September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

Similar documents
Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO

EROSION CONTROL NARRATIVE

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

FINAL DRAINAGE REPORT Villages at Riverdale Carriage Homes Thornton, CO

EROSION CONTROL NARRATIVE

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

BROADSTONE VANTAGE POINT APARTMENTS NE corner of S. Parker Road, and E. Cottonwood Drive Parker, Colorado

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Section 4: Model Development and Application

Wellsgate Terrace SPECIFICATIONS.

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

Stage Discharge Tabulation for Only Orifice Flow

Continuing Education Course #101 Drainage Design with WinTR-55

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

WATER MANAGEMENT REPORT FOR PAGE ESTATES

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

Hydrology Study Report

APPENDIX B DRAINAGE REPORT

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

3301 East 120 th Avenue Assited Living & Memory Care

WATERVIEW EAST PRELIMINARY DRAINAGE REPORT EL PASO COUNTY, COLORADO

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

Appendix B Equations and Examples

D. B. G R A Y E N G I N E E R I N G I N C.

Drainage Study for Civic Center Way

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

Stormwater Capacity Analysis for Westover Branch Watershed

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Materials. Use materials meeting the following.

Eastlake Assited Living & Memory Care

Final Drainage Report

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

Chapter 7 Mudflow Analysis

Appendix E Guidance for Shallow Flooding Analyses and Mapping

A HYDROLOGIC STUDY OF THE EFFECTS OF URBAN DEVELOPMENT ON STORM RUNOFF: A CASE STUDY IN QUEENS, NY ABSTRACT

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design

HYDROLOGY REPORT Tentative Tract No. 5978

Basic Hydraulics June 2007

STORMWATER MANAGEMENT REPORT

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

WELCOME Lake Wabukayne OPEN HOUSE

Stone Outlet Sediment Trap

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

Villages at Riverdale Thornton, CO

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

APPENDIX B WORKSHEETS & EXHIBITS

STORMWATER DESIGN CALCULATIONS

Chapter 7 Mudflow Analysis

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

Woodford County Erosion Prevention Plan and Permit. Application #

Specifications Whitcomb Elementary School Demolition January 15, 2016

Rock & Aggregate Drop Inlet Protection

City of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

HYDRAULIC EFFICIENCY OF GRATE AND CURB INLETS FOR URBAN STORM DRAINAGE

Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids

Chapter 10 - Sacramento Method Examples

CCR Rule Annual Inspection Report (cont.) 2

Hydrology and Hydraulics Design Report. Background Summary

APPENDIX G APPENDIX G SEDIMENT CONTAINMENT SYSTEM DESIGN RATIONALE

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

The Effect of Stormwater Controls on Sediment Transport in Urban Streams

Monitoring Considerations and Costs

TPDES: Soil, Erosion and Sedimentation Methods

PHASE III DRAINAGE STUDY FOR CRYSTAL VALLEY RANCH FILING 11. Castle Rock, Colorado PREPARED FOR CRYSTAL VALLEY RANCH DEVELOPMENT COMPANY, LLC

PARADIGM ODP FORT COLLINS, CO 80525

CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2015/2016 May 12, 2015

DRAINAGE REPORT FOR ROCKY S CONVENIENCE STORE

Drainage Analysis. Appendix F

Coarse Sediment Traps

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

DRAINAGE REPORT. Ministry of Transportation and Infrastructure. Highway 7 Four Laning Silverdale Avenue to Nelson Street 100% Detailed Design

3.11 Floodplains Existing Conditions

Preliminary Hydraulic Report

Caledon Villas Corporation

CASE STUDIES. Introduction

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

FINAL UTILITY REPORT Creekside Thornton, CO

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Wal-mart Store # Ft. Walton Beach, FL NE Corner of Eglin Parkway/S.R. 85 and South Street STORMWATER REPORT. February 2017

Instream Sediment Control Systems

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

Rucker Pond. Background

Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collecti

Transcription:

September 6, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report and calculations of the drainage design for the Maverik located at 112 th Avenue and Colorado Blvd in Thornton, CO. The storm water generated onsite will sheet flow to newly installed inlet boxes. The inlet boxes are equipped with a sump and snout that will filter the storm water from hydrocarbons and other pollutants. After passing through the filtration process, the storm water will be directed to an above ground open detention basin that has been sized for the WQCV, EURV, and 100-year volume per USDCM and City of Thornton criteria. Once the storm water is in the detention system, it will be gravity fed towards a control box that is equipped with an orifice plate that has been sized to control the outflow at rates of 0.10 cfs for WQCV, 0.20 cfs for EURV, and 5.20 cfs for the 100-yr volume. The storm water hydraulic and hydrology calculations including the basin sizing and orifice plate are discussed in this report. If you have any questions, or we can be of further assistance, please let us know. Sincerely, Nate Reeve, P.E. Principal Engineer Reeve & Associates, Inc. nreeve@reeve-assoc.com Anna Newman, E.I.T. Project Engineer Reeve & Associates, Inc. anewman@reeve-assoc.com Solutions You Can Build On Civil Engineering / Land Planning / Structural Engineering / Landscape Architecture / Land Surveying 5160 South 1500 West Riverdale, Utah 84405 Tel: 801-621-3100 Fax: 801-621-2666 Email: ogden@reeve-assoc.com Website: www.reeve-assoc.com

Stormwater Drainage Design Report 1.0 Introduction 1.1 Purpose The purpose of this drainage report is to reflect proposed changes to the current drainage patterns associated with the proposed Maverik located on 112 th Avenue and Colorado Boulevard in Thornton, CO. Proposed changes to the property include construction of a 5,518 sq. ft. Maverik convenience store with fuel pumps and associated utility service connections. The detention basin and associated facilities have been designed for a full build-out scenario. 1.2 General Property Description At the request of Thornton City, Reeve & Associates has prepared the following Storm Drainage Design Report for the proposed Maverik located on 112 th Avenue and Colorado Boulevard in Thornton, Colorado. The site is located in the northwest quarter of section 7, township 2 south, and range 67 west. Figure 1 in the Appendix contains a general location map that shows the proposed location and surrounding properties. A private storm sewer system will collect stormwater runoff from the proposed development. The storm sewer system will discharge into a private detention pond located on the south end of the property. An outlet pipe from the detention pond will outlet to the public right of way located along the east side of Colorado Boulevard. 1.3 Pre-developed Drainage Characteristics The existing site is currently undeveloped and consists mostly of dry weeds and sandy loam with the soil type being C/D. The existing runoff from this property is one basin(ex-1) and sheet flows to the south west and out the access of the adjacent property owner as outlined in this section and depicted on the predevelopment drainage plan located in the Appendix; with design point Z being the outfall of the basin. The property is bordered to the north by 112 th Avenue to the west by Colorado Boulevard, to the south by commercial developments (Conoco Gas Station), and to the east by a baseball field and church. The pre-developed stormwater runoff leaves the site without the use of engineered quality or detention facilities. 4

