Installation Manual. Southwest Windpower, Inc. Renewable Energy Made Simple

Similar documents
EZ TowerTM. Owner s Manual for Air wind generators. Assembly Installation Maintenance

WARNING. INJURY HAZARD Failure to observe these instructions could lead to severe injury or death.

INSTALLATION INSTRUCTIONS FRONT PLOW MOUNT KIT Part Number: Application: Polaris Sportsman 400, 500, 800

INSTALLATION INSTRUCTIONS ATV Plow Blade Part Number: (50 ), (54 ), or (60 ) Application: All Terrain Vehicles

INSTALLATION INSTRUCTIONS ProVantage Plow Pulley Part Number: 84526

PUSH TUBE STANDARD DUTY

INSTALLATION INSTRUCTIONS ATV SNOW PLOW Mounting Kit: PN Application: HONDA 300

INSTALLATION INSTRUCTIONS ATV SNOW PLOW Mounting Kit: PN Application: HONDA 400

INSTALLATION INSTRUCTIONS ATV SNOW PLOW Mounting Kit: PN Application: HONDA MODELS: 450S AND 450ES

DRIFTER PLOW-IN-A-BOX

ATV WP2 FRONT MOUNT PUSH TUBE

DRIFTER PLOW-IN-A-BOX ASSEMBLY / OWNER S MANUAL

INSTALLATION INSTRUCTIONS PLOW MOUNT KIT Part Number: Application: Honda Foreman 500

PLOW MOUNT KIT FOR POLARIS RANGER P/N ASSEMBLY / OWNERS MANUAL

INSTALLATION INSTRUCTIONS ATV PLOW ACCESSORY Plow Mounting Kit:Warn PN Application:2002 and newer+ Suzuki Eiger 400

SHARK Snow Plow. 52 (132 cm) / 60 (152 cm) Complete system blade INSTRUCTIONS / ESTABLISHMENT

50 Gordon Drive, Rockland, Maine sherplows.com. STORM BOXX Snowplow. 10' and 12' Box Plow for Backhoe Loaders

Consumer Guide. Southwest Windpower 1801 W. Route 66 Flagstaff, AZ USA

POWER PUSHER Snowplow

For Customer Service, Rev A - 6/ OF 6

A.R.M. 52 PLOW With QUICK ATTACH MOUNTING SYSTEM MODEL NUMBER BLACK MODEL NUMBER GRAY. Owner s Manual

FOR CAN-AM ATV s P/N ASSEMBLY / OWNERS MANUAL

FOR POLARIS ATV s P/N ASSEMBLY / OWNERS MANUAL

PLOW MOUNT KIT FOR YAMAHA VIKING P/N ASSEMBLY / OWNERS MANUAL. Application PLOW PUSH FRAME NO or

Must Read Before Installation TadPoleTM Safety and Warnings

THE VIPER ATV PLOW SYSTEM

WARNING. INJURY HAZARD Failure to observe these instructions could lead to severe injury or death.

A.R.M. 52 POLY PLOW BLACK With QUICK ATTACH MOUNTING SYSTEM MODEL NUMBER Owner s Manual

Service Information Letter SIL # 017

Snow Blade Operator s/assembly Instructions

SK Series BOX PLOW INSTALLATION & OWNER S MANUAL TABLE OF CONTENTS

Installation guide 862 MIT / MIR

FOREMAN ASSEMBLY / OWNER S MANUAL

Instruction Manual. Kite-22 Camera Crane Starter Package (KITE-22-STARTER) Exclusive of Weights

ASSEMBLY / OWNER S MANUAL

CBRD30CP3 & BOWRD30CP INSTRUCTION MANUAL

THE LOSMANDY G-11 MOUNT

product manual H-4204 Proving Ring Penetrometer

INSTALLING TRAK SPORT TIRE CHAINS ON 20 MODEL 3 TIRES

OASIS WIRELESS WEATHER STATION

Self-Testing Prevectron 2 Millenium Lightning Conductor Set-up and Installation Manual

LDR Series BOX PLOW INSTALLATION & OWNER S MANUAL TABLE OF CONTENTS

ER2 Short-head Electric Chain Hoist

Important Instructions

COMMODORE BRASS TELESCOPE ZHUMELL COMMODORE BRASS TELESCOPE

2.4M SERIES 1241 ANTENNA

The student will be able to: 1 Determine the torque of an applied force and solve related problems.

