MINISTRY OF ROAD TRANSPORT AND HIGHWAYS Through Punjab PWD B&R PROJECT REPORT

Similar documents
OUR COUNTRY INDIA LOCATIONAL SETTING

CROP COMBINATION REGION: A SPATIO-TEMPORAL ANALYSIS OF HARYANA: &

DROUGHT RISK EVALUATION USING REMOTE SENSING AND GIS : A CASE STUDY IN LOP BURI PROVINCE

Chapter-3 GEOGRAPHICAL LOCATION, CLIMATE AND SOIL CHARACTERISTICS OF THE STUDY SITE

CURRENT STATUS OF MONSOON Main Meteorological conditions of the last week (27August to 2 September)

The City School. Pakistan Studies 2059/02 Paper 2 The Environment of Pakistan Class 9

About places and/or important events Landmarks Maps How the land is, hills or flat or mountain range Connected to maps World Different countries

Land Cover Atlas of Pakistan The Punjab Province

3. HYDROMETEROLOGY. 3.1 Introduction. 3.2 Hydro-meteorological Aspect. 3.3 Rain Gauge Stations

PAKISTAN STUDIES 2059/02 The Environment of Pakistan

Land Cover Atlas of Pakistan The Punjab Province

ABSTRACT. 2. Location : 31 o 04'16'' to 32 o 31'27'' North Latitudes and 74 o 30'38'' to 76 o 08'45'' East Longitudes

ICSE Board Class X Geography Board Paper- 2014

Sec$on 1: Geography and Early China. How does China s geography affect the culture?

Geographical location and climatic condition of the

3. High-III a) Jalandhar & Amritsar outside M.C. Limits within 15 Km A. Residential Plotted B. Residential Group Housing*

Figure 2.1: Constituent Area

W E E K L Y MONSOON INSIGHT

Frequency analysis of rainfall deviation in Dharmapuri district in Tamil Nadu

Explain the impact of location, climate, natural resources, and population distribution on Europe. a. Compare how the location, climate, and natural

Geography Class XI Fundamentals of Physical Geography Section A Total Periods : 140 Total Marks : 70. Periods Topic Subject Matter Geographical Skills

Report for Area Drainage Studies for 1320 MW (2x660 MW) THERMAL POWER PROJECT AT MIRZAPUR, U.P.

variation analysis of Vattamalaikarai sub basin, Tamil Nadu, India.

CHAPTER 3 DESCRIPTION OF THE STUDY AREA

Flood hazard mapping in Urban Council limit, Vavuniya District, Sri Lanka- A GIS approach

Yaneev Golombek, GISP. Merrick/McLaughlin. ESRI International User. July 9, Engineering Architecture Design-Build Surveying GeoSpatial Solutions

Study of Hydrometeorology in a Hard Rock Terrain, Kadirischist Belt Area, Anantapur District, Andhra Pradesh

Hydrology and Hydraulics Design Report. Background Summary

Observations on Surface Water in the Seminary Fen in Spring, Prepared 6/4/13 by Sam Wetterlin; updated 7/28/13

What is the largest country in the world? Russia

Long Range Forecast Update for 2014 Southwest Monsoon Rainfall

investment decisions

Suppressed Surface Heating over northwestern parts of the Country and the ensuing Monsoon Rainfall

Geography. Grade XI. Full Marks: 100 (75T +25P) Teaching Hours: 150. I. Introduction

Summative Assessment I

The elevations on the interior plateau generally vary between 300 and 650 meters with

The agroclimatic resource change in Mongolia

Chapter 21 Southwest Asia: Harsh & Arid Lands

2. PHYSICAL FEATURES OF INDIA

EQ: Discuss main geographic landforms of the U.S. & Canada and examine varied landforms in relation to their lifestyles.

