ENVIRONMENTAL MANAGEMENT PLAN

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

lit)'*'" m ( Reft- Representation received from M/s. Kasturi Granites and Exports, Proprietor Smt. C. Kasturibai Dated:

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

Over an extent of Hectares in Sy. No. 01 of Kachavaram (V), Ibrahimpatnam (M), Krishna District, Andhra Pradesh State

THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

Lessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist.

Figure 2.1: Constituent Area

MCDR INSPECTION REPORT

Over an extent of 9.28 Acres in Sy. No. 72 / P of Jangameswarapuram (V), Martur (M), Prakasam District, Andhra Pradesh State

FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY

NOA ASSESSMENT HARRIS QUARRY MENDOCINO COUNTY, CALIFORNIA TABLE OF CONTENTS

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE

KRISHNA MERCHANTS PVT. LTD.

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

2013 GEOLOGICAL ASSESSMENT REPORT SHERIDAN HILL PROPERTY

APPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office

GROUNDWATER CONFIGURATION IN THE UPPER CATCHMENT OF MEGHADRIGEDDA RESERVOIR, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)

Flash flood disaster in Bayangol district, Ulaanbaatar

Submitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL

TABLE 1: Salient features of the project. Black Granite Mine of Sri D. Rama Rao GCP LATITUDE (N) LONGITUDE (E)

Roadmap to Stability

KANSAS GEOLOGICAL SURVEY Open File Report LAND SUBSIDENCE KIOWA COUNTY, KANSAS. May 2, 2007

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project.

Of Sri. Mohammad Akram. At Karigala Village, H.D. KoteTaluk, Mysore District, Karnataka Latitude & Longitude Piller Latitude Longitude Coordinates

ADDENDA #1 CONTRACT # C May 3, 2013 Page 1 of 1

Geology and the Aggregate Industry: The Role of Geologists

Materials. Use materials meeting the following.

Topographical Maps ANSWER KEY- Assignment 6

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT

about GCC

INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY

MINING PLAN FOR QUARTZ & FELDSPAR

M/s BENITA INDUSTRIES LIMITED

1.0 PURPOSE AND FORMAT OF THE FINAL EIR

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Woodford County Erosion Prevention Plan and Permit. Application #

UNIT 11 SOUTH ASIA SG 1 - PHYSICAL GEOGRAPHY & THE ENVIRONMENT

TECHNIQUES FOR ASSESSING COASTAL HAZARD AREAS FOR THE GISBORNE DISTRICT COAST

AGENDA ITEM 6 APPENDIX /0151/DET GROUND WATER & SURFACE WATER MANAGEMENT PLAN

Fukien Secondary School Monthly Vocabulary/Expression List for EMI Subjects Secondary Two. Subject: Geography

BOY SCOUTS GEOLOGY MERIT BADGE

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare)

Land subsidence due to groundwater withdrawal in Hanoi, Vietnam

(FOR THE ENSUING BALANCE 2 YEARS PERIOD i.e to ) (UPTO END OF LEASE PERIOD ) For

Smt. M. Hari Chandana

HUDSON BAY MINING AND SMELTING CO., LIMITED FLIN FLON TAILINGS IMPOUNDMENT SYSTEM. Dust Control Guidelines

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT. ESTIMATED COST : Rs

A Remote Sensing and GIS approach to trace the Densification in Residential Areas

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,


Landscape evolution. An Anthropic landscape is the landscape modified by humans for their activities and life

Impact of the Danube River on the groundwater dynamics in the Kozloduy Lowland

AGRICULTURAL LAND CLASSIFICATION ST HELENS UDP BIRCH TREE FARM (SITE 33)

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Prof. Stephen A. Nelson EENS 111. Groundwater

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Name. 4. The diagram below shows a soil profile formed in an area of granite bedrock. Four different soil horizons, A, B, C, and D, are shown.

Environmental Science Institute The University of Texas - Austin

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

Chapter 11. Rivers: Shaping our landscape

VILLAGE INFORMATION SYSTEM (V.I.S) FOR WATERSHED MANAGEMENT IN THE NORTH AHMADNAGAR DISTRICT, MAHARASHTRA

Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study

GOVERNMENT OF NEPAL MINISTRY OF IRRIGATION GROUND WATER RESOURCES DEVELOPMENT BOARD BABARMAHAL, KATHMANDU, NEPAL

CHAPTER 07 CANAL DESIGN

JAI MAA SHARDA STONE CRUSHING

1.1 INTRODUCTION. EMP Report For 3.30 Ha. of Feldspar &, Quartz Mine located in Budharam village, Gopalpet Mandal, Wanaparthy District, T.S.