Tornadoes Module 2. - Tornado Watch -

Assembly Instructions for the 1-Wire Weather Station V2.0/V3.0

INSTRUCTIONS FOR ATTACHING THE NORDIC PLOW TO THE ACTION TRACKCHAIR

Automatic Level Maintenance Manual SAL-XX W/ AIR DAMPENED COMPENSATOR

Assembly Manual for the Brevard Astronomical Society 16 inch F4.5 Dobsonian Telescope Brevard Astronomical Society P.O. Box 1084 Cocoa, FL 32922

WARRANTY AND ASSISTANCE

saxon Instruction Manual saxon Grandeur Brass Telescope High quality optics

How to Check Your G4 Spread Pattern

22X Builder s Transit Level Model No Instruction Manual

HS515G-M. PARALOW Circle Dot Sight. User's Manual. Holosun Technologies Inc. Phone: (909) Fax: (909)

1,836 people die and 136,309 people are injured every year from icy roads in the US.

Installation Manual. Installation manual for PerfectEnergy Solar Modules. Content

Installation instructions, accessories. Snow chains

22X Builder s Level Model No Instruction Manual

The student will be able to: the torque of an applied force and solve related problems.

AP Physics-B ElectroStatics Electric Charges: Subatomic Particles and Electricity: atoms subatomic particles protons neutrons electrons nucleus

Safety is no accident

Melton Series. Owners Manual. Lab Centrifuge. Model # s A C, A C, B C, B C, C C, C C, D C, D C

5. DRIVE 1. SAFETY 2. PREPARATION 3. FRAME 4. TRANSMISSION 6. ROW UNIT 7. OPTIONAL EQUIPMENT

Sitting height... 6 Back tilt and back height... 6 Armrest... 7 Brakes... 7 Charging VELA Tango 300E... 7

WEATHER STATION FIELD GUIDE

Keep Your Own Weather Journal Every meteorologist needs to keep a good weather journal. Remember, good observations make good forecasts.

Forces. Name and Surname: Class: L E A R N I N G O U T C O M E S. What is a force? How are forces measured? What do forces do?

Initial tension forces in guys of steel industrial chimneys at adjustment phase

HEAVY DUTY SWING-OUT VALVE

Red and Green Dot Sight FF26002 USER MANUAL

2.8-1 SCIENCE EXPERIMENTS ON FILE Revised Edition. Dew Formation

CRAIG MANUFACTURING LTD. 96 McLean Ave. Hartland, New Brunswick CANADA E7P 2K5

HEAVY DUTY SWING-OUT VALVE

Galileo Telescope Solar Viewer Joseph Hora, Elizabeth Hora 2017/09/18

Galileoscope Assembly Instructions

C A S S I N I TRACKER

QUAKE BRAKE TM MODEL QBC-12 SEISMIC SWAY BRACING KIT FEATURING

product manual H-3220A Benkelman Beam

HT600 Dat e Code: 2 - HT MW Purchase Date: PLEASE RETAIN THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE. All Rights Reserved

ASTRO-PHYSICS, INC. POLAR ALIGNMENT TELESCOPE

LEAPERS, INC. RED/GREEN DOTS

PAM-Station Land-Owner Information Guide Project: CuPIDO, Tucson AZ, Jul/Aug 2006

PROBLEM AREA 8 UNIT C8-2. Interest Approach LESSON 2. What skills are needed in agricultural mechanics? Student Learning Objectives.