Monthly overview. Rainfall

Board Question Paper : March 2015

Report on Disaster statistics of Nepal

Unit 1: Basics of Geography Test Review

Monday September 11, 2017

Unit 1 Test - Version A

Lesson- 6 WEATHER AND CLIMATE

Wastelands Analysis and Mapping of Bhiwani District, Haryana

Complete Geography Overview: Year 1 to Year 6

Evidence for Weakening of Indian Summer Monsoon and SA CORDEX Results from RegCM

Development of Agrometeorological Models for Estimation of Cotton Yield

Long-Term Trend of Summer Rainfall at Selected Stations in the Republic of Korea

The Soils and Land Capability for Agriculture. Land North of Aberdeen, Aberdeenshire

Seasonal Climate Outlook for South Asia (June to September) Issued in May 2014

Summary and Conclusions

Key Finding: Long Term Trend During 2014: Rain in Indian Tradition Measuring Rain

UNIT 11 SOUTH ASIA SG 1 - PHYSICAL GEOGRAPHY & THE ENVIRONMENT

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT HANOTA MAJOR PROJECT PRE FEASIBILITY REPORT. ESTIMATED COST : Rs

The AIR Tropical Cyclone Model for India

Spatial Distribution of Health Care Facilities in Rural Bist Doab (Punjab)

South, Southeast, and East Asia. Physical Geography

Distribution of Temperature over the National Capital Territory of Delhi - A Preliminary Report

Flash flood disaster in Bayangol district, Ulaanbaatar

Grade Five Social Studies Assessment Regions/Native Americans

Chapter 6, Part Colonizers arriving in North America found extremely landscapes. It looked different to region showing great.

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education

CBSE Question Paper 2010 GEOGRAPHY Class XII

Our Environment Class 7 Questions on Give Reasons for quick revision for Competitive Exams

World Geography Chapter 3

URBAN SPRAWL AND SPATIO TEMPORAL ANALYSIS OF HISAR CITY IN HARYANA USING REMOTE SENSING & GIS TECNOLOGY

WATERCOURSE HARNESSING BANK EROSION AND CONSOLIDATION

Soil Erosion Calculation using Remote Sensing and GIS in Río Grande de Arecibo Watershed, Puerto Rico

3 Temperate and Polar Zones

Effect of land use/land cover changes on runoff in a river basin: a case study

TABLE OF CONTENTS LIST OF TABLES. Page

Report. Developing a course component on disaster management

5 Themes of Geography Review Video Notes What is Geography?

[Penumaka, 7(1): January-March 2017] ISSN Impact Factor

The Impact of Geography in South and East Asia

The Impact of Geography in South and East Asia

Result of Field Geological Survey and Ground Truth for the Analysis Date: 2007/7/5 Location (UTM) Elev Geological Unit Point No. NT-02 VSW Index 260,7

Description DESCRIPTION

15. THE GLOBE AND THE MAP

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

3.12 Geology and Topography Affected Environment

Chapter 1 Study Guide

Weather and Climate of the Rogue Valley By Gregory V. Jones, Ph.D., Southern Oregon University

3.3 CLIMATE, GEOLOGY, TOPOGRAPHY, AND SOILS CLIMATE GEOLOGY TOPOGRAPHY

Answers to Saskatchewan Quizzes

Fog Hazards in Punjab

Development of Pakistan s New Area Weighted Rainfall Using Thiessen Polygon Method

Local Flood Hazards. Click here for Real-time River Information

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

CATCHMENT DESCRIPTION. Little River Catchment Management Plan Stage I Report Climate 4.0

Geography Class 6 Chapters 3 and

FINANCIAL PERFORMANCE OF UTTAR PRADESH DURING TENTH PLAN

GUIDED READING CHAPTER 1: THE LAY OF THE LAND (Page 1)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

The United States & Canada. A Regional Study of Anglo America

Transcription:

MINISTRY OF ROAD TRANSPORT AND HIGHWAYS Through Punjab PWD B&R CONSULTANCY SERVICES FOR PREPARATION OF FEASIBILITY SURVEY, DETAILED PROJECT REPORT OF EXISTING TWO LANE PLUS SHOULDER TO (4LANING OF TALWANDI BHAI TO FEROZEPUR KM: 170.00 TO 194.00 OF NEW NH5 (OLD NH95) IN THE STATE OF PUNJAB) TO BE EXECUTED ON EPC MODE. PROJECT REPORT Submitted by: THE EXECUTIVE ENGINEER Central works Division, Punjab PWD (B&R), Ferozepur Page 1

Table of Contents Description Page No Chapter 1 INTRODUCTION...1 1.1 General. 3 1.2 Punjab State at a Glance... 3 1.2.1 Ferozepur District at a Glance.. 5 1.2.1.1 Area. 6 Chapter2 Proposal 2.1 General. 7 2.2 Proposals... 7 Estimate... 8 Page 2

