C ' - 0" A120 UNISEX East Elevation. A120 UNISEX West Elevation A118 MEN'S South Elevation 3/8" = 1'-0"

Similar documents
RELEASE 1 DWG NO BB B * * 644 GREAT ALASKAN RENTAL PACKAGE 265 CODES/STANDARDS-CSA/CMVSS 23T DRAINAGE SYSTEM-HEATED 1B1 CODES/STANDARDS USA

REV 1 DWG NO 2 RELEASE * * 21M WASHER/DRYER PREP 21S WASHER & DRYER-PAIR 9. SEE DRAWING FOR INSTALLATION OF GROMMETS.

REV 1 DWG NO 2 RELEASE * * 12 CUT PART TO 90mm. 11 PREP THE SURFACE PER MANUFACTURERS INSTRUCTIONS BEFORE APPLYING THE HEATING PAD.

DATE 2 RELEASE REV DRAINAGE SYSTEM INSTL SEE DRAWING FOR INSTALLATION OF GROMMETS.

RELEASE E B 1 DWG NO C FRONT * * COACH 21S WASHER & DRYER-PAIR 21M WASHER/DRYER PREP 1B1 CODES/STANDARDS-USA

RELEASE K D 1 DWG NO * * 10.USE SUPPLIED HANDLE FROM VALVE. 9 USE SMOOTH PLUMBERS PUTTY TO SEAL STRAINER (0.2 PER STRAINER).

DATE 2 RELEASE REV * * DRAINAGE SYSTEM INSTL USE SMOOTH PLUMBERS PUTTY TO SEAL STRAINER (0.

RELEASE FRONT COACH 1 DWG NO BA CODES/STANDARDS USA * *

DATE FRONT OF COACH BA BB 2 RELEASE REV D CA * * DRAINAGE SYSTEM INSTL PART NO DETAIL BD CODES/STDS-CSA/CMVSS 1B1 CODES/STANDARDS-USA

DATE FRONT COACH BA CODES/STANDARDS USA 2 RELEASE REV C BB DRAINAGE SYSTEM INSTL

1B1 CODES/STANDARDS USA 11 GLUE FITTING AFTER CABINET IS INSTALLED.

RELEASE 1 DWG NO * * 21S WASHER/DRYER STACKED

RELEASE 1 DWG NO * * 21S WASHER/DRYER STACKED

DATE CA 265 CODES/STANDARDS-CSA/CMVSS 2 RELEASE REV DRAINAGE SYSTEM INSTL B1 CODES/STANDARDS USA 11 ADD TEFLON TAPE

RELEASE 1 DWG NO 10 PREP THE SURFACE PER MANUFACTURERS INSTRUCTIONS, BEFORE APPLYING THE HEATING PAD.

BE C 2 RELEASE REV * * DRAINAGE SYSTEM INSTL 21S WASHER & DRYER-PAIR 21M WASHER/DRYER PREP 1B1 CODES/STANDARDS-USA

214 DISHWASHER DRAWER STYLE 10 APPLY PRIMER AND CEMENT BETWEEN ELBOW AND FLEX PIPE.

DATE 2 RELEASE REV DRAINAGE SYSTEM INSTL 21S WASHER/DRYER STACKED

DATE 2 RELEASE REV * * DRAINAGE SYSTEM INSTL TOILET-MACERATOR SHOWER XXX 9PC CHT R42QL

C (6) DOORS TYPICAL, ALL SAME SIZE ENCLOSURE, CUSTOM 6 DOOR REVISION HISTORY ZONE REV DESCRIPTION DATE APPROVED 0.01 RELEASE FOR QUOTE 11/16/12 PH

1 OF / Aug-2018

DATE BA BB 2 RELEASE REV * * DRAINAGE SYSTEM INSTL TOILET-MACERATOR MODEL CHT R42HD CHT

THIS DRAWING DOES NOT APPLY TO CONNECTIONS TO LINED PIPE

HSS14X4X.500 STRINGER (LLV) MODER PROFILE ( STEP STONE ) FACE OF WALL CLOSER BENT C6X8.2 CLOSER BENT C6X8.2 MODER PROFILE ( STEP STONE )

1 OF / Oct-2018

Amphenol Canada Corp.

Amphenol High Speed Interconnects

TCC / SHORE TRANSIT BUS

A 3 WIRE PASSES THROUGH FLOOR IN THIS AREA.

DO NOT SCALE DRAWING

AMPHENOL PART NUMBER CONFIGURATION U98 - C 1 X X - X 0 X X PACKAGING 1 = TRAY PACKAGING

FIN. WALL CONCRETE SOLID MASONRY GENERAL NOTES: 1. SEALS LOCATION SHOULD BE TAKEN FROM CONTRACT DRAWINGS.

3 ROOFING MEMBRANE SYSTEM PROTECTION BOARD 4" RIGID INSULATION; R-5 / INCH, R-20 TOTAL VAPOR RETARDER PLYWOOD SHEATHING

Amphenol Canada Corp.

