 2013 to the e-laws currency date. Last amendment: O. Reg. 47/13. This Regulation is made in English only. Definitions 1. (1) In this Regulation, cm means centimetres; day means a 24-hour period; ice means all kinds of ice, however formed; motor vehicle has the same meaning as in subsection 1 (1) of the Highway Traffic Act, except that it does not include a motor assisted bicycle; non-paved surface means a surface that is not a paved surface; Ontario Traffic Manual means the Ontario Traffic Manual published by the Ministry of Transportation, as amended from time to time; paved surface means a surface with a wearing layer or layers of asphalt, concrete or asphalt emulsion; roadway has the same meaning as in subsection 1 (1) of the Highway Traffic Act; shoulder means the portion of a highway that provides lateral support to the roadway and that may accommodate stopped motor vehicles and emergency use; snow accumulation means the natural accumulation of any of the following that, alone or together, covers more than half a lane width of a roadway: 1. Newly-fallen snow. 2. Wind-blown snow. 3. Slush; substantial probability means a significant likelihood considerably in excess of 51 per cent; surface means the top of a roadway or shoulder; weather means air temperature, wind and precipitation. O. Reg. 239/02, s. 1 (1); O. Reg. 23/10, s. 1 (1); O. Reg. 47/13, s. 1. (2) For the purposes of this Regulation, every highway or part of a highway under the jurisdiction of a municipality in Ontario is classified in the Table to this section as a Class 1, Class 2, Class 3, Class 4, Class 5 or Class 6 highway, based on the speed limit applicable to it and the average annual daily traffic on it. O. Reg. 239/02, s. 1 (2). (3) For the purposes of subsection (2) and the Table to this section, the average annual daily traffic on a highway or part of a highway under municipal jurisdiction shall be determined, (a) by counting and averaging the daily two-way traffic on the highway or part of the highway; or (b) by estimating the average daily two-way traffic on the highway or part of the highway. O. Reg. 239/02, s. 1 (3); O. Reg. 23/10, s. 1 (2). (4) For the purposes of this Regulation, a municipality is deemed to be aware of a fact if, in the absence of actual knowledge of the fact, circumstances are such that the municipality ought reasonably to be aware of the fact. O. Reg. 23/10, s. 1 (3). CLASSIFICATION OF HIGHWAYS Average Annual Daily Traffic Posted or Statutory Speed Limit (kilometres per hour) 1

(number of motor vehicles) 91-100 81-90 71-80 61-70 51-60 41-50 1-40 15,000 or more 1 1 1 2 2 2 2 12,000-14,999 1 1 1 2 2 3 3 10,000-11,999 1 1 2 2 3 3 3 8,000-9,999 1 1 2 3 3 3 3 6,000-7,999 1 2 2 3 3 3 3 5,000-5,999 1 2 2 3 3 3 3 4,000-4,999 1 2 3 3 3 3 4 3,000-3,999 1 2 3 3 3 4 4 2,000-2,999 1 2 3 3 4 4 4 1,000-1,999 1 3 3 3 4 4 5 500-999 1 3 4 4 4 4 5 200-499 1 3 4 4 5 5 5 50-199 1 3 4 5 5 5 5 0-49 1 3 6 6 6 6 6 Application O. Reg. 613/06, s. 1. 2. (1) This Regulation sets out the minimum standards of repair for highways under municipal jurisdiction for the purpose of clause 44 (3) (c) of the Act. O. Reg. 288/03, s. 1. (2) REVOKED: O. Reg. 23/10, s. 2. (3) This Regulation does not apply to Class 6 highways. O. Reg. 239/02, s. 2 (3). Patrolling MINIMUM STANDARDS 3. (1) The minimum standard for the frequency of patrolling of highways to check for conditions described in this Regulation is set out in the Table to this section. O. Reg. 23/10, s. 3 (1). (2) If it is determined by the municipality that the weather monitoring referred to in section 3.1 indicates that there is a substantial probability of snow accumulation on roadways, ice formation on roadways or icy roadways, the minimum standard for patrolling highways is, in addition to that set out in subsection (1), to patrol highways that the municipality selects as representative of its highways, at intervals deemed