ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS

Similar documents
To: Rishi Adhikari and Roger Skirrow From: Leslie Cho and Ian Darrach Alberta Transportation File: Date: June 30, 2016

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

January 17, 2008 File:

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT

September 3, 2009 File: NORTH CENTRAL REGION GEOHAZARD ASSESSMENT HWY 40:28 NORTH OF CADOMIN (NC50) 2009 ANNUAL INSPECTION REPORT

January 12, 2006 File:

PEACE REGION (PEACE RIVER- HIGH LEVEL AREA) GEOHAZARD ASSESSMENT CALL-OUT PH56: EMBANKMENT FAILURE ON HWY 35:08 SOUTHWEST OF MEIKLE RIVER CROSSING

August 10, 2007 File:

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

PEACE RIVER EAST HILL - HWY 2:60 (PH2) SELECT PHOTOGRAPHS August 22, 2007 File: Photo E003. Station May 2007

Drilled Shafts for Bridge Foundation Stability Improvement Ohio 833 Bridge over the Ohio River An Update

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Jackson County 2013 Weather Data

December 11, 2006 File:

WHITE POINT LANDSLIDE GEOTECHNICAL INVESTIGATION November 29, 2012 Status Report

The results of KCB s site inspection observations and our recommendations for further work are presented herein.

1 INTRODUCTION 1.1 General

PEACE REGION GRANDE PRAIRIE GEOHAZARD RISK ASSESSMENT SITE INSPECTION FORM NAD 83 COORDINATES N 6,178,811 E 403,309

Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC

GAMINGRE 8/1/ of 7

Table 1 - Infiltration Rates

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Monitoring on Subsidence Claims. John Parvin Subsidence Claims Manager

ISSUED FOR CONSTRUCTION

REDWOOD VALLEY SUBAREA

3.12 Geology and Topography Affected Environment

Appin Colliery - Longwall 705

1. PROJECT BACKGROUND. July 18, Alberta Infrastructure & Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

Geosynthetics Applications and Performance Reviews Select Case Histories

Jackson County 2018 Weather Data 67 Years of Weather Data Recorded at the UF/IFAS Marianna North Florida Research and Education Center

WEST QUESNEL LAND STABILITY PROGRAM ANNUAL MONITORING REPORT Prepared for:

Data Report for White Point Landslide Boring B-12 W.O. E Task Order Solicitation San Pedro District Los Angeles, California

Stormwater Outlet Sediment Traps

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

#10, 340 MacAlpine Crescent, Fort McMurray, AB T9H 4A8 T: F: thurber.ca. Attachment #1

Geotechnical Investigation and Monitoring Results of a Landslide Failure at Southern Peninsular Malaysia (Part 1: Investigating Causes of Failure)

8 VISIBILITY. 8.1 Setting. 8.2 Assessment Focus. Table 8-1: Key Issue for Visibility

Drought Characterization. Examination of Extreme Precipitation Events

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed

Wind Resource Data Summary Cotal Area, Guam Data Summary and Transmittal for December 2011

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

GEOMECHANICAL MODELING OF THE STEINERNASE LANDSLIDE Alessio Ferrari, Lyesse Laloui and Christophe Bonnard

Project No India Basin Shadow Study San Francisco, California, USA

GEOLOGICAL BRANCH ASSESSMENT REPORT 12. FItE NO: ACTION: THE GOLDEN MINING DIVISION, GOLDEN, Including THE NTS MAP; M82K/15W

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

Coarse Sediment Traps

Appendix A. Producer Statement Advisory Note

Landslide Investigation on State Route 7 along the Ohio River

Appendix C Surface Water and Groundwater Interaction Memorandum

Butte County Drought Task Force December 1, :00 AM noon 202 Mira Loma Drive, Tahoe Room Oroville, CA. Agenda

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Memo. I. Executive Summary. II. ALERT Data Source. III. General System-Wide Reporting Summary. Date: January 26, 2009 To: From: Subject:

Minnesota s Climatic Conditions, Outlook, and Impacts on Agriculture. Today. 1. The weather and climate of 2017 to date

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

Rock & Aggregate Drop Inlet Protection

Budge Road Landslide Jackson Extensometer installation report April 2014 with data to 20 May

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road

National Integrated Drought Information System. Southeast US Pilot for Apalachicola- Flint-Chattahoochee River Basin 20-March-2012

MARMOT CREEK BASIN: MANAGING FORESTS FOR WATER

U-Shaped Sediment Traps

September 18, 2017 Project No.: 5077

Treasury Metals Incorporated Goliath Gold Project Environmental Impact Statement

Rock Sizing for Multi-Pipe & Culvert Outlets

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

Mass Wasting. Mass Wasting. Earth s s External Processes

STATISTICAL FORECASTING and SEASONALITY (M. E. Ippolito; )

Suitable Applications Sediment traps should be considered for use:

Climate Change Impact Assessment on Long Term Water Budget for Maitland Catchment in Southern Ontario

Woodford County Erosion Prevention Plan and Permit. Application #

Gotechnical Investigations and Sampling

Comparison of Particulate Monitoring Methods at Fort Air Partnership Monitoring Stations

Use of Shredded Tires for Lightweight Fill

Three main areas of work:

2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement

Fluvial Driven Alluvial Fans

CLIMOGRAPH UNIT: s^io

NORTHUMBERLAND COUNTY, PA

Culvert and Pipe Phasing

APPENDIX A: EROSION & SEDIMENT CONTROL FORMS

Effects of the slope toe evolution on the behaviour of a slow-moving large landslide

July 2017 LOGISTICAL HARMONY

Quality Pavement Markings

ZUMWALT WEATHER AND CLIMATE ANNUAL REPORT ( )

Agry 465 Exam October 18, 2006 (100 points) (9 pages)

October 26, Ms. Aimee Zack Canadian Pacific 120 S. Sixth Street Suite 900 Minneapolis, Minnesota 55402

2 Groundwater Basin Monitoring

Etobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

January 16, Re: Soo Line Dump Site 2018 Annual Soil Cover Inspection. Dear Mr. Nichols:

Area-wide geotechnical information summary for CERA zoning review panel

Drainage Used to Control Movements of a Large Rock Slide in Canada

Jackson County 2014 Weather Data

Champaign-Urbana 2000 Annual Weather Summary

Practice Test Chapter 8 Sinusoidal Functions

Monitoring and Characterization of the Meadowview Lane Landslide: Boyd County, KY

Slope Stability Assessment Proposed Development 4401 Fallowfield Road Lands Ottawa, Ontario Rev-02

Evaluation of Geotechnical Hazards

Transcription:

ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS SPRING 1 SECTION C SITE PH7-1: HWY 9:, DEADWOOD SLIDE 1. OBSERVATIONS 1.1 Field Program and Instrumentation Status Two slope inclinometers (SI15-1 and SI15-) were installed at the Hwy 9: Deadwood Slide site during construction in the fall of 15. The majority of construction work was completed by the end of November 15. The two SIs were read on June 1, 1 by Mr. Niraj Regmi, G.I.T. and Mr. Eddy Mar, E.I.T., both of Thurber Engineering Ltd. The SIs were read using a RST Digital Inclinometer probe with a ft. wheelbase and a RST Pocket PC readout. Inclinometer reading depths were defined as per cable markings with respect to the top of the inclinometer casings.. INTERPRETATION.1 General SI plots with A and B directions are presented in Section D and are summarized below. Where movement has been recorded, the resultant plot (X direction, if applicable) and a rate of movement have also been provided. 17 Roper Road, Edmonton, AB TB 3S5 T: 7 3 1 F: 7 37 715 thurber.ca

