FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund

Similar documents
TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

JAI MAA SHARDA STONE CRUSHING

Kurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,

MCDR INSPECTION REPORT

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

PRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh

MCDR INSPECTION REPORT

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary

MCDR INSPECTION REPORT

Limestone Deposit of Nimbahera area of Chittorgarh District (Raj.)

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Anthill Resources Yukon - An Update on the Einarson Project

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Geology and the Aggregate Industry: The Role of Geologists

As compaction and cementation of these sediments eventually occur, which area will become siltstone? A) A B) B C) C D) D

MCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011

PRE-FEASIBILITY REPORT

Monday 2 June 2014 Morning

PRE FEASIBILITY REPORT

Brief Summary. Production = 4,00,000 TPA

THIS IS A NEW SPECIFICATION

Highland Lake Bathymetric Survey

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)

S.No. Particulars Details 1. Plot. No Name of Mineral Sand Stone 3. Khasra Nos. Details of village wise Khasra details are as: Name of Village

Study on Bromide in Groundwater in Parts of Nalgonda District, Andhra Pradesh

Bosl/Brac _Arnot_Gumeni Undermining Study_Stage1_InterimFinal_ docx

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT

PRE FEASIBILITY REPORT

Table 1.1 Salient Features of the Mine Site & Surrounding Details

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE

2 Aggregates in Indiana

MINING PLAN OF KUMHARI SAND MINE (ORDINARY), AREA 6.00 Ha. Gram Panchayat Kumhari, Tehsil- Arang, District- Raipur (Chhattisgarh) CHAPTER-1 GENERAL

Geology 12 FINAL EXAM PREP. Possible Written Response Exam Questions

5.11 MINERAL RESOURCES

GEOLOGY OF TODMORDEN MOOR 2 BACKGROUND

Sedimentary Rocks, our most Valuable Rocks. Or, what you will probably find when you are outdoors exploring.

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

Tuesday 6 June 2017 Afternoon

PRE - FEASIBILITY REPORT Shri Santosh Kumar Dwivedi S/o Shri Goverdhan Dwivedi R/o Village Adampur Saibasi Majre

Scout Name: Unit #: Date: GEOLOGY

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates

An Introduction to Field Explorations for Foundations

ASSESSMENT REPORT GEOLOGICAL BRANCH. 50' 23 'North. GEOLOGICAL and GEOCHEMICAL SURVEYS ON THE. PUTNAM PROPERTY (Putnam Mineral Claim)

Progress Report (Mali), November 2011 T. Jerzykiewicz (Geoclastica Consulting Ltd), W. Sliwinski (Geological Consultant)

PRE FEASIBILITY REPORT OF QUARTZ & FELDSPAR MINING PROJECT (ML No- 80/03) FOR TERMS OF REFERENCE

COAU PROPERTY LEMHI COUNTY, IDAHO

For Sale - 56 Acre Sandstone Quarry State Route 511, Oberlin/Kipton, OH 44075

ARCH 1250 APPLIED ENVIRONMENTAL STUDIES

GEOLOGIC MAPS PART II

Metal Bulletin Iron Ore Conference 22 November 2005 Koolan Island Iron Ore Project

the Quarrying Industry Dewatering and the Quarrying Industry the Quarrying Industry

Hydraulic Impacts of Limestone Quarries and Gravel Pits. Jeff Green Minnesota DNR-Division of Ecological & Water Resources

EMP. In respect of. Cluster of Two Mines (Cluster area Ha)

WE DELIVER THE USE OF RTK GPS IN BLAST OPTIMIZATION THE USE OF RTK GPS IN BLAST OPTIMIZATION THE CASE OF GOLD FIELDS GHANA LTD, TARKWA

POTENTIAL OF THE DONGWE COPPER GOLD PROJECT

Mineral Formation & Mining

WEALTH MINERALS LTD. Mackenzie Gold Project

The use of local building materials in the Baltic States Vilnius

CONTANGO ORE, INC. Contango ORE Announces Results of 2012 Exploration Program

Chapter 6 Sedimentary and Metamorphic Rock

(3) The consent letter/declaration/undertaking may have uniform signature of the lessee.