Stormwater Drainage Design Report 1.4 Post-developed Drainage Characteristics The proposed site will operate as a Maverik Convenience Store with vehicle fueling stations. The entire parcel sits on 3.04 acres. The site will contain 54,208 s.f. of hard surface area, 54,208 s.f. of landscaped area and 5,518 s.f. of building area. The proposed grading will divide the site into eleven drainage basins and seven design points as outlined in this section and depicted on the developed drainage plan located in the Appendix. Basin R-1 encompasses 0.12 acres of landscape between the onsite curb and gutter and the adjacent property owner to the east. Stormwater generated in this basin will sheet flow undetained to the east and then to the south and follow its historical pattern into Colorado Blvd. Basin R-2 encompasses 0.24 acres of landscape and a small area of sidewalk between the onsite curb and gutter and Colorado Boulevard right of way. Stormwater generated in this basin will sheet flow undetained into the curb and gutter within the right-of-way and into the southwest corner of the lot and into Colorado Blvd. Basin R-3 encompasses 0.14 acres of landscape to the south of the property and in between the adjacent property owner to the south. Stormwater generated in this basin will sheet flow undetained into the right-of-way and into the southwest corner of the lot and into Colorado Blvd. Basin R-4 encompasses 0.10 acres of asphalt paving on the southwest corner of the lot. Stormwater generated in this basin will sheet flow undetained into the curb and gutter within the right-of-way in Colorado Blvd. Basin B-1 encompasses 0.31 acres of parking and drive aisles of the proposed convenience store. Stormwater generated in this basin will sheet flow to a low point on the curb with an inlet box titled A. The water will be conveyed by a private storm sewer system to the private detention pond. Basin B-2 encompasses 0.15 acres of parking, drive aisles and building from the proposed convenience store. Stormwater generated in this basin will sheet flow to a low point on the curb with an inlet box titled A. The water will be conveyed by a private storm sewer system to the private detention pond. Basin B-3 encompasses 0.32 acres of parking, drive aisles and landscape of the proposed convenience store. Stormwater generated in this basin will sheet flow to a low point on curb with an inlet box titled B. The water will be conveyed by a private storm sewer system to the private detention pond. 5

Stormwater Drainage Design Report Basin B-4 encompasses 0.10 acres of parking, drive aisles, building and landscape of the proposed convenience store. Stormwater generated in this basin will sheet flow to a low point on curb with an inlet box titled C. The water will be conveyed by a private storm sewer system to the private detention pond. Basin B-5 encompasses 0.30 acres of parking and drive aisles. Stormwater generated in this basin will sheet flow to a low point on curb with an inlet box titled E. The water will be conveyed by a private storm sewer system to the private detention pond. Basin B-6 encompasses 0.67 acres of parking and drive aisles and landscape for the proposed convenience store. Stormwater generated in this basin will sheet flow to a low point on curb with an inlet box titled D. The water will be conveyed by a private storm sewer system to the private detention pond. Basin B-7 encompasses 0.53 acres of detention pond. This has been sized to detain the 100-year storm event per COT code with an outlet structure and orifice plates for the WQCV, EURV and 100-year storm event. It will be landscaped per COT code. Pipe P1 conveys the stormwater from Basin B-1 from the inlet box A. This pipe also carries the water from Basin B-2. Pipe P2 conveys the stormwater from Basin B-3 from the inlet box B. Pipe P3 conveys the stormwater from Basin B-4 from the inlet box C. This pipe also carries the water from Basin B-3, B-2 and B-1. Pipe P4 conveys the stormwater from B-6 from the inlet box D. This pipe also carries the water from Basin B-4, B-3, B-2 and B-1. Pipe P5 conveys the stormwater from B-5 from the inlet box E. This pipe also carries the water from Basin B-6, B-4, B-3, B-2 and B-1. Pipe P6 conveys the stormwater from B-7, the detention pond. Ultimately, all storm water runoff from this site is conveyed to the South Platte River. Once completed, 0.65 cfs and 1.17 cfs will exit the site untreated during the 5-yr and 100-yr storms respectively with the majority of it passing through landscape areas. The remaining storm water from hard surface areas will be directed to a private detention pond that is sized for the WQCV, EURV and 100- yr volumes. It will release 0.3 cfs and 5.20 cfs into the Colorado Blvd right-ofway during the 5-year and 100-year storm events respectively. 6

Stormwater Drainage Design Report 1.5 Water Quality Post-development stormwater runoff will be collected via curb and gutter and private combination curb inlets throughout the property. A private storm sewer system will convey storm water flows to the private detention pond facility located along the northeast property line. The detention pond will provide storage for the water quality capture volume of 0.084 acre-feet or 3,659 c.f. with a water surface elevation of 5199.85 and the EURV storage has also been provided with a volume of 0.168 acre-feet or 7,318 c.f. with an elevation of 5201.06. An outlet structure within the detention pond will provide water quality and staged release of stored stormwater that meets the City of Thornton Storm Drainage Design requirements. Because the 5-yr, and 100-yr design storm event developed flows are larger than the pre-developed site runoff totals, the detention pond outlet structure also reduces the release rates of the post-developed flows to the pre-developed rates. The pond will provide storage for the 5-yr design storm event and the water quality volume of 0.299 acre-feet or 13,024 c.f. with a water surface elevation of 5201.35. The pond will also provide storage for the 100-yr, design storm event with a volume of 0.429 acre-feet or 18,687 c.f. with a water surface elevation of 5202.04. During the 100-yr design storm event, the pond outlet structure will provide a release rate of 5.2 cfs which is less than the predeveloped outflow of 16.1 cfs provided the UD-Detention analysis of the detention pond volume. A private 15 RCP pipe will connect to the outlet structure and release into a sidewalk chase drain and into the curbline along the north side of Colorado Boulevard. See Hydraulic Calculations located in the Appendix for more details regarding detention pond design. 1.6 Hydrology Calculations The City of Thornton Storm Drainage Design, Grading, and Water Quality Technical Criteria within the City of Thornton Standards and Specifications was used to perform hydrology calculations. The Rational Method has been used to compute storm water runoff, as preferred for drainage areas less than 100-acres. Design storms with the 5-yr, and 100-yr, occurrence intervals were used. Weighted or composite C values for the site were calculated using the following formula. 7

Stormwater Drainage Design Report 5-year, and 100-yr, flows for the proposed site are summarized in the Appendix. Table 1 shows a comparison between pre-development discharges and postdevelopment discharges from the project site. Tablie 1: Peak Discharge Comparison Pre-Development Discharge (cfs) Post-Development Discharge (cfs) Discharge Difference (cfs) Q5 Colorado Blvd 1.1 0.3-0.8 Q100 Colorado Blvd 5.7 5.2-0.5 Pipe and inlet capacity calculations were performed at each design point as shown on the drainage plan. Storm sewer for this project was designed to convey the required 10-yr storm even with a surcharge hydraulic grade line not less than one foot below finished grade. Hydrologic and hydraulic calculations are located in the Appendix. All assumptions shall be field verified by the contractor prior to commencing construction, and discrepancies shall be reported to the engineer immediately for review. 1.7 Floodplain Statement According to the Federal Emergency Management Agency (FEMA), as depictured on Flood Insurance Rate Map (FIRM) 08001C0314H with an effective date of March 5, 2007, the site lies within areas determined to be outside the 500- year floodplain. 1.8 Erosion Control It is respectfully requested that an erosion control plan be submitted in conjunction with the final grading plan and not be required to be submitted with this drainage report. Erosion control will be implemented in 2 phases. Phase 1 is during construction and Phase 2 is post-construction. 8

Stormwater Drainage Design Report Phase 1 erosion control components include the following. Two 25 x 20 construction entrances with 8 compacted clean gravel will be placed at the construction accesses to reduce amounts of sediment tracked onto roadways. A concrete wash area will be placed on site to contain concrete waste. A silt fence will be placed at the perimeter of the site as a dust control measure. A temporary drainage ditch will be created prior to installation of infrastructure to provide a path for storm water and prevent runoff to adjacent property. Inlet protection bmps will be implemented at all inlets to prevent sediment from entering storm drain system. In addition to these components, streets will be swept within 1,000 feet of construction entrances daily if necessary. Phase 2 erosion control components include a snout and sump filter on strategically placed inlet box and extended detention basin. Snout and sump filter will be placed on inlet box that directly outlets to detention basin to filter hydrocarbons and other contaminants from entering the detention basin. Extended detention basin provides water quality volume as well as EURV. 1.9 Summary Developed runoff generated from the project site during the 100-yr. design storm event are anticipated to be less than or equal to the pre-developed runoff rates. Prior to being released off-site, runoff will be treated via a private detention pond and water quality facility, while a small percentage of the site s runoff will discharge (un-detained) to the adjacent right-of-way or adjacent properties. Downstream of the detention pond, a private 15 RCP pipe and sidewalk chase drain will convey treated runoff into the Colorado Boulevard right of way. A series of private combination inlets will collect runoff in multiple locations on site and convey the runoff to the proposed private detention pond east of the Maverik building. The storm sewer has been designed to handle developed flows in the required 10-yr. design storm event condition within minimal surcharge. Since the site s anticipated developed runoff rate is less than the allowed predevelopment runoff rate, development on this site as described in the enclosed drainage plan is not anticipated to adversely impact downstream stormwater infrastructure. Upon the completion of construction, if conditions or outfall locations differ from the assumptions stated within this drainage study, an amendment to this report must be completed. Maverik Inc. will be responsible for any maintenance on the drainage facilities. 9