Chapter 1 1.0 Introduction 1.1 General The Government of India has taken up a massive programme of up gradation & development of National Highways. Under NH s development project, hundreds of kilometres have been proposed to be widened to 4/6 lane depending up on the traffic volume. These National Highways would provide high speed connectivity. NH95 (0ld) renamed as NH05 (new) is one of the road under this programme. For the purpose of project preparation, various corridors have been divided into convenient sections, selected on the basis of traffic generation and attraction potential, geographic location and other considerations. This report deals with converting this section from Km. 170.00 (Talwandi Bhai) to Km. 194.00 (Ferozepur) from 2lane to 4 lanning. The starting point of this section is at one Kilometer from Talwandi Bhai Chowk (Lat.30 50'51"N, Long.74 54'24"E) (Km 170 of existing NH95) and moves in the West Direction and ends near village Dhakka Basti (Lat. 30 54'18"N, Long. 74 40'28"E.) (Km194 of existing NH95), both in the district Ferozepur of Punjab, traversing through plain terrain. The broad features of the state of Punjab and Ferozepur district in which our Project Road lies are briefed herein under. 1.2 Punjab State at a Glance The State of Punjab is situated in the North Western part of India and is surrounded by the states of Jammu & Kashmir, Himachal Pradesh, Chandigarh, Haryana and it also borders the Pakistan province to the west. Punjab's capital is Chandigarh, which is administered separately as a Union Territory since it is also the capital of neighbouring Haryana. Other major cities of Punjab include Mohali, Ludhiana, Amritsar, Bathinda, Patiala and Jalandhar. Punjab state is located between 29 30' N to 32 32' N latitude and between 73 55' E to 76 50' E longitude. Its average elevation is 300 m from the sea level. The total area of the state is 50,362 square kilometres (19,445 square miles). The population is 2.77 crores (2011). The population density per sq. km is 550. Punjab has a literacy rate of 76.70%, The total number of districts in Punjab is 22. Following are some facts and figures about the state: Page 3

A large portion of the land of the state is under cultivation because the Punjab plain is free from physical handicaps. The deficiency of rainfall has been made up by irrigation facilities. It is only the districts of Ropar and Hoshiarpur that the cultivated area is less than 60 per cent of the total. It is in these districts that considerable land is covered by Shivalik Hills and the beds of seasonal streams that cannot be brought under cultivation. The major crops grown in this state include wheat, rice, sugarcane, cotton, maize, bajra etc. Minor crops like millet, barley and fruit and vegetables are also produced in some areas. The soil of the state is very fertile and it is formed by the deposition of alluvium. From geographical point of view the state is divided into two parts i.e. plain region and hilly region. Irrigation in the state is mainly dependent on canals. The agricultural industries in the state include mainly cotton textile, sugar and dairy industry. The state is the major producer of milk in the country. It has got highest per capita availability of milk. Operation Flood was launched in the year 1969 70 to increase the production of milk in the country. The three major seasons in Punjab are: summer, rainy and winter. The climate of the plains is excessively hot and dry between April and August, with temperatures as high as 49 C. The rains of the monsoon season begin at the end of June and continue till August. Annual rainfall ranges from about 915 mm (about 36 in) in the north to 102 mm (4 in) in the south. Winters are cool with some frosts. The average temperature in January is 13 C, although at night the temperature sometimes lowers to freezing. In June the average temperature is 34 C occasionally climbing as high as 45 C. Annual average rainfall ranges from 1250 mm in the north to 350 mm in the southwest. More than 70 percent of the annual rainfall occurs during the monsoon season from July to September. Excluding agriculture, other major industries include the manufacture of scientific instruments, electrical goods, machine tools, textiles, tourism, sewing machines, sports goods, starch, fertilizers, bicycles, and the processing of pine oil and sugar. Page 4

1.2.1 Ferozepur District at a Glance The District Ferozepur is situated at India Pakistan border, at the east side Faridkot district, Moga district and at the south side Muktsar District is situated. On the north east the River Sutlej generally separates it from the FIROZPUR and Kapurthala districts and on the south west side the Fazilka district touches the boundaries of Ferozepur. The united stream of the Sutlej and Beas generally separates it from the Amritsar district in the northwest, and farther down from Pakistan with the exception of some areas on each side of the river. Page 5