necessary by the municipality, to check for such conditions. O. Reg. 47/13, s. 2. (3) Patrolling a highway consists of observing the highway, either by driving on or by electronically monitoring the highway, and may be performed by persons responsible for patrolling highways or by persons responsible for or performing highway maintenance activities. O. Reg. 23/10, s. 3 (1). (4) This section does not apply in respect of the conditions described in section 10, subsections 11 (0.1) and 12 (1) and section 16.1. O. Reg. 23/10, s. 3 (1). Class of Highway Patrolling Frequency 1 3 times every 7 days 2 2 times every 7 days 3 once every 7 days 4 once every 14 days 5 once every 30 days Weather monitoring PATROLLING FREQUENCY O. Reg. 239/02, s. 3, Table; O. Reg. 23/10, s. 3 (2). 3.1 (1) From October 1 to April 30, the minimum standard is to monitor the weather, both current and forecast to occur in the next 24 hours, once every shift or three times per calendar day, whichever is more frequent, at intervals determined by the municipality. O. Reg. 47/13, s. 3. (2) From May 1 to September 30, the minimum standard is to monitor the weather, both current and forecast to occur in the next 24 hours, once per calendar day. O. Reg. 47/13, s. 3. Snow accumulation 4. (1) The minimum standard for addressing snow accumulation is, 2

(a) after becoming aware of the fact that the snow accumulation on a roadway is greater than the depth set out in the Table to this section, to deploy resources as soon as practicable to address the snow accumulation; and (b) after the snow accumulation has ended, to address the snow accumulation so as to reduce the snow to a depth less than or equal to the depth set out in the Table within the time set out in the Table, (i) to provide a minimum lane width of the lesser of three metres for each lane or the actual lane width, or (ii) on a Class 4 or Class 5 highway with two lanes, to provide a total width of at least five metres. O. Reg. 47/13, s. 4. (2) If the depth of snow accumulation on a roadway is less than or equal to the depth set out in the Table to this section, the roadway is deemed to be in a state of repair with respect to snow accumulation. O. Reg. 47/13, s. 4. (3) For the purposes of this section, the depth of snow accumulation on a roadway may be determined in accordance with subsection (4) by a municipal employee, agent or contractor, whose duties or responsibilities include one or more of the following: 1. Patrolling highways. 2. Performing highway maintenance activities. 3. Supervising staff who perform activities described in paragraph 1 or 2. O. Reg. 47/13, s. 4. (4) The depth of snow accumulation on a roadway may be determined by, (a) performing an actual measurement; (b) monitoring the weather; or (c) performing a visual estimate. O. Reg. 47/13, s. 4. (5) For the purposes of this section, addressing snow accumulation on a roadway includes, but is not limited to, (a) plowing the roadway; (b) salting the roadway; (c) applying abrasive materials to the roadway; or (d) any combination of the methods described in clauses (a), (b) and (c). O. Reg. 47/13, s. 4. (6) This section does not apply to that portion of the roadway designated for parking. O. Reg. 47/13, s. 4. Class of Highway Depth Time 1 2.5 cm 4 hours 2 5 cm 6 hours 3 8 cm 12 hours 4 8 cm 16 hours 5 10 cm 24 hours Ice formation on roadways and icy roadways SNOW ACCUMULATION O. Reg. 47/13, s. 4. 5. (1) The minimum standard for the prevention of ice formation on roadways is doing the following in the 24-hour period preceding an alleged formation of ice on a roadway: 1. Monitor the weather in accordance with section 3.1. 2. Patrol in accordance with section 3. 