Stormwater Drainage Design Report APPENDIX 10

Stormwater Drainage Design Report Figure 1 Vicinity Map 12 th Avenue and Colorado Boulevard Project Site The project site is located at 112 th Avenue and Colorado Boulevard.in Thornton, CO. 11

12 Stormwater Drainage Design Report

13 Stormwater Drainage Design Report

14 Stormwater Drainage Design Report

15 Stormwater Drainage Design Report

16 Stormwater Drainage Design Report

17 Stormwater Drainage Design Report

18 Stormwater Drainage Design Report

19 Stormwater Drainage Design Report

20 Stormwater Drainage Design Report

21 Stormwater Drainage Design Report

22 Stormwater Drainage Design Report

23 Stormwater Drainage Design Report

24 Stormwater Drainage Design Report

25 Stormwater Drainage Design Report

26 Stormwater Drainage Design Report

27 Stormwater Drainage Design Report

28 Stormwater Drainage Design Report

29 Stormwater Drainage Design Report

30 Stormwater Drainage Design Report

31 Stormwater Drainage Design Report

32 Stormwater Drainage Design Report

33 Stormwater Drainage Design Report

Storm Runoff Calculations Maverik, Inc 112th Avenue & Colorado Boulevard 9/6/2016 TJH Basin Designation EX-1 Composite 'C' Factors - Pre & Post-Development GRASS ROOFS PAVEMENT GRAVEL COMPOSITE C FACTOR Grass Roofs Paved Gravel Total 5-YR 10-YR 100-YR 5-YR 10-YR 100-YR 5-YR 10-YR 100-YR 5-YR 10-YR 100-YR 5-YR 10-YR 100-YR 0 90 100 40 3.03 0.00 0.00 0.00 3.03 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.070 0.220 0.520 % IMPERVIOUS 0.00 R-1 R-2 R-3 R-4 B-1 B-2 B-3 B-4 B-5 B-6 B-7 * EX = existing * R = undetained * B = detained 0.12 0.00 0.00 0.00 0.12 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.070 0.220 0.520 0.24 0.00 0.01 0.01 0.26 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.115 0.258 0.543 0.14 0.00 0.00 0.00 0.14 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.070 0.220 0.520 0.00 0.00 0.09 0.00 0.09 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.920 0.940 0.960 0.01 0.00 0.30 0.00 0.31 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.893 0.917 0.946 0.01 0.06 0.08 0.00 0.15 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.827 0.864 0.911 0.11 0.00 0.21 0.00 0.32 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.628 0.693 0.809 0.01 0.07 0.02 0.00 0.10 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.738 0.790 0.863 0.00 0.09 0.21 0.00 0.30 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.893 0.919 0.945 0.07 0.00 0.61 0.00 0.68 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.833 0.866 0.915 0.53 0.00 0.01 0.00 0.54 0.07 0.22 0.52 0.83 0.87 0.91 0.92 0.94 0.96 0.40 0.50 0.69 0.086 0.233 0.528 0.00 0.04 0.00 1.00 0.97 0.93 0.66 0.86 1.00 0.90 0.02 Basin Designation EX-1 Time of Concentration Slope C5 Acre Length (ft) Slope % Ti (min) Length (ft) Vel. (fps) Tt (min.) Total (ft/ft) 0.070 3.03 300.00 0.035 21.30 250 0.025 3.16 1.58 22.88 R-1 0.000 0.12 20.00 0.05 5.22 350 0.019 3.63 0.09 5.00 R-2 0.038 0.26 20.00 0.03 6.33 25 0.07 1.89 0.18 6.33 R-3 0.000 0.14 22.00 0.02 8.15 0 0 0.00 0.00 5.00 min. assumed R-4 1.000 0.09 22.00 0.02 0.74 0 0 0.00 0.00 5.00 min. assumed B-1 0.968 0.31 5.00 min. assumed B-2 0.933 0.15 5.00 min. assumed B-3 0.656 0.32 5.00 min. assumed B-4 0.860 0.10 5.00 min. assumed B-5 1.000 0.30 5.00 min. assumed B-6 0.897 0.68 5.00 min. assumed B-7 0.019 0.54 5.00 min. assumed * EX = existing * R = undetained * B = detained Design Point Z A B C E D * EX = existing * R = undetained * B = detained Design Storm: 5-Year Runoff Basin Area (ac) Coeff. (c) Tc C*A I (in./hr.) Q (cfs) Sum Area Max (Tc) EX-1 3.03 0.070 22.88 0.21 2.83 0.600 3.03 22.88 R-1 R-2 R-3 R-4 B-1 B-2 B-3 B-4 B-5 B-6 B-7 0.12 0.070 5.00 0.01 4.58 0.038 0.26 0.115 6.33 0.03 4.75 0.143 0.14 0.070 5.00 0.01 4.58 0.045 0.09 0.920 5.00 0.08 4.58 0.379 0.31 0.893 5.00 0.28 4.58 1.267 0.15 0.827 5.00 0.12 4.58 0.568 0.32 0.628 5.00 0.20 4.58 0.920 0.10 0.738 5.00 0.07 4.58 0.338 0.30 0.893 5.00 0.27 4.58 1.227 0.68 0.833 5.00 0.57 4.58 2.593 0.54 0.086 5.00 0.05 4.23 0.196 Sum C*A Total Q (cfs) 0.2121 0.60 0.46 5.00 0.40 1.84 0.32 5.00 0.20 0.92 0.10 5.00 0.07 0.34 0.30 5.00 0.27 1.33 0.68 5.00 0.57 2.79 Passby Q (cfs) 0.5 1.5