Solar Schoolhouse Human Sundial Building a Sundial with the Online Calculator

Nordic Plow. Zero Turn 49 Blade Plow DANSK...18 ENGLISH...11 NORSK FRANCAIS...12 SVENSKA...20 PORTUGUES...16 XXXXXX...

Centripetal Force Lab

ASTRO-PHYSICS, INC. POLAR ALIGNMENT TELESCOPE (PASILL2)

取扱説明書 /INSTRUCTION MANUAL 自動レベル /AUTOMATIC LEVEL AT-B2/B3/B4 FC10386-A012-02

Telescope. 1. Read these instructions carefully and familiarise yourself with the procedure before assembling the unit.

Ballistic pendulum Operating Instructions Fig. 1: Ballistic pendulum SAFETY PRECAUTIONS

3B SCIENTIFIC PHYSICS

Field Pro Operation and Installation Manual

SKID STEER LOADER SNOWPLOW STEEL STRAIGHT PLOW MODELS 2275, 2280, 2285 SCOOP PLOW MODELS 2682, TRIP EDGE STRAIGHT PLOW MODEL 2103

Conversion Kit for: 7620 and 7820 Swing-Out Valves ft-lbs ft-lbs 8835/ ft-lbs

1073 Series One Way Snowplow owner s manual. Read before operating. Important safety and operation instructions inside.

How to Prepare for a Tornado

iweathar EDGE V Installation Guide Copyright 2012 iweathar. All rights reserved.

Transcription:

EZ -Tower Installation Manual 29 ft. (8.8 m) For the AIR and AIR-X Wind Generators Renewable Energy Made Simple 1801 West Route 66 Flagstaff, Arizona 86001 Phone: 928.779.9463 Fax: 928.779.1485 Email: info@windenergy,com Web Page: http://www.windenergy.com

LTE21 Copyright 2005. All rights reserved.

Table of Contents Table of Contents Chapter 1 Introduction 1-1 Welcome... 1-1 Introduction to the EZ -Tower... 1-2 Chapter 2 Safety 2-1 Notice to the Reader... 2-1 Safety Precautions... 2-2 Safe Installation... 2-3 Chapter 3 EZ -Tower Parts and Required Tools 3-1 EZ -Tower Parts... 3-1 Required Tools... 3-4 Chapter 4 Site Selection 4-1 Wind Speed... 4-2 Surface Roughness... 4-2 Topography... 4-3 Barriers... 4-3 Chapter 5 Tower Base and Earth Anchor Layout 5-1 Tower Layout... 5-1 Tower Assembly - Hillside... 5-2 Tower Base... 5-2 Arrowhead Earth Anchors... 5-3 Soil Type and Recommended Anchors... 5-6 EZ -Tower i

Table of Contents Chapter 6 Tower Assembly 6-1 Tower Tube Layout... 6-1 Attaching the Guy Wires... 6-4 Raising the Tower... 6-6 Adjusting the Guy Wires... 6-6 Chapter 7 Installing the AIR Wind Generator 7-1 Chapter 8 EZ -Tower Maintenance 8-1 ii EZ -Tower

Introduction Chapter 1 Introduction Chapter Contents Welcome... 1-1 Introduction to the EZ -Tower... 1-2 Welcome Dear Valued Customer: On behalf of all of us at, thank you for choosing our company as the source for your renewable energy system. Southwest Windpower, Inc. is confident that you will be pleased with the performance and quality of our products. Nearly 3 billion people in the world do not have electricity. By necessity, most will ultimately get their electricity from renewable resources to the benefit of all. You are a pioneer and part of the solution! Renewable energy power systems provide independent electric power for boats, homeowners, farms, villages and commercial applications. If utility power is available, your renewable energy system can reduce your electric bill and provide electrical backup during storms or line failure. Renewable means energy sources that: Do not deplete the world s finite fossil fuel resources Do not pollute or warm the atmosphere, and * Do not generate hazardous waste We hope you will enjoy the benefits of your wind powered electrical system for many years to come. Thank you again for choosing Frank P. Greco, Chief Executive Officer EZ -Tower 1-1