DETAIL CAGE ASSEMBLY MATERIAL: NICKEL SILVER, 0.25 THICK HEAT SINK MATERIAL: HEAT SINK CLIP MATERIAL: STAINLESS STEEL

FINISH SCHEDULE FINISH ITEM AREA / LOCATION

BUMPER A CATCH-DOOR HOLER A BLK A PWT SCREW 000G (4) C 105 PANEL-VALANCE,DOOR XXX SCREW

ACCURATE DRAFTING, INC. DRAWING GUIDELINES ALL FASTENERS SHOWN ON THIS SHOP DRAWING ARE FOR REFERENCE ONLY. ACTUAL FASTENER TYPES AND SIZES

TRACK-END CAP XXX (A04,A05,A06,ACB,AR5,AR6,AR7,ACC) CHT (8) CVR-CUSH,OVHD,REAR,27X80X5"

EMI SPRINGS OUTER LIGHT PIPES , SCALE 5:1 REVERSED OUTER LIGHT PIPES , SCALE 5:1

DOOR ASM-VALANCE XXX KEEPER B (2) 000G B (12) (1100) CATCH-DOOR HOLDER A BLK A PWT

322R 331K 325B 327Q 331G

RCP-2 (DET AC) RIGHT COMPONENT SEAL-TRIM,EDGE (60 MM) (2) TAPE-FOAM (250 MM) (2)

2 CONTROL-HTR CHT

1 OF / Nov-2017

WIRE ASM-AUX HOLDING TANK WIRE ASM-MAIN HOLDING TANK B DRAINAGE SYSTEM/HEAT-PREWIRE DRAINAGE SYSTEM-HEATED

2 D 4X ( 9.81) SHOWN WITH CAM LEVER AND SPACER IN LOADED POSTION APPLICABLE COMPONENTS (FOR REFERENCE ONLY) NOMINAL TERMINAL SIZE

C REVISED PER ECR DEC2015 T.S E.T $ D/C MATING CONNECTOR PART NUMBER WEIGHT. (g)

318 Main Street, Farmington, CT t (860) f (860)

RAMP W x 192 = 1,538 A-221 D21 D20 D19 RAMP RAMP 858 2, , , , ,361

1 OF / Jul-2018

SHEET NUMBER BUILDING GEORGIA AVENUE, SUITE 908, SILVER SPRING, MD 20910, TELE: (301) FAX: (301) JOB NUMBER:

GP 00 CAGE ASSEMBLY ( ) (DIM.A) EMI SPRING EMI SPRING ( ) ( ) AS SHOWN CONTACT ORGANIZER HOUSING

DE-TYPE SHUNTING LOCO MOTOR OF THE DUTCH RAILWAYS SERIES

ES-TA-3..1 Six- and Ten-Input E-Stop Safety Modules with DeviceNet

REVISION HISTORY

PLAN Scale: 1:400 [A3] ELEVATION Scale: 1:400 [A3]

C C SLIDEOUT CRANK REF LEFT SIDE, SLIDEOUT COMPARTMENT DO NOT SCALE DRAWING FRONT RIGHT COMPARTMENT

DOOR ASM-STORAGE XXX TRIM-FEATURE,INNER A B (2) CATCH-DOOR HOLDER CHT RIVET CHT(4)

FROM: PARKHILL SMITH & COOPER, INC. PROJECT NAME: CoEP Regional Water Parks District 7 Waterpark PROJECT NO.:

PRELIMINARY GP 00 MATERIAL. MINIMUM PC BOARD THICKNESS: SINGLE SIDED = 1.45mm BELLY TO BELLY = 2.25mm PADS AND VIAS CHASSIS GROUND 1X2 CAGE ASSEMBLY

ASK STUDIO G102 PROJECT RIVERVIEW PARK - PERFORMANCE STAGE - PH I CITY OF DES MOINES - PARKS & RECREATION PHASING ELEVATION

FOUR SCORE, LLC 144 STURBRIDGE ROAD CHARLTON, MA, PROJECT: PROJECT TEAM MECHANICAL

DWG NO CABINET ASM-REFRIG/WARDROBE CABINET ASM-OVHD,LIGHT XXX SOCKET-SNAP FASTNER (10) BUTTON SCREW XXX(10)

P R O J E C T D A T A PROJECT DESCRIPTION: - DEMOLISH [E] 1-STORY HOUSE, [E] SHED, [E] POOL, - REMOVE 3 TREES

( ) CAGE ASSEMBLY ( )

COVER-ELECTRICAL CHT SCREW G U (6) LABEL-SLIDEOUT CTL,BLK W/WHT LIGHT-DOME,SGL,W/SWITCH / CHT (4)

1 OF / Mar-2018

1 OF / Sep-2016

REPRODUCTION FORBIDDEN

Danger of electrical shock, burns or death.

A-A DIM D PLC CONTACT PLATING: NOBLE METAL PLATING ON CONTACT FUNCTIONAL AREA OF POWER AND SIGNAL CONTACTS

UNITED CEREBRAL PALSY OF THE WABASH VALLEY CONSTRUCTION OF 2 HOUSES 1400 HULMAN STREET TERRE HAUTE, IN

Amphenol Canada Corp.

