Southern California Edison ESRB-8 Report Regarding Pro-Active De-Energization Event December 29 to January 1, 2019

Similar documents
PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES

Southern California Edison Wildfire Mitigation & Grid Resiliency

MULTI-AGENCY COORDINATION SYSTEM PUBLICATION CALIFORNIA FIRE WEATHER PROGRAM RISK PREPAREDNESS GUIDE MACS 410-3

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects

2003 FIRE SIEGE CAUSES, RESPONSE AND RECOVERY

Director, Operations Services, Met-Ed

SITUATION REPORT #7 September 8 th, 2017

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Massachusetts Electric Company Nantucket Electric Company d/b/a National Grid

Wednesday, March 30, 2016

Circuit Reliability Review

TXWARN Tabletop Exercise: Hurricane Helen

UDOT Weather Program Traffic Operations Center

Temporary College Closure Due to Inclement Weather or Other Adverse Conditions.

Comprehensive Emergency Management Plan

BVES Annual Reliability Public Presentation 2016 Performance

PSEG Long Island LLC 111 Eighth Avenue, 13th Floor New York, NY 10011

SONOMA COUNTY FIRE TIMELINE. November 1, 2017

Winter Storm Saturday into Sunday December 14-15, 2013

May 31, Flood Response Overview

Extreme Temperature Protocol in Middlesex-London

Situation Report KC#56896 Winter Storm 3/13-15/2017 Pennsylvania Emergency Management Agency

West Hollywood General Plan

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

2014 San Gabriel Valley Water Forum. October 2, 2014

A HURRICANE IS COMING. Presented by Atiba Upchurch Broward Emergency Management Division

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Heidemarie C. Caswell

Parish of Ascension. ASCENSION PARISH SITUATIONAL REPORT 06 August 2008 As of: 1600 Hours

WELCOME TO THE 2018 RA-IV WORKSHOP ON HURRICANE FORECASTING AND WARNING

Smoke Fog Superfog - Smoke and Fog mixture Heavy rain and wind

Winter Storm Briefing #3 Monday Evening Wednesday Evening

IWT Scenario 2 Integrated Warning Team Workshop National Weather Service Albany, NY October 31, 2014

CALIFORNIA GOVERNOR'S OFFICE OF EMERGENCY SERVICES CAL OES CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE PROTECTION CAL FIRE

SITUATION REPORT: February 2018 Ohio River Flooding

Weather forecasts and warnings: Support for Impact based decision making

Issued by: National Weather Service San Joaquin Valley - Hanford CA. Issue time: 409 AM PST Wed Jan

Weather Briefing Mixed Winter Storm Event February 26-27, 2013

Tropical Update. 5 PM EDT Tuesday, September 5, 2017 Hurricane Irma, Tropical Storm Jose, and Tropical Depression Thirteen

SPEARFISH FIRE DEPARTMENT POLICIES AND PROCEDURES

California OES Weather Threat Briefing

Winter Ready DC District of Columbia Public Service Commission

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

2014 Annual Mitigation Plan Review Meeting

City of Punta Gorda Community Emergency Management Plan 2013

Paul Rooney 5/31/16 Paul Rooney Assistant Vice President of Operations Valencia College

Monday, November 19, :30 a.m. EST

GUIDELINES FOR FILMING IN TOMBALL, TEXAS

Daily Operations Briefing. Wednesday, December 20, :30 a.m. EST

Attachment A. Page 1 of 15

Saturday, November 17, :30 a.m. EST

South African Weather Service. Description of Public Weather and Warning Services. Tshepho Ngobeni. 18 November 2013

School Cancellation Procedures Due to Extreme Weather Conditions

Daily Operations Briefing Friday, November 11, :30 a.m. EST

CITY OF LOS ANGELES EXTREME HEAT AND COLD ANNEX

Standard Operating Procedure

Critical Results from Severe Weather Monitoring and Notification. (Three Case Studies)

Press Release. March 12, 2018

Daily Operations Briefing Friday, January 13, :30 a.m. EST

WHAT HAPPENS WHEN A TORNADO STRIKES THE COMMUNITY? Carroll County Sheriff s Office Emergency Management

Tropical Update. 11 AM EDT Tuesday, October 9, 2018 Hurricane Michael, Tropical Storm Leslie, Tropical Storm Nadine

Oklahoma Department of Emergency Managment. Crisis Communications

WINTER STORM Annex II

Nor easter Monday Night Wednesday December 8 10, 2014

Tropical Update. 5 AM EDT Wednesday, September 6, 2017 Hurricane Irma, Tropical Storm Jose, and Tropical Storm Katia