3. If the municipality determines, as a result of its activities under paragraph 1 or 2, that there is a substantial probability of ice forming on a roadway, treat the roadway to prevent ice formation within the time set out in the Table to this section, starting from the time that the municipality determines is the appropriate time to deploy resources for that purpose. O. Reg. 47/13, s. 5. (2) If the municipality meets the minimum standard set out in subsection (1) and, despite such compliance, ice forms on a roadway, the roadway is deemed to be in a state of repair until the earlier of, (a) the time that the municipality becomes aware of the fact that the roadway is icy; or (b) the applicable time set out in the Table to this section for treating the roadway to prevent ice formation expires. O. Reg. 47/13, s. 5. 3

(3) The minimum standard for treating icy roadways after the municipality becomes aware of the fact that a roadway is icy is to treat the icy roadway within the time set out in the Table to this section, and an icy roadway is deemed to be in a state of repair until the applicable time set out in the Table for treating the icy roadway expires. O. Reg. 47/13, s. 5. (4) For the purposes of this section, treating a roadway means applying material to the roadway, including but not limited to, salt, sand or any combination of salt and sand. O. Reg. 47/13, s. 5. Class of Highway Time 1 3 hours 2 4 hours 3 8 hours 4 12 hours 5 16 hours Potholes ICE FORMATION PREVENTION AND ICY ROADWAYS O. Reg. 47/13, s. 5. 6. (1) If a pothole exceeds both the surface area and depth set out in Table 1, 2 or 3 to this section, as the case may be, the minimum standard is to repair the pothole within the time set out in Table 1, 2 or 3, as appropriate, after becoming aware of the fact. O. Reg. 239/02, s. 6 (1). (2) A pothole is deemed to be in a state of repair if its surface area or depth is less than or equal to that set out in Table 1, 2 or 3, as appropriate. O. Reg. 239/02, s. 6 (2); O. Reg. 47/13, s. 6. 1 POTHOLES ON PAVED SURFACE OF ROADWAY Class of Surface Area Depth Time Highway 1 600 cm² 8 cm 4 days 2 800 cm² 8 cm 4 days 3 1000 cm² 8 cm 7 days 4 1000 cm² 8 cm 14 days 5 1000 cm² 8 cm 30 days 2 POTHOLES ON NON-PAVED SURFACE OF ROADWAY O. Reg. 239/02, s. 6, Table 1. Class of Surface Area Depth Time Highway 3 1500 cm² 8 cm 7 days 4 1500 cm² 10 cm 14 days 5 1500 cm² 12 cm 30 days Class of Surface Area Depth Time Highway 1 1500 cm² 8 cm 7 days 2 1500 cm² 8 cm 7 days 3 1500 cm² 8 cm 14 days 4 1500 cm² 10 cm 30 days 5 1500 cm² 12 cm 60 days Shoulder drop-offs 3 POTHOLES ON PAVED OR NON-PAVED SURFACE OF SHOULDER O. Reg. 239/02, s. 6, Table 2. O. Reg. 239/02, s. 6, Table 3. 7. (1) If a shoulder drop-off is deeper, for a continuous distance of 20 metres or more, than the depth set out in the Table to this section, the minimum standard is to repair the shoulder drop-off within the time set out in the Table after becoming aware of the fact. O. Reg. 239/02, s. 7 (1). 4

(2) A shoulder drop-off is deemed to be in a state of repair if its depth is less than or equal to that set out in the Table. O. Reg. 239/02, s. 7 (2); O. Reg. 47/13, s. 7. (3) In this section, shoulder drop-off means the vertical differential, where the paved surface of the roadway is higher than the surface of the shoulder, between the paved surface of the roadway and the paved or non-paved surface of the shoulder. O. Reg. 239/02, s. 7 (3). Class of Highway Depth Time 1 8 cm 4 days 2 8 cm 4 days 3 8 cm 7 days 4 8 cm 14 days 5 8 cm 30 days Cracks SHOULDER DROP-OFFS 5 O. Reg. 239/02, s. 7, Table. 8. (1) If a crack on the paved surface of a roadway is greater, for a continuous distance of three metres or more, than both the width and depth set out in the Table to this section, the minimum standard is to repair the crack within the time set out in the Table after becoming aware of the fact. O. Reg. 239/02, s. 8 (1). (2) A crack is deemed to be in a state of repair if its width or depth is less than or equal to that set out in the Table. O. Reg. 239/02, s. 8 (2); O. Reg. 47/13, s. 8. Class of Width Depth Time Highway 1 5 cm 5 cm 30 days 2 5 cm 5 cm 30 days 3 5 cm 5 cm 60 days 4 5 cm 5 cm 180 days 5 5 cm 5 cm 180 days Debris CRACKS O. Reg. 239/02, s. 8, Table. 