SOF CONSTRUCT 23 STS MOBILITY STORAGE FACILITY FTEV

329B A 54W FRONT RIGHT COMPARTMENT DO NOT SCALE DRAWING TITLE: ACCESSORY INSTL /21/2009 WRENCH-LUG ALUMIMUM WHEEL 54W REF

PART NUMBER 1 TD TD TD TD TD TD TD

Kingswood Women's Softball Dugouts and Field

TAIL LENGTH # TYP.087 TYP.087 TYP.084 TYP LP CONFIGURATION TAIL DIMENSIONS

DIVISION OF THE STATE ARCHITECT (DSA) DSA LOS ANGELES REGIONAL OFFICE 700 N. ALAMEDA STREET, SUITE LOS ANGELES, CA PHONE: (213)

PROJECT AREA RENOVATION OF BLDG MCAS CHERRY POINT, NC

2 CONTROL-HTR CHT

ALDI EXPANSION FINAL STIE DEVELOPMENT PLAN OVERLAND PARK, KANSAS 8333 WEST 95TH STREET PLANT SCHEDULE

4036 East Moyer Road Terre Haute, Indiana

Z-Z DIM L #.010 THRU PLC NOT RELEASED FOR PRODUCTION VARIABLE DIMENSIONS SHOWN ON VIEW (SHEET 3 AND 4). DIM W

A100 ARCH 3610 ADV. DETAIL STUDIO ISOMETRICS. 6 Date Drawn by. Author Checked by. Checker. No.

th Street NW th Street NW, Washington, DC

1. LOCATION AND VERTICAL SPACING OF BOLTED FIXED END SHIMS AS REQUIRED

SOUTHWEST OILFIELD PRODUCTS, INC.

IMC EINSTEIN BAGEL EXHAUST REPLACEMENT CONSTRUCTION DOCUMENTS 03/22/ Copyright 2018 Perkins+Will

SOUTHWEST OILFIELD PRODUCTS, INC.

A D D E N D U M N o. 2. The following additions, clarifications, deletions and/or changes shall be made to the SPECIFICATIONS:

PRELIMINARY GP 00 MATERIAL MINIMUM PITCH DIMENSION. 3. MATES WITH QSFP MSA COMPATIBLE TRANSCEIVER. 2D BARCODE AND DATE CODE

DES MOINES SOCIAL CLUB

LGB JDWDS OCTOBER 2017 SHEET: 01 OF 06. NOTES: TITLE NG ELECTRIC LOCO OF THE MIX NITZ-ST. ERHARD LOCAL RAILWAY (GAUGE 184mm (7.

FISHMASTER WARHOUSE EXPANSION

P40T, P40L

MACON-BIBB COUNTY GILEAD-BLOOMFIELD GYMNASIUM OFFICE RENOVATION

SECTION COIL SECTION COIL OPTIONAL: AUXILIARY DRAIN PAN FOR PIPING PACKAGE COIL CONFIGURATIONS (RH CONNECTIONS SHOWN) HEATING ONLY 1 COOLING PREHEAT

PRESCHOOL T.I N. CRESTVIEW AVE. AND 616 & 630 E. ORANGE ST. SAN BERNARDINO, CA SITE 1157 N. CRESTVIEW AVE SAN BERNARDINO, CA 92410

Transcription:

GENERL NOTES INTERIOR ELEVTIONS 6 09.0 09.0 E0 0.08. SEE SHEET G00 FOR STNR N MOUNTING HEIGHTS FOR LL ESSORIES 0. 0. 0. Keynote Legen 09.0 0. 0.6 0..0 0.07 06.06 06.07 08.0 0.0 0.0 ' 0.06.0 08.0.0 ' 6 08.0 09.0 0..0 09.0 ' 9 0. E /8 = '0 0 UNISEX North Elevtion /8 = '0 0.08 / 0.6 ' 6 0. 09.0 8 /8 0. 7/8 ' 0 UNISEX West Elevtion /8 = '0 0 UNISEX South Elevtion /8 = '0 ' 6 E / UNISEX 0 08.0 E0 ' 08.0.0.0.0.06.07.09. 0.07 metho stuio in. 9 south west temple slt lke ity, uth 80 p h o n e : (8 0 ) /8 08.0 0.07 ' 6 0. 0. ' 9 0. E0 ' 8 09.0 ' 7 0. 06.07 ' 0 Enlrge Puli Restrooms /8 = '0 8 MEN'S South Elevtion /8 = '0. 0. ' 8 09.0.06 0.08 projet: ' 0 0..0 ' 0 0.07.06 09.0 E ' 0 ' 8.09 /8 ' 8 0. 0..0 ' ' 6 / ' 8 6 / ' 6 ' / ' 09.0 09.0 0.0 0.08 ' 7 0.0 6' ' 6 / 0. 0.6 0. 0.6 8 ' 6 0.0 0.0 MEN'S 8 0.0 MOP.07 E0.0 ' ' E0.06 B E0 / 0.07 0 /8 ' 6 / B 0. ' 7 ' 6. 0. 0. 0. ' 7.0 09.0 09.0 09.0 0.0 0.0 0.07 0.08 0. 0. E0 ' / B 0. 0.07 ' B ' 6 08.0 ' ' 9 E0.0 0.0 0 UNISEX Est Elevtion E.06 0.0 MU WLL WITH BLOK FILLER, PINTE. SUPPORT BRKETS, SEE OUNTER TOP SETION STINLESS STEEL OUNTER TOP PINTE HOLLOW METL OOR N FRME, RE: OOR SHEULE OVERHE OILING OOR, MNUL OPERTION, RE: OOR SHEULE /8 GYP. B, PINTE, RE: FINISH SHEULE BSE S SHEULE, RE FINISH SHEULE ERMI TILE; RE: FINISH SHEULE URINL SREEN, TYP. PER PLN N SPES TOILET PPER ISPENSER, RE: ESSORY SPE SNITRY NPKIN ISPOSL, RE: ESSORY SPE SOP ISPENSER, RE: ESSORY SPE BBY HNGING STTION, TYP. PER PLNS N SPES '0 X '0 MIRROR, TYP. SEE ESSORY SPE N ETIL SHEET E0 FOR BKING ETIL T GYP BOR. 6 GRB BR, RE: ESSORY SPE N TYPIL MOUNTING HEIGHTS SHEET G00 8 VERTIL GRB BR, RE: ESSORY SPE N TYPIL MOUNTING HEIGHTS SHEET G00 GRB BR, RE: ESSORY SPE SHEET N TYPIL MOUNTING HEIGHTS SHEET G00 SHELF WITH MOP N BROOM RK, RE: ESSORY SPE TOILET PRTITIONS, TYP. PER PLN N SPEIFITIONS HN RYERS, TYP. RE: ESSORY SPE RINKING FOUNTINS, FOUNTIN SHOUL OMMOTE WTER BOTTLE FILLER. RE: PLUMBING PLNS TOILET FIXTURE, RE: PLUMBING PLNS SINK, RE; PLUMBING PLNS HEIGHT TOILET FIXTURE, RE PLUMBING PLNS HEIGHT SINK, RE PLUMBING PLNS FLOOR SINK, RE PLUMBING PLNS HEIGHT URINL. RE: PLUMBING PLNS URINLS, TYP. PER PLNS N SPEIFITIONS 0. 0. 6 WOMEN'S South Elevtion Grn Juntion, O 06.06 /8 = '0 0.08 09.0.06 6 09.0 8 onessions /8 = '0 09.0 projet#: te: 09.0 0. 0. 0. 0.0 0. 0.0 0. 0.08.060 July, 06 09.0 0..09 0.0 ' 0.07.0 ' 0 09.0 ' 0 09.0.0 09.0 09.0 09.0 ' 09.0 09.0 B B 8 MEN'S North Elevtion 8 MEN'S West Elevtion.0 /8 = '0 B /8 = '0 8 MEN'S Est Elevtion B /8 = '0 Enlrg Plns & Interior Elevtions MOP West Elevtion /8 = '0 08.0 0.08 09.0 0. 0. 09.0.06 0. 0.0 ' 0. 0. 0.6 09.0.0.0 09.0 09.0 ' 0 ' 0 09.0.07.0 6 WOMEN'S North Elevtion /8 = '0 0.0 ' 0 09.0 0. 09.0 0. 09.0 09.0 0. 6 WOMEN'S West Elevtion /8 = '0 6 WOMEN'S Est Elevtion /8 = '0 MOP North Elevtion /8 = '0 E0 00% ONSTRUTION OUMENTS

