SCIAMACHY OPERATIONS IN AN EXTENDED MISSION UP TO 2010

Similar documents
DETERMINATION OF SCIAMACHY LINE-OF-SIGHT MISALIGNMENTS

4. Instrument Operations

SCIAMACHY IN-FLIGHT CALIBRATION

PROBA 1. F. Teston ESA/ESTEC D/TEC-EL

Angelika Dehn Rob Koopman 10 Years GOME on ERS-2 Workshop

TROPOMI. Sentinel 5 Precursor instrument for air quality and climate observations. R. Voors Dutch Space. ICSO, 11 October 2012

CURRENT RETRIEVAL AND INTER-COMPARISONS RESULTS OF SCIAMACHY NIGHTTIME NO X

SCIAMACHY SOLAR OCCULTATION: OZONE AND NO 2 PROFILES

Status of IASI FM2 on METOP-A. Carole Larigauderie (CNES), Laurence Buffet (CNES), Dominique Montero (Eumetsat), Patrick Astruc (TAS)

Anomaly Investigations. The following anomalies have occurred since Launch : SDPSS DPC4 error

Long-Term Time Series of Water Vapour Total Columns from GOME, SCIAMACHY and GOME-2

Instrument pointing issues on ENVISAT

SCIAMACHY Operations Concept II. Timelines: Generation, Planning & Execution Rules and Reference Timelines

I EPORT ULY UGUST. /document title/ titre du document. Gabriele Brizzi. prepared by/préparé par. reference/réference

GROUNDBASED FTIR, OZONESONDE AND LIDAR MEASUREMENTS FOR THE VALIDATION OF SCIAMACHY (AOID 331)

Figure 1. View of ALSAT-2A spacecraft

SP-1291 June Mars Express. The Scientific Investigations

Announcement of Opportunity AKARI (ASTRO-F)

SCIAMACHY REFLECTANCE AND POLARISATION VALIDATION: SCIAMACHY VERSUS POLDER

Science planning and operations for Mars Express

Impact of the Envisat Mission Extension on SAR data

Impact of the Envisat Mission Extension on SAR data

SCIAMACHY Level 1b-2 Data Processing Status & Changes

THE MICRO ADVANCED STELLAR COMPASS FOR ESA S PROBA 2 MISSION

NEW EUMETSAT POLAR SYSTEM ATTITUDE MONITORING SOFTWARE

Improved pointing information for SCIAMACHY from in-flight measurements of the viewing directions towards sun and moon

ADCSS 2017: Sodern presentation

5. Calibration & Monitoring

Atmospheric Lidar The Atmospheric Lidar (ATLID) is a high-spectral resolution lidar and will be the first of its type to be flown in space.

IMPACT OF SPACE DEBRIS MITIGATION REQUIREMENTS ON THE MISSION DESIGN OF ESA SPACECRAFT

Autonomous Vision Based Detection of Non-stellar Objects Flying in Formation with Camera Point of View

Product Quality README file for GOME Level 1b version 5.1 dataset

Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document

NEW CGMS BASELINE FOR THE SPACE-BASED GOS. (Submitted by the WMO Secretariat) Summary and Purpose of Document

I EPORT ULY UGUST. /document title/ titre du document. Angelika Dehn. prepared by/préparé par

Simulated Radiances for OMI

ACHIEVING THE ERS-2 ENVISAT INTER-SATELLITE INTERFEROMETRY TANDEM CONSTELLATION.

The post launch assessment review confirmed the following previous assertions about the mission status:

Thermal Design and Analysis of the BroadBand Radiometer. Oliver Poyntz-Wright (Rutherford Appleton Laboratory, United Kingdom)

Eight Years MOS-IRS Summary of Calibration Activities

ASAR LEVEL 0 PRODUCT ANALYSIS FOR ALTERNATING POLARISATION AND GLOBAL MONITORING MODE

VIIRS SDR Cal/Val: S-NPP Update and JPSS-1 Preparations

SCIAMACHY MONITORING THE CHANGING EARTH S ATMOSPHERE

GOME-2 COMMISSIONING RESULTS: GEOPHYSICAL VALIDATION OF LEVEL 1 PRODUCTS

BepiColombo MPO Science Operations Planning Drivers IWPSS-2013

RELATIVE MISSION ANALYSIS FOR PROBA 3: SAFE ORBITS AND CAM

Overview of the Current Baseline of the Solar-C Spacecraft System

Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document

BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN. Jose Sergio Almeida INPE (Brazil)

