CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CTF3 DRIVE BEAM INJECTOR OPTIMISATION

Similar documents
Short Introduction to CLIC and CTF3, Technologies for Future Linear Colliders

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH

COMBINER RING LATTICE

Longitudinal Beam Dynamics

High average current photo injector (PHIN) for the CLIC Test Facility at CERN

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH THE CLIC POSITRON CAPTURE AND ACCELERATION IN THE INJECTOR LINAC

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

SRF GUN CHARACTERIZATION - PHASE SPACE AND DARK CURRENT MEASUREMENTS AT ELBE*

TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER

THE CLIC PROJECT - STATUS AND PROSPECTS

Particle Accelerators Projects in Iran (Focused on the IPM recent and future projects)

RF LINACS. Alessandra Lombardi BE/ ABP CERN

Why do we accelerate particles?

Recent Progress at the CLIC Test Facility 3 at CERN

Linac JUAS lecture summary

Multiparameter optimization of an ERL. injector

Dark Current at Injector. Jang-Hui Han 27 November 2006 XFEL Beam Dynamics Meeting

!"#$%$!&'()$"('*+,-')'+-$#..+/+,0)&,$%.1&&/$ LONGITUDINAL BEAM DYNAMICS

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH BEAM-BASED ALIGNMENT IN CTF3 TEST BEAM LINE

Alignment requirement for the SRF cavities of the LCLS-II injector LCLSII-TN /16/2014

Lattice Design of 2-loop Compact ERL. High Energy Accelerator Research Organization, KEK Miho Shimada and Yukinori Kobayashi

Compressor Lattice Design for SPL Beam

STATUS OF THE NOVOSIBIRSK ENERGY RECOVERY LINAC

Status of linear collider designs:

X-Band RF Harmonic Compensation for Linear Bunch Compression in the LCLS

PAL LINAC UPGRADE FOR A 1-3 Å XFEL

Notes on the HIE-ISOLDE HEBT

Towards a Low Emittance X-ray FEL at PSI

$)ODW%HDP(OHFWURQ6RXUFHIRU/LQHDU&ROOLGHUV

ASTRA simulations of the slice longitudinal momentum spread along the beamline for PITZ

Investigation of the Effect of Space Charge in the compact-energy Recovery Linac

Introduction. Thermoionic gun vs RF photo gun Magnetic compression vs Velocity bunching. Probe beam design options

ERL FOR LOW ENERGY ELECTRON COOLING AT RHIC (LEREC)*

Tomographic transverse phase space measurements at PITZ.

3. Synchrotrons. Synchrotron Basics

Monte Carlo Simulations of Beam Losses in the Test Beam Line of CTF3

PARTICLE BEAMS, TOOLS FOR MODERN SCIENCE AND MEDICINE Hans-H. Braun, CERN

SwissFEL INJECTOR DESIGN: AN AUTOMATIC PROCEDURE

PBL (Problem-Based Learning) scenario for Accelerator Physics Mats Lindroos and E. Métral (CERN, Switzerland) Lund University, Sweden, March 19-23,

S2E (Start-to-End) Simulations for PAL-FEL. Eun-San Kim

Low slice emittance preservation during bunch compression

A Low Energy Beam Transport Design with high SCC for TAC Proton Accelerator

Status of linear collider designs:

CHARACTERISTICS OF A HIGH-CURRENT, MULTI-BUNCHED BEAM

CLIC Status. Philip Burrows. John Adams Institute Oxford University

Femto second X ray Pulse Generation by Electron Beam Slicing. F. Willeke, L.H. Yu, NSLSII, BNL, Upton, NY 11973, USA

ILC Particle Sources -Electron and PositronMasao KURIKI (Hiroshima University)

Simulation of transverse emittance measurements using the single slit method

AGS INJECTOR AND PRE INJECTOR BEAM STUDIES. A. van Steenbergen Brookhaven National Laboratory

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH BEAM MOMENTUM CHANGES DUE TO DISCHARGES IN HIGH- GRADIENT ACCELERATOR STRUCTURES