Design Storm: 10-Year Runoff Design Point Basin Area (ac) Coeff. (c) Tc C*A I (in./hr.) Q (cfs) Sum Area Max (Tc) Sum C*A Total Q (cfs) EX-1 3.03 0.220 22.88 0.67 3.38 2.253 Z 3.03 22.88 0.6666 2.25 R-1 0.12 0.220 5.00 0.03 5.46 0.144 R-2 0.26 0.258 6.33 0.07 5.17 0.347 R-3 0.14 0.220 5.00 0.03 5.46 0.168 R-4 0.09 0.940 5.00 0.08 5.46 0.462 A B-1 0.31 0.917 5.00 0.28 5.46 1.552 0.46 5.00 0.41 2.26 B-2 0.15 0.864 5.00 0.13 5.46 0.708 B B-3 0.32 0.693 5.00 0.22 5.46 1.210 0.32 5.00 0.22 1.21 C B-4 0.10 0.790 5.00 0.08 5.46 0.431 0.10 5.00 0.08 0.43 E B-5 0.30 0.919 5.00 0.28 5.46 1.505 0.30 5.00 0.28 1.51 D B-6 0.68 0.866 5.00 0.59 5.46 3.215 0.68 5.00 0.59 3.21 B-7 0.54 0.233 5.00 0.13 5.04 0.635 * EX = existing * R = undetained * B = detained Design Point Basin EX-1 Z R-1 R-2 R-3 R-4 A B-1 B-2 B B-3 C B-4 E B-5 D B-6 B-7 Design Storm: 100-Year Runoff Area (ac) Coeff. (c) Tc C*A I (in./hr.) Q (cfs) Sum Area Max (Tc) 3.03 0.520 22.88 1.58 5.57 8.776 3.03 22.88 0.12 0.520 5.00 0.06 9.02 0.563 0.26 0.543 6.33 0.14 8.88 1.255 0.14 0.520 5.00 0.07 9.02 0.657 0.09 0.960 5.00 0.09 9.02 0.779 0.31 0.946 5.00 0.29 9.02 2.645 0.15 0.911 5.00 0.14 9.02 1.232 0.32 0.809 5.00 0.26 9.02 2.334 0.10 0.863 5.00 0.09 9.02 0.779 0.30 0.945 5.00 0.28 9.02 2.557 0.68 0.915 5.00 0.62 9.02 5.610 0.54 0.528 5.00 0.29 8.35 2.381 0.46 0.32 0.10 0.30 0.68 5.00 Sum C*A Total Q (cfs) 1.5756 8.78 0.43 3.88 5.00 0.26 2.33 5.00 0.09 0.78 5.00 0.28 2.76 5.00 0.62 6.81 Passby Q (cfs) 1.5 4.8 Sum Area Max (Tc) Sum C*A Total Q (cfs) A B-1 + B-2 0.46 5.00 0.43 3.88 B B-3 0.32 5.00 0.26 2.33 C B-4 0.10 5.00 0.09 0.78 D B-6 0.68 5.00 0.62 5.61 E B-5 0.30 5.00 0.62 2.56 FOR PIPE CAPACITY CALCULATIONS P1 P2 P3 P4 P5 Sum Area 0.46 0.32 0.88 1.18 2.40 (Tc) 5.00 5.00 7.50 8.50 8.52 Sum C*A 0.29 0.29 0.55 1.05 2.14 I (in./hr) 4.58 4.58 4.58 4.35 4.25 P6 See UD-Detention Spreadsheet Total Q (cfs) 2.26 1.21 3.90 7.12 8.62 5.20 Z post See UD-Detention Spreadsheet 5.20

Inlet Management Worksheet Protected INLET NAME Inlet A Inlet B Inlet C Inlet D Inlet E ed Site Type (Urban or Rural) URBAN URBAN URBAN URBAN URBAN Inlet Application (Street or Area) STREET STREET STREET STREET STREET Hydraulic Condition In Sump On Grade On Grade On Grade On Grade Inlet Type Denver No. 16 Combination Denver No. 16 Combination Denver No. 16 Combination Denver No. 16 Combination Denver No. 16 Combination USER-DEFINED INPUT User-Defined Design Flows Minor Q Known (cfs) Major Q Known (cfs) Bypass (Carry-Over) Flow from Upstream Receive Bypass Flow from: Minor Bypass Flow Received, Q b (cfs) Major Bypass Flow Received, Q b (cfs) 1.8 0.9 0.3 2.6 1.2 3.9 2.3 0.8 5.5 2.6 No Bypass Flow Received No Bypass Flow Received No Bypass Flow Received Inlet B Inlet C 0.0 0.0 0.0 0.2 0.1 0.0 0.0 0.0 1.2 0.2 Watershed Characteristics Subcatchment Area (acres) Percent Impervious NRCS Soil Type Watershed Profile Overland Slope (ft/ft) Overland Length (ft) Channel Slope (ft/ft) Channel Length (ft) Minor Storm Rainfall Input Design Storm Return Period, T r (years) One-Hour Precipitation, P 1 (inches) C 1 C 2 C 3 User-defined C User-defined 5-yr C 5 User-defined T c Major Storm Rainfall Input Design Storm Return Period, T r (years) One-Hour Precipitation, P 1 (inches) C 1 C 2 C 3 User-defined C User-defined 5-yr C 5 User-defined T c CALCULATED OUTPUT Minor Total Design Peak Flow, Q (cfs) Major Total Design Peak Flow, Q (cfs) Minor Flow Bypassed Downstream, Q b (cfs) Major Flow Bypassed Downstream, Q b (cfs) Minor Storm (Calculated) Analysis of Flow Time C C 5 Overland Flow Velocity, Vi Channel Flow Velocity, Vt Overland Flow Time, Ti Channel Travel Time, Tt Calculated Time of Concentration, T c T c (Equation 5-5 USDCM) Recommended T c T c selected by User Design Rainfall Intensity, I Calculated Local Peak Flow, Q p Major Storm (Calculated) Analysis of Flow Time C C 5 Overland Flow Velocity, Vi Channel Flow Velocity, Vt Overland Flow Time, Ti Channel Travel Time, Tt Calculated Time of Concentration, T c T c (Equation 5-5 USDCM) Recommended T c T c selected by User Design Rainfall Intensity, I Calculated Local Peak Flow, Q p 1.8 0.9 0.3 2.8 1.3 3.9 2.3 0.8 6.7 2.8 N/A 0.2 0.1 1.5 0.5 N/A 1.2 0.2 4.8 1.5 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 112th Avenue & Colorado Boulevard Basin 1 Inlet at Design Point A Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb T BACK = 0.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) S BACK = 0.000 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) n BACK = 0.012 Height of Curb at Gutter Flow Line H CURB = 6.00 inches Distance from Curb Face to Street Crown T CROWN = 40.0 ft Gutter Width W = 1.50 ft Street Transverse Slope S X = 0.044 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) S W = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition S O = 0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) n STREET = 0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm T MAX = 10.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm d MAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Q allow = SUMP SUMP cfs INLET IN A SUMP OR SAG LOCATION Lo (C) H-Curb W W P H-Vert Wo Lo (G) Design Information (Input) MINOR MAJOR Denver No. 16 Combination Type of Inlet Type = Denver No. 16 Combination Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') a local = 2.00 2.00 inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = 6.0 6.0 inches Grate Information MINOR MAJOR Override Depths Length of a Unit Grate L o (G) = 4.00 4.00 feet Width of a Unit Grate W o = 1.50 1.50 feet Area Opening Ratio for a Grate (typical values 0.15-0.90) A ratio = 0.31 0.31 Clogging Factor for a Single Grate (typical value 0.50-0.70) C f (G) = 0.50 0.50 Grate Weir Coefficient (typical value 2.15-3.60) C w (G) = 3.60 3.60 Grate Orifice Coefficient (typical value 0.60-0.80) C o (G) = 0.60 0.60 Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening L o (C) = 4.00 4.00 feet Height of Vertical Curb Opening in Inches H vert = 6.50 6.50 inches Height of Curb Orifice Throat in Inches H throat = 5.25 5.25 inches Angle of Throat (see USDCM Figure ST-5) Theta = 0.00 0.00 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) W p = 1.50 1.50 feet Clogging Factor for a Single Curb Opening (typical value 0.10) C f (C) = 0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7) C w (C) = 3.70 3.70 Curb Opening Orifice Coefficient (typical value 0.60-0.70) C o (C) = 0.66 0.66 Low Head Performance Reduction (Calculated) MINOR MAJOR Depth for Grate Midwidth d Grate = 0.520 0.521 ft Depth for Curb Opening Weir Equation d Curb = 0.37 0.38 ft Combination Inlet Performance Reduction Factor for Long Inlets RF Combination = 0.84 0.85 Curb Opening Performance Reduction Factor for Long Inlets RF Curb = 1.00 1.00 Grated Inlet Performance Reduction Factor for Long Inlets RF Grate = 0.84 0.85 MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Q a = 4.7 4.8 cfs Inlet Capacity IS GOOD for Minor and Major Storms(>Q PEAK) Q PEAK REQUIRED = 1.8 3.9 cfs Copy of UD-Inlet_v4.03.xlsm, Inlet A 9/7/2016, 10:45 AM