9. (1) If there is debris on a roadway, the minimum standard is to deploy resources, as soon as practicable after becoming aware of the fact, to remove the debris. O. Reg. 239/02, s. 9 (1). (2) In this section, debris means any material (except snow, slush or ice) or object on a roadway, (a) that is not an integral part of the roadway or has not been intentionally placed on the roadway by a municipality, and (b) that is reasonably likely to cause damage to a motor vehicle or to injure a person in a motor vehicle. O. Reg. 239/02, s. 9 (2); O. Reg. 47/13, s. 9. Luminaires 10. (0.1) The minimum standard for the frequency of inspecting all luminaires to check to see that they are functioning is once per calendar year, with each inspection taking place not more than 16 months from the previous inspection. O. Reg. 23/10, s. 6; O. Reg. 47/13, s. 10 (1). (1) For conventional illumination, if three or more consecutive luminaires on a highway are not functioning, the minimum standard is to repair the luminaires within the time set out in the Table to this section after becoming aware of the fact. O. Reg. 239/02, s. 10 (1). (2) For conventional illumination and high mast illumination, if 30 per cent or more of the luminaires on any kilometre of highway are not functioning, the minimum standard is to repair the luminaires within the time set out in the Table to this section after becoming aware of the fact. O. Reg. 239/02, s. 10 (2). (3) Despite subsection (2), for high mast illumination, if all of the luminaires on consecutive poles are not functioning, the minimum standard is to deploy resources as soon as practicable after becoming aware of the fact to repair the luminaires. O. Reg. 239/02, s. 10 (3).

(4) Despite subsections (1), (2) and (3), for conventional illumination and high mast illumination, if more than 50 per cent of the luminaires on any kilometre of a Class 1 highway with a speed limit of 90 kilometres per hour or more are not functioning, the minimum standard is to deploy resources as soon as practicable after becoming aware of the fact to repair the luminaires. O. Reg. 239/02, s. 10 (4). (5) Luminaires are deemed to be in a state of repair, (a) for the purpose of subsection (1), if the number of non-functioning consecutive luminaires does not exceed two; (b) for the purpose of subsection (2), if more than 70 per cent of luminaires on any kilometre of highway are functioning; (c) for the purpose of subsection (3), if one or more of the luminaires on consecutive poles are functioning; (d) for the purpose of subsection (4), if more than 50 per cent of luminaires on any kilometre of highway are functioning. O. Reg. 239/02, s. 10 (5); O. Reg. 47/13, s. 10 (2). (6) Subsections (1), (2) and (3) only apply to, (a) Class 1 and Class 2 highways; and (b) Class 3, Class 4 and Class 5 highways with a posted speed of 80 kilometres per hour or more. O. Reg. 239/02, s. 10 (6). (7) In this section, conventional illumination means lighting, other than high mast illumination, where there are one or more luminaires per pole; high mast illumination means lighting where there are three or more luminaires per pole and the height of the pole exceeds 20 metres; luminaire means a complete lighting unit consisting of, (a) a lamp, and (b) parts designed to distribute the light, to position or protect the lamp and to connect the lamp to the power supply. O. Reg. 239/02, s. 10 (7). Class of Highway Time 1 7 days 2 7 days 3 14 days 4 14 days 5 14 days Signs LUMINAIRES O. Reg. 239/02, s. 10, Table. 