Introduction Introduction to the EZ -Tower Congratulations! You have just received the simplest, and most economical EZ -Tower available for your AIR Wind Generator. This kit is designed to be easy to assemble and erect. The EZ -Tower is designed specifically for AIR- Wind Generator, AIR-403 and AIR-X Wind Generators. This guy wire-supported tower uses lightweight tubing while providing plenty of strength. Two people can easily erect this tower in about an hour. Since the wind generator and EZ -Tower are lightweight, no winches or vehicles are needed to erect the tower. The EZ -Tower includes a simple yet effective tower base and anchoring system, which eliminates the need for a concrete pad. Depending on your soil conditions, cement may be necessary for proper anchoring. It is important to read this manual first and understand your soil conditions before you begin construction. Read this manual thoroughly before beginning assembly. assumes no responsibility for inaccuracies or omissions. The user of this information and product assumes full responsibility and risk. All specifications are subject to change without notice. If you have any questions on siting, proper installation or operation, please contact or your dealer before installation. 1-2 EZ -Tower

Safety Chapter 2 Safety Chapter Contents Notice to the Reader... 2-1 Safety Precautions... 2-2 Safe Installation... 2-3 Notice to the Reader The reader is expressly warned to consider and adopt all safety precautions that might be indicated by the activities described herein, and to avoid all potential hazards. By following the instructions contained herein, the reader willingly assumes all risks in connection with such instructions. The reader is further warned to pay strong attention to all information boxes emphasized with these special alert symbols: This symbol indicates helpful information. This symbol alerts the reader to follow proper procedures and/or possible damage to equipment. This symbol indicates the presence of electrical shock hazards, situations and/or procedures that may present a danger to personal safety. EZ -Tower 2-1

Safety Safety Precautions systems present mechanical, electrical and chemical (battery) hazards addressed in the following safety messages: Obtain all required permits and engineering certifications for your tower and tower location. Soil and wind conditions vary. Towers and tower foundations must be designed for your specific location. Locate tower so as not to fall on occupied buildings, neighbors property or power lines. STOP! DO NOT climb the tower. Tower climbing is very dangerous. Locate the tower mounting mast well away from occupied buildings and power lines. A minimum of 300 ft. (100 m) is recommended. If the wind generator sounds or appears loose, or if the tower is making an unusual sound, correct the condition immediately. A loose wind generator or component will incur further damage and/or may fall from the tower. Never stand in line with an operating propeller. High voltage systems represent a dangerous shock hazard. All high voltage systems should be wired and maintained by a qualified and licensed electrician. Use protective gloves when handling guy wires. Use protective gloves and safety glasses when working around batteries. 2-2 EZ -Tower

Safety Safe Installation It is very important to remember that any wind generator has high speed spinning parts and can be very dangerous! Be sure that all bolted connections are tight and guy wire anchors are suitable for your soil conditions. These elements will be explained in further detail later in this manual. When installing your EZ -Tower: Two people must be present when the tower is raised. Have at least two people available during assembly and erection of tower. Always wear closed-toe shoes. Always wear safety glasses. Always wear protective gloves when handling cable. Important! Choose a very calm day to do your installation. A gust of wind at the wrong moment could cause a very serious accident. EZ -Tower 2-3

Safety 2-4 EZ -Tower

EZ -Tower Parts and Required Tools Chapter 3 EZ -Tower Parts and Required Tools Chapter Contents EZ -Tower Parts... 3-1 Required Tools... 3-4 EZ -Tower Parts The EZ -Tower includes: EZ -Tower Parts Description Quantity Tower Base 1 21 ft. Guy Wire Set (wire Guy Wire Attachment Plate) 1 30 ft. Guy Wire Set (with Guy Wire Attachment Plate) 1 M10 x 65 mm Bolt 1 M10 Locknut 1 Cable Thimbles 8 Cable Clamps 16 Tower Base Earth Spikes 4 Arrowhead Earth Anchors 4 Earth Anchor Driving Rod 1 1-7/8 inch x 72 inch Tower Tubes 4 1-7/8 inch x 48 inch Tower Tube 1 1-7/8 inch x 42 inch Tower Tube 1 If any parts are missing from the list shown above, call EZ -Tower 3-1