April 9, Phosphate Mining and Reclamation Overview

24.0 Mineral Extraction

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

& ADJOINING QUARRY LEASE AREA Lease Name Extent- Ha

Your web browser (Safari 7) is out of date. For more security, comfort and the best experience on this site: Update your browser Ignore

[Penumaka, 7(1): January-March 2017] ISSN Impact Factor

MAFF Ministry of IfiriLE Agriculture Fisheries and Food

SITE SELECTION CRITERIA FOR A SOLAR PV PLANT. Under The Guidence of SOHEL PATEL

Laboratory Exercise #4 Geologic Surface Processes in Dry Lands

FOREST RESEARCH INSTITUTE, DEHRADUN

INDEX. Environmental Management Plan

Transcription:

ENVIRONMENTAL MANAGEMENT PLAN Of GRAVEL & BUILDING STONE QUARRY For Sri Prathipati. Ram Prasad 1.235 HA GRAVEL & BUILDING STONE QUARRY SY. NO. 860, Vedurupavuluru (V), Gannavaram(M), Krishna(DT), ANDHRA PRADESH Submitted by P.V.SATYANARAYANA & HAMPANNA GOUD Consultant Geologist & RQP Regn.No. RQP / DMG/ AP/ 34/ 2017 Lattice It Bommasani Sadhan, 2nd Floor, Near One Center,Gollapudi, Vijayawada -521225 Ph No-8610692941

INTRODUCTION Sri Prathipati Ram Prasad has filed an application for grant of quarry lease for Gravel, Building Stone, over an extent of 1.235 Hectares in Sy No. 860, of Vedurupavuluru Village, Gannavaram Mandal, Krishna District, Andhra Pradesh, for a period of 10 years. The same was received by the Asst. Director of Mines and Geology, Vijayawada on 15.10.2013. The Assistant Director of Mines and Geology, Vijayawada submitted proposals on the application filed by Sri P. Ram Prasad duly recommending for grant of Quarry Lease for gravel & Building Stone over an extent of 1.235 Hectares in Sy No. 860, of Vedurupavuluru Village, Gannavaram Mandal, Krishna District, Andhra Pradesh, for a period of 10 years. The mining plan is prepared under G.O.Ms.56, I&C (Mines-II), Dt: 30.04.2016 of AP for obtaining the Environmental Clearance (EC) from State Environmental Impact Assessment Authority (SEIAA) & annual production plan under semi mechanized open cast method of mining under Rule 7(A) of APMMCR 1966. The Mining Plan was approved by the Deputy Director Of Mines & Geology, Kakinada vide letter No. 4052/Q3/2018, Dated: 31.01.2019 2

The mine lease area falls under the Toposheet No. 65D/14 bearing following Toposheet details: S.No. Latitude Longitude 1. N16 33'55.42" E080 45'09.40" 2. N16 33'51.29" E080 45'17.20" 3. N16 33'50.57" E080 45'11.63" 4. N16 33'51.94" E080 45'11.36" LOCATION OF THE MINE The applied area falls in the Toposheet No. 65D/14. The quarry lease area is spread over in Survey No. 860, of Vedurupavuluru Village, Gannavaram Mandal, Krishna District, Andhra Pradesh. State Transport bus services ply from Nuzivid to Gannavaram towns frequently. Private transport is also available on this road network. Primary & Upper primary school education is available at Gannavaram & Vijayawada. Higher education is available at Vijayawada. Introduction of the Project Land The Quarry Lease for Gravel & Building Stone over an extent of 1.235 Hectares/ 3.05 Acres in Sy. No. 860, of Vedurupavuluru Village, Gannavaram Mandal, Krishna District, Andhra Pradesh. Location 1.235 Hectares of Gravel & Building Stone Quarry, Sy.No.860, Vedurupavuluru Village, Gannavaram Mandal, Krishna Dt, Andhra Pradesh. The present mining lease area falls in the Government land from Vedurupavuluru at a distance of 3.2 Kms from the Quarry Lease Area. 3