11. (0.1) The minimum standard for the frequency of inspecting signs of a type listed in subsection (2) to check to see that they meet the retro-reflectivity requirements of the Ontario Traffic Manual is once per calendar year, with each inspection taking place not more than 16 months from the previous inspection. O. Reg. 23/10, s. 7 (1); O. Reg. 47/13, s. 11 (1). (0.2) A sign that has been inspected in accordance with subsection (0.1) is deemed to be in a state of repair with respect to the retro-reflectivity requirements of the Ontario Traffic Manual until the next inspection in accordance with that subsection, provided that the municipality does not acquire actual knowledge that the sign has ceased to meet these requirements. O. Reg. 47/13, s. 11 (2). (1) If any sign of a type listed in subsection (2) is illegible, improperly oriented, obscured or missing, the minimum standard is to deploy resources as soon as practicable after becoming aware of the fact to repair or replace the sign. O. Reg. 239/02, s. 11 (1); O. Reg. 23/10, s. 7 (2). (2) This section applies to the following types of signs: 1. Checkerboard. 2. Curve sign with advisory speed tab. 3. Do not enter. 3.1 Load Restricted Bridge. 3.2 Low Bridge. 6

3.3 Low Bridge Ahead. 4. One Way. 5. School Zone Speed Limit. 6. Stop. 7. Stop Ahead. 8. Stop Ahead, New. 9. Traffic Signal Ahead, New. 10. Two-Way Traffic Ahead. 11. Wrong Way. 12. Yield. 13. Yield Ahead. 14. Yield Ahead, New. O. Reg. 239/02, s. 11 (2); O. Reg. 23/10, s. 7 (3). Regulatory or warning signs 12. (1) The minimum standard for the frequency of inspecting regulatory signs or warning signs to check to see that they meet the retro-reflectivity requirements of the Ontario Traffic Manual is once per calendar year, with each inspection taking place not more than 16 months from the previous inspection. O. Reg. 23/10, s. 8; O. Reg. 47/13, s. 12 (1). (1.1) A regulatory sign or warning sign that has been inspected in accordance with subsection (1) is deemed to be in a state of repair with respect to the retro-reflectivity requirements of the Ontario Traffic Manual until the next inspection in accordance with that subsection, provided that the municipality does not acquire actual knowledge that the sign has ceased to meet these requirements. O. Reg. 47/13, s. 12 (2). (2) If a regulatory sign or warning sign is illegible, improperly oriented, obscured or missing, the minimum standard is to repair or replace the sign within the time set out in the Table to this section after becoming aware of the fact. O. Reg. 23/10, s. 8. (3) In this section, regulatory sign and warning sign have the same meanings as in the Ontario Traffic Manual, except that they do not include a sign listed in subsection 11 (2) of this Regulation. O. Reg. 23/10, s. 8. Class of Highway Time 1 7 days 2 14 days 3 21 days 4 30 days 5 30 days Traffic control signal systems REGULATORY AND WARNING SIGNS 7 O. Reg. 239/02, s. 12, Table. 13. (1) If a traffic control signal system is defective in any way described in subsection (2), the minimum standard is to deploy resources as soon as practicable after becoming aware of the defect to repair the defect or replace the defective component of the traffic control signal system. O. Reg. 239/02, s. 13 (1). (2) This section applies if a traffic control signal system is defective in any of the following ways: 1. One or more displays show conflicting signal indications. 2. The angle of a traffic control signal or pedestrian control indication has been changed in such a way that the traffic or pedestrian facing it does not have clear visibility of the information conveyed or that it conveys confusing information to traffic or pedestrians facing other directions. 3. A phase required to allow a pedestrian or vehicle to safely travel through an intersection fails to occur. 4. There are phase or cycle timing errors interfering with the ability of a pedestrian or vehicle to safely travel through an intersection. 5. There is a power failure in the traffic control signal system. 6. The traffic control signal system cabinet has been displaced from its proper position.