DARE Mission and Spacecraft Overview

Orbit Design Marcelo Suárez. 6th Science Meeting; Seattle, WA, USA July 2010

RETRIEVAL OF TRACE GAS VERTICAL COLUMNS FROM SCIAMACHY/ENVISAT NEAR-INFRARED NADIR SPECTRA: FIRST PRELIMINARY RESULTS

Appendix O. Implementation of the Equation of Time in Sun Synchronous Orbit Modelling and ESARAD Planet Temperature Mapping Error at the Poles

The AEOLUS Mission - In Orbit Commissioning and Verification

In-flight Spectral Calibration of MERIS/OLCI. Jürgen Fischer, Rene Preusker, Rasmus Lindstrot Institute for Space Science Free University Berlin

MISSION ENGINEERING SPACECRAFT DESIGN

NPP ATMS Instrument On-orbit Performance

DRAFT. Robotic Lunar Exploration Program Lunar Reconnaissance Orbiter 431-ICD Date: September 15, 2005

Reduction of the Response Time of Earth Observation Satellite Constellations using Inter-satellite Links

SBUV(/2) and SSBUV Solar Irradiance Measurements Matthew DeLand, Richard Cebula, Liang-Kang Huang Science Systems and Applications, Inc.

Venus Express: Results, Status and Future Plans

DRAFT. Robotic Lunar Exploration Program Lunar Reconnaissance Orbiter (LRO)

Calibration of MERIS on ENVISAT Status at End of 2002

Improving Space Surveillance with Space-Based Visible Sensor

Status of the Sentinel-5 Precursor Presented by C. Zehner S5p, S4, and S5 Missions Manager - ESA

Lunar Satellite Attitude Determination System

SciBox, a Proven Automated Planning and Commanding System

VERIFICATION OF MERIS LEVEL 2 PRODUCTS: CLOUD TOP PRESSURE AND CLOUD OPTICAL THICKNESS

New GOME/ERS-2 Level-1 Product In-Flight Calibration and Degradation Monitoring

Satellite Position Determination of LEO Spacecraft

Newsletter of the INTEGRAL Science Operations Centre

ENVISAT - AATSR CYCLIC REPORT #63

Herschel Science/Instrument Planning and Scheduling. Jon Brumfitt (ESAC) SCIOPS September 2013

Mechanical and Thermal Design of XMM

May 15, Lunar Reconnaissance Orbiter (LRO) Instrument Thermal Balance and Thermal Vacuum Direction. Rev. (Initial) j Mission

Europe to the Moon. BHF 10 Feb 2005 SPC

What Is Air Temperature?

RESULTS OF A NEW STRAYLIGHT CORRECTION FOR SCIAMACHY

ABB Remote Sensing Atmospheric Emitted Radiance Interferometer AERI system overview. Applications

The In-Orbit Commissioning of MSG-1

Usage of IGS TEC Maps to explain RF Link Degradations by Spread-F, observed on Cluster and other ESA Spacecraft

BEOSAT (BRUNSWICK-EARTH-OBSERVATION-SATELLITE)

EUCLID SKY SCANNING TOOL

IASI FM2 on METOP A Performances after 1.5 year in orbit

AN UPDATE OF MICROCARB PROJECT PROGRESS AND PERSPECTIVE.

ETS-Ⅷ Ion Engine and its Operation on Orbit

1.0 Introduction 1.1 The Earth Radiation Budget

ENVISAT - AATSR CYCLIC REPORT #88

Your Partner in Environment Monitoring

GCOM-C SGLI calibration and characterization. Hiroshi Murakami JAXA/EORC Satellite instrument pre- and post-launch calibration

mstar: Space-Time Asymmetry Research

The EarthCARE mission: An active view on aerosols, clouds and radiation

Vicky Chu, Jer Ling, Tom Lin, Joe Fong, Feng-Tai Huang, Guey-Shin Chang. April 15, 2011