NOTE: USE R N B WGNER FOR INTERIOR USE OR PPROVE UL. MLLEBLE IRON #76 ' 0 ' 0 ' 0 ' 0 NOTE: USE R N B WGNER FOR INTERIOR USE OR PPROVE UL. MLLEBLE IRON #76 VERIFY SOLI BLOKING BEHIN BRKET ONNETION FOR LL SIMILR EXTERIOR ONITIONS LL STEEL IS TO BE GLVNIZE. PRIME N PINT S SPEIFIE. = '0 p h o n e : (8 0 ) = '0 NOTE: GRIN WELS SMOOTH PRIME N PINT S SPEIFIE. Hnril tthment Wethere Steel Wll slt lke ity, uth 80 TYP Hnril Rmp Setion / X I. STEEL BSE, SEURE W/ () / I. POWERS WEGE BOLTS. PRIME N PINT S SPEIFIE. stuio in. 9 south west temple 96' 0 OPTIONL LIFT LOTION / I. STEEL BR BRKET @ 8 O..MX metho Set into onrete lrger thn pipe size, set in nonshrink grout (SIK Grout or pprove equl) ' 0 6 TYP. ' 0 ' 0 Slope grout up to rin wy from post 00' 0 ' 0 RRY GURRIL ROUN EGE OF STGE HERE (6) TRES onrete rmp 6 FREESTNING PINTE PIPE HNRIL N GURRIL WETHERE STEEL WLL BEYON ' 0 6' 0 E Sim (7) RISERS E / i. (.66 O..) Steel vertil pipe eqully spe (Not to exee '0 o.. prt) Grin ll wels smooth. ' 0 E / I. SHEULE 0 STEEL PIPE HNRIL. PLUG ENS N RETURN TO WLL, LEVING / GP BETWEEN WLL N FINISH EN OF RIL. / i. (.66 O..) Steel vertil pipe eqully spe (Not to exee o.. prt) Grin ll wels smooth. OWEL STIR INTO STGE FNN WLL ST IN PLE ONRETE STIR OVER GRVEL ' ' 0 VERIFY SOLI BLOKING BEHIN WETHERE STEEL FOR BRKET ONNETION / i. vent hole t eh min pipe / i. steel pipe hnril, grin ll wels smooth (WHEN OURS) WETHERE STEEL PNELE WLL /. / i. (.66 O..) Steel pipe top ril, wel to min vertil steel pipe 6 Stge Stir / Lift /8 = '0 MU WLL LINE, BLOK FILLER N PINT TYP. Stir Setion t Stge / I. SHEULE 0 STEEL PIPE HNRIL. PLUG ENS N RETURN TO WLL, LEVING / GP BETWEEN WLL N FINISH EN OF RIL. /8 = '0 / I. STEEL BR BRKET @ 8 O..MX / X I. STEEL BSE, SEURE W/ () / I. POWERS WEGE BOLTS. PRIME N PINT S SPEIFIE. NOTE: GRIN WELS SMOOTH PRIME N PINT S SPEIFIE. MIN 0 /8 6' B ' 0 E S E R )T (6 / E Sim / HMFER TYP. BOTH SIES 00' 0 00' 0 STEEL NGLE TYP. LL LOING OK EGES projet: LOING OK FLOOR, SLOPE WY FROM BUILING. SEE IVIL PLNS FOR OK ELEVTIONS OK BUMPERS, SEE SPEIFITION MIN WTER STOP 6 7/8 ' ' 0 0 7 Risers 0 ' 0 ' 0 ' = '0 6 Typ UP E 6 ST IN PLE ONRETE STIR OVER GRVEL 6' Hnril tthment MU 6 Typ ' ONRETE PRKING LOT, SEE IVIL Grn Juntion, O 96' 0 GRVEL OLUMN 96' 0 EXPNSION JOINT projet#: te: ONRETE FOOTING, SEE STRUTURL B Stge Right Stir /8 = '0 B Stir Setion B /8 = '0 PERFORTE PIPE, TIE TO STORM RIN.060 July, 06 Setion Thru Loing ok / = '0 NOTE: SFETY TRE ETIL TYPIL OF LL TUNNEL N EXTERIOR STIRS MIN 6 OPEN SPE PROVIE IS FOR NHORING RILINGS. SEE /S0 FOR NHORING ETILS 6 TYP E / TYP. / TYP. Stir Plns n Setions 7 MX EXTERIOR STIR TRE EPOXY OTE REBR S SPEIFIE BY STRUTURL N IVIL ONRETE STIRS METL SLIP RESISTNT STIR TRE N STRIPING TYP. SEE SPEIFITIONS MX. STRIPING TO LERT THE VISULLY IMPRE, SHLL BE OF ONTRSTING OLOR FROM STIR TRE PROVIE ONTINUOUS STRIPING N SLIP RESISTNT NOSING T LL STIRS SEE SPEIFITIONS FOR PROUT INFO. Stir etil / = '0 E Typ Stir Tre / = '0 00% ONSTRUTION OUMENTS

Keynote Legen 0.08 0.0.0 ST IN PLE ONRETE RMP, : SLOPE ST IN PLE ONRETE LNING OK BUMPER, SEE SPEIFITIONS ' B metho 0 stuio in. E ' 9 south west temple 0 ' ' slt lke ity, uth 80 0 p h o n e : (8 0 ) 0 E 0' 0 6' E0 ' 0 /.0 BLE REM OV ' 6 ' 0 6 /8 projet: ' 0 ' 0 B E 0 E ' 0 E ' 0 8' 0' 0 ' ' 0 UP : SLO PE Grn Juntion, O LN ING ' 0 00' 0 projet#: te: 8 /8 ' 6 ' 0 ' 0 ' 6.060 July, 06 LN ING ' 0 ' 0 ' 6 0 IL 0' 0.08 ' 0 : SLO PE TO R E E / RIL E ' 6 0.0 96' 0 ONTRTOR MY PROVIE SLB ON GRE FOR RMP IF ESIRE 0.08 B Rmp Setion B / = '0 Rmp n ok re / = '0 E E E E ' 6 ' 0 ' 0 E Stir Plns n Setions ' 0 00' 0 ' 0 ' 6 ' 6 0' 0 ' 0 0.08 ' 6 ' 0 00' 0 96' 0 0.08 96' 0 ONTRTOR MY PROVIE SLB ON GRE INSTE OF SOLI ONRETE FOR RMP IF ESIRE E ONTRTOR MY PROVIE SLB ON GRE INSTE OF SOLI ONRETE FOR RMP IF ESIRE Rmp Setion / = '0 Rmp Setion / = '0 00% ONSTRUTION OUMENTS