CLEA# Approved Date: Feb Revision Date: Aug 02, May06, Mar08, Jan 09 New ( ) Amends ( ) Rescinds ( ) Pages:

Daily Operations Briefing

A Prepared Marylander Creates a Resilient Maryland

Tropical Update. 5 PM EDT Thursday, September 7, 2017 Hurricane Irma, Hurricane Jose, and Hurricane Katia

Hurricane Sandy October 28 th 31 st 2012

Safety Matters C ENTENNIAL SCHOOL DISTRICT

Tropical Update. 5 AM EDT Thursday, September 7, 2017 Hurricane Irma, Hurricane Jose, and Hurricane Katia

A Complex Weather System: Tuesday Afternoon into Thursday March 3 5, 2015

PROCEDURE NO.: SO5-2-6 PAGES: 1 OF 10 CHIEF SYSTEM OPERATOR

VISIT MISSISSIPPI GULF COAST CRISIS COMMUNICATION MANUAL 2016

Tropjcal Cyclone Warning and Response Mulipola A. Titimaea (ACEO-Met) Filomena Nelson (ACEO-Disaster Management

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

NWS Resources For School Districts

Region IX Daily Situational Awareness Report (DSAR) As of 0900 PDT, Monday, October 05, 2015

Tahlequah Public Schools Inclement Weather Transportation Plan

Superstorm Sandy What Risk Managers and Underwriters Learned

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response

Region IX Daily Situational Awareness Report (DSAR) As of 0900 PDT, Saturday, September 19, 2015

SNOW CONTROL OPERATIONS

Daily Operations Briefing. Sunday, October 22, :30 a.m. EDT

Very Dangerous Coastal Storm Sandy October 28 th 31 st 2012

Responders Organized for Pass Emergencies (ROPE)

WEATHER SYSTEMS IMPACTING THE CAYMAN ISLANDS Prepared by the staff of the Cayman Islands National Weather Service

KEELE UNIVERSITY SNOW AND SEVERE WEATHER MANAGEMENT PLAN

Innovative Decision Support Services for the 27 February 2011 Wildfire Outbreak Across the Texas Panhandle. Michael Scotten NOAA/NWS Amarillo, Texas

Daily Operations Briefing Friday, November 25, :30 a.m. EST

Daily Operations Briefing. Tuesday, January 9, :30 a.m. EST

Remote Sensing and Sensor Networks:

Tropical Update. 5 AM EDT Tuesday, September 12, 2017 Post-Tropical Cyclone Irma, Hurricane Jose, & Tropical Wave (10%)

2018 VACO Achievement Awards Nomination Summary York County, Virginia. In 2017, the York County Department of Fire and Life Safety/Office of


Winter Weather. Naval Station Great Lakes Winter Season

Tropical Update. 5 PM EDT Sunday, September 10, 2017 Hurricane Irma, Hurricane Jose, Tropical Wave (60%)

Preliminary Summary Report of Serious or Near Serious CAL FIRE Injuries, Illnesses and Accidents GREEN SHEET. Near Serious Accident 12/9/2017

Daily Operations Briefing Friday, January 20, :30 a.m. EST

Transcription:

Southern California Edison Submitted to: California Public Utilities Commission Director of the Safety and Enforcement Division January 15, 2019