. Zones of Movement Zones of new movement were not observed in slope inclinometers SI15-1 and SI15- since the fall of 17 readings. Zones of movement are summarized in Table PH7-1-1 at the end of this report. This table also provides a historical account of the total movement, the depth of movement and the maximum rate of movement that has occurred at this site since the initialization of the slope inclinometers..3 Interpretation of Monitoring Results Slope inclinometer SI15-1 showed a rate of movement of. mm/yr over 5. m to 7. m depth since the fall of 17 readings. SI15- showed a rate of movement of 1. mm/yr over. m to 5. m depth since the fall of 17 readings. Historical groundwater levels recorded in the piezometers are summarized in Tables PH7-1- and PH7-1-3 at the end of this report. All piezometers at this site were damaged prior to or during construction. 3. RECOMMENDATIONS 3.1 Future Work The instruments should be read again during the fall of 1. 3. Instrumentation Repairs No instrumentation repairs are required at this time. Client: Alberta Transportation Date: August, 1 File: 13351 e-file: \\H\13351 rpt PH7-1 - Edm Page of

Date Monitored: June 1, 1 INSTRUMENT # SI15-1 SI15- DATE INITIALIZED October 1, 15 October 1, 15 TABLE PH7-1-1 SPRING 1 HWY 9: DEADWOOD SLIDE SLOPE INCLINOMETER INSTRUMENTATION READING SUMMARY TOTAL CUMULATIVE RESULTANT MOVEMENT AT NOTED DEPTH SINCE INITIAL READING (mm) 7.9 mm over 5. m to 7. m depth in 19 direction 5. mm over. m to 5. m depth in 15 direction MAXIMUM RATE OF MOVEMENT (mm/yr) 5 in October 15 971 in October 15 CURRENT STATUS Operational Operational DATE OF PREVIOUS READING October 1, 17 October 1, 17 INCREMENTAL MOVEMENT SINCE PREVIOUS READING (mm) Drawing 13351-PH7-1-1 in Section D provides a sketch of the approximate locations of the monitoring instrumentation for this site. CURRENT RATE OF MOVEMENT (mm/yr) CHANGE IN RATE OF MOVEMENT SINCE PREVIOUS READING (mm/yr) 1.5. -.5 1. 1..3 Client: Alberta Transportation Date: August, 1 File: 13351 e-file: \\H\13351 rpt PH7-1 -Edm Page 3 of

INSTRUMENT # TABLE PH7-1- SPRING 1 HWY 9: DEADWOOD SLIDE STANDPIPE PIEZOMETER INSTRUMENTATION READING SUMMARY DATE INITIALIZED TIP DEPTH GROUND ELEV. SP1-1 November, 1 9. 559.5 CURRENT STATUS Blocked at 1.7 mbgs MAXIMUM GROUNDWATER LEVEL BGS. on November, 1 1.1 on May 7, 11.3 on July 7, 11 GROUNDWATER LEVEL BGS.9 (Sept. 5, 13) SP1-3 November, 1.9 55. Destroyed 1.9 (Oct. 1, 1) SP1-5 April 7, 1.9 51.7 Damaged 1. (Sept. 17, 15) Drawing 13351-PH7-1-1 in Section D provides a sketch of the approximate locations of the monitoring instrumentation for this site. TABLE PH7-1-3 SPRING 1 HWY 9: DEADWOOD SLIDE VIBRATING WIRE PIEZOMETER INSTRUMENTATION READING SUMMARY INSTRUMENT DATE INITIALIZED TIP ELEV. GROUND ELEV. CURRENT STATUS MAXIMUM GROUNDWATER ELEVATION GROUNDWATER ELEVATION VW1-1 5. m on May 3, 15 5. April 7, 11 553.5 5. Destroyed (1D191) (1. mbgs) (May 3, 15) VW1-55.9 m on June, 1 55.9 April 7, 11 555.17 5.9 Destroyed (1D1917) (. mbgs) (June, 1) Drawing 13351-PH7-1-1 in Section D provides a sketch of the approximate locations of the monitoring instrumentation for this site. Client: Alberta Transportation Date: August, 1 File: 13351 e-file: \\H\13351 rpt PH7-1 -Edm Page of

ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS SPRING 1 SECTION D DATA PRESENTATION SITE PH7-1: HWY 9:, DEADWOOD SLIDE

ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING FIELD SUMMARY (PH7-1) SPRING 1 Location: Deadwood Slide (HWY 9: C1.31) Readout: File Number: 13351 Extension: 3.3 Probe: RST Set 5R and R Temp: 1 Cable: RST Set 5R and R Read by: NKR/EM SLOPE INCLINOMETER (SI) READINGS SI# GPS Location Date Stickup from top Magn. North Current Bottom Remarks (UTM 11) of casing (ft) A+ Groove Readings Easting Northing A+ A- B+ B- SI15-1 93.71 71. 1-Jun-1. 5 to 17-15 33-75 7 SI15-975.7 73.5 1-Jun-1 1. 5 to 1 1-197 -55 515 * *USE DUMMY PROBE for next reading INSPECTOR REPORT

H:\13\13351 Geohazard Assessment - Peace RiverHigh Level (CON17)\Drafting\1\INST - SPRING\13351-PH7-1-1.dwg - Layout1 - Jul. 5, 1 59 5 CREEK 57 5 EXTENT OF STOCKPILING (SEPT, 15) FRENCH DRAINS (TYP). (SEE DETAIL SHEET ) LIMIT OF TREE CLEARING SILT FENCE INSTALLED CLASS RIP RAP 55.7 5 559 5 1mm Ø C.SP. CULVERT 55 5 57 51.515 SP1-3 (TH1-3) 55 5.55 SI1-1 (TH1-) 9% SI15-1 SOIL COVERING MAT 5 5 CRACK AS OF SEPT, 15) VW1-1 VW1- SP1-5 SI15- DIP DOWNSLOPE SUBDRAIN (SEE DETAIL SHEET ) 53 SI1- (TH1-5) 51 53 CRACK 55 5 SWALE LINED WITH TYPE "A" TEMPORARY RECP T T ACP PATCH SILT FENCE INSTALLED 5 USED NON-PERFORATED PIPE THROUGH CULVERT CLAY SEAL ZONE CLASS RIP RAP 5 HIGHWAY 9 557 55 557 559 51 5 559 55 CREEK 53 W 5 51 SILT FENCE INSTALLED N S E 559 SP1-1 5 55 5 559 EXISTING CULVERT REMOVED NEW mm CULVERT INSTALLED (BF7371) Dunvegan Hines Creek PH7-1 Fairview Manning Peace River 5 1 15 3m SCALE 1: 5 5 53 PEACE REGION (PEACE RIVER/ HIGH LEVEL) 1 LEGEND: 55 PH7-1: HWY 9: - DEADWOOD SLIDE INSTRUMENT LOCATIONS SI INSTRUMENT LOCATION INSTRUMENT NOT IN USE SLOPE INCLINOMETER SLOPE INCLINOMETER MOVEMENT DIRECTION DRAWN BY DESIGNED BY APPROVED BY SCALE DATE FILE No. ML BWN DWP 1: JULY 1 13351 DWG No. 13351-PH7-1-1

Thurber Engineering Ltd. -75-37.5 37.5 75 LEGEND Initial 1 Oct 15 9 Oct 15-5 -5 5 5 3 Nov 15 1 Nov 15 May 1 Oct 1 1 Jun 17 1 Oct 17 1 Jun 1 1 1 1 1 1 1 1 1 1 1 1 1 Ref. Elevation 5.739 m 1 1-75 -37.5 37.5 75 Cumulative Deflection Direction A 1 1-5 -5 5 5 Incremental Deflection Direction A PH7-1 Deadwood Slide, Inclinometer SI15-1 Alberta Transportation H:\13\13351 Geohazard Assessment - Peace RiverHigh Level (CON17)\Instruments\Spring 1\SI Readings\PH 7\SI15-1.gtl