7. There is a failure of any of the traffic control signal support structures. 8. A signal lamp or a pedestrian control indication is not functioning. 9. Signals are flashing when flashing mode is not a part of the normal signal operation. O. Reg. 239/02, s. 13 (2). (3) Despite subsection (1) and paragraph 8 of subsection (2), if the posted speed of all approaches to the intersection or location of the non-functioning signal lamp or pedestrian control indication is less than 80 kilometres per hour and the signal that is not functioning is a green or a pedestrian walk signal, the minimum standard is to repair or replace the defective component by the end of the next business day. O. Reg. 239/02, s. 13 (3). (4) In this section and section 14, cycle means a complete sequence of traffic control indications at a location; display means the illuminated and non-illuminated signals facing the traffic; indication has the same meaning as in the Highway Traffic Act; phase means a part of a cycle from the time where one or more traffic directions receive a green indication to the time where one or more different traffic directions receive a green indication; power failure means a reduction in power or a loss in power preventing the traffic control signal system from operating as intended; traffic control signal has the same meaning as in the Highway Traffic Act; traffic control signal system has the same meaning as in the Highway Traffic Act. O. Reg. 239/02, s. 13 (4). Traffic control signal system sub-systems 14. (1) The minimum standard is to inspect, test and maintain the following traffic control signal system sub-systems once per calendar year, with each inspection taking place not more than 16 months from the previous inspection: 1. The display sub-system, consisting of traffic signal and pedestrian crossing heads, physical support structures and support cables. 2. The traffic control sub-system, including the traffic control signal cabinet and internal devices such as timer, detection devices and associated hardware, but excluding conflict monitors. 3. The external detection sub-system, consisting of detection sensors for all vehicles, including emergency and railway vehicles and pedestrian push- buttons. O. Reg. 239/02, s. 14 (1); O. Reg. 47/13, s. 13 (1). (1.1) A traffic control signal system sub-system that has been inspected, tested and maintained in accordance with subsection (1) is deemed to be in a state of repair until the next inspection in accordance with that subsection, provided that the municipality does not acquire actual knowledge that the traffic control signal system sub-system has ceased to be in a state of repair. O. Reg. 47/13, s. 13 (2). (2) The minimum standard is to inspect, test and maintain conflict monitors every five to seven months and at least twice per calendar year. O. Reg. 239/02, s. 14 (2); O. Reg. 47/13, s. 13 (3). (2.1) A conflict monitor that has been inspected, tested and maintained in accordance with subsection (2) is deemed to be in a state of repair until the next inspection in accordance with that subsection, provided that the municipality does not acquire actual knowledge that the conflict monitor has ceased to be in a state of repair. O. Reg. 47/13, s. 13 (4). (3) In this section, conflict monitor means a device that continually checks for conflicting signal indications and responds to a conflict by emitting a signal. O. Reg. 239/02, s. 14 (3). Bridge deck spalls 15. (1) If a bridge deck spall exceeds both the surface area and depth set out in the Table to this section, the minimum standard is to repair the bridge deck spall within the time set out in the Table after becoming aware of the fact. O. Reg. 239/02, s. 15 (1). (2) A bridge deck spall is deemed to be in a state of repair if its surface area or depth is less than or equal to that set out in the Table. O. Reg. 239/02, s. 15 (2); O. Reg. 47/13, s. 14. (3) In this section, bridge deck spall means a cavity left by one or more fragments detaching from the paved surface of the roadway or shoulder of a bridge. O. Reg. 239/02, s. 15 (3). Class of Surface Area Depth Time BRIDGE DECK SPALLS 8