EZ -Tower Parts and Required Tools Tower Base Lower Guy Cable Wires - 21 ft. length Upper Guy Cable Wire - 30 ft. length Cable Clamps (16) Guy Wire Attachment Plates Cable Thimbles (8) 3-2 EZ -Tower

EZ -Tower Parts and Required Tools Tower Base Earth Spikes Arrowhead Earth Anchor Earth Anchor Driving Rod (1) 42 inch Tower Tube (4) 72 inch Tower Tubes (1) 48 inch Tower Tube EZ -Tower 3-3

EZ -Tower Parts and Required Tools Required Tools Required Tools Before you begin installation of your EZ -Tower, be sure you have all parts and required tools. Description Quantity 100 ft. Measuring Tape 1 5/16 inch Wrench, Socket or Nut Driver (preferred) 1 or 2 9/16 inch Wrench or Socket 2 10 kg Hammer 1 Mallet 1 Pliers 1 Carpenter s Level 1 Safety Glasses 1 pair for each person Protective Gloves 1 pair for each person 3-4 EZ -Tower

Site Selection Chapter 4 Site Selection Chapter Contents Wind Speed... 4-2 Surface Roughness... 4-2 Topography... 4-3 Barriers... 4-3 The information in this chapter gives specifics about the ideal siting of the EZ -Tower. If your area does not have an ideal location, find the best location possible. The most important factor in maximizing the performance of your wind generator is proper siting. Remember! The better the siting, the greater the performance of the AIR Wind Generator - EZ -Tower. Small increases in average wind speeds result in dramatic increases in energy output of the wind generator. For example, an increase in wind speed of 10% (9 mph to 10 mph) results in approximately a 30% increase in the power available from the wind. Therefore, the better the location the better the performance. As a rule, the wind generator should be mounted as high and as far away from obstructions as possible. Two basic requirements for a good wind generator site: 1. Good average wind speed 2. Low wind turbulence The lower the turbulence, the less stress your wind generator will sustain, the longer it will last and the more energy it will produce. EZ -Tower 4-1

Site Selection Wind Speed Another important element to maximize performance of your wind generator is average wind speed. Your wind generator will produce energy when there is wind. Your solar panel will produce energy when the solar is plentiful. This is typical of seasonal changes. When it is sunny it is calm; when it is cloudy it is windy. ER For your wind generator to produce energy, average wind speed at your site should be at least 8 mph: 8 miles/hour = 3.6 meters/second If winds in your area are less than 8 mph, it is recommended that you install a Photovoltaic (PV) system next to your wind generator creating a hybrid renewable energy system. Surface Roughness Wind and Solar are complementary AVERAGE MONTHLY WIND SPEED WINTER AVERAGE MONTHLY INSOLATION HOURS Rough ground is land covered with small bushes, trees or other obstructions. Smooth land is an area covered only by grass or earth. SUMMER Summer Winter Summer The smoother the ground, the less the friction. The rougher the ground the greater the friction, thereby requiring the tower to be higher. It is important to locate your wind generator in an area with as smooth a surface as possible. 4-2 EZ -Tower

Site Selection Topography Place your tower on the highest land practical. If your location is basically flat, topography is not in issue when deciding where to place your wind generator. There are circumstances where the highest land available may not be the best place for your wind generator. Highest land nearby may be awkward to get to, may be too far away from where you need the power, or may expose your wind generator to potentially damaging turbulent conditions. Barriers Barriers (buildings, trees, etc. that impede flow of wind) produce wakes that may extend far downwind of the barrier and to a height considerably above the barrier. These wakes are areas of decreased wind speed and can cause potentially damaging turbulence. Barriers near the wind generator will affect its performance. Region of highly turbulent flow Keep the following in mind when siting: 1. A tower immediately downwind of a building should be at least 20 ft. (6.0 m) above the height of the building. 2. The tower should be 20 ft. (6.0 m) higher than any barrier within a 500 ft. radius. EZ -Tower 4-3