End of Life Re-orbiting The Meteosat-5 Experience

Developing a Compact Doppler/Magnetograph for Solar Diagnostics

Beam. RF antenna. RF cable

Orbit and Transmit Characteristics of the CloudSat Cloud Profiling Radar (CPR) JPL Document No. D-29695

Solar Cycle 24 Variability Observed by Aura OMI Matthew DeLand and Sergey Marchenko Science Systems and Applications, Inc. (SSAI)

Spitzer Space Telescope Current Status and Future Plans

Emission Limb sounders (MIPAS)

Transcription:

SCIAMACHY OPERATIONS IN AN EXTENDED MISSION UP TO 2010 Manfred Gottwald (1), Eckhart Krieg (1), Stefan Noël (2), Klaus Bramstedt (2), Heinrich Bovensmann (2) (1) German Aerospace Center, Remote Sensing Technology Institute, Münchner Str. 20, D-82234 Wessling, Germany, Email: manfred.gottwald@dlr.de (2) Institute of Environmental Physics, University of Bremen, Otto-Hahn-Allee 1, D-28359 Bremen, Germany, Email: stefan.noel@iup.physik.uni-bremen.de ABSTRACT SCIAMACHY on ENVISAT has successfully finished the originally specified 5 years mission lifetime [1] and has started the mission extension. In order to preserve SCIAMACHY's excellent status, it is necessary to adapt certain aspects of operations to the extended mission. This concerns instrument measurement execution and monitoring. Special attention has to be paid for the life limited items on-board SCIAMACHY. Therefore the mission scenarios must be revised to ensure that in-flight usage does not conflict with specifications but still fulfills scientific requirements. Additional monitoring tasks are required to understand the performance of instrument subsystems which might be subject to degradation in a longer mission lifetime. Particularly interesting in this respect are the scanners and the thermal systems. For this purpose we have developed and implemented an extended monitoring concept. It will permit maintaining SCIAMACHY in a healthy status, a prerequisite for generating high quality scientific data for the years to come. 1. INSTRUMENT PERFORMANCE AFTER 5 YEARS SCIAMACHY has been specified for a mission lifetime of 5 years. At March 1 st, 2007 when ENVISAT crossed the equator on the nightside of Earth to begin orbit 26139 this time period was finished with SCIAMACHY still being in excellent condition. At the start of the routine operations phase a rather thorough monitoring concept had been implemented aiming at retrieving continuously detailed status information from various instrument subsystems. This does not only concern the longterm behavior of the optical performance but also Life Limited Items (LLI) thermal systems scanner mechanisms warnings and anomalies In the setup for the SCIAMACHY operations support, the optical performance was treated separately from the remaining issues. Thus corresponding details of how the optical throughput changed in the first years of the mission can be found in another paper at this symposium (see [2]). 1.1 Life Limited Items Several components of the instrument are expected to have a limited operational lifetime. These are Nadir calibration window mechanism (NCWM): opens and closes the subsolar port Aperture stop mechanism (APSM): rotates the small aperture into the lightpath Neutral density filter mechanism (NDFM): moves the neutral density filter into the lightpath White light source (WLS) Spectral line source (SLS) Cryogenic Heatpipe: transports energy during decontamination Pre-launch life tests have established budgets for the in-orbit use of the LLIs [3]. They are given in Table 1 together with the fractional accumulated LLI usage after 5 years. Table 1: In-orbit LLI budgets and usage after 5 years LLI In-orbit Budget In-orbit Usage NCWM 2400 0.69 APSM 49000 0.62 NDFM 49000 0.68 WLS (cycles) 7500 0.12 WLS (sec) 90000 0.24 SLS (cycles) 24317 0.04 SLS (sec) 1717200 0.01 Cryo Heatpipe 40 0.38 These limits were used to define the routine operations scenario, i.e. number of expected executions of solar states (using APSM, NDFM or NCWM), lamp calibrations (using WLS, SLS) and decontaminations. Regular comparison with planning information and downlinked HK telemetry controlled the actual LLI usage ensuring to stay below the allocated budgets. 1.2 Thermal Subsystems The Optical Bench Module (OBM) needs to be operated in orbit in a temperature range between -17.6 and -18.2 C to preserve validity and accuracy of the on-ground calibration & characterization. This is Proc. Envisat Symposium 2007, Montreux, Switzerland 23 27 April 2007 (ESA SP-636, July 2007)