Physical design of FEL injector based on performance-enhanced EC-ITC RF gun

arxiv: v1 [physics.acc-ph] 21 Oct 2014

Physics 610. Adv Particle Physics. April 7, 2014

X-band Experience at FEL

ELECTRON COOLING OF PB54+ IONS IN LEIR

FACET-II Design Update

CEPC Linac Injector. HEP Jan, Cai Meng, Guoxi Pei, Jingru Zhang, Xiaoping Li, Dou Wang, Shilun Pei, Jie Gao, Yunlong Chi

Velocity Bunching Studies at FLASH. Bolko Beutner, DESY XFEL Beam Dynamics Meeting

The FAIR Accelerator Facility

Muon Front-End without Cooling

Beam-beam Effects in Linear Colliders

Integrated luminosity performance studies of linear colliders with intra-train IP-FB system: ILC and CLIC

Longitudinal Measurements at the SLAC Gun Test Facility*

CLIC Detector studies status + plans

The MAX IV Thermionic preinjector

Positron Source using Channelling for the Baseline of the CLIC study

First propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division

Simulation of the Beam Dump for a High Intensity Electron gun

RFQ BEAM DYNAMICS DESIGN FOR LARGE SCIENCE FACILITIES AND ACCELERATOR-DRIVEN SYSTEMS

CLIC THE COMPACT LINEAR COLLIDER

The SARAF 40 MeV Proton/Deuteron Accelerator

High-gradient X-band RF technology for CLIC and beyond

Design of an RF Photo-Gun (PHIN)

6 Bunch Compressor and Transfer to Main Linac

Longitudinal dynamics Yannis PAPAPHILIPPOU CERN

Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002

HIRFL STATUS AND HIRFL-CSR PROJECT IN LANZHOU

Experimental Measurements of the ORION Photoinjector Drive Laser Oscillator Subsystem

THE COMPACT LINEAR COLLIDER (CLIC) STUDY

The LHC: the energy, cooling, and operation. Susmita Jyotishmati

Nonlinear Single-Particle Dynamics in High Energy Accelerators

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN - SL DIVISION. Multi-TeV CLIC Photon Collider Option. H. Burkhardt

VELA/CLARA as Advanced Accelerator Studies Test-bed at Daresbury Lab.

LOLA: Past, present and future operation

CTF 3 Commissioning 2006

The TESLA Dogbone Damping Ring

INJECTION PAINTING AND ASSOCIATED HW FOR 160 MeV PSB H

Phase Space Study of the Synchrotron Oscillation and Radiation Damping of the Longitudinal and Transverse Oscillations

ICFA ERL Workshop Jefferson Laboratory March 19-23, 2005 Working Group 1 summary Ilan Ben-Zvi & Ivan Bazarov

FURTHER UNDERSTANDING THE LCLS INJECTOR EMITTANCE*

Diagnostics at the MAX IV 3 GeV storage ring during commissioning. PPT-mall 2. Åke Andersson On behalf of the MAX IV team

Particle Driven Acceleration Experiments

Tools of Particle Physics I Accelerators

The SARAF CW 40 MeV Proton/Deuteron Accelerator

Pros and Cons of the Acceleration Scheme (NF-IDS)

OPTIMIZATION OF COMPENSATION CHICANES IN THE LCLS-II BEAM DELIVERY SYSTEM

INTENSITY AND ENERGY LIMITATIONS OF THE CERN PS COMPLEX

On-axis injection into small dynamic aperture

III. CesrTA Configuration and Optics for Ultra-Low Emittance David Rice Cornell Laboratory for Accelerator-Based Sciences and Education

Basic Principle of Cyclotron

Transcription:

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CLIC Note 1060 CTF3 DRIVE BEAM INJECTOR OPTIMISATION - 1 Sh. Sanaye Hajari 1, 2, * H. Shaker 1, 2 and S. Doebert 2 Institute for Research in Fundamental Sciences (IPM), School of Particles and Accelerators, Tehran, Iran 2European Organization for Nuclear Research (CERN), Geneva, Switzerland Abstract CERN-ACC-2016-0002 30/06/2015 In the Compact Linear Collider (CLIC) the RF power for the acceleration of the Main Beam is extracted from a high-current Drive Beam that runs parallel to the main linac. The main feasibility issues of the two-beam acceleration scheme are being demonstrated at CLIC Test Facility 3 (CTF3). The CTF3 Drive Beam injector consists of a thermionic gun followed by the bunching system and two accelerating structures all embedded in solenoidal magnetic field and a magnetic chicane. Three sub-harmonic bunchers (SHB), a prebuncher and a travelling wave buncher constitute the bunching system. The phase coding process done by the sub-harmonic bunching system produces unwanted satellite bunches between the successive main bunches. The beam dynamics of the CTF3 Drive Beam injector is reoptimised with the goal of improving the injector performance and in particular decreasing the satellite population, the beam loss in the magnetic chicane and the beam emittance in transverse plane compare to the original model based on P. Urschuetz works. Geneva, Switzerland 30/06/2015

CTF3 Drive Beam Injector Optimisation Sh. Sanaye Hajari, 1, 2, * H. Shaker 1, 2 and S. Doebert 2 1 Institute for Research in Fundamental Sciences (IPM), School of Particles and Accelerators, P.O. Box 19395-5531, Tehran, Iran 2 European Organization for Nuclear Research (CERN), BE Department, CH-1211 Geneva 23, Switzerland Abstract In the Compact Linear Collider (CLIC) the RF power for the acceleration of the Main Beam is extracted from a high-current Drive Beam that runs parallel to the main linac. The main feasibility issues of the two-beam acceleration scheme are being demonstrated at CLIC Test Facility 3 (CTF3). The CTF3 Drive Beam injector consists of a thermionic gun followed by the bunching system and two accelerating structures all embedded in solenoidal magnetic field and a magnetic chicane. Three sub-harmonic bunchers (SHB), a prebuncher and a travelling wave buncher constitute the bunching system. The phase coding process done by the sub-harmonic bunching system produces unwanted satellite bunches between the successive main bunches. The beam dynamics of the CTF3 Drive Beam injector is reoptimised with the goal of improving the injector performance and in particular decreasing the satellite population, the beam loss in the magnetic chicane and the beam emittance in transverse plane compare to the original model based on P. Urschuetz works. 1. Introduction The Compact Linear Collider (CLIC) is a future multi-tev electron-positron collider under study at CERN [1]. In CLIC acceleration scheme the RF power for the acceleration of the main beam is provided by a high current Drive Beam that runs parallel to the main linac. The Drive Beam loses its energy in special RF structures (decelerators) called Power Extraction and Transfer Structures (PETS). The Drive Beam is generated and accelerated in lower frequency structures then it goes through a frequency multiplication process because klystrons at lower frequencies are more efficient. The main characteristics of the Drive Beam injector is the phase coding process done by the sub-harmonic bunching system operating at half the acceleration frequency. The phase coding process (described below) is essential for the Drive Beam frequency multiplication. During this process the so called satellite bunches are produced which adversely affects the machine power efficiency. The main feasibility issues of the two-beam acceleration scheme have being demonstrated at the CLIC Test Facility 3 (CTF3) which is a small-scale version of CLIC [2]. The main points which have been demonstrated at CTF3 are the efficient generation of the Drive Beam and the RF power production as well the phase coding process [1]. The CTF3 Drive Beam injector consists of a thermionic gun providing a beam with a current of 6 A, a bunching system and two accelerating structures to accelerate the beam up to about 19 MeV and a magnetic chicane with a horizontal slit to reduce the beam energy spread and trim the longitudinal phase space of the beam. The bunching system consists of three 1.5 GHz sub-harmonic bunchers, a standing wave prebuncher and a travelling wave buncher both operating at 3 GHz as the accelerating structures. In the transverse plane, the focusing is provided by solenoid magnets up to the end of second accelerating structure and for the rest of the beam line quadrupole magnets are used. The general layout of the injector is shown in fig.1. The sub-harmonics bunching system operates at half the acceleration frequency, therefore only every second RF bucket is occupied. However, a few percent of particles are captured in wrong buckets called satellite bunches. The sub-harmonic bunching system changes its phase at the end of each bunch train by 180 o. This process is called the phase coding [1]. Therefore, as illustrated in fig. 2 the main pulse is made up of even and odd bunch trains. Such a phase coded beam then passes through a delay loop and a combiner ring for the frequency multiplication process. * Corresponding author. Email address: ssanayeh@cern.ch