Boundaries: North : Hill Area & Agricultural Lands. East : Othersquarrylease &HillArLands West : Hill Area & Agricultural Lands South : NunnaRoad&AgriculturalLands.. The Salient Features of the proposed project Nature of the project Sri P.Ram Prasad Mining of Gravel & Building Stone Quarry Size of the Project 1.235Ha Production 31,390.4 M 3 /annum. LOCATION OF PROJECT District & State Krishna District, Andhra Pradesh Village & Mandal Vedurupavuluru Village, Gannavaram Mandal Land Availability 1.235 Ha. Nearest Village Vedurupavuluru at a distance of 3.2 Km Ownership Government Land Toposheet No. 65D/14 GENERAL CLIMATIC CONDITIONS Annual rainfall 1,000 mm Min and max temp. 25 C and 48 C Avg. relative humidity 75% Predominant wind direction WE & NS HISTORICAL / IMPORTANT PLACES Nearest human settlement Nearest town Nearest railway station Archaeological /Historically Important Site Sensitive Places Sanctuaries / National parks The Nearest Village Vedurupavuluru is situted 3.2 km due SW. Gannavaram at a distance of 6.5 Kms Gannavaram is the Nearest Railway Station is about to 7km from this Q.L.applied area. None within 10 km radius of the site Hospitals, schools and community facilities are available at Vedurupavuluru village& Gannavaram Mandal None within 10 km radius of the site. 4

GOOGLE MAP AROUND 10 KM RADIUS 5

TOPO MAP AROUND 05 KM RADIUS 7

DETAILS OF THE MINE Mine Area This mine lease (ML) area is located in government land and the Quarry Lease for Gravel & Building Stone over an extent of 1.235Hectares/ 3.05 Acres in Sy. No. 860, of Vedurupavuluru Village, Gannavaram Mandal, Krishna Dt, Andhra Pradesh. The quarry lease applied area is located southern part of Small hillock, over the gravel & building stone outcrop with a maximum elevation of 75M above ground level. The lowest & highest contours is 30M and 105M. Regional Geology The subject area is physiographical small hillock area. The area is constituted of naturally occurring gravel. The area constitutes southernmost part of Eastern Ghat Mobile Belt (EGMB), where the belt is tapering to less than 20 km width. EGMB is trending in NNE SSW in the area. They consist of Gollanapally sandstone, fluvial geological formation, quartz, k-feldspar, and garnet, and silliminite, graphite, with or without corundum. In the Northeastern part, a number of calc granulite and quartzite bands are present, within khondalite. Rocks of Upper Gondwana Group of the Gondwana Super group, comprising Tirupati Sandstone, Gollapalle/Chintalapudi Sandstone and Kamthi Sandstone are exposed north, northwest and east of Nuzivid. These rocks trend NE-SW with 200 dip towards SE Unconformably overlaying the Gondwana rocks is a small patch of Rajahmundry Sandstone, occurring NE of Nuzividu. The sandstone is brick red in colour and contains nodules of clay. Major part of the district in the southern part is represented by the alluvial plains forming the Krishna delta. The river Krishna and its tributaries have contributed to the formation of this alluvial plain. There is no significant surface drainage in these alluvial plains. The delta is relatively a flat area. The alluvial plains along the major course of rivers form the flood plain deposits. The coastal and deltaic alluvial plain extends from Challapalli on the west to Kolleti Kota on the east and up to the coast line on the south. The main geomorphic units exist in these plains are palaeo-channels, beach ridges, lagoons, sand spits and sand barriers. The predominant soils in the district are black cotton soils/deltaic soils, red loamy soils and sandy soils. Red clayey soils with sandy loam to clayey loam in texture and occur in the northern part of the district. The deltaic alluvium is grey brown to black in colour with fine to medium texture and poorly permeable. They are fertile soils. The coastal sandy soils occur all along the coast, highly porous and lack of binding material. The rocks of Archean age are overlain by Proterozoic cover sequence of Cuddapah super group and Kurnool group. The contacts between older crystalline and the younger sediment is marked by pronounced unconformity known as Eparchaean Unconformity. 8