T.O. WLL 7' STNING SEM METL ROOF N UNERLYMENT EXTERIOR SHETHING METL EK MU SHLL EXTEN TO ROOF EK BETWEEN BEMS. RE: STRUT STEEL BEM STEEL PLTE ON SLOPE BLOK OURSE; RE: STRUT HMFER SLB EGE ONTINUOUS T STGE EGE 00' 0 ONT. VLLEY FLSHING B E0 STNING SEM METL ROOF N UNERLYMENT RIKET WHERE OURS, SEE ROOF PLN SHEET WTERPROOFING UNERLYMENT EXT. GRE PLYWOO SHETHING RRY METL ROOFING N UNERLYMENT UP ONTO WOO PLTE STNING SEM METL ROOF W/ WTERPROOF UNERLYMENT B E0 MU WLL, RE: STRUTURL X BLOKING EXTERIOR GRE PLYWOO METL EK, RE: STRUTURL ' 0.F.F. '0 ± PER SHOP WGS MX SETION SEMIREESSE FIRE EXTINGUISHER BINET REFER TO SHOP RWINGS PROVIE REESS FOR F.E. BINET S R' REFER TO WLL TYPES FOR WLL ONSTRUTION REFER TO SHEET G00 FOR HEIGHT metho TPO ROOF MEMBRNE TURN UP WLL TO METL LET SHEET WTERPROOFING UNERLYMENT RIGI INSULTION TERM BR METL OUNTERFLSHING TPO MEMBRNE BEM BERING ' 0 METL EK RRY ROOF MEMBRNE UP N OVER METL OPING, TYP. METL OPING PLYWOO N BLOKING TO BE FLUSH WITH MU METL LET B E0 Min. 9 8 MIN ' T.O. Blok Rer Stge Wll to Roof onition / = '0 TPO Roof To Wll etil / = '0 B Prpet etil = '0 8 HONE MU BLOK WLL ONT. SELNT ROOF HTH, RE: ROOF PLN HTH LER / X PLYWOO WITH POSITIVE SLOPE BK TOWR ROOF X8 BLOKING / OUNTERSINK NHOR BOLT @ O.. HONE MU BLOK, SEE ELEVTION FORM RIP EGE BY BENING PST 90 EG. GSKETE SREWS @ 8 O.. Stge Ege etil / = '0 WTERPROOF UNERLYMENT, RUN OVER TOP OF PRPET / PLYWOO (PT) Portl Wll Height ' / PREFINISHE ROUN TORX HE FSTENER, TYP. 8 G WETHERE STEEL PNEL EXTERIOR GRE PLYWOO RUN METL ROOFING UNERLYMENT UP N OVER WLL /8 METL STU FRMING @ 6 O.. STNING SEM METL ROOF N UNERLYMENT 8 G WETHERE STEEL PNEL G. METL FLSHING ONT. VLLEY FLSHING RIKET OVERLP 6 / / Prpet etil / = '0 / I X BOLT W/ WSHER N NUT METL ROOF EK MU W/ SOLI GROUT RE: STRUT STEEL NGLE BOLTE ONNETION; RE: STRUT STEEL BEM BEM BERING ' 0 METL P FLSHING N LIP RUN METL ROOFING UNERLYMENT UP N OVER WLL STEEL BEM N STRUTURL ONNETION. RE: STRUTURL RWINGS EXTERIOR SHETHING G. METL FLSHING METL EK STNING SEM METL ROOF W/ UNERLYMENT BRKE METL OPING RRY UNERLYMENT OVER URB X WOO PLTE URB EXT. GRE PLYWOO SHETHING METL ROOF EK LET FSI METL W/ RIP EGE 0 EXPOSE PINTE STRUTURL STEEL, RE: STRUTURL Stning Sem Roof to Wll etil / = '0 6 0 MIN LEVEL 00'0 8 G WETHERE STEEL PNEL /8 METL STU FRMING @ 6 O.. BOTTOM TRK 7/8 METL 'Z' FURRING PREFINISHE ROUN TORX HE FSTENER, TYP. GRE, SLOPE WY FROM STRUTURE Roof nopy Ege etl / = '0 SELFHERING SHEET WTERPROOFING OVER EXTERIOR GRE PLYWOO GLVNIZE METL FLSHING W/ / RIP EGE, OVERLP WTERPROOFING OVER FLSHING SEL SELER /8 STEEL BEM, RE: STRUTURL rry unerlyment over ege n own fsi Steppe rke metl fsi Metl roof ek, Re: struturl Steel ngle, Re: struturl rip ege ontinuous metl let ut steel ege plum to groun surfe = '0 6 ' ± PER SHOP WGS PLN Fire Extinguisher inet / = '0 Expose, pinte struturl steel. Re: struturl Front nopy Roof Ege Metl roof p flshing lip Stning sem metl roof w/ wterproof unerlyment Ext. gre ply shething Slope, rigi insultion. See Roof Pln. stuioin. 9 s o u t h w e s t t e m p l e s l t l k e i t y, u t h 8 0 p h o n e : (8 0 ) projet: Grn Juntion, O p r o j e t # : t e :.060 July, 06 etils STNING SEM METL ROOF SHEET WTERPROOFING UNERLYMENT 9 MIN. 6 MIN. OVERLP STEEL BEM EXTERIOR SHETHING STNING SEM METL ROOFING N UNERLYMENT ON FOUNTION; RE: STRUT EXT. GRE PLYWOO SHETHING METL ROOF EK EXPOSE PINTE STRUTURL STEEL, RE: STRUTURL ST IN PLE ON STIR; RE: STRUT EXPNSION JOINT Roof nopy MU Ege etil Typ / = '0 Portl Prpet Setion = '0 Portl Wll Setion llout = '0 E0 00% ONSTRUTION OUMENTS