Site Selection 4-4 EZ -Tower

Tower Base and Earth Anchor Layout Chapter 5 Tower Base and Earth Anchor Layout Chapter Contents Tower Layout... 5-1 Tower Base... 5-2 Arrowhead Earth Anchors... 5-3 Soil Type and Recommended Anchors... 5-6 Tower Layout Overview When laying out the tower, be sure you have a very calm day, with no wind. The tower is assembled on the ground, then tilted into position. The tower base supports the tower on the ground, and serves as the pivot point to raise and lower the tower. Two sets of guy wires (an upper and lower set with four wires per set) secure the tower vertically: The upper set of guy wires secure the tower at a height of approximately 26 ft. (8.0 m). The lower set of guy wires secure the tower at a height of approximately 15 ft. (4.6 m). Four arrowhead earth anchors (located approximately 15 ft. (4.6 m) from the tower base at 90 intervals) secure the guy wires to the ground. One upper guy wire and one lower guy wire attach to each earth anchor. EZ -Tower 5-1

Tower Base and Earth Anchor Layout Tower Assembly - Hillside If possible, position the tower to tilt along the incline of the hill, with the top of the tower uphill from the tower base. Tower Base Two people must assemble and erect the tower. 1. Locate the area where you will install the tower. Place the tower base on the ground and orient in the direction the tower will be tilted. 2. Have one person stand at the tower base holding a measuring tape. 3. The second person takes the measuring tape end and walks out 15 ft. (4.6 m) and in a circle around the tower base. Make sure there are no obstructions along the circumference. Make sure there is sufficient room to tilt the tower into position and install the wind generator. 4. Drive the four tower base earth spikes into the ground toward the center of the base, as shown here. 5-2 EZ -Tower

Tower Base and Earth Anchor Layout Arrowhead Earth Anchors 1. Position the first earth anchor on the ground along the tower tilt axis, 15 ft. (4.6 m) from the tower base. 2. Place the second earth anchor along the tower tilt axis, 15 ft. (4.6 m) from the tower base in the opposite direction. With the tower base in the center, the first and second earth anchors should form a straight line 30 ft. (9.2 m) along the tower tilt axis. 3. Place the third earth anchor 15 ft. (4.6) from the tower base. 4. Place the fourth earth anchor 15 ft. (4.6 m) from the tower base. With the tower base in the center, the third and fourth earth anchors should form a line perpendicular to the line formed by the first two earth anchors. = Anchor Distance from Tower Base to anchor (4 places) 15 ft. (4.6 m) Distance between anchors (4 places) 21.2 ft. (6.6 m) 1 Tower Base 15 ft. (4.6 m) 3 4 21.2 ft. (6.6 m) 2 EZ -Tower 5-3

Tower Base and Earth Anchor Layout 5. Check the position of the earth anchors to ensure that they are within approximately 6 inches (15 cm) of their ideal position. Each earth anchor should be 15 ft. (4.6 m) from the tower base. 6. Insert the beveled end of the earth anchor driving rod into the arrowhead earth anchor, as shown here. 7. Drive the earth anchor into the ground using the earth anchor driving rod and a 10 kg hammer. Notice the angle at which the earth anchor is being driven. This angle is important for maximum pull strength. The angle should be in line with the angle of the guy wire (i.e. the angle should be pointing towards the tower base). Earth anchors must be installed in soil that has been undisturbed. 5-4 EZ -Tower