Project: Inlet ID: ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 112th Avenue & Colorado Boulevard Inlet B Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb T BACK = 0.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) S BACK = 0.000 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) n BACK = 0.012 Height of Curb at Gutter Flow Line H CURB = 6.00 inches Distance from Curb Face to Street Crown T CROWN = 40.0 ft Gutter Width W = 1.50 ft Street Transverse Slope S X = 0.010 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) S W = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition S O = 0.013 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) n STREET = 0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm T MAX = 10.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm d MAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Q allow = 1.6 4.0 cfs Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' INLET ON A CONTINUOUS GRADE Design Information (Input) MINOR MAJOR Denver No. 16 Combination Type of Inlet Type = Denver No. 16 Combination Local Depression (additional to continuous gutter depression 'a') a LOCAL = 2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Warning 1 Length of a Single Unit Inlet (Grate or Curb Opening) L o = 4.00 4.00 ft Warning 1 Width of a Unit Grate (cannot be greater than W, Gutter Width) W o = 1.50 1.50 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5) C f -G = 0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) C f -C = 0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity' MINOR MAJOR Total Inlet Interception Capacity Q = 0.7 1.2 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Q b = 0.2 1.2 cfs Capture Percentage = Q a /Q o = C% = 76 50 % Warning 1: Dimension entered is not a typical dimension for inlet type specified. Copy of UD-Inlet_v4.03.xlsm, Inlet B 9/7/2016, 10:45 AM

Project: Inlet ID: ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 112th Avenue & Colorado Boulevard Inlet C Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb T BACK = 0.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) S BACK = 0.000 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) n BACK = 0.012 Height of Curb at Gutter Flow Line H CURB = 6.00 inches Distance from Curb Face to Street Crown T CROWN = 10.0 ft Gutter Width W = 1.50 ft Street Transverse Slope S X = 0.018 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) S W = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition S O = 0.045 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) n STREET = 0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm T MAX = 5.0 5.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm d MAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Q allow = 1.6 1.6 cfs Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' INLET ON A CONTINUOUS GRADE Design Information (Input) MINOR MAJOR Denver No. 16 Combination Type of Inlet Type = Denver No. 16 Combination Local Depression (additional to continuous gutter depression 'a') a LOCAL = 2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Warning 1 Length of a Single Unit Inlet (Grate or Curb Opening) L o = 4.00 4.00 ft Warning 1 Width of a Unit Grate (cannot be greater than W, Gutter Width) W o = 1.50 1.50 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5) C f -G = 0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) C f -C = 0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity' MINOR MAJOR Total Inlet Interception Capacity Q = 0.3 0.6 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Q b = 0.1 0.2 cfs Capture Percentage = Q a /Q o = C% = 85 74 % Warning 1: Dimension entered is not a typical dimension for inlet type specified. Copy of UD-Inlet_v4.03.xlsm, Inlet C 9/7/2016, 10:46 AM

Project: Inlet ID: ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 112th Avenue & Colorado Boulevard Inlet D Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb T BACK = 0.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) S BACK = 0.000 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) n BACK = 0.012 Height of Curb at Gutter Flow Line H CURB = 6.00 inches Distance from Curb Face to Street Crown T CROWN = 40.0 ft Gutter Width W = 1.50 ft Street Transverse Slope S X = 0.055 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) S W = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition S O = 0.040 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) n STREET = 0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm T MAX = 5.0 8.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm d MAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Q allow = 6.0 13.0 cfs Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' INLET ON A CONTINUOUS GRADE Design Information (Input) MINOR MAJOR Denver No. 16 Combination Type of Inlet Type = Denver No. 16 Combination Local Depression (additional to continuous gutter depression 'a') a LOCAL = 2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Warning 1 Length of a Single Unit Inlet (Grate or Curb Opening) L o = 4.00 4.00 ft Warning 1 Width of a Unit Grate (cannot be greater than W, Gutter Width) W o = 1.50 1.50 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5) C f -G = 0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) C f -C = 0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity' MINOR MAJOR Total Inlet Interception Capacity Q = 1.3 1.9 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Q b = 1.5 4.8 cfs Capture Percentage = Q a /Q o = C% = 47 28 % Warning 1: Dimension entered is not a typical dimension for inlet type specified. Copy of UD-Inlet_v4.03.xlsm, Inlet D 9/7/2016, 10:46 AM

Project: Inlet ID: ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) 112th Avenue & Colorado Boulevard Inlet E Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb T BACK = 0.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) S BACK = 0.000 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020) n BACK = 0.012 Height of Curb at Gutter Flow Line H CURB = 6.00 inches Distance from Curb Face to Street Crown T CROWN = 20.0 ft Gutter Width W = 1.50 ft Street Transverse Slope S X = 0.050 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) S W = 0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition S O = 0.041 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020) n STREET = 0.012 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm T MAX = 5.0 5.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm d MAX = 6.0 6.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Spread Criterion Q allow = 5.3 5.3 cfs Minor storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design flow given on sheet 'Inlet Management' INLET ON A CONTINUOUS GRADE Design Information (Input) MINOR MAJOR Denver No. 16 Combination Type of Inlet Type = Denver No. 16 Combination Local Depression (additional to continuous gutter depression 'a') a LOCAL = 2.0 2.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Warning 1 Length of a Single Unit Inlet (Grate or Curb Opening) L o = 4.00 4.00 ft Warning 1 Width of a Unit Grate (cannot be greater than W, Gutter Width) W o = 1.50 1.50 ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5) C f -G = 0.50 0.50 Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1) C f -C = 0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity' MINOR MAJOR Total Inlet Interception Capacity Q = 0.8 1.3 cfs Total Inlet Carry-Over Flow (flow bypassing inlet) Q b = 0.5 1.5 cfs Capture Percentage = Q a /Q o = C% = 65 47 % Warning 1: Dimension entered is not a typical dimension for inlet type specified. Copy of UD-Inlet_v4.03.xlsm, Inlet E 9/7/2016, 10:46 AM