Figure 2.1: Constituent Area

CAPITAL REGION STUDY (WINNIPEG AND SURROUNDING AREAS) UPDATE AND STRATIGRAPHIC DRILLING 2002, MANITOBA by R.K. Bezys, J.D. Bamburak and G.G.

Practice Test Rocks and Minerals. Name. Page 1

QUINTETTE COAL LIMITED 1979 EXPLORATION ASSESSMENT REPORT

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

Prospecting Report 'S Office i DB Property, B.C. -J Negro Creek Nelson Mining District NTS 82F.050. Operator: Kootenay Gold Inc.

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

KRISHNA ENTERPRISES C-56, TDI City, Panipat Haryana

A Sedimentary Rock is..

Minerals in Afghanistan

NC Earth Science Essential Standards

THE OHIO JOURNAL OF SCIENCE

Amboy Iron Mines, Bristol Mountains, San Bernardino County, California. Gregg Wilkerson 2017

For personal use only

REPORT ON THE FIRST PHASE OF LIMESTONE EXPLORATION IN MANJI AREA, DHOFAR REGION, SULTANATE OF OMAN APRIL, 2011 SUBMITTED BY:

Geology and Soils. Technical Memorandum

This file was created by scanning the printed publication. Errors identified by the software have been corrected; however, some errors may remain.

MERCURY - PERSEUS TRANSMISSION LINE ENGINEERING GEOLOGICAL ASSESSMENT FOR ROUTE 1

A Sedimentary Rock is..

GEOLOGICAL MAPPING OF SKARNS ON THE SHEEP AND EWE CLAIMS, TURNAGAIN RIVER, B.C. DURING THE 1979 SUMMER SEASON

Understanding Earth Fifth Edition

Research and Reviews: Journal of Ecology and Environmental Sciences

City of Six Project. Gold Mining Property in Downieville, CA. 60 Acres of Claims. Estimated Resource of over 8,800 ounces of Gold

SWELLING POTENTIAL OF THE RESIDUAL SOIL, BASED ON PLASTICITY INDEX VALUE AT MUAROSIJUNJUNG, WEST SUMATERA

Sediment. Weathering: mechanical and chemical decomposition and disintegration of rock and minerals at the surface

1. What is the most important agent of chemical weathering on Earth? a. oxygen b. salt c. carbon dioxide d. carbonic acid e. water

Sediment and Sedimentary rock

Sedimentary Rocks. Origin, Properties and Identification. Physical Geology GEOL 101 Lab Ray Rector - Instructor

Sediment and sedimentary rocks Sediment

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

Sedimentary Rocks. Origin, Properties and Identification. Physical Geology GEOL 100. Ray Rector - Instructor

Transcription:

Project Report FOR Sand Stone Quarry at Village : Chhirraleva Tehsil : Basna District : Mahasamund

Contents 1. About the Firm... 1 2. Location of the Project... 1 3. Environmental Setting of Project... 1 4. Geology and Reserve... 2 5. Proposed Rate of Production when the Quarry is Fully Developed:... 3 6. Proposed Method of Quarrying... 3 7. Loading, Hauling/ Transport & Miscellaneous operation:-... 3 8. Use of Minerals... 4 9. Quarry Lease Area... 4 10. Project cost... 4