Local Geology: The Quarry lease applied area is fallen southern flack of hillock with 75m above ground level, which was trending to NE-SW directions with the lowest contour 30m and highest contour 105 m. The gravel exposed on the surface of the hillock. Which was formed insitu weathering of Khondalite group of rocks of the Eastern ghat super group of rock of Archean age. Especially in this area the rock of Khondalite were semi consolidate nature i.e., Schist formation. The Khondalite schist is not formed fully rock due to low grade of metamorphism of sedimentary rocks. Hence it is considered (or) treated as Gravel of the weathered zone of Khondalite and semi consolidated rock material upto 6m from the top surface of the hillock (or) weathered zone of Khondalite. If any hard rock of Khondalite will be arrived i.e Gneiss form of Khondalite it will be stocked at dumpy yard. The gravel utilized for formation of kaccha road & filling of low laying area formation layouts. Reserves and Average Production The deposit is found to be small hillock land. Hence, cross sectional method adopted for Estimation of Geological Reserves. Accordingly, 3 Sections A-A1 to C-C1 has drawn at equal distance perpendicular to the trend direction of the deposit to estimate the reserves (Plate IV). In this method, the ore body is divided into blocks by constructing geologic sections at intervals along the transverse lines. The interval between sections may be constant or may vary to suit the geological setting and mining methodology. As the applied area is uneven shape we use the formula V= ((s1+s2)/2)*l1+ ((s2+s3)/2)*l2+ ((s3+s4)/2)*l3+ _+ ((sn1+sn)/2)*ln Where V= Volume L1, L2, L3, _, LN are perpendicular distances between the adjoining sections with areas S1, S2, S3, _, SN. 9

TOTAL GEOLOGICAL RESERVES S 1 CR OS S- SE CTI ON S L1 G CROSS SECTIONAL AREA (Sq.m) L2 G& L3 G& A-A' 705 714 713 AVERAG E DETAIL S 4,39 3 (S1+S2) /2 L1 G 52 6 AVG. CROSS SECTIONAL AREA (Sq.m) L2 G& L3 G& 532 533 3,04 0 Dist anc e B/ W Sec tion s L1 G VOLUME (CU.M) L2 G& L3 G& L1 Gravel GRAVEL (60%) L2 VOLUME (CU.M) (40%) GRAVEL (40%) 34 17,884 18,088 18,122 10,3360 17884 10,853 7,235 7,249 L3 (60% ) 10,8 73 1,03,360 S 2 B-B 347 350 353 1,68 7 S 3 C- C 0 0 0 0 (S2+S3) /2 173.5 175 176.5 843. 5 53 9,195. 5 9,275 9,354. 5 44,705.5 9195.5 5,565 3,710 3,742 5,61 2 44,705.5 SUB TOTAL 27,079. 5 27,363 27,476.5 1,48,06 5.5 27,079. 5 16418 10945 10991 16485 1,48,065.5 The Reserves in the triangles 4-3-A & 2-C-C are not used for production purposes because the area is Local Occupied Area Therefore, Total Geological Reserves of Gravel = 54,488.5 Cu.M Total Geological Reserves of Building Stone = 1,75,495.5 Cu.M Reserves Blocked under Temporary safety Benches = 31,679 Cu.M *Note-1: The Reserves Blocked under the Temporary Safety Benches are utilized for the production *Note-2: As per Executed sketch appended, Notice. No: 4052/Q3/2018,Dated: 24/11/2018, An area of 1.43 Acres /0.5787 Hectare is excavated 26 i.e, 6 Mts below the surface level & 1,44,675 Cu.M of mineral is already excavated in the Quarry Lease Applied Area upto RL

