Punjab Cities Program (P156972)

Similar documents
The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Public Disclosure Copy

Public Disclosure Copy

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank Mali Reconstruction and Economic Recovery (P144442)

The World Bank Local and Regional Competitiveness Project (P154263)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

Seq No: 8 ARCHIVED on 21-May-2018 ISR30720 Created by: Raghava Neti on 04-Dec-2017 Modified by: Raghava Neti on 08-May-2018

Public Disclosure Copy

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank BiH Floods Emergency Recovery Project (P151157)

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Indonesia National Slum Upgrading Project (P154782)

EC Ibarra Transport Infrastructure Improvement Project (P147280)

Sri Lanka Strategic Cities Development Project (P130548)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Emergency Agricultural Livelihoods and Climate Resilience Project (P166328)

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank Pakistan: Third Punjab Education Sector Project (P154524)

Public Disclosure Copy

Cities and Climate Change (P123201)

The World Bank Mali Reconstruction and Economic Recovery (P144442)

Urban Water Supply Project (P156739)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

Zambia - Mining and Environmental Remediation and Improvement Project (P154683)

The World Bank Community Development Program Support Project-Phase III (P144637)

Public Disclosure Copy

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank Greater Maputo Water Supply Expansion Project (P125120)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

The World Bank Ethiopia: National Quality Infrastructure Development Project (P160279)

The World Bank Indonesia National Slum Upgrading Project (P154782)

The World Bank Regional Infrastructure Development Fund (P154947)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Cities and Climate Change (P123201)

The World Bank Earthquake Housing Reconstruction Project (P155969)

Sierra Leone Energy Access Project - Sierra Leone Infrastructure Development Fund (P126180)

SUSTAINABLE CITIES (P128605)

Public Disclosure Copy

The World Bank Transport Connectivity and Asset Management Project (P132833)

Public Disclosure Copy

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

The World Bank Dam Operational Improvement and Safety (P096532)

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738)

PAMSIMAS Support Trust Fund (P116236)

Public Disclosure Copy. Implementation Status & Results Report KH - Livelihood Enhancement and Association of the Poor Project (LEAP) (P153591)

SUSTAINABLE CITIES (P128605)

The World Bank Cusco Regional Development (P117318)

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

The World Bank Community Development Program Support Project-Phase III (P144637)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525)

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220)

The World Bank IN Maharashtra Rural Water Supply and Sanitation Program (P126325)

Public Disclosure Copy

Upper Egypt Local Development PforR (P157395)

Public Disclosure Copy

The World Bank Health System Performance Reinforcement Project (P156679)

The World Bank OECS Regional Tourism Competitiveness (P152117)

Public Disclosure Copy

The World Bank Can Tho Urban Development and Resilience (P152851)

Public Disclosure Copy. Implementation Status & Results Report Girls Education and Womens Empowerment and Livelihood Project (P151451)

Public Disclosure Copy

Public Disclosure Copy

The World Bank AF Rural Enterprise Development Program (P110407)

Public Disclosure Copy

Sustainable Low-Carbon Development in Orinoquia region Project (P160680)

Public Disclosure Copy

The World Bank Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

The World Bank Community Development Program Support Project-Phase III (P144637)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Somali Core Economic Institutions and Opportunities Program (SCORE) (P152241)

The World Bank Indonesia: Geothermal Energy Upstream Development Project (P155047)

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

Public Disclosure Copy

Seq No: 4 ARCHIVED on 12-Jun-2018 ISR32726 Created by: Pierre Joseph Kamano on 23-May-2018 Modified by: Mohamed Yassine on 07-Jun-2018

The World Bank Ghana - Maternal, Child Health and Nutrition Project (P145792)

Sindh Enhancing Response to Reduce Stunting (P161624)

Name Previous Rating Current Rating

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Cambodia Global Partnership for Education Second Education Support Project (P144715)

The World Bank. DRC Electricity Access & Services Expansion (EASE) (P156208) Key Dates. Project Development Objectives. Components.

The World Bank Ho Chi Minh City Green Transport Development (P126507)

Relaunching Agriculture: Strengthening Agriculture Public Services II Project (GAFSP - IDA) (P126744)

Public Disclosure Copy

Transcription:

Public Disclosure Authorized SOUTH ASIA Pakistan Social, Urban, Rural and Resilience Global Practice Global Practice Requesting Unit: SACPK Responsible Unit: GSU12 IBRD/IDA Program-for-Results Financing FY 2018 Team Leader(s): Shahnaz Arshad Seq No: 1 ARCHIVED on 03-Dec-2018 ISR34771 Created by: Michelle Lisa Chen on 07-Nov-2018 Modified by: Shahnaz Arshad on 01-Dec-2018 Public Disclosure Authorized Program Development Objectives Program Development Objective (from Program Appraisal Document) The objective of the Operation is to strengthen the performance of participating urban local governments in urban management and service delivery. Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO -- Satisfactory Public Disclosure Authorized Overall Implementation Progress (IP) -- Satisfactory Implementation Status and Key Decisions The Punjab Municipal Development Funds Company (PMDFC) is assisting the 16 participating Municipal Committees (MCs) to achieve the reduced set of Minimum Access Conditions specified for the first performance assessment. These require MCs to have: Updated infrastructure maps. Approved Annual Development Plans. Core locally appointed staff to operate systems. Functional websites and automated systems for managing finances, complaints, and performance. Environment and social management focal persons; systems for preparation, approval, and supervision of investments; and capacity to develop and implement environment and social management instruments. Achievement of these results, once duly verified, will lead to the successful MCs receiving the first Performance-Based Grant. Public Disclosure Authorized Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P156972 IDA-62430 Effective USD 200.00 200.00 0.00 0.00 192.51 0% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P156972 IDA-62430 Effective 25-May-2018 29-May-2018 29-May-2018 30-Sep-2023 30-Sep-2023 12/4/2018 Page 1 of 10

Program Action Plan 1. PMDFC will conduct workshops to sensitize and inform all Program MCs about PCP, MACs, PMs, PBGs, and the IPF Window. LG&CDD/PMDFC No 21-Jan-2019 Not Yet Due LG&CDD and PMDFC have been interacting frequently with elected representatives and appointed officials of Program MCs. A formal Program Launch Workshop with all MCs is planned after PC-I approvals by the Government. 2. MCs will fully operationalize systems developed under PMSIP. No disbursement will be made to any defaulting MC against the achievement of reduced MACs. MCs Yes YEARLY MCs have achieved MACs In Progress PMDFC is assisting MCs in getting all systems developed under PMSIP to become fully operational. This will be verified during the assessment of the reduced MACs, and all APAs thereafter. 3. FD will ensure that PBG disbursements to MCs are fully integrated into the provincial budget and released to cities within 30 days of disbursement by the Bank. Failing this, further Program disbursements will be suspended. Finance Department Yes YEARLY Not Yet Due The first PBG disbursement is yet to take place. 4. MCs will report on grant funds utilization through required biannual and annual reporting processes, using customized Chart of Accounts for new conditional grants in budget, and expenditure recording second year onwards LG&CDD and Finance Department Yes SEMIANNUAL Not Yet Due The first PBG disbursement is yet to take place. 5. The APA will report on implementation status and compliance with environmental and social management and investments. LG&CDD and APA Firm Yes YEARLY Not Yet Due The APA cycle has not yet been initiated. 12/4/2018 Page 2 of 10

6. LG&CDD will procure an independent private firm for APA (annually or on multiyear contract), and ensure adherence to PBG disbursement cycle. LG&CDD Yes YEARLY Not Yet Due Delayed government approvals are impacting procurement of the APA firm. While the action is not yet due, further delays in PC-I approvals could lead to the APA agency not being engaged within the prescribed period (within 6 months of Effectiveness). 7. MCs will seek guidance on environmental and social management system as described in the POM, which is consistent with provincial systems and principles. LG&CDD and PMDFC Yes CONTINUOUS Not Yet Due 8. Appointment of Environmental Specialists and Social Development Specialists for each PMDFC team (Lahorebased team plus three regional teams). PMDFC Yes CONTINUOUS Not Yet Due Delay in PC-I approvals and release of funds to PMDFC is impacting recruitment of specialists by PMDFC. 9. Technical staff in MCs trained on O&M Manuals as part of sensitization conducted by the LG&CDD/ PMDFC. LG&CDD and PMDFC Yes CONTINUOUS Not Yet Due 10. LG&CDD/LGB will appoint qualified officials to fill vacancies in provincially appointed MC positions. LGB and LG&CDD Yes CONTINUOUS Delayed The change in government and turnover of key counterparts at LGB and LG&CDD has delayed appointment of officials against provincially appointed MC positions. 12/4/2018 Page 3 of 10

11. Tenure of provincially appointed officials will be maintained by LG&CDD/LGB for at least 3 years, except for exceptional cases. LGB and LG&CDD Yes CONTINUOUS Not Yet Due 12. DG District Audit, Punjab will ensure that audits of financial statements of the 16 MCs are conducted, and reports shared with the Bank not later than October 30 each year. A private audit firm may be used in the initial years. DG District Audit/Private Firm Yes YEARLY Not Yet Due 13. MCs will maintain focal persons for finance, planning, internal audit, accounting, procurement, and complaint handling throughout implementation. MCs Yes CONTINUOUS In Progress 14. MCs will provide bi-annual and annual reports on financial and Program implementation, safeguard management, grievance redress, and other relevant information. MCs and PMDFC Yes SEMIANNUAL Not Yet Due 15. MCs will appoint focal persons for Environment and Social Management. MCs Yes CONTINUOUS In Progress 16. MCs will adopt and implement the updated Environmental and Social Management Framework (ESMF). 12/4/2018 Page 4 of 10