Tower Base and Earth Anchor Layout 8. Drive the earth anchor into the ground until 6 inches (15 cm) of cable remains above ground. 9. Then, insert the earth anchor driving rod through the cable eye and pull up with force. You will notice the earth anchor pulling out of the ground slightly. This will lock the earth anchor in the ground. No more than 12 inches (30 cm) of earth anchor cable should be out of the ground once it has been locked into place. 10. Finish installing the remaining three earth anchors as described above. Although the earth anchor is designed to break through rocks, if there is a rock or obstruction that is too large, remove and relocate the anchor. The depth of the anchor is critical to its effectiveness. EZ -Tower 5-5

Tower Base and Earth Anchor Layout Soil Type and Recommended Anchors What anchor to be used depends on the soil type. Refer to the Soil Type and Anchor Recommendations table below for suggestions. Soil Type and Anchor Recommendations Soil Type Recommended Anchor Alternative Anchor Loose Sand Cast Concrete (Buried) None Loose Gravel Arrowhead Cast Concrete (Buried) Loam Arrowhead Cast Concrete (Buried) Clay Arrowhead Cast Concrete (Buried) Rocky Soil Arrowhead Cast Concrete (Buried) Gravely Soil Arrowhead Cast Concrete (Buried) Solid Rock (Soft) Large/Long Expansion Bolt Large Eye Bolt and Cement Solid Rock (Hard) Smaller Expansion Bolt None If the arrowhead earth anchors included with the EZ -Tower do not work with your soil conditions, contact for assistance with an alternative anchor. 5-6 EZ -Tower

Tower Assembly Chapter 6 Tower Assembly Chapter Contents Tower Tube Layout... 6-1 Attaching the Guy Wires... 6-4 Raising the Tower... 6-6 The tower is assembled in several easy steps. If this is a permanent installation, first dig a trench from the base of the tower, to where the battery is housed. Tower Tube Layout 1. Lay out the six tower tubes on the ground as shown on the following page. Leave approximately 6 inches (15 cm) between each tube. EZ -Tower 6-1

Tower Assembly 42 Top Tower Tube Location for 30 ft. guy wire attachment plate 72 Tower Tubes Four 72 tubes between top and bottom tower tubes Guy Wire Attachment Plate 42 Location for 21 ft. guy wire attachment plate 72 72 72 72 48 Drawings not to scale. 48 Bottom Tower Tube 6-2 EZ -Tower

Tower Assembly 2. With the tubes laid out as shown on the preceding page, slide the guy wire attachment plates over the corresponding tower tubes. The expanded end of the tube prevents the guy wire attachment plate from sliding down the tube, and positions the guy wire attachment plate at the correct height. Slide the 30 ft. guy wire attachment plate over the top tower tube. Slide the 21 ft. guy wire attachment plate over the fourth tower tube from the bottom. 3. Align the guy wire attachment plate so that each guy wire is in line with the anchors. 4. With all guide wire attachment plates in position, electrical wire can be run through the tower tubes. Leave sufficient wire protruding at the top of the tower to connect the wind generator. Electrical wire can also be pulled through with a wire snake, after the tower tubes are assembled. Refer to AIR Wind Generator Operator s Manual (AAS32 - Document #0056) for proper wire gauge selection. 5. Join the tower tubes together using a soft-faced mallet or hammer. Use a piece of wood between the tube and the mallet to protect the end of the tube. EZ -Tower 6-3

Tower Assembly 6. Secure the lower tube to the tower base with the M10 bolt and nyloc nut. Tighten the nut until it just contacts the tower base. Attaching the Guy Wires 1. Orient guy wire attachment plates with their corners pointing towards the anchor. If they are not pointing towards the anchor, adjust them before continuing. 2. Uncoil each guy wire bundle and extend them to their respective anchoring point. The fourth anchor point is directly under the tower. Be careful not to let the guy wires become twisted when the tower is erected. 6-4 EZ -Tower