Fig. 1. CTF3 Drive Beam injector layout. Fig. 2. Phase switching of the sub-harmonic bunching system and the satellite concept. The CTF3 Drive beam injector is reoptimised with the goal of reducing the satellite population, the beam loss at the chicane and the beam emittance. In this optimisation only minor changes are applied rather than changing all the parameters of the system and the effort has taken to improve the injector performance using the small number of the available knobs. In the next sections, we first describe the original model which is based on P. Urschuetz works [3] and then the effect of minor changes on the injector performance. The optimisation methods used here are already applied on CLIC Drive Beam injector. The physics behind the optimisation procedures and the design of CLIC Drive Beam injector are described extensively in [4, 5]. 2. Description of the original model In the original model, the voltages of the three sub-harmonic bunchers are the same and equal to 20 kv and for the prebuncher it is 50 kv. The length of each SHB and the prebuncher is 15 cm and 2 cm respectively. The length of the drift spaces of the sub-harmonic bunching system is listed in Table I and the beam parameters after the magnetic chicane can be found in Table II. TABLE I. Drift spaces of the SHB system Drift space Length (cm) D1 43 D2 7.8 D3 10.2 Dp 9.5 The satellite to main bunch population after the buncher is 10.2%. The satellite population reduces about 3% in the chicane because of particle losses. In fact the energy spread of the satellite bunches is larger than the main

bunch therefore we lose a larger fraction of the satellite particles compare to the main bunch particles. Figure 3 shows the longitudinal phase space of the both bunches before the chicane. TABLE II. Beam parameters after the magnetic chicane Beam parameters RMS bunch length 1.66 mm RMS energy spread 0.143 MeV Beam energy 18.6 MeV Satellite to main bunch population 7.0% Beam loss at chicane 18.8% Beam emittance 38.8 mm-mrad FIG. 3. Longitudinal Phase space of the beam before the magnetic chicane. The low energy tail of the bunches cause a large beam loss at the chicane. The population of the particles in these low energy tails depends mostly on the buncher design and on the shape of the longitudinal phase space at the buncher entrance as well. The longitudinal phase space of the beam at the buncher entrance is shown in fig. 4. As will be discussed in next section the tail particles shown in red ellipses are mostly added to the low energy tail of the bunches and especially to the satellite bunches after the buncher. If we can reduce the tails shown in fig. 4 somehow then we probably will be able to reduce the satellite population and the beam loss at chicane as discussed in next sections. FIG. 4.Longitudinal Phase space of the beam at the buncher entrance.