RESERVES AVAILABLE FOR MINING Total Geological Reserves 2,29,984M 3 Reserves Blocked Under Temporary Safety Benches 31,679 M 3 Available reserves 1,98,305 M 3 Extraction of Market Grade Reserves Gravel 54,488.5 M 3 Building Stone 1,43,816.5 M 3 Production Per Annum 31,390.4 M 3 Life of the Mine = Total of Mineable Proved Reserves Average Annual Production = 1,98,305 m 3 / 31,390.4 m 3 = 6.31 Years (Say 6 Years) PROJECT DESCRIPTION MINING PROCESS The proposed Mining is an open-cast method of mining. The Gravel & Building Stone mineral by nature it is soft and loose in information, Hence no need of any type of blasting. The operations will involved only digging by excavators and directly loads into the tippers/ tractors. The same will be transporting to destination. The excavations will be carried with bench height 3 to 5 meters and width 6 to 8 meters minimum. Haul roads gradient will be 1:16. YEAR WISE PRODUCTION: YEAR PRODUCTION First Year 7,956 Second Year 41,480 Third Year 39,304 Fourth Year 36,536 Fifth Year 31,676 Total 1,56,952 Average 31,390.4 Waste Dump Management: 100% of produced gravel will be useful. Hence no need of waste dump maintenance. The top soil will be preserved within the lease area for using reclamation of the pit at the time of closure. 11

Employment Potential: The human resources deployed are as follows: S. No Designation Staff 1. Mines Manager 1 2. Mine Supervisor 1 3. Hitachi Oprators 1+1No. 4. Tipper Oprators 4No s 5. Skilled WorkersSemi skilled workers 4 6. Semi skilled workers 6 7. Un-skilled 11 FRESH WATER REQUIREMENT & WASTE WATER GENERATION S.No Description Fresh water Waste water Disposal 1 Domestic 1.0 KLD 0.8 KLD Septic tank followed by Green belt 3.0 KLD -- soak pit Dust suppression 4.0 KLD -- List of Machinery: SI.NO. Machinery No.S 1 Excavator 1 No.S 2 Tipper 1 No.S 3 Tractor with Trailers 2 No.S Total 4 No.S 12

Environmental Management Plan The Environmental Management Plan envisage for this Mining Project is described here under with a strong commitment to follow the best Environmental Practices to reduce the negative implication to make this Project a sustainable development endeavor. The management action plan aims at controlling pollution at the source level to the possible extent with the available and affordable technology followed by treatment measures before they are discharge. Provided hutments in the southpart of the lease area for mine workers accommodation purpose. Air Environment and control measures: Dust emissions and particulate emissions mitigation measures will be through water spraying at all the sources of dust formation and these measures are further elaborated as follows: Regular water sprinkling at dust emanating sources viz., transportation through haulage roads, etc will be carried out. Regular grading of haul roads and service roads will be taken up to clear accumulation of loose material. Periodic maintenance of transport vehicles and equipment will be carried out to check emission levels. Greenbelt will be developed with avenue plantation all along the haulage roads and peripheral plantation all around the mine in order to control dust. Overloading of trucks will be avoided and carrying the mineral in covered trucks will be taken-up to minimize pollution levels. Water Pollution Management: No rivers and other perennial water courses flow through the ML area. However, during rains the water flows through the slopes of the ML area and across the mine lease boundary and joins a natural drainage. The rainwater that collects in the mine pit bottom during the rainy season will be utilized for water spraying on the haul roads and mining area. This water will also be used for the plantation in and around the Mine Lease area. The total water requirement will be 8.0 KLD which will be utilized from nearby water tankers and treated water from septic tank. The usage will be as follows: 13

The following that flows in the core zone will be routed adequately through channels to avoid any erosion and contamination. The mine pit water collected due to rains will be utilized for water spraying on the haul roads and for watering plantation. The waste water generated from the domestic usage will be fed to septic tank followed by soak pit. Noise Environment: The observed noise level for various activities is as under, where the noise levels cross the limits specified, the relevant PPE is being provide to the workmen. The machinery will be maintained properly to reduce the noise levels. The protective noise reducing gear like earmuffs, the company will provide earplugs. Proper maintenance of equipment. Machinery will be fitted with properly designed noise generating acoustic silencers. Providing noise insulation/padding wherever practicable. Proper maintenance and periodic lubrication of noise generating parts of the machines Provision of thick plantation in and around the mine is planned in order to reduce the noise and prevent it from reaching to surrounding habitation areas. Solid Waste Generation of Sub-Grade or reject material and waste it nill.100% of material will be utilized including dust or soil. GREEN BELT DEVELOPMENT The development of greenbelt in the peripheral buffer zone of the mine lease area will be undertaken well before the starting of the mining activity. Green Belt has been recommended as one of the major component of Environmental Management Plan, which will improve ecology, environment and quality of the surrounding area. Plantation will be done along the haulage roads and the unused area in the ML area will be developed with green cover. Suitable advice on this plantation activity will be consulted. 14