Tower Assembly 3. Begin attaching the guy wires to the earth anchors at the sides of the tower. Insert two cable thimbles in each earth anchor eyelet. Thread an upper guy wire and lower guy wire around its own cable thimble. Loosely attach two cable clamps to each guy wire. You may need to use pliers to spread open the cable thimbles to install them on the anchors. Use the pliers to press the open end of the cable thimbles back together before attaching the guy wires. 4. Leave about 6 inches (15 cm) of slack in the guy wires, and tighten the cable clamps. The guy wire to the tower should contact the saddle side of the cable clamp. On level ground, there will be approximately 5 ft. (1.5 m) of extra cable. 5. Attach two cable thimbles to the third earth anchor located directly below the tower. 6. Measure the length of the upper and lower guy wires on the side earth anchors. Use the same length for the guy wires on the third earth anchor. 7. Secure the cable clamps to the third guy wire. 8. Place two cable thimbles on the fourth earth anchor. DO NOT connect the guy wires at this time. 9. The fourth set of guy wires are used to help tilt the tower into position. Secure these guy wires after the tower is upright. EZ -Tower 6-5

Tower Assembly Raising the Tower highly recommends first tilting the tower into position without the wind generator attached, to verify proper installation and operation of the tower. 1. Before raising the tower, have another person ready to assist with installation. Be sure to wear gloves when handling the guy wires! 2. One person should push the tower up into position. The other person should pull by the unattached upper guy wire. With the tower off the ground a few feet, make sure that all the wires are coming up cleanly. Adjusting the Guy Wires Ensure that all side and rear guy wires are attached and that all cable clamps are tight before raising the tower! If the guy wires are too tight they may cause the tower to bow as it is raised. If this happens, lower the tower to the ground and reduce the tension on the guy wires. Check to see which wire(s) are too tight (the wires act in pairs). Release the tension on one of the wires by loosening the 2 cable clamps until the cable can be slid through them Let out some cable until there is no tension in the wire. It is easy to overtighten the guy wires. Wires should only have the slack taken out with no real tension. 6-6 EZ -Tower

Tower Assembly 3. Retighten the cable clamps before raising the tower. 4. Once the tower is raised to vertical, attach the last guy wires to their anchor. 5. Now walk a short distance from the tower and look to see that it is straight. 6. Focus on the angle of the tower. Adjust the cables until the tower is straight up and down. Use a carpenter s level held against the tower for this. 7. To adjust the angle of the tower, relax one guy wire and tighten the guy wire opposite to it. Repeat this process until the tower is straight. 8. When the tower is straight, make sure that all cable clamps are tight. 9. After all the adjustments have been made, lower the tower. When the tower is lowered to install the wind generator, undo only the pull-side cables. When adjusting the cables, NEVER loosen both sets of guy wires at the same time. When the tower is re-erected, only those pull-side cables will need to be readjusted. EZ -Tower 6-7

Tower Assembly 6-8 EZ -Tower

Installing the AIR Wind Generator Chapter 7 Installing the AIR Wind Generator Refer to your AIR Wind Generator Operator s Manual for assembly instructions. Helpful Tips: Use the box that your AIR Wind Generator was packed in to support the tower when attaching the wind generator. A strain relief installed at the top of the tower will help support the wires hanging inside the tower. Proper grounding is very important to protect your AIR Wind Generator from lightning and/or other transient voltages. EZ -Tower 7-1

Installing the AIR Wind Generator 7-2 EZ -Tower

EZ -Tower Maintenance Chapter 8 EZ -Tower Maintenance There are no moving parts in the tower, so maintenance is minimal. However, as part of your annual maintenance, Southwest Windpower, Inc. recommends that several areas are inspected to ensure long term integrity of your EZ -Tower. Check guy wire condition. Inspect for wear and fraying at the guy wire to earth anchor connection points. Check guy wire tension. Guy wires should have uniform tension. Wires should be free of slack, but not overly taut. Check all bolts for tightness. Check cable clamps and pivot bolt. Check any unusual noises or vibrations. Investigate and correct as necessary. EZ -Tower 8-1

EZ -Tower Maintenance 8-2 EZ -Tower