The World Bank Identity and Targeting for Social Protection Project (P155198)

Similar documents
The World Bank Strengthening Social Safety Net Project (P145699)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

The World Bank Cusco Regional Development (P117318)

Public Disclosure Copy

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Girls Education and Womens Empowerment and Livelihood Project (P151451)

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

Public Disclosure Copy

PAMSIMAS Support Trust Fund (P116236)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

The World Bank MA- Noor Ouarzazate Concentrated Solar Power Project (P131256)

The World Bank Can Tho Urban Development and Resilience (P152851)

Public Disclosure Copy

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

The World Bank Georgia National Innovation Ecosystem (GENIE) Project (P152441)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings

SUSTAINABLE CITIES (P128605)

Public Disclosure Copy

The World Bank Regional Infrastructure Development Fund (P154947)

SÃO PAULO METRO LINE 4 (PHASE 2) (P106390)

The World Bank Decentralized Community Driven Services Project (P117764)

Urban Water Supply Project (P156739)

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

Public Disclosure Copy

The World Bank Ethiopia: National Quality Infrastructure Development Project (P160279)

Public Disclosure Copy. Implementation Status & Results Report AGRICULTURAL COMPETITIVENESS IMPROVEMENT PROJECT (P122812)

The World Bank Zambia Water Resources Development Project (P114949)

Public Disclosure Copy. Implementation Status & Results Report KH - Livelihood Enhancement and Association of the Poor Project (LEAP) (P153591)

Public Disclosure Copy. Implementation Status & Results Report Emergency Agricultural Livelihoods and Climate Resilience Project (P166328)

Public Disclosure Copy

The World Bank OECS Regional Tourism Competitiveness (P152117)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank Local and Regional Competitiveness Project (P154263)

Public Disclosure Copy

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank Tamil Nadu Sustainable Urban Development Program (P150395)

EC Ibarra Transport Infrastructure Improvement Project (P147280)

Public Disclosure Copy

The World Bank Greater Maputo Water Supply Expansion Project (P125120)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Cambodia Global Partnership for Education Second Education Support Project (P144715)

The World Bank BiH Floods Emergency Recovery Project (P151157)

Public Disclosure Copy

The World Bank Senegal Tourism and Enterprise Development Project (P146469)

Public Disclosure Copy

Public Disclosure Copy

West Bank and Gaza: Finance for Jobs (P151089)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank Health System Performance Reinforcement Project (P156679)

Public Disclosure Copy. Implementation Status & Results Report REVITALIZING EDUCATION DEVELOPMENT IN SIERRA LEONE (P133070)

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Second Tamil Nadu Road Sector Project (P143751)

The World Bank CG Rep. LISUNGI Safety Nets System Project (P145263)

The World Bank Ho Chi Minh City Green Transport Development (P126507)

The World Bank Uganda Energy for Rural Transformation III (P133312)

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives.

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

Public Disclosure Copy

The World Bank Dam Operational Improvement and Safety (P096532)

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power

The World Bank Indonesia: Geothermal Energy Upstream Development Project (P155047)

The World Bank Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738)

The World Bank Local and Regional Competitiveness Project (P154263)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

The World Bank Pakistan: Third Punjab Education Sector Project (P154524)

Public Disclosure Copy

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Public Disclosure Copy

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Community Development Program Support Project-Phase III (P144637)

The World Bank Health System Strengthening and Support Project (P152799)

Public Disclosure Copy. Implementation Status & Results Report Pacific Islands Regional Oceanscape Program - Solomon Islands (P151777)

Public Disclosure Copy

Public Disclosure Copy

Rio de Janeiro Strengthening Public Sector Management Technical Assistance Project (P127245)

The World Bank Ecuador Risk Mitigation and Emergency Recovery Project (P157324)

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525)

Public Disclosure Copy

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

Transcription:

Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Morocco Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 1 ARCHIVED on 29-Aug-2017 ISR28949 Implementing Agencies: Kingdom of Morocco, Ministry of Interior Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:10-Mar-2017 Planned Mid Term Review Date:23-Sep-2019 Original Closing Date:31-Dec-2021 Project Development Objectives Effectiveness Date:27-Jun-2017 Actual Mid-Term Review Date:-- Revised Closing Date:31-Dec-2021 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The objective of the Project is to expand coverage of a unique identifying number for the Moroccan population and foreign residents, and to improve targeting of Social Safety Nets in the Project Area. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Public Disclosure Authorized Name Design and Development of the National Population Register (NPR) with a Unique Identifying Number (UIN), and Establishment of a National Identity Agency (NIA):(Cost $45.00 M) Design and Development of a Social Registry (SR):(Cost $50.00 M) Project Management, Capacity Building, and Monitoring and Evaluation:(Cost $4.75 M) Front end fee:(cost $0.25 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO -- Satisfactory Overall Implementation Progress (IP) -- Satisfactory Overall Risk Rating -- Substantial 8/29/2017 Page 1 of 9

Implementation Status and Key Decisions Prior to effectiveness, the Bank provided Technical Assistance (TA) to the Borrower related to the largest disbursement linked indicators scheduled for the calendar year 2017. The TA included (i) exchange of experience with the Unique Identification Authority of India (UIDAI) on the leading biometrically based authentication systems in the world (the Aadhaar program) to inform the design of the National Population Registry (NPR); and (ii) provision of hands-on training to the joint team from the Haut Commissariat au Plan (HCP) and the Ministry of Interior (MI) on the calibration of scoring formula to estimate the well-being of the Moroccan households (a Proxy-Means Test (PMT) Model). The TA focused on the estimation of a new targeting formula to estimate household welfare based on the HCP s latest available household survey data. The output involved the following activities: (i) drafting of terms of reference (ToRs) to estimate the PMT formula using the HCP s latest consumption survey which spelled out the rationale for the work, data requirements, main analytical models, sensitivity analysis, as well as a framework (set of indicators) used to select among different prediction models; (ii) distance-learning workshops with key staff from the HCP and the MI (April 5-6 2017) with the objective to expose the HCP and the MI staff to the analytical models used to estimate household welfare under a PMT approach and to use the ADePT SP software to carry out benefit incidence analysis for the existing programs (e.g. the RAMED program) or for those resulting from the estimation of different PMT models. In addition, a World Bank mission initiated the technical work for the calibration of the PMT model in Rabat (April 10-14, 2017). The preliminary results suggest that the targeting performance of RAMED is quite weak (only 28% of the cards go to the poorest quintile), which provides an excellent justification for the social registry and the new targeting formula. The preliminary PMT formula would increase the RAMED coverage of the poorest quintile from 28 percent to about 60 percent. The TA related to the development of a biometrically based national population registry, financed by both the ID4D group and the MENA Subsidy Reform Trust funds, focused on the exchange of information between the MI team in charge of developing the NPR and the India Aadhaar project. Specifically, a Moroccan delegation from the MI traveled to India to learn about the largest biometrically based identity system in the world, Aadhaar, which serves as an inspiration for their new National Population Registry. The mission equipped the Moroccans with in-depth knowledge on the functioning of the Aadhaar program, which in turn helped them finalize some of the bidding documents for the NPR and jump-start the first component of the project. The data and documentation on the Aadhaar program contributed to helping them improve the ToRs for the NPR and will ultimately equip them with a better understanding of both the services and the biometrically supported identity platform. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate -- Moderate Macroeconomic Moderate -- Moderate Sector Strategies and Policies Substantial -- Substantial Technical Design of Project or Program Substantial -- Substantial Institutional Capacity for Implementation and Sustainability Substantial -- Substantial Fiduciary Substantial -- Substantial Environment and Social Moderate -- Low Stakeholders Substantial -- Substantial Other -- -- -- Overall Substantial -- Substantial Results 8/29/2017 Page 2 of 9