achieved via a closed loop Active Thermal Control (ATC) system in conjunction with the dedicated radiator RAD A. For the detectors operating temperatures lie well below ambient. They are cooled via the Radiant Reflector Unit (RRU) of the Radiant Cooler Assembly to temperatures of 195-230 K for channels 1-6 and 140-160 K for channels 7 and 8. Since the cooling efficiency of the Radiant Cooler is designed to be adequate until the end of the mission, a Thermal Control (TC) system is required to prevent the detector modules from becoming too cold by counter heating using three trim heaters. While the ATC keeps the OBM temperature autonomously within limits the TC system requires occasional adjustments. To avoid degradation of the Radiant Cooler reflecting surface caused by contaminating substances, commanded episodes with elevated temperatures (decontaminations) can be used to re-establish the cooler efficiency. The original decontamination concept was modified since it had turned out that the RRU efficiency does not degrade with the rate estimated before launch. The new decontamination approach, aiming at raising the temperature of the instrument to get also rid of the ice layers and associated water content in cannels 7 & 8, not only switches on the decontamination heaters but also the ATC and TC heaters. Early during the routine phase decontaminations occurred more frequently since experience had to be gained about the most appropriate duration of the warm-up phase. Then, with a frequency of twice per year, decontaminations were executed, one in summer and one in winter. An occasional anomaly during the cool-down phase after a decontamination in winter 2003/2004 had resulted in a very stable throughput in channels 7 & 8. This led to the hypothesis that a second cold trap exists in channels 7 & 8 which can be activated under certain circumstances. It was therefore decided to initiate a decontamination only when the ice induced throughput reduction of channels 7 & 8 had reached unacceptable levels and to execute a particular decontamination sequence in order to activate the second cold trap. This procedure was implemented operationally for the decontamination in winter 2004/2005. It removed almost all the ice from the light path of channel 7 and kept the reduction in channel 8 to less than 30%. In the first years of operations, the ATC settings as of June 2002 provided a very stable average OBM temperature of -17.90 C per orbit (fig. 1). No adjustments were necessary. TC settings changes occurred with a rate of about 2-3 per year. Since channels 4 & 5 have the highest temperature sensitivity, most of the TC adjustments were caused by the seasonal variations of these detectors. Early during 2003 the temperatures selected by the TC settings for June 2002 were considered not to be optimum. Therefore in a number of TC adjustments during February 2003, the detector temperatures were brought into new ranges (fig. 2). The temperature behavior of the infrared channels 7 & 8 was initially driven by the ice conditions leading to an increased infrared absorption and thus radiatively heated detectors. This results in a slow but steady rising temperature. Immediately after a decontamination ice was removed and temperatures were at the selected cold level from where they started to increase caused by the growth of the ice layer until the next decontamination was executed. The situation changed in 2005 when due to the removal of the ice from the light path a stable situation developed in channels 7 & 8 with seasonal variations becoming visible (fig. 3). Prior to launch a degradation of both thermal systems was predicted. This is observed in the ATC where particularly the Nadir heater power decreases. Also the TC system displays degradation as can be seen by a steady increase of average temperatures in all channels. It amounts to about 0.3-0.4 K per year in channels 1-6 while detectors 7 & 8 increase with about 0.5-1 K per year. Figure 1. Mean OBM temperature per orbit (June 2002 February 2007)

Figure 2. Mean detector temperature per orbit for channels 1-6 (June 2002 February 2007) Figure 3. Mean detector temperature per orbit for channels 7 and 8 (June 2002 February 2007) Figure 4. Instrument availability from March 2002 to February 2007