For the transverse plane, the evaluation of the beam size and the beam emittance is illustrated in fig. 5. FIG. 5. Evaluation of the beam size and the beam emittance. In the first diagram the red curve is the x coordinate of the outermost particle with respect to the beam axis and the blue cure shows the rms beam size multiplied by minus 3 (-3x rms ). The second diagram illustrates the beam emittance coordinate in x and y direction in cm-mrad. The red line displays the longitudinal position of the buncher entrance. The beam emittance has a large jump at the prebuncher and the buncher entrance. As will be discussed in section 5, if we increase the focusing field in this region we will expect a smaller jump. In the next sections we first focus on the satellite reduction issue then discus shortly the emittance growth problem. 3. Satellite population reduction The satellite population is mostly determined by the sub-harmonic bunching system. In the sub-harmonic bunching system, the phase of each cavity is adjusted so that the main bunch is always launched at zero crossing (approximately) and after each cavity the phase space of the main bunch is longitudinally convergent. On the other hand the longitudinal phase space of the satellite bunch is always divergent. In this way particles continuously evacuate the satellite bunches and are added to the main bunches. To reduce the satellite population we need to provide the maximum time for the satellite particle to leave this bunch. Therefore, as the first general approach for optimisation of the sub-harmonic bunching system we need to choose the maximum length for the drift sections. For the cavity voltages we note that a larger voltage (larger velocity modulation) helps particles penetrate more into the main bunch against the space-charge forces resulting in a shorter bunch length. However, we don t prefer a short bunch length especially at early stages. In a shorter bunch, particles are longitudinally close together experiencing strong space-charge forces. When such a bunch is passed through a long drift space some particles at the border of the bunch might get a large energy deviation due to the large repulsive forces as illustrated in fig. 6. Therefore, as the second general approach we start with a relatively low value of the voltage for the first SHB and increase it for the downstream cavities. More details on the optimisation procedure can be found in [4]. We first optimise the sub-harmonic bunching system without any restrictions to see to what extend the satellite population can be reduced. In this optimisation we will try to reduce the satellite population while keeping the other beam parameters unchanged. The parameters of the sub-harmonic bunching system for this case are listed in Table III and the beam parameters can be found in Table IV. According to this optimisation the satellite population can be reduced significantly. The satellite population after the buncher is 3.5% and reduces to 2.5% after the chicane.

FIG. 6. Longitudinal phase space of the beam 45 cm away from a 30kV cavity. Using a large voltage, results in accumulation of particles in a short bunch of high particle density. Due to the large repulsive forces, some particles at the border of the bunch are pushed out getting a large energy deviation. In this situation it would be difficult (or impossible) to keep these particles in the main bunch downstream. TABLE III. Parameters of the sub-harmonic bunching system optimised without any restriction. Parameters D1 D2 D3 Dp V1 V2 V3 Vp 60 cm 20 cm 15 cm 6 cm 12 kv 30 kv 45 kv 70 kv TABLE IV. Longitudinal beam parameters after the magnetic chicane for a system optimised without any restriction. Beam parameters RMS bunch length 1.60 mm RMS energy spread 0.108 MeV Beam energy 18.7 MeV Satellite to main bunch population 2.5% Beam loss at chicane 19.1% The next step is to keep the drift spaces fixed and optimise the sub-harmonic bunching system only by changing the voltages. The optimum value of the voltages and also the beam parameters are given in Tables V and VI. TABLE V. Parameters of the sub-harmonic bunching system optimised by keeping the drift sections unchanged. Parameters V1 V2 V3 Vp 13 kv 25 kv 40 kv 70 kv

TABLE VI. Longitudinal beam parameters after the magnetic chicane for a system optimised by keeping the drift sections unchanged. Beam parameters RMS bunch length 1.92 mm RMS energy spread 0.139 MeV Beam energy 18.7 MeV Satellite to main bunch population 4.5% Beam loss at chicane 19.3% In this case the satellite population after the buncher is 7.5% and reduces to 4.5%. Although the satellite population is reduced significantly, we will need larger power for the second and third cavities which is not currently available. Therefore, in the last case, we will try to reduce the satellite population by keeping the voltages below 20 kv. If we reduce the voltage of the first SHB from 20 kv to 15kV the tails shown in fig. 4. will be shortened. This is illustrated in fig. 7. FIG. 7. Longitudinal Phase space of the beam at the buncher entrance for the case in which the voltage of the first SHB is reduced to 15 kv. By reducing the voltage of the first SHB to 15 kv the satellite population after the buncher reduces from 10.2% to 8.5% however, after the chicane it becomes 7.0% as in the original model. This means that the tails shown in fig. 4 are added to the low energy tail of the satellite bunch which is going to be lost in the chicane. Therefore, by reducing the voltage of the first SHB, the satellite population after the magnetic chicane cannot be reduced. However, the population of the low energy tail of the bunches after the buncher is reduced which results in a reduction in beam loss at the magnetic chicane of about 4%. The beam parameters for the case of V1=15 kv can be found in Table VII. TABLE VII. Longitudinal beam parameters after the magnetic chicane for the case of V1=15 kv. Beam parameters RMS bunch length 1.69 mm RMS energy spread 0.157 MeV Beam energy 18.6 MeV Satellite to main bunch population 7.0% Beam loss at chicane 14.6% Therefore, with such a small change the beam current after the magnetic chicane will be about 5% larger.