DETENTION BASIN STAGE-STORAGE TABLE BUILDER Project: 112th Ave & Colorado Blvd Basin ID: Detention Basin Depth Increment = 0.2 ft Optional Optional Example Zone Configuration (Retention Pond) Stage - Storage Stage Override Length Width Area Override Area Volume Volume Description (ft) Stage (ft) (ft) (ft) (ft^2) Area (ft^2) (acre) (ft^3) (ac-ft) Required Volume Calculation Micropool 0.00 5.8 5.8 33 0.001 Selected BMP Type = EDB ISV 0.33 5.8 5.8 33 0.001 11 0.000 Watershed Area = 3.37 acres 0.40 5.8 5.8 33 0.001 13 0.000 Watershed Length = 556 ft 0.60 5.8 5.8 33 0.001 20 0.000 Watershed Slope = 0.031 ft/ft 0.80 5.8 5.8 33 0.001 26 0.001 Watershed Imperviousness = 75.00% percent 1.00 33.1 10.2 338 0.008 54 0.001 Percentage Hydrologic Soil Group A = 0.0% percent 1.20 67.2 15.8 1,060 0.024 188 0.004 Percentage Hydrologic Soil Group B = 15.0% percent 1.40 101.3 21.3 2,162 0.050 503 0.012 Percentage Hydrologic Soil Groups C/D = 85.0% percent 1.60 135.5 26.9 3,642 0.084 1,078 0.025 Desired WQCV Drain Time = 40.0 hours 1.80 169.6 32.4 5,502 0.126 1,986 0.046 Location for 1-hr Rainfall Depths = Thornton - Thornton City Office 2.00 203.7 38.0 7,742 0.178 3,304 0.076 Water Quality Capture Volume (WQCV) = 0.084 acre-feet Optional User Input Zone 1 (WQCV) 2.04 212.3 39.4 8,361 0.192 3,706 0.085 Excess Urban Runoff Volume (EURV) = 0.252 acre-feet 1-hr Precipitation 2.20 239.6 43.8 10,501 0.241 5,212 0.120 2-yr Runoff Volume (P1 = 0.95 in.) = 0.196 acre-feet inches 2.40 273.7 49.4 13,518 0.310 7,607 0.175 5-yr Runoff Volume (P1 = 1.35 in.) = 0.301 acre-feet inches 2.60 307.9 54.9 16,914 0.388 10,644 0.244 10-yr Runoff Volume (P1 = 1.61 in.) = 0.377 acre-feet inches Zone 2 (EURV) 2.62 311.3 55.5 17,274 0.397 10,986 0.252 25-yr Runoff Volume (P1 = 2.03 in.) = 0.504 acre-feet inches Floor 2.69 321.5 57.2 18,378 0.422 12,055 0.277 50-yr Runoff Volume (P1 = 2.32 in.) = 0.593 acre-feet inches 2.80 323.4 58.2 18,830 0.432 14,293 0.328 100-yr Runoff Volume (P1 = 2.66 in.) = 0.702 acre-feet inches 3.00 325.0 59.8 19,443 0.446 18,120 0.416 500-yr Runoff Volume (P1 = 3.33 in.) = 0.910 acre-feet inches Zone 3 (100-year) 3.04 325.3 60.2 19,566 0.449 18,900 0.434 Approximate 2-yr Detention Volume = 0.186 acre-feet 3.20 326.6 61.4 20,061 0.461 22,070 0.507 Approximate 5-yr Detention Volume = 0.268 acre-feet 3.40 328.2 63.0 20,684 0.475 26,145 0.600 Approximate 10-yr Detention Volume = 0.296 acre-feet 3.60 329.8 64.6 21,313 0.489 30,344 0.697 Approximate 25-yr Detention Volume = 0.341 acre-feet 3.80 331.4 66.2 21,946 0.504 34,670 0.796 Approximate 50-yr Detention Volume = 0.378 acre-feet 4.00 333.0 67.8 22,585 0.518 39,123 0.898 Approximate 100-yr Detention Volume = 0.438 acre-feet 4.20 334.6 69.4 23,229 0.533 43,704 1.003 4.40 336.2 71.0 23,878 0.548 48,415 1.111 Stage-Storage Calculation 4.60 337.8 72.6 24,532 0.563 53,256 1.223 Zone 1 Volume (WQCV) = 0.084 acre-feet 4.80 339.4 74.2 25,191 0.578 58,228 1.337 Zone 2 Volume (EURV - Zone 1) = 0.168 acre-feet 5.00 341.0 75.8 25,856 0.594 63,333 1.454 Zone 3 Volume (100-year - Zones 1 & 2) = 0.186 acre-feet 5.20 342.6 77.4 26,525 0.609 68,571 1.574 Total Detention Basin Volume = 0.438 acre-feet 5.40 344.2 79.0 27,199 0.624 73,943 1.698 Initial Surcharge Volume (ISV) = 11 ft^3 5.60 345.8 80.6 27,879 0.640 79,451 1.824 Initial Surcharge Depth (ISD) = 0.33 ft 5.80 347.4 82.2 28,564 0.656 85,095 1.954 Total Available Detention Depth (H total) = 3.04 ft 6.00 349.0 83.8 29,254 0.672 90,877 2.086 Depth of Trickle Channel (H TC) = 0.50 ft 6.20 350.6 85.4 29,949 0.688 96,797 2.222 Slope of Trickle Channel (S TC) = 0.006 ft/ft 6.40 352.2 87.0 30,649 0.704 102,857 2.361 Slopes of Main Basin Sides (S main) = 4 H:V 6.60 353.8 88.6 31,354 0.720 109,057 2.504 Basin Length-to-Width Ratio (R L/W) = 6 6.80 355.4 90.2 32,065 0.736 115,399 2.649 7.00 357.0 91.8 32,780 0.753 121,883 2.798 Initial Surcharge Area (A ISV) = 33 ft^2 7.20 358.6 93.4 33,501 0.769 128,511 2.950 Surcharge Volume Length (L ISV) = 5.8 ft 7.40 360.2 95.0 34,227 0.786 135,284 3.106 Surcharge Volume Width (W ISV) = 5.8 ft 7.60 361.8 96.6 34,957 0.803 142,202 3.265 Depth of Basin Floor (H FLOOR) = 1.86 ft 7.80 363.4 98.2 35,693 0.819 149,267 3.427 Length of Basin Floor (L FLOOR) = 322.4 ft 8.00 365.0 99.8 36,435 0.836 156,480 3.592 Width of Basin Floor (W FLOOR) = 57.3 ft 8.20 366.6 101.4 37,181 0.854 163,841 3.761 Area of Basin Floor (A FLOOR) = 18,481 ft^2 8.40 368.2 103.0 37,932 0.871 171,353 3.934 Volume of Basin Floor (V FLOOR) = 11,937 ft^3 8.60 369.8 104.6 38,689 0.888 179,015 4.110 Depth of Main Basin (H MAIN) = 0.35 ft 8.80 371.4 106.2 39,450 0.906 186,828 4.289 Length of Main Basin (L MAIN) = 325.3 ft 9.00 373.0 107.8 40,217 0.923 194,795 4.472 Width of Main Basin (W MAIN) = 60.2 ft 9.20 374.6 109.4 40,989 0.941 202,915 4.658 Area of Main Basin (A MAIN) = 19,566 ft^2 9.40 376.2 111.0 41,766 0.959 211,191 4.848 Volume of Main Basin (V MAIN) = 6,743 ft^3 9.60 377.8 112.6 42,548 0.977 219,622 5.042 Calculated Total Basin Volume (V total) = 0.429 acre-feet 9.80 379.4 114.2 43,335 0.995 228,210 5.239 10.00 381.0 115.8 44,127 1.013 236,956 5.440 10.20 382.6 117.4 44,925 1.031 245,861 5.644 10.40 384.2 119.0 45,727 1.050 254,927 5.852 10.60 385.8 120.6 46,535 1.068 264,153 6.064 10.80 387.4 122.2 47,348 1.087 273,541 6.280 11.00 389.0 123.8 48,166 1.106 283,092 6.499 11.20 390.6 125.4 48,989 1.125 292,807 6.722 11.40 392.2 127.0 49,817 1.144 302,688 6.949 11.60 393.8 128.6 50,650 1.163 312,734 7.179 11.80 395.4 130.2 51,488 1.182 322,948 7.414 12.00 397.0 131.8 52,332 1.201 333,330 7.652 12.20 398.6 133.4 53,181 1.221 343,881 7.894 12.40 400.2 135.0 54,034 1.240 354,603 8.141 12.60 401.8 136.6 54,893 1.260 365,495 8.391 12.80 403.4 138.2 55,757 1.280 376,560 8.645 13.00 405.0 139.8 56,626 1.300 387,798 8.903 13.20 406.6 141.4 57,500 1.320 399,211 9.165 13.40 408.2 143.0 58,380 1.340 410,799 9.431 13.60 409.8 144.6 59,264 1.361 422,563 9.701 13.80 411.4 146.2 60,154 1.381 434,505 9.975 14.00 413.0 147.8 61,049 1.401 446,625 10.253 14.20 414.6 149.4 61,948 1.422 458,925 10.535 14.40 416.2 151.0 62,853 1.443 471,405 10.822 14.60 417.8 152.6 63,763 1.464 484,067 11.113 14.80 419.4 154.2 64,679 1.485 496,911 11.407 15.00 421.0 155.8 65,599 1.506 509,938 11.707 UD-Detention_v3.02.xlsm, Basin 7/26/2016, 1:26 PM