Table 2: SCIAMACHY availability statistics Year Orbits Total Nominal MCMD CCA Check Error Anomalies (Orbits) SEU Platform Anomaly Other Anomalies Planned Unavailability (Orbits) 2002 4380 3605 178 39 361 114 83 2003 5224 4790 51 138 171 29 46 2004 5239 5096 52 73 0 0 18 2005 5225 5161 0 32 0 0 32 2006 5225 4847 17 112 186 9 54 1.3 Scanner Mechanisms During the initially specified mission lifetime both the Azimuth Scan Mechanism (ASM) and Elevation Scan Mechanism (ESM) were not considered to be a life limited item. A regular execution of state 65 rotated both scanners by 360 each orbit in clockwise and counterclockwise direction. Together with the quasicontinuous scanner operation in the limb/nadir sequence on the dayside of the orbit this ensured that the special lubrication used in the bearings maintained its performance. No specific scanner monitoring was therefore required during the first 5 years of the mission. 1.4 Instrument Availability and Anomalies Although SCIAMACHY operations occurred with a very high duty cycle (fig. 4), occasional measurement interrupts could not be avoided. These were either triggered by planned platform/instrument unavailabilities including maintenance activities and orbit control maneuvers or anomalies on platform or instrument level. On instrument level mainly two anomalies persisted. One is the MCMD CCA Check Error caused by a bug in the Instrument Control Unit (ICU) blocking temporarily its interface to the ENVISAT Payload Management Computer. This error occurred rather frequently in the early phase of the mission until a s/w patch was uploaded in October 2002 curing the problem to a large degree. Subsequent years show a reduced rate of the MCMD CCA Check Error compliant with what was expected from the s/w patch. The second type of anomaly was related to high energy particles switching instrument status information thus triggering transfers to safe modes. These Single Event Upsets (SEU) were not only restricted to the South Atlantic Anomaly (SAA) but impacted instrument operations over the entire orbit. Both MCMD CCA Check Errors and SEUs could be well identified in SCIAMACHY s HK telemetry. In those cases instrument recovery was initiated immediately reducing the duration of unavailability periods drastically. 2. REQUIREMENTS OF MISSION EXTENSION Extending SCIAMACHY operations beyond the specified 5 years mission lifetime requires to review the operations and the monitoring concept. The latter has to take into account potentially faster degrading properties. In addition, the behavior of components which were initially considered uncritical may now become a matter of concern and needs regular inspections. The operations concept has to ensure that in-flight budgets of the LLIs stay within limits without compromising the scientific requirements too much. When the mission approaches the currently proposed end it may even become necessary to adapt to a possible degradation of the orbit, particularly the shift of the Local Time at Descending Node (LTDN) crossing and a different orbital period. SCIAMACHY s operations concept is rather robust using timelines being defined relative to Sun and moon fixed events and states taking into account varying Sun zenith angles over the orbit. Therefore LTDN changes of a few minutes are expected not to hamper instrument operations. However care must be taken that the onboard s/w used in the scanner control is capable of dealing with a changing orbit. If required this s/w has to be updated by patches. For example the limb/nadir matching approach requires to compensate the platform yaw steering by a dedicated instrument yaw steering. The corresponding instrument yaw steering table is orbit dependant and would need update in case of major orbit modifications. Also onground s/w, particularly used in mission planning, might need adaption since in the case of a drifting orbit the assumption of a reference orbit is no longer strictly valid. Any modification of instrument operations has to ensure that the LoS pointing knowledge does not degrade.