Southern California Edison (SCE) submits the following report to the California Public Utilities Commission s Director of the Safety and Enforcement Division pursuant to Resolution ESRB-8 reporting requirements applicable to a proactive de-energization event. In separate sections of this report, SCE sets forth the reasons for its decision to notify and de-energize customers utilizing the Public Safety Power Shut-Off protocol, day-by-day background for the events leading up to de-energization, and responds to the specific questions set forth by ESRB-8. SCE s Decision to Notify and De-energize Customers SCE s decision to notify and de-energize customers utilizing the Public Safety Power Shut-Off (PSPS) protocol during this event was based on many factors including forecasted wind speeds, the Fire Potential Index (which includes but is not limited to the status of native grasses, fuels, fuel moisture, wind speeds, humidity, and dew point depression), National Weather Service Watches and Warnings issued for the service territory, and the interest of public safety over the New Year s Eve holiday. Background Event Timeline December 29, 2018 to January 1, 2019 Friday, December 28, Southern California Edison (SCE) meteorologists notified the SCE Business Resiliency Duty Manager (BRDM) and other SCE personnel of forecasts predicting high winds and increased fire potential across the SCE service territory beginning late Monday, December 31, 2018 into late Tuesday, January 1, 2019. Per the SCE Wildfire Response Plan, an internal situational awareness call was scheduled for the next day. Saturday, December 29, SCE Business Resiliency conducted a situational awareness call regarding the predicted weather event and to discuss the need for an Incident Management Team and Incident Support Team to be activated. The decision was made to activate an Incident Support Team and Incident Management Team on Sunday, December 30, 2018 at 7:00 a.m. at the SCE Emergency Operations Center (EOC). Notifications were made to local government and public safety agencies in potentially affected counties, to the California Public Utilities Commission, and to the California State Warning Center that SCE would be monitoring the weather event to determine the need for proactive de-energization. Sunday, December 30, SCE meteorologists used the variables of forecasted wind gusts, SCE s internal Fire Potential Index criteria (which utilizes the state of native grasses, live fuel moistures, wind speeds, dew point depression, humidity, and other factors) and the National Weather Service Fire Weather Watch for the Los Angeles and Santa Monica mountains for Tuesday, January 1 to Wednesday, January 2, 2019, to identify circuits for monitoring during the weather event. This methodology initially identified a total of 55 circuits across parts of Los Angeles, Orange, Riverside, and San Bernardino counties. Given this information, SCE notified local government and public safety agencies in affected counties, the California Office of Emergency Services (CalOES) Warning Center, and other government stakeholders of the potential areas of impact. SCE also began initial notifications to the 74,564 customers served by 2 P a g e

those circuits at approximately 3:00 p.m., December 30. During this initial notification push, some customers in the West Hollywood, Beverly Hills, and Riverside areas were notified in error that they were on circuits that would be monitored for PSPS. This occurred due to some personnel inadvertently accessing an out-of-date Monitored Circuit List. Government partners were notified that some customers in their areas received these erroneous notifications. Impacted customers received correction notifications when the error was discovered. Monday, December 31, SCE meteorologists refined the Monitored Circuit List adding and removing circuits based on decreasing wind thresholds, updated FPI ratings, and evaluation of circuit specifics in several districts. This methodology identified a final total of 38 circuits across parts of Los Angeles, Orange, Riverside, and San Bernardino Counties to be monitored from 8:00 p.m., December 31 to approximately 12:00 p.m., January 1. SCE updated county emergency managers, first responders, and other government stakeholders of changes to the Monitored Circuit List. SCE also began status notifications to the 50,759 customers associated with the reduced circuit total at approximately 2:00 p.m. on December 31. Additionally, as an added precaution for public safety, the decision was made to enable Fast Curve Settings on circuit breakers and remote automatic reclosers (RAR) in the identified areas. These settings were applied before the onset of predicted high winds. Tuesday, January 1, High winds continued overnight on December 31 through the morning of January 1. Given these conditions, as well as real time observations in the field of conditions that posed a public safety risk, the Incident Support Team Incident Commander made the determination to de-energize a portion of one circuit in Orange County as detailed below. All of the customers on this circuit had received prior notification of a possible de-energization event. Notifications of de-energization were also made to Orange County local government and public safety agencies, the Safety and Enforcement Division of the CPUC as required, and the CalOES Warning Center as requested. Taiwan 12kV Circuit-Orange County, out of the Moderna Substation in the city of Orange, was proactively de-energized at 2:27 a.m. on January 1 after observations in the field identified wind gusts of 62 mph in the affected area posing a significant fire risk. A total of 34 customers, mostly commercial, were affected, with no critical care or essential customers impacted. After winds abated, appropriate re-energization protocols were applied, repairs were made, and power was restored at 5:08 p.m. on January 1. On January 1 at approximately 7:00 a.m., the Incident Support Team Incident Commander began removing circuits from the Monitored Circuit List based on improving weather conditions. As of 12:00 p.m. on the afternoon of January 1, there were no circuits remaining on the Monitored Circuit List and the Incident Management Team was demobilized. 3 P a g e