Thurber Engineering Ltd. -75-37.5 37.5 75 LEGEND Initial 1 Oct 15 9 Oct 15-5 -5 5 5 3 Nov 15 1 Nov 15 May 1 Oct 1 1 Jun 17 1 Oct 17 1 Jun 1 1 1 1 1 1 1 1 1 1 1 1 1 Ref. Elevation 5.739 m 1 1-75 -37.5 37.5 75 Cumulative Deflection Direction B 1 1-5 -5 5 5 Incremental Deflection Direction B PH7-1 Deadwood Slide, Inclinometer SI15-1 Alberta Transportation H:\13\13351 Geohazard Assessment - Peace RiverHigh Level (CON17)\Instruments\Spring 1\SI Readings\PH 7\SI15-1.gtl

Thurber Engineering Ltd. 1 Jan 1 1 Jul 1 1 Jan 17 1 Jul 17 1 Jan 1 1 Jul 1 7 Displacements shown are in the A Direction 7 5./7. m 5 5 Displ. (mm) 3 3 1 1 1 Jan 1 1 Jul 1 1 Jan 17 1 Jul 17 1 Jan 1 1 Jul 1 PH7-1 Deadwood Slide, Inclinometer SI15-1 Alberta Transportation

Thurber Engineering Ltd. -75-37.5 37.5 75 LEGEND Initial 1 Oct 15 9 Oct 15-75 -37.5 37.5 75 3 Nov 15 1 Nov 15 May 1 Oct 1 1 Jun 17 1 Oct 17 1 Jun 1 1 1 1 1 1 1 1 1 1 1 Ref. Elevation 51.3 m 1 1-75 -37.5 37.5 75 Cumulative Deflection Direction A -75-37.5 37.5 75 Incremental Deflection Direction A PH7-1 Deadwood Slide, Inclinometer SI15- Alberta Transportation H:\13\13351 Geohazard Assessment - Peace RiverHigh Level (CON17)\Instruments\Spring 1\SI Readings\PH 7\SI15-.gtl

Thurber Engineering Ltd. -1-5 5 1 LEGEND Initial 1 Oct 15 9 Oct 15-75 -37.5 37.5 75 3 Nov 15 1 Nov 15 May 1 Oct 1 1 Jun 17 1 Oct 17 1 Jun 1 1 1 1 1 1 1 1 1 1 1 Ref. Elevation 51.3 m 1 1-1 -5 5 1 Cumulative Deflection Direction B -75-37.5 37.5 75 Incremental Deflection Direction B PH7-1 Deadwood Slide, Inclinometer SI15- Alberta Transportation H:\13\13351 Geohazard Assessment - Peace RiverHigh Level (CON17)\Instruments\Spring 1\SI Readings\PH 7\SI15-.gtl

Thurber Engineering Ltd. -1-5 5 1 LEGEND Initial 1 Oct 15 9 Oct 15-75 -37.5 37.5 75 3 Nov 15 1 Nov 15 May 1 Oct 1 1 Jun 17 1 Oct 17 1 Jun 1 1 1 1 1 1 1 1 1 1 1 Ref. Elevation 51.3 m 1 1 skew = 31deg -1-5 5 1 Cumulative Deflection Direction X -75-37.5 37.5 75 Incremental Deflection Direction X PH7-1 Deadwood Slide, Inclinometer SI15- Alberta Transportation H:\13\13351 Geohazard Assessment - Peace RiverHigh Level (CON17)\Instruments\Spring 1\SI Readings\PH 7\SI15-.gtl

Thurber Engineering Ltd. 1 Jan 1 1 Jul 1 1 Jan 17 1 Jul 17 1 Jan 1 1 Jul 1 7 Displacements shown are in the X Direction (skew = 31 degrees) 7./5. m 5 5 Displ. (mm) 3 3 1 1 1 Jan 1 1 Jul 1 1 Jan 17 1 Jul 17 1 Jan 1 1 Jul 1 PH7-1 Deadwood Slide, Inclinometer SI15- Alberta Transportation