Project Development Objective Indicators Number of newborns for whom a UIN has been attributed through civil registration in the project area (Number (Thousand), Custom) Value 0.00 -- 0.00 266.00 Number of newborns for whom a UIN has been attributed through civil registration in the project area - Female (Number (Thousand), Custom Breakdown) Value 0.00 -- 0.00 120.00 Population (six years old and above) for which a UIN has been attributed in the project area (Milion) (Number, Custom) Value 0.00 -- 0.00 26.00 Population (six years old and above) for which a UIN has been attributed in the project area (Milion) - Female (Number, Custom Breakdown) Value 0.00 -- 0.00 12.00 Share of beneficiaries of the RAMED, Tayssir, and DAAM programs registered in the Social Registry (SR) and who are in the first consumption quintile in the project area (Percentage, Custom) 8/29/2017 Page 3 of 9

Value 0.00 -- 0.00 65.00 Comments Share of beneficiaries of the RAMED, Tayssir, and DAAM programs registered in the Social Registry (SR) and who are in the first consumption quintile in the project area - Female (Percentage, Custom Breakdown) Value 0.00 -- 0.00 26.00 Date 30-Nov-2016 -- 27-Jun-2018 31-Dec-2021 Overall Comments Intermediate Results Indicators Direct project beneficiaries (Number (Thousand), Custom) Value 0.00 -- 0.00 26,266.00 8/29/2017 Page 4 of 9

Direct project beneficiaries - Female (Number (Thousand), Custom Supplement) Value 0.00 -- 0.00 11,800.00 Number of beneficiaries of RAMED, Tayssir, and DAAM (Million) (Number, Custom) Value 9.30 -- 9.30 9.30 Share of the civil registry office (Bureaux d'etat Civil, BEC) connected to a UIN generator (Percentage, Custom) Value 0.00 -- 0.00 25.00 Share of new individuals registered in year t (MASSAR, CNIE and Register of foreign residents) are communicated electronically to the NPR and attributed a UIN (Percentage, Custom) Value 0.00 -- 0.00 85.00 8/29/2017 Page 5 of 9

Share of new individuals registered in year t (MASSAR, CNIE and Register of foreign residents) are communicated electronically to the NPR and attributed a UIN - Female (Percentage, Custom Breakdown) Value 0.00 -- 0.00 40.00 Share of new applicants to RAMED, DAAM, and Tayssir programs registered in the SR (Percentage, Custom) Value 0.00 -- 0.00 100.00 Share of beneficiaries of RAMED/DAAM in SR (Percentage, Custom) Value 0.00 -- 0.00 68.00 Share of beneficiaries of Tayssir in the SR (Percentage, Custom) Value 0.00 -- 0.00 20.00 8/29/2017 Page 6 of 9

Number of programs/services that have included the UIN in their MIS (Number, Custom) Value 0.00 -- 0.00 3.00 Share of claims and grievances of SR beneficiaries documented, processed, and resolved within 30 days (Percentage, Custom) Value 0.00 -- 0.00 100.00 Survey on a random sample beneficiaries of Tayssir, DAAM, and RAMED (Yes/No, Custom) Value N -- N Y Operational audit conducted (Yes/No, Custom) Value N -- N Y 8/29/2017 Page 7 of 9

Capacity building (Yes/No, Custom) Value N -- Y Y Comments Capacity building: Technical Assistance delivered is summarized below: (a) an exchange of experience with Unique Identification Authority of India (UIDAI) on the largest biometricallybased authentication systems in the world (the program Aadhaar) to inform the design of the National Population Registry; and (b) handson training for the joint team from the Haut Commissariat au Plan (HCP) and the Ministry of Interior (MI) on the calibration of a scoring formula to estimate the well being of the Moroccan households (a proxy-means test model). Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P155198 IBRD-87180 Effective USD 100.00 100.00 0.00 28.82 71.18 29% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P155198 IBRD-87180 Effective 10-Mar-2017 16-Jun-2017 27-Jun-2017 31-Dec-2021 31-Dec-2021 Cumulative Disbursements 8/29/2017 Page 8 of 9

Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 8/29/2017 Page 9 of 9