Map of District Ferozepur 1.2.1.1 Area Area and Physiography The total geographical area of the district is 5303 sq. km out of which 3258.78 sq. km fall under Bet area and 196.63 sq. km fall under Border area. The topography of the district is even. It is a plane of alluvial formation sloping gently @ 2ft. per mile from the North East to the South West. The district is divided into three main belts running somewhat parallel to the course of river Sutlej. On South West side, the bet area called "Hittar" having land alluvial dark and gray clay intermixed with straits of sand. On the South East side, the Rohi and Mukhi Plains have light and sandy soil and brackish water in wells. The district has two types of soil namely chestnut brown (Alluvial)69% and desert soil (31%) Page 6

CHAPTER2 PROPOSAL 2.1 General: Based on the survey of complete NH95 the following observations have been noticed: a) Section from Km.92+000 to Km.170+000 ( LudhianaMogaTalwandi Bhai Section): Is being widened concentrically by providing Flexible Pavement on both sides of the existing road. b) Section from Km.194+000 to Km.199+000: Is also being widened concentrically by providing Flexible Pavement on both sides of the existing road. c) The available ROW is 60 meter and the existing road alignment is in the centre of ROW. There is no Horizontal curve in the proposed section from Km.170+000 to Km.194+000. d) There is built up area at seven locations (Villages) along the road. A few structures exists in the ROW at these village locations. e) There are five major bridges on the road (In the centre of ROW). The condition of these bridges is good and does not require immediate replacement. Two bridges (adjacent to each other) Rajasthan Feeder and Sirhind Feeder. These are perennial canals, there is no closure. 2.2 Proposals: As described above and keeping in view the various factors discussed with engineers of Authority following option is proposed. 2.2.1 Concentric Widening with all Flexible Pavement: a) Maintain the existing centre line of the road as proposed centre line in the complete length except at the location of approaches to bridges. b) Widen the existing road on both sides with flexible pavement in complete stretch. Page 7

ESTIMATE FOR CONSTRUCTION OF 4 LANING OF TALWANDI BHAIFEROZEPUR SECTION OF NH95 (NEW NH5) FROM RD 170.0 KM. TO RD 194.0 KM. IN THE STATE OF PUNJAB CONCENTRIC WIDENING WITH FLEXIBLE PAVEMENT(OPTION1) GENERAL ABSTRACT OF COST S. No. Description Amount ( in Rupees) 1 Cost of Road, Service road & Junctions (Road Work) a Site Clearance & Dismantling 16493044 b Earthwork 146998279 c Granular Sub Base & Base Course 375604565 d Bituminous Course 769951003 e Rigid Pavement(GSB+DLC+PQC only) Sub Total(a+b+c+d+e) 1309046891 2 Structures a Cost of Steel Bridge 45 M. on Sirhind Feeder 42187500 b Cost of Steel Bridge 100 M. on Rajasthan Feeder 93750000 c Cost of Bridge 30 M. on Ferozepur Feeder 16875000 d Cost of Bridge 30 M. on Phidda Drain 16875000 e Cost of Bridge 30 M. on Drain 16875000 f Cost of Light Vehicular Under Pass (6 No.) 327498507 g Cost of RCC Box Culverts 89601867 h Cost of Hume Pipe Culverts 18345676 i Cost RCC Drain 134484135 Sub Total(a+b+c+d+e+f+g+h) 756492685 3 Cost of Bus Lay bay 33291885 4 Miscellaneous items/traffic signs etc 179788272 A Total 2278619733 Arboriculture/ Horticulture @ 1.0% of Road Work(1) 13090469 B Civil Construction Cost 2291710202 Civil Construction Cost in Crores 229.171 Civil Cost per Km (Length = 24.0 Km.)in Crores 9.549 Add 2.80% Contingency of (B) 64167886 C Total Including contingency 2355878087 Centages Administrative Charges @ 1.0% of B 22917102 Quality Control Charges @ 1.0% of B 22917102 Road Safety Cell Audit Charges @ 0.5% of B 11458551 Construction Supervision Charges @ 2.0% of B 45834204 Maintainace during DLP payable to contractor @ 7.5% of B for four years 171878265 Escalation Cost @ 5.0% PA for 2 years i.e. 10% of B payable to contractor (Bidding period of 1 year + Construction period of 1 years) 229171020 D TOTAL PROJECT COST 2860054332 Forest Clearance Cost * 57201087 Utility Shifting Cost * 85801630 E TOTAL CAPITAL COST = 3003057048 Lac 30030.570 Crores 300.306 Note : * = Amount of Forest Clearance,& utility shifting may vary, actual estimate is awaited from the concerned departments Page 8