PMDFC and MCs Yes CONTINUOUS Not Yet Due 17. MCs will update and implement the following already developed under PMSIP: (a) Communication Strategy (b) Public Consultation Framework PMDFC and MCs Yes CONTINUOUS In Progress 18. MCs will develop, notify, and implement SOPs for Physical Cultural Resources and Health, Safety, and Environment. PMDFC and MCs Yes CONTINUOUS Not Yet Due 19. MCs will improve enforcement of labour and gender-related laws. PMDFC and MCs Yes CONTINUOUS Not Yet Due 20. MCs will ensure generation and monitoring of environmental data, and coordination with relevant agencies. PMDFC and MCs Yes CONTINUOUS Not Yet Due 21. Institutional strengthening of LG&CDD/LGB PMDFC No 31-May-2019 Not Yet Due 12/4/2018 Page 5 of 10

Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial -- Substantial Macroeconomic Substantial -- Substantial Sector Strategies and Policies Moderate -- Moderate Technical Design of Project or Program Moderate -- Moderate Institutional Capacity for Implementation and Sustainability Moderate -- Moderate Fiduciary Substantial -- Substantial Environment and Social Substantial -- Substantial Stakeholders Low -- Low Other Moderate -- Moderate Overall Substantial -- Substantial Results PDO Indicators by Objectives / Outcomes PDO Indicator 1 IN00648032 Score in the APA for achievement of institutional performance measures, averaged across all MCs that qualify. (Number, Custom) Value 0.00 -- 0.00 60.00 PDO Indicator 2 IN00648033 People living in targeted cities benefiting from municipal service delivery infrastructure created or rehabilitated under the Program. (Number, Custom) Value 0.00 -- 0.00 1,000,000.00 12/4/2018 Page 6 of 10

IN00648067 PDO Indicator 2.a. Of which female (Supplemental) (Percentage, Custom) Value 0.00 -- 0.00 50.00 Intermediate Results Indicators by Results Areas IR Indicator 1.1 IN00648034 MCs with the full set of enhanced e-governance systems operationalized. (Number, Custom) Value 8.00 -- 8.00 16.00 IN00648035 IR Indicator 1.1.a. Performance Management System (Supplemental) (Number, Custom) Value 8.00 -- 8.00 16.00 IN00648071 IR Indicator 1.1.b. Computerized Financial Management System (Supplemental) (Number, Custom) Value 8.00 -- 8.00 16.00 IN00648068 IR Indicator 1.1.c. Complaint Tracking System (Supplemental) (Number, Custom) 12/4/2018 Page 7 of 10

Value 8.00 -- 8.00 16.00 IR Indicator 1.2 IN00648069 MCs with Infrastructure Maps updated under the Program. (Number, Custom) Value 0.00 -- 0.00 10.00 Date 29-May-2018 -- 15-Nov-2018 31-May-2023 IR Indicator 1.3 IN00648054 MCs with IDAMPs developed and adopted, ensuring consultation with women groups. (Number, Custom) Value 0.00 -- 0.00 5.00 IR Indicator 1.5 IN00648055 MCs with at least 10% increase in OSRs. (Number, Custom) Value 0.00 -- 0.00 5.00 IR Indicator 1.4 IN00648042 MCs with timely audits conducted of annual financial statements and no adverse or disclaimed audit opinion. (Number, Custom) Value 0.00 -- 0.00 16.00 12/4/2018 Page 8 of 10

IR Indicator 1.6 IN00648076 Annual performance assessment of Program MCs conducted on time. (Text, Custom) Value No APAs conducted -- No APAs conducted APAs conducted per annual schedule. IR Indicator 2.1 IN00648043 Percentage of local infrastructure targets as set out in the annual work plans delivered by MCs utilizing Program funds. (Percentage, Custom) Value 0.00 -- 0.00 80.00 IR Indicator 2.2 IN00648044 Percentage of infrastructure contracts with gender responsive working conditions (Percentage, Custom) Value 0.00 -- 0.00 80.00 IR Indicator 2.3 IN00648045 MCs that execute at least 80 percent of their annual O&M budget. (Number, Custom) Value 0.00 -- 0.00 10.00 12/4/2018 Page 9 of 10

Disbursement Linked Indicators DLI_IND_TABLE DLI 1 MCs have achieved MACs (Process, 45.00, 0%) Baseline Actual (Previous) Actual (Current) Fourth APA Value 0.00 -- NA X MCs have complied with MACs Date -- -- 15-Nov-2018 -- DLI 2 MCs have achieved PMs as scored in the APA (Process, 135.00, 0%) Baseline Actual (Previous) Actual (Current) Fourth APA Value 0.00 -- 0.00 70.00 Date -- -- 15-Nov-2018 -- 12/4/2018 Page 10 of 10