OVERHE OILING OUNTER OOR ' 9 STINLESS STEEL OUNTER TOP RIUSE BULLNOSE EGE, THIS SIE N OUTSIE ' MIRROR PLSTI LMINTE OUNTER TOP N BKSPLSH ' 9 ' 9 / STINLESS STEEL BRKET SUPPORTS ' 9 / RIUS BULLNOSE EGE STINLESS STEEL BRKET SUPPORTS ' 0 ' 9 ' 6 metho stuioin. MU WLL WITH BLOK FILLER, PINTE MU WLL WITH BLOK FILLER, PINTE 9 s o u t h w e s t t e m p l e BSE BSE s l t l k e i t y, u t h 8 0 LINE OF FLOOR LINE OF FLOOR p h o n e : (8 0 ) ounter Top Setion / = '0 ounter Top Setion / = '0 projet: OORINTE WITH TILE THIKNESS Grn Juntion, O SHEULE WLL p r o j e t # : t e :.060 July, 06 SHLUTER: SHIENE NOIZE LUMINUM TRIM PIEE. SIZE TO MTH TILE THIKNESS TYP. T TOP OF TILE WINSOT MIRROR TO HVE FLT POLISHE EGES. SEE ELEVTIONS FOR MIRROR SIZE. PROVIE ONTINUOUS MF BKING BEHIN MIRROR (BOVE TILE). HERE TO WLL USING GUNTHER'S MSTI. SHLUTER: SHIENE NOIZE LUMINUM TRIM PIEE TO WRP LL EGES OF MF. SIZE OF TRIM TO MTH TILE THIKNESS. MIRROR TO HVE FLT POLISHE EGES. SEE ELEVTIONS FOR MIRROR SIZE. SEE INTERIOR ELEVTIONS HONE MU WLL, SEE ELEVTIONS. RE: STRUTURL GLVNIZE METL FLSHING W/ / RIP EGE 00' 0 ONRETE SLB OVER ONT. VPOR BRRIER OVER MIN FREE RINGE GRVEL; RE: STRUT etils SEE INTERIOR ELEVTIONS PLN VIEW SHLUTER: SHIENE NOIZE LUMINUM TRIM PIEE. SIZE TO MTH TILE THIKNESS TYP. T TOP OF TILE WINSOT SHEULE WLL TILE SEL SELER ON FOUNTION; RE: STRUT ONT. RIGI INSULTION BOR SETION VIEW E0 Restroom Mirror etil = '0 Typ Fountion etil = '0 00% ONSTRUTION OUMENTS

OOR SHEULE oor Frme o o r oor Frme Frme oor Frme Hrwre Numer With Height Thikness Type Mteril Finish Set Type Mteril Finish He Jm Sill Fire Rting omments 00 6' 0 ' 0 / 0 00 6' 0 ' 0 / 0 0 ' 0 7' 0 / 06 HM /60 /60 /60 0B 0' 0 8' 0 B 0 MFR 6/60 6/60 6/60 0 ' 0 7' 0 / 06 HM /60 /60 /60 0 0' 0 8' 0 B 0 MFR 6/60 6/60 6/60 0 ' 0 7' 0 / 07 HM /60 /60 /60 0 ' 0 7' 0 / 09 HM /60 /60 /60 0 ' 0 7' 0 / 09 HM /60 /60 /60 06 ' 0 7' 0 / HM /60 /60 /60 07 ' 0 7' 0 / HM /60 /60 /60 08 ' 0 7' 0 / HM /60 /60 /60 08B ' 0 7' 0 / HM /60 /60 /60 09 ' 0 7' 0 / HM /60 /60 /60 0 ' 0 7' 0 / HM /60 /60 /60 ' 0 7' 0 / 0 HM /60 /60 /60 ' 0 7' 0 / 09 HM /60 /60 /60 ' 0 7' 0 / 09 HM /60 /60 /60 ' 0 7' 0 / 0 HM /60 /60 /60 B 0' 0 8' 0 B 0 MFR 6/60 6/60 6/60 6 ' 0 7' 0 / 0 8 ' 0 7' 0 / 0 0 ' 0 7' 0 / 0 ' 6 7' 0 / 09 B ' 6 7' 0 / 09 ' 0 7' 0 / 08 8 ' 0 7' 0 / 0 8B ' 0 ' 0 B 0 MFR metho stuioin. 9 s o u t h w e s t t e m p l e s l t l k e i t y, u t h 8 0 p h o n e : (8 0 ) SEE SHE ' 0 ' 0 SEE SHE 6' 0 HM Pinte Frme 7' 0 HM Pinte Frme 7' 0 SEE SHE SEE SHE SEE SHE HM PINTE FTORY PINTE B HM PINTE Frme Type / = '0 oor Type / = '0 projet: Grn Juntion, O SHEULE WLL GYP. BOR (PINTE) GROUT FULL / / OUBLE WOO STU HEER, PROVIE () WOO STUS T OOR TYP. BON BEM PER STRUTURL BULLNOSE BLOK T OOR JMB & HE MU HEER p r o j e t # : t e :.060 July, 06 SELNT N BKER RO (BOTH SIES) INTERIOR SIE ONRETE WLL (BEYON) 7 / HOLLOW METL FRME, PINTE /8 6 HOLLOW METL FRME, PINTE GROUT FULL SETION SHEULE OOR HOLLOW METL FRME (BEYON) THRESHOL PER HRWRE SETS SETION SHEULE OOR HOLLOW METL FRME BEYON THRESHOL PER HRWRE SETS INSTLL OOR PER MNUFTURER'S RUIREMENTS OVERHE OOR TRK BEYON STEEL THRESHOL Typ. oor/winow Sheules & HOLLOW METL FRME (PINTE). 6 JMB NHOR SETION MU EXTERIOR Types PLN HOLLOW METL OOR (PINTE) SHEULE WLL PLN SHEULE OOR PLN INTERIOR E60 Typil HM Interior oor / = '0 Typil HM oor @ MU / = '0 Roll Up oor He / = '0 00% ONSTRUTION OUMENTS