4. Beam emittance growth reduction In transverse plane, the main issue is the beam emittance growth. The main reason for the emittance growth in a solenoid channel is the beam mismatching. When the focusing field does not have the correct magnitude the beam envelope oscillates around its matched value. The extra energy associated with these oscillations is then available for the beam emittance growth [6, 7]. The envelope equation provides mathematically the matching condition for a continuous monoenergetic beam. However, because of the bunched nature of the beam and the beam energy spread perfect matching is not possible and in the best condition we can match the larger fraction of the beam to the focusing field and the mismatched part of the beam will contribute the beam emittance growth. As illustrated in fig. 5. The largest emittance growth occurs through the prebuncher and at the buncher entrance. This is because the beam relative energy spread has its largest value through the channel at the prebuncher and at the entrance of the buncher. According to Wangler s formula [8], the rate of the beam emittance growth is smaller for a beam of smaller size. However, to reduce the beam size we will need a larger focusing field. The beam emittance growth can be reduced easily by increasing the soleniodal field in small region around the buncher entrance. For example if we increase the coil s current from z = 160 cm to z = 208 cm by about 50% the beam emittance at the end of injector will reduce from 38.8 mm-mrad to 29.5 mm-mrad. The beam size and emittance evaluation trough the soleniodal channel is illustrated in fig. 8 which can be compared with fig. 5. FIG. 8. Evaluation of the beam size and the beam emittance for a focusing channel in which the soleniodal field at the entrance of buncher has been increased. The solenoidal field of this case can be compared with the original model in fig. 6. FIG. 6.Solenoidal focusing field for the original model (blue line) and the increased one (red line).

5. Conclusion The performance of the CTF3 injector can be improved slightly by applying minor changes to the operational parameters. For instance by reducing the voltage of the first SHB the beam loss at chicane can be reduced and by increasing the focusing field at the buncher entrance the beam emittance growth can be limited. However if it would be possible to choose the distance of the drift space and the power to the sub-harmonic bunchers freely a substantial reduction of the satellite population could be obtained. [1] A Multi-TeV linear collider based on CLIC technology: CLIC Conceptual Design Report, edited by M. Aicheler, P. Burrows, M. Draper, T. Garvey, P. Lebrun, K. Peach, N. Phinney, H. Schmickler, D. Schulte and N. Toge, CERN-2012-007. [2] G. Geschonke et al., CTF3 Design Report, CERN/PS 2002-008 (RF), 2002. [3] P. Urschuetz et al, Beam Dynamics and First Operation of the Sub-Harmonic Bunching System in the CTF3 Injector, Proceedings of EPAC 2006, Edinburgh, Scotland, MOPLS101 [4] Sh. Sanaye Hajari, H. Shaker and S. Doebert, Beam dynamics design of the Compact Linear Collider drive beam injector, Nuclear Instruments & Methods in Physics Research Section A, Submitted, 2015. [5] Sh. Sanaye Hajari, H. Shaker and S. Doebert, Beam Dynamics Studies of the CLIC Drive Beam Injector complex, Proceeding of LINAC 14, Geneva, Switzerland 2014. [6] M. Reiser, Theory and Design of Charged Particle Beams, 2nd edition, John Wile & Sons, 2008. [7] T.P. Wangler et al., RF Linear Accelerator, 2nd edition, John Wile & Sons, 2008. [8] T.P. Wangler et al., Relation between Field Energy and RMS Emittance in Intense Particle Beams, IEEE Transactions on Nuclear Science, Vol. NS-32, No. 5, (1985)