Concepts of Green Belt Development The concepts of Green Belt Plantation scheme are 1. Nature of Pollutants 2. Emission Levels 3. Maximum Impact zone CRITERIA FOR SELECTION OF SPECIES Species to be selected should fulfill the following specific requirements of the area - Availability of seed material - Tolerance to specific conditions or alternatively wide adapts ability to ecophysiological conditions. - Rapid growth - Capacity to endure water stress and climatic extremes after initial establishment - Differences in height, growth habits - Pleasing appearance - Providing shade - Ability of fixing atmospheric Nitrogen - Improving waste lands. DESIGN OF GREEN DEVELOPMENT The greenbelt shall be developed around the plant to act as a sink for pollutants, attenuation of noise levels and improvement in aesthetic quality of the plant. The following criteria shall be adopted in the design of greenbelt: 1. Generally fast growing trees should be planted as otherwise it will take many years for other types of trees to attain their full height. 2. Trees will be planted along the road side in such a way that there is no direct line of sight when viewed from appoint outside the foliage perimeter. 3. Trees growing up to 10 m or more in height with thick perennial foliage should be planted around the plant. 4. Sensitive species such as magnifier indica should be planted in patches along the entire greenbelt to work as an indicator of pollution. 5. Trees shall be planted staggeredly in each row (minimum three rows encircling the perimeter of the plant). 6. Tree trunk being free foliage up to a height of 2 to 3 m, it is advisable to grow shrubs in front of trees to give coverage to the open portion. 7. Greenbelt will be developed all around the plant area with a width of 10 m. 15

8. Greenbelt will be developed around the plant except wherever buildings and other structures. SOCIO-ECONOMIC ENVIRONMENT Agriculture and sheep breeding are important professions of these people living in the village besides involving themselves in quarrying activity. There is no adverse socio economic impact on the persons in the villages, due to the quarrying operations There is a positive impact of the quarry operations on the socio economic standards of the villagers. The persons from the villages are being given employment in the quarry suiting to their education level and experience. The management is also participating actively in the Corporate Responsibility schemes by grouping with other quarry managements or individually, depending on the merits of the service. SAFETY AND ENVIRONMENT In addition a safety committee will be formed and manned by equal participants from Management and Workers. Personal protection equipment (PPE) will be issued to each worker. Other safety equipments shall be used according to the nature of job involved. The management firmly believes in the concept of safety and environmentally sustainable growth. The authorities and staff are very much concern in Environment issues. The management is going to develop scientifically designed green belt around the premises to mitigate air and noise pollution impacts on the surroundings. The management proposed to monitor ambient air as per APPCB guidelines. All the employees are provided with personal protective equipment such as helmets, hand gloves, safety shoes, goggles and apron as per their place of work. The management will provide safety training to all employees periodically and regularly. POST PROJECT ENVIRONMENTAL MONITORING PROGRAMME In order to maintain the environmental quality within the standards, regular monitoring of various environmental components is necessary. The mines manager will take care of Environmental Management activities with objectives as To implement control/mitigation measures To monitor this implementation process 16

To determine and improve the efficiency of the implemented measures To identify any other unforeseen effect on environment not covered hereby and To inspect and maintain the plantation survival rate, regular cleaning drains, channels and water logged ponds and improve the drainage system and retaining walls over certain timelines. Regular monitoring of various environmental parameters shall be carried out to ascertain the following points: Status of air, noise, water, land pollution within the plant and in its vicinity; Generate data for predictive or corrective purpose in respect of pollution; and To assess and monitor environmental impacts periodically. Project Schedule and Cost Estimates: The envisaged maximum annual production of gravel & Building Stone is estimated to be 31,390.4 m 3 /Annum The cost of the project: 15.0 Lakhs The annual cost estimated for Environmental Monitoring is 5.0 Lakhs. CONCLUSION: The land that is going to be disturbed cannot be reclaimed during the lease period, as the gravel & Building Stone quarry is persisting at further depth and it will take a very long time to exhaust. There is no other significant negative impacts are anticipated as the involved mining activities are very small. All possible measures shall be adopted to control pollution emissions to the minimum and kept below CPCB/MoEF/SPCB standard norms (Air, water, noise standard limits). 17