Highway 1 600 cm² 8 cm 4 days 2 800 cm² 8 cm 4 days 3 1,000 cm² 8 cm 7 days 4 1,000 cm² 8 cm 7 days 5 1,000 cm² 8 cm 7 days Roadway surface discontinuities O. Reg. 239/02, s. 15, Table. 16. (1) If a surface discontinuity on a roadway, other than a surface discontinuity on a bridge deck, exceeds the height set out in the Table to this section, the minimum standard is to repair the surface discontinuity within the time set out in the Table after becoming aware of the fact. O. Reg. 23/10, s. 9. (1.1) A surface discontinuity on a roadway, other than a surface discontinuity on a bridge deck, is deemed to be in a state of repair if its height is less than or equal to the height set out in the Table to this section. O. Reg. 47/13, s. 15. (2) If a surface discontinuity on a bridge deck exceeds five centimetres, the minimum standard is to deploy resources as soon as practicable after becoming aware of the fact to repair the surface discontinuity on the bridge deck. O. Reg. 23/10, s. 9. (2.1) A surface discontinuity on a bridge deck is deemed to be in a state of repair if its height is less than or equal to five centimetres. O. Reg. 47/13, s. 15. (3) In this section, surface discontinuity means a vertical discontinuity creating a step formation at joints or cracks in the paved surface of the roadway, including bridge deck joints, expansion joints and approach slabs to a bridge. O. Reg. 23/10, s. 9. Class of Highway Height Time 1 5 cm 2 days 2 5 cm 2 days 3 5 cm 7 days 4 5 cm 21 days 5 5 cm 21 days Sidewalk surface discontinuities SURFACE DISCONTINUITIES O. Reg. 239/02, s. 16, Table. 16.1 (1) The minimum standard for the frequency of inspecting sidewalks to check for surface discontinuity is once per calendar year, with each inspection taking place not more than 16 months from the previous inspection. O. Reg. 23/10, s. 10; O. Reg. 47/13, s. 16 (1). (1.1) A sidewalk that has been inspected in accordance with subsection (1) is deemed to be in a state of repair with respect to any surface discontinuity until the next inspection in accordance with that subsection, provided that the municipality does not acquire actual knowledge of the presence of a surface discontinuity in excess of two centimetres. O. Reg. 47/13, s. 16 (2). (2) If a surface discontinuity on a sidewalk exceeds two centimetres, the minimum standard is to treat the surface discontinuity within 14 days after acquiring actual knowledge of the fact. O. Reg. 23/10, s. 10; O. Reg. 47/13, s. 16 (3). (2.1) A surface discontinuity on a sidewalk is deemed to be in a state of repair if it is less than or equal to two centimetres. O. Reg. 47/13, s. 16 (4). (3) For the purpose of subsection (2), treating a surface discontinuity on a sidewalk means taking reasonable measures to protect users of the sidewalk from the discontinuity, including making permanent or temporary repairs, alerting users attention to the discontinuity or preventing access to the area of discontinuity. O. Reg. 23/10, s. 10. (4) In this section, surface discontinuity means a vertical discontinuity creating a step formation at joints or cracks in the surface of the sidewalk. O. Reg. 23/10, s. 10. Review REVIEW OF REGULATION 17. (1) The Minister of Transportation shall conduct a review of this Regulation and Ontario Regulation 612/06 (Minimum Maintenance Standards for Highways in the City of Toronto) made under the City of Toronto Act, 2006 every five years. O. Reg. 613/06, s. 2. 9

(2) Despite subsection (1), the first review after the completion of the review started before the end of 2007 shall be started five years after the day Ontario Regulation 23/10 is filed. O. Reg. 23/10, s. 11. 18. OMITTED (PROVIDES FOR COMING INTO FORCE OF PROVISIONS OF THIS REGULATION). O. Reg. 239/02, s. 18. Back to top 10