Response to ESRB-8 Questions The following material addresses Resolution ESRB-8 requirements in each of the five categories associated with notifications. 1. The local communities representatives contacted prior to de-energization, the date on which they were contacted, and whether the areas affected by the de-energization are classified as Zone 1, Tier 2, or Tier 3 as per the definition in General Order 95, Rule 21.2-D SCE maintained ongoing communications with counties and cities affected throughout the duration of the weather event ending January 1. Additionally, PDF maps and electronic mapping files for affected areas were sent to all potentially impacted County Offices of Emergency Management. The following table illustrates when initial contact was made to the appropriate community. Table 1 - Initial Communications to Local Communities Community/Representative Date Zone 1 Tier 2 Tier 3 State/Regulatory Agencies California Public Utilities Commission 12/29/18 California Office of Emergency Services 12/29/18 California State Warning Center 12/29/18 Los Angeles County X X X LA County Office of Emergency Management 12/29/18 City of San Fernando 12/30/2018 City of Beverly Hills 12/30/2018* City of Covina 12/30/2018 Culver City 12/30/2018 City of Glendora 12/30/2018 City of Industry 12/30/2018 City of San Dimas 12/30/2018 City of Santa Clarita 12/30/2018 City of Walnut 12/30/2018 City of West Covina 12/30/2018 City of West Hollywood 12/30/2018* Orange County X X Orange County Office of Emergency Management 12/29/18 City of Irvine 12/30/2018 City of Lake Forest 1/1/2018 City of Orange 12/30/2018 City of Rancho Santa Margarita 1/1/2019 City of Villa Park 12/30/2018 Riverside County X X Riverside County Office of Emergency Management 12/29/18 4 P a g e

Community/Representative Date Zone 1 Tier 2 Tier 3 City of Corona 12/30/2018 City of Jurupa Valley 12/30/2018* City of Norco 12/30/2018 City of Riverside 12/30/2018* San Bernardino County X X San Bernardino County Office of Emergency 12/29/18 Management City of Fontana 12/30/2018 City of Rancho Cucamonga 12/30/2018 City of Rialto 12/30/2018 City of Upland 12/30/2018 *These municipalities received notification that some residents in their cities may have received a notification in error. SCE provided informational updates to the public during the weather event through SCE s Energized by Edison website (see Table 2 below), SCE.com, media interviews and social media. A total of seven media inquiries were received. Interviews were conducted with two radio stations - KPCC and KNX and SCE provided information on the weather event to the Ventura County Star, KCBS, KNBC, City News Service and Spectrum. SCE leveraged social media to share information regarding the weather event, including launching Public Safety Power Shutoff and wind safety ads on Twitter and Facebook/Instagram. The ads for PSPS were geo-targeted and focused on notifying customers that their area was under consideration for a PSPS. Geo-targeted ads were also launched when cities were removed from PSPS consideration. The PSPS ads generated more than 1.1 million impressions on Facebook/Instagram and more than 354,000 impressions on Twitter. Our safety ads generated over 590,000 impressions on Facebook/Instagram and 147,000 impressions on Twitter. The following table illustrates initial publishing of a news article that was updated on our Energized by Edison website as new information became available: Table 2 - Communications to Media/Public Outreach Outlet Date Article Name Energized by Edison Dec. 31, 2018 SCE Crews Prepared for Southern California Winds 5 P a g e

Energized by Edison Jan. 1, 2019 SCE Crews Prepared for Southern California Winds (Updated) SCE Crews Prepared for Southern California Winds (Updated) 2. If unable to provide customers with notice at least 2 hours prior to the de-energization event, provide an explanation in its report. Not applicable. All customers who were proactively de-energized during the reporting period received timely notifications. 3. Summarize the number and nature of complaints received as the result of the deenergization event and include claims that are filed due to de-energization. Customer 1- The City of Corona reached out to their key account representative and expressed concern, as this was the first time they had received notification of a potential PSPS in their jurisdiction. The key account representative and Local Public Affairs explained the potential impact of de-energizations in more detail to the caller. 4. Provide a detailed description of the steps taken to restore power. The circuit proactively de-energized during this event was evaluated under the following criteria before it was re-energized: o Wind (sustained and gusts) must be at 20% below threshold for the circuit for at least two hours and not predicted to escalate for the next 48 hours; o Field conditions must validate that no winds near or above threshold exist; o Circuit must be physically patrolled end-to-end for damage; o Any damage found on the circuit must be isolated and/or repaired; o Incident Commander (IC) in consultation with Grid Operations makes the determination to re-energize or leave de-energized based on applicable criteria; and o Grid Operations physically re-energizes the circuit once approved by the IC. 5. Identify the address of each community assistance location during a de-energization event, describe the location (in a building, a trailer, etc.), and describe the assistance available at each location, and give the days and hours that it was open. Not applicable. SCE did not establish any stand-alone community assistance locations directly related to this de-energization event. 6 P a g e