1. About the Firm Mr. Imran Dalla is engaged in mining & Trading of minerals. 2. Location of the Project District / State Tehsil Village Khasra No. Area Mahasamund Basna Chhirraleva 97 (P) 3.40 Hect (C.G) The area is a gently sloping territory having general slopes towards northeast. The area under proposed quarry lease is a private land and no forest land is included in the area. 3. Environmental Setting of Project The lease area located at 96 km from the District headquarter [Mahasamund] in the Village Chhirraleva (Basna). The village Chhirraleva (Basna) is approachable in all season metal roads from Saraipali and Basana as well. Drinking water is available in open well and bore-well in village Chhirraleva (Basna), near the area is potable and it is pure and clean. Nearest Railway Station is bargarh (96 Km). The proposed quarry lease is under process with Mining Department, GoCG for Quarrying of Sand Stone to the tune of 300 Tons/ Year. Details of project setting given below: Details of Project Settings S. No. Particulars Details 1 Latitude 21º23 23 N 2 Longitude 83º 58 29 E 3 Height above mean sea level 280 m 4 Nearest town Saraipali - 9.0 Km 5 Nearest Airport Raipur 130.0 Km 6 Nearest Highway NH 6 : 8.9 Km [S] 7 Nearest Village Chhirraleva (Basna) 8 Ecological Sensitive Zone -- 9 Historical Place -- Page: 1

4. Geology and Reserve In the area rocks of Chhattisgarh Supergroup & intrusives are exposed. These rocks are of Raigarh formation of Raipur Group and Chandrapur Formation of Chandrapur group of Chhattisgarh Supergroup & intrusives which are represented by sand stone, siltstone, limestone, shale and doleritic intrusion etc. However, the generalized stratigraphic sequence of the study area is given in Table below: Age Supergroup Group Formation Lithology QUATERNARY Recent to sub-recent Alluvium Sand, Silt, Clay PROTEROZOIC Chhattisgarh Supergroup Raipur Group Raigarh Formation Sand stone, limestone, Siltstone and Shale Chandrapur Group Sand stone, Siltstone Shale & Conglomarate ARCHAEAN Doleritic intrusion CHHATTISGARH GROUP: A) Raipur Group: In the area, Raigarh formation of Raipur group is exposed in major part of the study area belonging to Proterozoic age. It mainly consists of shale, limestone, and dolomite. These are generally horizontly bedded, unmetamorphosed, thinly laminated intruded by series of dolerite dyke. B) Chandrapur Group: In the area Chandrapur formation of rocks of Proterozoic age are exposed in extreme southern & eastern part of the study area. It mainly consist of Page: 2

sand stone, siltstone, quartzite and shale. These are generally horizontally bedded, affected by marginal faults and N-S trending faulted ridge. Reserve :- Mineable reserve = 900 Tons for first 3 Years Anticipated life of quarry will be: - 10 Years The working of anticipated life of quarry is on preliminary studies. QUARRYING Sand stone is covered with lateritic soil and phyllite and exposed in the old pit; open cast quarrying by manual method is to be preferred. Development and production of Lime Stone would be carried out simultaneously. Quarrying for Lime Stone would be carried out by opencast method of Quarrying and consists of following activities, namely: 1. Removal of overburden, soil & waste rocks to the dump-sites. 2. Quarrying of Lime Stone through manual excavation works. 3. Removal of mined ROM to surface yard for proper breaking, sizing, sorting, and stacking. 4. Preparing grade wise stacks of ore for delivery. 5. Proposed Rate of Production when the Quarry is Fully Developed: It will be 300 T / Year of saleable sand stone [100 m 3 / Year]. 6. Proposed Method of Quarrying The proposed method of Quarrying is by open cast method. 7. Loading, Hauling/ Transport & Miscellaneous operation:- Pit head loading of ore will be done on contract basis, after the material is shifted to surface storage yard manually. The ore is transported by trucks to the buyer's destination, on contract basis. After ore is brought to the Page: 3

storage yard, proper, stacks for sampling are prepared & subsequently ore is delivered. All these operations are manual. 8. Use of Minerals Mineral has vast utilization in cement industries & steel industries (as Fluxing Agent). 9. Quarry Lease Area Area under quarry lease = 3.40 Hect. 10. Project cost The total capital investment will be about Rs.10 Lacs for the proposed project. Page: 4