MTERIL PROUT NME / NUMBER MNUFTURER OLOR / FINISH SIZE Numer OMMENTS 00 TILE FT ermi Tile ltile Pver Surfe / 0Q78 Golen Brown / Qurry Pver 6 x 6 WT ermi Tile ltile Mtte Group Mtte lmon X7 x 6 00 Ly in Suwy Tile rik pttern Rittenhouse olletion 0 0 0 EILING T Suspene oustil Tile USG Frost 9 FLB Ege Flt White 00 x On entriitee XT Gri. See Reflete eiling Pln for lyout 0 0 ONRETE S Sele onrete BSE 06 07 08 09 RB Ruer Bse Roppe 700 Series 7 Slte H RB Ruer Bse Roppe 700 Series 00 Blk H TB ermi Tile ltile Mtte Group / S9T Mtte lmon X7 0 6 8 0 8 / x 6 PINT Pint Sherwin Willims Interior Pint SemiGloss SW 767 White Heron PNT Pint Sherwin Willims Interior Pint Mtte SW 6989 omino Epoxy Pint, pplies to Sie n Rer Wlls t Stge 0 PNT Pint Sherwin Willims Interior Pint Mtte SW 6989 omino Epoxy Pint, pplies to Expose Steel ek n Struture ove Stge 0 PNT Pint Sherwin Willims Interior Pint SemiGloss SW 7068 Grizzle Gry Epoxy Pint, pplies to Exterior HM oors/frmes n Gurril/Hnrils Stinless Steel 8 guge min. thikness Plsti Lminte Wilsonrt Lminte 7988 Borwlk Ok Tile to onrete Shluter STINLESS STEEL OUNTERTOP SS Nme UNER STGE LEFT UNER STGE RIGHT STGE STGE RIGHT SEURE USTOIL ROSSOVER PNT GENERL NOTES FINISH PLN ROOM FINISH SHEULE INTERIOR FINISH LEGEN OE W W STR W STR RESSING OFFIE MEHNIL ELETRIL IT STGE LEFT WOMENS MEN'S UNISEX MOP ONESSIONS Finishes Wll Bse eiling Floor S S omments SEE FLOOR PLNS FOR INTERIOR ELEVTIONS LL METL STUS WLLS TO EK BOVE, SEE SHEET E0 FOR WLL TYPES PROVIE EFLETION TRKS T LL STU WLLS, SEE ETIL X/EXXX LL MTERILS TO BE INSTLLE PER SPEIFI MNUFTURER'S INSTLLTION REOMMENTIONS LL EXPOSE METL TO BE INSTLLE PER SPEIFI MNUFTURER'S INSTLLTION REOMMENTIONS FLOORING MTERIL TRNSITIONS TO OUR T ENTER LINE OF OOR THRESHOLS, U.N.O. PREPRE FLOORS/WLLS TO REIEVE FINISH MTERIL. REFER TO MNUFTURERS REOMMENTIONS FOR SURFE PREPERTION. NOTIFY RHITET IF ONITIONS RE INUTE FOR RURE INSTLLTION. REFER TO ROOM FINISH SHEULE N MTERIL LEGEN IN SHEET E60 FOR MORE INFORMTION SEE E0 FOR WLL TYPES ONTRTOR TO PROVIE SOLI BLOKING T LL SE WORK, FIXE FURNISHINGS N UIPMENT. OORINTE WITH ELEVTIONS, SETIONS N FURNITURE N FIXTURE SHEETS N SPEIFITIONS. SEE SHEET E90 FOR TYP. ETILS S PNT S S PNT RB PNT RB RB T 6 7 S * WT/PNT RB T * SEE ELEVTIONS S * PNT RB T * PNT ONLY ON SOUTH GYP. B. WLL FT * WT/PNT TB T * SEE ELEVTIONS FT * WT/PNT TB T * SEE ELEVTIONS FT * WT/PNT TB T * SEE ELEVTIONS S PNT RB T S S S S S FT FT FT S S S PNT * WT/PNT * WT/PNT * WT/PNT * WT/PNT PNT PNT RB RB TB TB TB TB RB RB T T T T T T T T T T 8 9 0 metho stuio in. 9 south west temple SYMBOL LEGEN: slt lke ity, uth 80 p h o n e : (8 0 ) XX MTERIL TRNSITION * SEE ELEVTIONS * SEE ELEVTIONS * SEE ELEVTIONS * SEE ELEVTIONS MTERIL TYPE FT S LMINTE PL Bullnose Ege TRNSITION STRIPS TS RENORMP luminum B projet: Grn Juntion, O ONESSIONS 8 UP projet#: te: STGE LEFT STGE RIGHT 0 STGE 0 MEN'S 8 MOP WOMENS 6 Finish Floor Pln UNISEX 0 ROSSOVER 0 IT SEURE 0 ELETRIL.060 July, 06 MEHNIL OFFIE 0 STR RESSING 09 STR W 08 W 07 W 06 USTOIL 0 F00 Finish Floor Pln /6 = '0 00% ONSTRUTION OUMENTS