Area (acres) Volume (ac-ft) Length, Width (ft.) Area (sq.ft.) DETENTION BASIN STAGE-STORAGE TABLE BUILDER 440 0 User Defined Stage-Area Boolean for Message 0 Equal Stage-Area Inputs Watershed L:W 1 CountA 65600 330 0 Calc_S_TC 1.86 H_FLOOR 49200 L_FLOOR_OTHER 0.33 ISV 0.33 ISV 220 2.69 Floor 2.04 Zone 1 (WQCV) 2.04 Zone 1 (WQCV) 2.62 Zone 2 (EURV) 2.62 Zone 2 (EURV) 2.69 Floor 3.05 Zone 3 (100-yea 3.05 Zone 3 (100-year) 32800 110 16400 0 0 0.00 4.00 8.00 12.00 16.00 Stage (ft) Length (ft) Width (ft) Area (sq.ft.) 1.520 11.720 1.140 8.790 0.760 5.860 0.380 2.930 0.000 0.000 0.00 4.00 8.00 12.00 16.00 Stage (ft.) Area (acres) Volume (ac-ft) UD-Detention_v3.02.xlsm, Basin 7/26/2016, 1:26 PM

Detention Basin Outlet Structure Design Project: 88th & Pecos Maverik Fueling Station Basin ID: Full Build-Out Detention Basin Stage (ft) Zone Volume (ac-ft) Outlet Type Zone 1 (WQCV) 2.04 0.084 Orifice Plate Zone 2 (EURV) 2.62 0.168 Orifice Plate Zone 3 (100-year) 3.05 0.186 Weir&Pipe (Restrict) Example Zone Configuration (Retention Pond) 0.438 Total 24 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP) Calculated Parameters for Underdrain Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft 2 Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP) Calculated Parameters for Plate Invert of Lowest Orifice = 0.00 ft (relative to bottom of basin at Stage = 0 ft) WQ Orifice Area per Row = N/A ft 2 Depth at top of Zone using Orifice Plate = 2.62 ft (relative to bottom of basin at Stage = 0 ft) Elliptical Half-Width = N/A feet Orifice Plate: Orifice Vertical Spacing = N/A inches Elliptical Slot Centroid = N/A feet Orifice Plate: Orifice Area per Row = N/A inches Elliptical Slot Area = N/A ft 2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft) 0.00 1.75 2.04 Orifice Area (sq. inches) 0.54 0.54 2.50 Stage of Orifice Centroid (ft) Orifice Area (sq. inches) Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional) User Input: Vertical Orifice (Circular or Rectangular) Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice = N/A N/A ft (relative to bottom of basin at Stage = 0 ft) Vertical Orifice Area = N/A N/A ft 2 Depth at top of Zone using Vertical Orifice = N/A N/A ft (relative to bottom of basin at Stage = 0 ft) Vertical Orifice Centroid = N/A N/A feet Vertical Orifice Diameter = N/A N/A inches User Input: Overflow Weir (Dropbox) and Grate (Flat or Sloped) Calculated Parameters for Overflow Weir Zone 3 Weir Not Selected Zone 3 Weir Not Selected Overflow Weir Front Edge Height, Ho = 2.62 N/A ft (relative to bottom of basin at Stage = 0 ft) Height of Grate Upper Edge, H t = 3.05 N/A feet Overflow Weir Front Edge Length = 6.00 N/A feet Over Flow Weir Slope Length = 6.02 N/A feet Overflow Weir Slope = 14.00 N/A H:V (enter zero for flat grate) Grate Open Area / 100-yr Orifice Area = 39.98 N/A should be > 4 Horiz. Length of Weir Sides = 6.00 N/A feet Overflow Grate Open Area w/o Debris = 25.26 N/A ft 2 Overflow Grate Open Area % = 70% N/A %, grate open area / total area Overflow Grate Open Area with Debris = 12.63 N/A ft 2 Debris Clogging % = 50% N/A % User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice) Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected Depth to Invert of Outlet Pipe = 0.00 N/A ft (distance below bottom of basin at Stage = 0 ft) Outlet Orifice Area = 0.63 N/A ft 2 Outlet Pipe Diameter = 12.00 N/A inches Outlet Orifice Centroid = 0.41 N/A feet Restrictor Plate Height Above Pipe Invert = 9.00 inches Half-Central Angle of Restrictor Plate on Pipe = 2.09 N/A radians User Input: Emergency Spillway (Rectangular or Trapezoidal) Calculated Parameters for Spillway Spillway Invert Stage= 3.10 ft (relative to bottom of basin at Stage = 0 ft) Spillway Design Flow Depth= 0.66 feet Spillway Crest Length = 8.00 feet Stage at Top of Freeboard = 4.76 feet Spillway End Slopes = 4.00 H:V Basin Area at Top of Freeboard = 0.58 acres Freeboard above Max Water Surface = 1.00 feet Routed Hydrograph Results Design Storm Return Period = WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 500 Year One-Hour Rainfall Depth (in) = 0.53 1.07 0.95 1.35 1.61 2.03 2.32 2.66 3.33 Calculated Runoff Volume (acre-ft) = 0.084 0.252 0.196 0.301 0.377 0.504 0.593 0.702 0.910 OPTIONAL Override Runoff Volume (acre-ft) = Inflow Hydrograph Volume (acre-ft) = 0.083 0.251 0.195 0.301 0.376 0.504 0.592 0.701 0.909 Predevelopment Unit Peak Flow, q (cfs/acre) = 0.00 0.00 0.02 0.32 0.55 1.06 1.34 1.68 2.34 Predevelopment Peak Q (cfs) = 0.0 0.0 0.1 1.1 1.9 3.6 4.5 5.7 7.9 Peak Inflow Q (cfs) = 2.0 5.9 4.6 7.0 8.8 11.8 13.8 16.4 21.2 Peak Outflow Q (cfs) = 0.0 0.1 0.1 0.3 1.0 2.8 4.2 5.0 7.3 Ratio Peak Outflow to Predevelopment Q = N/A N/A N/A 0.3 0.6 0.8 0.9 0.9 0.9 Structure Controlling Flow = Plate Plate Plate Overflow Grate 1 Overflow Grate 1 Overflow Grate 1 Overflow Grate 1 Outlet Plate 1 Spillway Max Velocity through Grate 1 (fps) = N/A N/A N/A 0.0 0.0 0.1 0.2 0.2 0.2 Max Velocity through Grate 2 (fps) = N/A N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) = 40 65 58 68 69 69 69 69 69 Time to Drain 99% of Inflow Volume (hours) = 40 65 59 68 69 69 69 69 69 Maximum Ponding Depth (ft) = 2.00 2.58 2.43 2.68 2.78 2.90 2.97 3.07 3.29 Area at Maximum Ponding Depth (acres) = 0.18 0.38 0.32 0.42 0.43 0.44 0.44 0.45 0.47 Maximum Volume Stored (acre-ft) = 0.078 0.237 0.181 0.273 0.315 0.372 0.403 0.447 0.548

