Implementation Status & Results Report Croatia & Bosnia & Herzegovina GEF Adriatic Sea Environmental Pollution Control Project (I) (P143921)

Similar documents
Public Disclosure Copy

The World Bank Local and Regional Competitiveness Project (P154263)

Key Dates. Global Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Public Disclosure Copy

The World Bank Zambia Water Resources Development Project (P114949)

Public Disclosure Copy

Name Previous Rating Current Rating

Public Disclosure Copy

The World Bank Cusco Regional Development (P117318)

The World Bank Greater Maputo Water Supply Expansion Project (P125120)

The World Bank BiH Floods Emergency Recovery Project (P151157)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Local and Regional Competitiveness Project (P154263)

Public Disclosure Copy. Implementation Status & Results Report Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project (P112158)

Sierra Leone Energy Access Project - Sierra Leone Infrastructure Development Fund (P126180)

Public Disclosure Copy

EC Ibarra Transport Infrastructure Improvement Project (P147280)

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

The World Bank Guilin Integrated Environment Management (P133017)

Public Disclosure Copy

SUSTAINABLE CITIES (P128605)

Public Disclosure Copy. AFCC2/RI-The Eastern Electricity Highway Project under the First Phase of the Eastern Africa Power

Urban Water Supply Project (P156739)

The World Bank Zambia Water Resources Development Project (P114949)

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

The World Bank Regional Infrastructure Development Fund (P154947)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Public Disclosure Copy

The World Bank Uganda Energy for Rural Transformation III (P133312)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

SÃO PAULO METRO LINE 4 (PHASE 2) (P106390)

Public Disclosure Copy

SUSTAINABLE CITIES (P128605)

Public Disclosure Copy

Public Disclosure Copy

The World Bank Dam Operational Improvement and Safety (P096532)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

Relaunching Agriculture: Strengthening Agriculture Public Services II Project (GAFSP - IDA) (P126744)

The World Bank Ethiopia: National Quality Infrastructure Development Project (P160279)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy

P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project (P159632)

Implementation Status & Results Report Red Sea and Gulf of Aden Strategic Ecosystem Management GEF Project (P113794)

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

Public Disclosure Copy

Public Disclosure Copy

The World Bank MA- Noor Ouarzazate Concentrated Solar Power Project (P131256)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Small Town Water Supply and Urban Septage Management Project (P156738)

The World Bank Indonesia: Geothermal Energy Upstream Development Project (P155047)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report AGRICULTURAL COMPETITIVENESS IMPROVEMENT PROJECT (P122812)

Key Dates. Project Development Objectives. Components. Overall Ratings

Second Tamil Nadu Road Sector Project (P143751)

The World Bank Earthquake Housing Reconstruction Project (P155969)

The World Bank OECS Regional Tourism Competitiveness (P152117)

The World Bank Sri Lanka Agriculture Sector Modernization Project (P156019)

The World Bank Integrated Forest Ecosystem Management (P151102)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

PAMSIMAS Support Trust Fund (P116236)

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

Key Dates. Project Development Objectives. Components. Overall Ratings

Public Disclosure Copy

Public Disclosure Copy

West Bank and Gaza: Finance for Jobs (P151089)

The World Bank Ho Chi Minh City Green Transport Development (P126507)

Public Disclosure Copy

The World Bank Can Tho Urban Development and Resilience (P152851)

Third South West Indian Ocean Fisheries Governance and Shared Growth Project (SWIOFish3)

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives.

The World Bank Pakistan: Third Punjab Education Sector Project (P154524)

Public Disclosure Copy

Public Disclosure Copy

Sri Lanka Strategic Cities Development Project (P130548)

SOUTH KARAKALPAKSTAN WATER RESOURCES MGMT IMPROVEMENT (P127764)

Public Disclosure Copy. Implementation Status & Results Report Pacific Islands Regional Oceanscape Program - Solomon Islands (P151777)

The World Bank Earthquake Housing Reconstruction Project (P155969)

Rio de Janeiro Strengthening Public Sector Management Technical Assistance Project (P127245)

Public Disclosure Copy

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

The World Bank. Key Dates. Project Development Objectives. Components. Implementation Status & Results Report. Key Project Dates

Climate Adaptation and Mitigation Program for Aral Sea Basin CAMP4ASB (P151363)

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

Public Disclosure Copy

Coral Reef Rehabilitation and Management Program- Coral Triangle Initiative (COREMAP-CTI) (P127813)

Kiribati Adaptation Phase III (LDCF) (P112615)

Public Disclosure Copy

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

The World Bank Second Irrigation and Drainage Improvement Project (P086592)

Public Disclosure Copy. Implementation Status & Results Report REVITALIZING EDUCATION DEVELOPMENT IN SIERRA LEONE (P133070)

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Public Disclosure Copy. Implementation Status & Results Report Strengthening Institutional Capacity for Government Effectiveness Project (P149176)

Transcription:

EUROPE AND CENTRAL ASIA Western Balkans Water Global Practice Global Environment Project Investment Project Financing FY 2014 Seq No: 7 ARCHIVED on 04-Jan-2018 ISR31078 Implementing Agencies: Ministry of Finance, Ministry of Environment and Energy, Environmental Protection and Energy Efficiency Fund, Ministry of Foreign Trade and Economic Relations Key Dates Key Project Dates Bank Approval Date:11-Jun-2014 Planned Mid Term Review Date:24-Oct-2017 Original Closing Date:15-Mar-2017 Global Development Objectives Effectiveness Date:05-Dec-2014 Actual Mid-Term Review Date:12-Dec-2017 Revised Closing Date:15-Feb-2019 Global Environmental Objective (from Project Appraisal Document) The project s development and global environmental objectives are: (a) to reduce the discharge of pollutants with transboundary importance, particularly Nitrogen, in selected hot-spots of the eastern Adriatic Sea; and (b) to improve the capacity in Croatia and Bosnia and Herzegovina to prepare pollution control projects in selected localities of Dalmatia and Herzegovina and to strengthen the capacity to monitor environmentally sensitive areas of the sea. Has the Global Environmental Objective been changed since Board Approval of the Project Objective? No Components Name Component 1. Demonstration investments to reduce nutrient discharges and improve water quality monitoring capacity:(cost $27.77 M) Component 2. Technical Assistance:(Cost $1.98 M) Component 3: Project Management and Dissemination:(Cost $0.22 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Unsatisfactory Overall Risk Rating Substantial Substantial 1/4/2018 Page 1 of 7

Implementation Status and Key Decisions In Croatia project implementation is progressing well. The contract for Sitnica landfill works was signed in October 11, 2107 to be implemented in the next 12 months. Most of the studies planned as part of Component 2: Technical Assistance (TA), preparation of investment proposals and feasibility studies, EPEEF is financing from Government funds. To date six (6) projects along the Adriatic coast were prepared for EU funding. The procurement of sea monitoring equipment is delayed but planned for 2018. Implementation in BH is delayed due to the rebidding selection process for Design, Supply, and Installation for treatment of leachate at the sanitary landfill Uborak-Buđevci in Mostar. The bidding process is finalized and signing of the contract is expected in January 2018 1/4/2018 Page 2 of 7

Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Substantial Substantial Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Moderate Moderate Institutional Capacity for Implementation and Sustainability -- Substantial Substantial Fiduciary -- Moderate Moderate Environment and Social -- Moderate Moderate Stakeholders -- Moderate Moderate Other -- Moderate Moderate Overall -- Substantial Substantial Results 1/4/2018 Page 3 of 7

Global Environmental Objective Indicators Nutrient load reduction (Nitrogen(N)) achieved under the project(tones/year, Custom) Value 0.00 0.00 0.00 70.00 Investment Proposals prepared for EU funding(number, Custom) Value 0.00 6.00 6.00 6.00 Number of sea water quality measurements reported annually by the Croatian Ministry of Environment and Natural Resources from the new monitoring system(text, Custom) Value Manual reporting not yet available not yet available 3.00 Direct project beneficiaries(number, Custom) Value 0.00 0.00 0.00 140,500.00 1/4/2018 Page 4 of 7

Female beneficiaries(percentage, Custom Supplement) Value 0.00 0.00 0.00 50.00 Overall Comments Intermediate Results Indicators Analysis of the policy, legal and/or institutional reforms conducted and draft report completed per TOR (Text, Custom) Value No in progress in progress Yes Date 09-Sep-2013 20-Jun-2017 20-Jun-2017 15-Feb-2019 Approval of the Strategic Environmental Assessment for leachate management plan (Text, Custom) Value No done (Yes) done (Yes) Yes Date 09-Sep-2013 17-Jan-2017 17-Jan-2017 15-Feb-2019 1/4/2018 Page 5 of 7

Leachate management systems completed (Number, Custom) Value 0.00 0.00 0.00 2.00 Feasibility studies for the rehabilitation of leachate and wastewater treatment plants completed (Number, Custom) Value 0.00 6.00 6.00 4.00 Monitoring stations sampled (Number, Custom) Value 0.00 0.00 0.00 60.00 Overall Comments Meeting the results framework indicator is going according to the plan, i.e. revised results framework during the restructuring process in 2016. Some indicators are actually ahead of schedule, like Investment Proposals prepared and presented to the EU for funding, as already six (6) of those have been prepared only under Croatian TF (the total number of studies of both TFs is to be 6 at the end of the project). Contrary to that indicators related to sea monitoring equipment are slightly delayed due to postponed procurement process for obtaining the equipment. The basic review on monitoring as per new EU requirements will be prepared in early 2018. Indicators related to leachate treatment as well as project objectives are being met according to the revised results framework. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed 1/4/2018 Page 6 of 7

P143921 TF-17706 Effective USD 4.33 4.33 0.00 1.29 3.04 30% P143921 TF-17727 Effective USD 2.44 2.44 0.00 0.26 2.18 11% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P143921 TF-17706 Effective 08-Sep-2014 08-Sep-2014 05-Dec-2014 15-Mar-2017 15-Feb-2019 P143921 TF-17727 Effective 10-Sep-2014 10-Sep-2014 03-Jun-2015 15-Mar-2017 15-Feb-2019 Cumulative Disbursements Restructuring History Level 2 Approved on 19-Sep-2016 Related Project(s) There are no related projects. 1/4/2018 Page 7 of 7