3. OPERATIONS MODIFICATIONS 3.1 Life Limited Items As can be seen from Tab. 1, the NCWM is the LLI which is expected to hit the in-flight budget limit first. In an use-as-is approach the limit would be reached in October 2008. Similarly NDFM and APSM would exceed the in-flight budgets in April 2009 and November 2009, respectively. Because the NCWM budget has not been derived using a margin factor a specific feature in the development of the subsolar port mechanism it has been decided to reduce the number of subsolar measurements to an appropriate level. This is supported by the experience gained in the lightpath monitoring where it has turned out that reliable results can also be obtained with less measurements. Therefore from October 2006 on only 2 subsolar observations are executed per week. The accumulated NCWM usage will reach 100% of the allocated inflight budget by end of 2012. The selected approach for NDFM and APSM is different. Since both LLIs have a safety margin factor of 2 and the pre-launch life tests had shown no signs of degradation, currently no reduction in the rate of solar occultation measurements is implemented. This supports the high scientific value of this type of observations. The fact that the NDFM and the APSM will exceed their in-flight budgets before end of 2010 is accepted because both LLIs still stay well below the total figures obtained in the life tests. Furthermore NDFM and APSM are monitored on a regular basis. If monitoring results would indicate degrading mechanisms, the operations concept would have to be adapted accordingly. The SCIAMACHY building block approach for measurement execution with states and timelines permits quick response to those requests. 3.2 Thermal Systems For the thermal systems no change in operations is expected. Both systems will be monitored as in the previous years. If necessary, TC adjustments have to be scheduled to maintain detector temperatures within limits. The observed degradation can still be compensated since two of the three heaters are currently providing power in excess of 0.5 W, i.e. a reduction to obtain lower detector temperature is still feasible. Assuming that the degradation is caused by a slowly contaminating reflector unit on the Radiant Cooler, decontaminations might become a means to improve the reflecting efficiency as foreseen in the original concept. However the need for decontamination has to be well weighed against the status of detectors 7 and 8. Heating up and cooling down these channels might bring back the ice layers in their light paths thus degrading retrieval of important geophysical parameters such as CO. The slow degradation of the ATC will require to modify its setpoints as soon as the ATC Nadir Power reaches the lower limit. This will be a first in SCIAMACHY routine operations because the ATC system still operates on the settings as of June 2002. Currently we expect to change the ATC setpoints by 2007/2008. 4. SCANNER MONITORING All of the current monitoring tasks are to be continued in the extended mission. They are complemented by a few functions, particularly aiming to keep an eye on the scanner performance. The scanner performance is the result of the complete scanner control chain. It starts for some states with the provision of aspect and nadir parameters via the START TIMELINE MCMD, Figure 5. ASM/ESM motor currents from 2002 to 2006. Scanner rotations: counterclockwise (red), clockwise (blue), mean (green)

includes the on-board scanner control s/w both for the ASM and ESM, the Sun Follower (SF) h/w and control s/w and finally the scanner mechanisms. Additionally the platform attitude contributes to the scanner Line-of- Sight (LoS) performance. Any observed scanner inconsistency could be the result of a malfunction in one of the components of the chain. Our scanner monitoring is restricted to SCIAMACHY specific items. Several methods exist to monitor scanners although no dedicated scanner monitoring measurements are specified. The ADC calibration/scanner maintenance state 65 is a good candidate for regular inspection of the scanner performance. It is executed each orbit, i.e. sufficient statistics exist over the mission lifetime. The state has a duration of 42 sec such that about 3 HK telemetry readings are generated. The HK parameters contain motor currents for clockwise or counterclockwise rotations and their mean values. Since scanner operation in state 65 is defined in phases with acceleration/deceleration periods interleafed with free rotation, the motor currents are a complex function of time. When sampled at a rate of 1/16 Hz this leads to a specific pattern. Our scanner monitoring assumes that this pattern does not change as long as the scanner performance remains stable (fig. 5). State 65 motor current readings are extracted from the HK telemetry over time periods of at least 1-2 months and plotted against time. The resulting curves are a good indicator of the scanner status. A more indirect scanner monitoring method uses the LoS anomalies observed in some solar states (see [4]). The anomalies cause jumps in azimuth and elevation when switching scanner control from prediction to SF. Regular analysis of the azimuth and elevation readings around the times of SF acquisition retrieves the jump width. As long as the ASM and ESM performance does not degrade, we expect these jumps not to change. Although this method does in first instance only permit to derive statements about the complete scanner control chain it is regarded an additional useful means for scanner monitoring. 5. OUTLOOK SCIAMACHY has been operated successfully throughout the originally specified mission lifetime from early 2002-2007. For the now started mission extension instrument operations including monitoring have been adapted such that the excellent performance is ensured for the coming years. Although the currently implemented modifications are considered sufficient for the specified extended mission lifetime SCIAMACHY is aware that further changes might be necessary, particularly when orbit maintenance has to be relaxed in favour of an even longer mission. REFERENCES 1. Gottwald, M., et al., SCIAMACHY, Monitoring the Changing Earth s Atmosphere, DLR-IMF, 2006. 2. Noël, S., et al., SCIAMACHY Degradation Monitoring Results, these proceedings, ENVISAT/ERS Symposium, Montreux, Switzerland, 2007. 3. EADS Astrium, SCIAMACHY Instrument Operation Manual (IOM), Technical Document, 2003. 4. Gottwald, M., et al., Determination of SCIAMACHY LOS misalignments, these proceedings, ENVISAT/ERS Symposium, Montreux, Switzerland, 2007.