AREA [ft^2], VOLUME [ft^3] OUTFLOW [cfs] PONDING DEPTH [ft] FLOW [cfs] Detention Basin Outlet Structure Design 25 20 15 10 5 500YR COUNTA IN for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1 Vert Orifice 2 500YR Count_Underdrain OUT = 0 0.11 eter = 3/8 inch) 2 1 1 100YR IN Count_WQPlate = 1 0.14 ter = 7/16 inch) 100YR OUT Count_VertOrifice1 = 0 0.18 eter = 1/2 inch) Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean 50YR IN Count_VertOrifice2 = 0 0.24 ter = 9/16 inch) 4 1 5yr, <72hr 0 50YR OUT 25YR IN Count_Weir1 = 1 0.29 eter = 5/8 inch) >5yr, <120hr 0 25YR OUT Count_Weir2 = 0 0.36 er = 11/16 inch) Max Depth Row 10YR Count_OutletPipe1 IN = 1 0.42 eter = 3/4 inch) WQCV 200 Watershed Constraint Check 10YR Count_OutletPipe2 OUT = 0 0.50 er = 13/16 inch) 2 Year 244 Slope 0.031 5YR IN COUNTA_2 (Standard FSD Setup)= 1 0.58 eter = 7/8 inch) EURV 259 Shape 2.11 5YR OUT MaxPondDepth_Error? FALSE 0.67 er = 15/16 inch) 5 Year 269 2YR IN Hidden Parameters & Calculations 0.76 meter = 1 inch) 10 Year 279 Spillway Depth 2YR OUT 0.86 1-1/16 inches) 25 Year 291 0.66 EURV IN WQ Plate Flow at 100yr depth = 0.14 0.97 = 1-1/8 inches) 50 Year 298 EURV OUT CLOG #1= 35% 1.08 1-3/16 inches) 100 Year 308 1 Z1_Boolean WQCV IN C dw #1 = 1.03 1.20 = 1-1/4 inches) 500 Year 330 1 Z2_Boolean WQCV OUT C do #1 = 0.89 1.32 1-5/16 inches) Zone3_Pulldown Message 1 Z3_Boolean Overflow Weir #1 Angle = 0.071 1.45 = 1-3/8 inches) 1 Opening Message CLOG #2= #VALUE! 1.59 1-7/16 inches) Draintime Running C dw #2 = #VALUE! 1.73 = 1-1/2 inches) Outlet Boolean Outlet Rank Total (1 to 4) C do #2 = #VALUE! 1.88 1-9/16 inches) Vertical Orifice 1 0 0 1 Overflow Weir #2 Angle = #VALUE! 2.03 = 1-5/8 inches) Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth = 0.00 2.20 1-11/16 inches) Overflow Weir 1 0 1 1 0 Max Depth 0.1 VertOrifice1 Q at 100yr depth = 0.00 2.36 = 1-3/4 inches) Overflow 1 Weir 2 0 0 0 500yr Depth 10 VertOrifice2 Q at 100yr depth = 0.00 2.54 1-13/16 inches) TIME [hr] Outlet Pipe 1 1 1 0 Freeboard EURV_draintime_user = 2.72 = 1-7/8 inches) Outlet Pipe 2 0 0 1 Spillway 3.5 Count_User_Hydrographs 0 2.90 1-15/16 inches) 0 Spillway Length 500YR CountA_3 (EURV & 100yr) = 1 3.09 eter = 2 inches) Button Visibility Boolean 100YR CountA_4 (100yr Only) = 1 3.29 gular openings) 1 Button_Trigger 50YR 3 2.5 25YR 10YR 5YR 2YR EURV WQCV 0 Underdrain 1 WQCV Plate 0 EURV-WQCV Plate 0 EURV-WQCV VertOrifice 1 Outlet 90% Qpeak 0 Outlet Undetained 2 1.5 1 0.5 0 0.1 1 10 100 DRAIN TIME [hr] 600000 User Area [ft^2] 6,000.00 500000 Interpolated Area [ft^2] Volume [ft^3] 5,000.00 400000 Outflow [cfs] 4,000.00 300000 3,000.00 200000 2,000.00 100000 1,000.00 0 0.00 0 5 10 15 20 25 PONDING DEPTH [ft]

Detention Basin Outlet Structure Design Outflow Hydrograph Workbook Filename: Storm Inflow Hydrographs The user can override the calculated inflow hydrographs from this workbook with inflow hydrographs developed in a separate program. SOURCE WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK Time Interval TIME WQCV [cfs] EURV [cfs] 2 Year [cfs] 5 Year [cfs] 10 Year [cfs] 25 Year [cfs] 50 Year [cfs] 100 Year [cfs] 500 Year [cfs] 4.77 min 0:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0:04:46 0.00 0.01 0.01 0.01 0.02 0.02 0.02 0.03 0.04 Hydrograph 0:09:33 0.12 0.34 0.26 0.40 0.49 0.65 0.75 0.88 1.11 Constant 0:14:19 0.27 0.80 0.63 0.96 1.18 1.57 1.83 2.15 2.75 1.048 0:19:05 0.76 2.22 1.74 2.65 3.28 4.34 5.05 5.93 7.56 0:23:51 1.90 5.58 4.36 6.65 8.25 10.92 12.72 14.93 19.07 0:28:38 1.96 5.87 4.56 7.04 8.78 11.78 13.82 16.36 21.17 0:33:24 1.63 4.93 3.82 5.93 7.41 9.97 11.73 13.93 18.12 0:38:10 1.29 3.95 3.05 4.75 5.95 8.02 9.45 11.24 14.65 0:42:56 1.04 3.17 2.45 3.81 4.78 6.44 7.58 9.01 11.74 0:47:43 0.81 2.48 1.92 2.99 3.74 5.05 5.95 7.08 9.24 0:52:29 0.64 1.96 1.51 2.36 2.97 4.00 4.72 5.61 7.33 0:57:15 0.54 1.64 1.27 1.97 2.46 3.31 3.90 4.63 6.02 1:02:01 0.38 1.16 0.89 1.39 1.75 2.36 2.79 3.32 4.34 1:06:48 0.28 0.87 0.67 1.05 1.32 1.78 2.10 2.49 3.25 1:11:34 0.19 0.60 0.46 0.72 0.91 1.23 1.45 1.73 2.27 1:16:20 0.14 0.44 0.34 0.53 0.66 0.90 1.06 1.26 1.64 1:21:06 0.11 0.34 0.26 0.41 0.52 0.70 0.82 0.98 1.27 1:25:53 0.09 0.28 0.22 0.34 0.43 0.57 0.68 0.80 1.05 1:30:39 0.08 0.25 0.20 0.31 0.38 0.51 0.60 0.71 0.93 1:35:25 0.08 0.24 0.19 0.29 0.37 0.49 0.58 0.68 0.89 1:40:12 0.08 0.24 0.19 0.29 0.36 0.48 0.57 0.67 0.87 1:44:58 0.08 0.24 0.19 0.29 0.36 0.48 0.57 0.67 0.87 1:49:44 0.08 0.24 0.19 0.29 0.36 0.48 0.57 0.67 0.87 1:54:30 0.05 0.15 0.11 0.18 0.22 0.30 0.36 0.43 0.56 1:59:17 0.03 0.09 0.07 0.10 0.13 0.18 0.21 0.25 0.33 2:04:03 0.01 0.05 0.04 0.06 0.07 0.10 0.12 0.14 0.19 2:08:49 0.01 0.03 0.02 0.03 0.04 0.05 0.06 0.08 0.10 2:13:35 0.00 0.01 0.01 0.01 0.02 0.03 0.03 0.04 0.05 2:18:22 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.01 2:23:08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2:27:54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2:32:40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2:37:27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2:42:13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2:46:59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2:51:45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2:56:32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:01:18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:06:04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:10:51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:15:37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:20:23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:25:09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:29:56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:34:42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:39:28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:44:14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:49:01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:53:47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3:58:33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:03:19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:08:06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:12:52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:17:38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:22:24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:27:11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:31:57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:36:43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:41:30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:46:16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:51:02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4:55:48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:00:35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:05:21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:10:07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:14:53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:19:40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:24:26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:29:12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:33:58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:38:45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5:43:31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1 2 6/2/2015 7:10:47 AM A B C D 0" 1" 2" 1 2 3 3 4 4 5 5 SEAL DATE STATUS DATE REVISION PROJECT NUMBER????? FILE DRAWN BY R. Hansen CHECKED BY J.Nate Reeve, P.E. SCALE As indicated PRE-DEVELOPED DRAINAGE PLAN THORNTON MAVERIK 112TH AVENUE & COLORADO BOULEVARD THORNTON, COLORADO PERMIT SET