GEO-SLOPE International Ltd, Calgary, Alberta, Canada Rapid Drawdown

Similar documents
Consolidation of a 1D column

Soft Ground Coupled Consolidation

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Wick Drain

Seepage through a dam embankment

Filling Pond Head vs Volume Functions

Cubzac-les-Ponts Experimental Embankments on Soft Clay

Modified Cam-clay triaxial test simulations

Settlement due to Pumping Well

Freezing Around a Pipe with Flowing Water

Verification of the Hyperbolic Soil Model by Triaxial Test Simulations

Anisotropy in Seepage Analyses

A Pile Pull Out Test

Tutorial 12 Excess Pore Pressure (B-bar method) Undrained loading (B-bar method) Initial pore pressure Excess pore pressure

Hyperbolic Soil Bearing Capacity

Permafrost Thawing and Deformations

Seismic Stability of Tailings Dams, an Overview

Frozen Ground Containment Barrier

Procedures and Methods for a Liquefaction Assessment using GeoStudio 2007

Example Application 12. Embankment Loading on a Cam-Clay Foundation

Flow and stability of Al-Wand earth dam during rapid drawdown of water in reservoir

Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Convective air flow in heated column

Contaminant Modeling

Dynamic Analysis Contents - 1

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

RAPID DRAWDOWN IN DRAINAGE CHANNELS WITH EARTHEN SIDE SLOPES 1

Earth dam steady state seepage analysis

APPENDIX I. Deformation Analysis of the Left Abutment

Effect of Tidal Fluctuation on the Stability of

b) EFFECTIVE STRESS (c) SEEPAGE

Calibration of Seepage and Stability Models for analysis of Dams and Levees. Francke C Walberg Consulting Geotechnical Engineer, AECOM

Numerical model comparison on deformation behavior of a TSF embankment subjected to earthquake loading

SEEPAGE ANALYSIS AND SEISMIC BEHAVIOUR OF EARTH FILL DAM USING GEO-STUDIO

Chapter 7 Permeability and Seepage

STABILITY ANALYSIS OF EARTH DAM SLOPES SUBJECTED TO EARTHQUAKE USING ERT RESULTS INTERPRETATION

Modelling the Construction of a High Embankment Dam

TIME-DEPENDENT BEHAVIOR OF PILE UNDER LATERAL LOAD USING THE BOUNDING SURFACE MODEL

Rapid Drawdown Stability Analysis of San Luis Dam

Centrifuge modelling of drawdown seepage in tailings storage facilities

1 Slope Stability for a Cohesive and Frictional Soil

The process of consolidation and settlement

Distribution of pore water pressure in an earthen dam considering unsaturated-saturated seepage analysis

Numerical Analysis of Seepage and Slope Stability in an Earthen Dam by Using Geo-Slope Software

Instructor : Dr. Jehad Hamad. Chapter (7)

The Effect of Impervious Clay Core Shape on the Stability of Embankment Dams

APPLICATION OF COMPOSITE CLAY AS CORE MATERIAL IN EARTHFILL EMBANKMENT DAMS

Air Flow Modeling. An Engineering Methodology. February 2012 Edition. GEO-SLOPE International Ltd.

(Refer Slide Time: 02:18)

Use of Instrumented Test Fill to Assess Static Liquefaction of Impounded Fly Ash

Endochronic model applied to earthfill dams with impervious core: design recommendation at seismic sites

2D Liquefaction Analysis for Bridge Abutment

Verification Hand Calculations

Practical methodology for inclusion of uplift and pore pressures in analysis of concrete dams

Triaxial Shear Test. o The most reliable method now available for determination of shear strength parameters.

*** ***! " " ) * % )!( & ' % # $. 0 1 %./ +, - 7 : %8% 9 ) 7 / ( * 7 : %8% 9 < ;14. " > /' ;-,=. / ١

Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method

1.060 Engineering Mechanics II Spring Problem Set 8

Tikrit University. College of Engineering Civil engineering Department CONSOILDATION. Soil Mechanics. 3 rd Class Lecture notes Up Copyrights 2016

YOUR HW MUST BE STAPLED YOU MUST USE A PENCIL (no pens)

Laboratory Testing Total & Effective Stress Analysis

Dynamic Analysis of Stability and Liquefaction in Dams in Unsaturated Soil Mode

RT3D Rate-Limited Sorption Reaction

13 Dewatered Construction of a Braced Excavation

Address for Correspondence

Stress and Strains in Soil and Rock. Hsin-yu Shan Dept. of Civil Engineering National Chiao Tung University

Time Rate of Consolidation Settlement

Soil Dynamics Prof. Deepankar Choudhury Department of Civil Engineering Indian Institute of Technology, Bombay

A practical method for extrapolating ambient pore pressures from incomplete pore pressure dissipation tests conducted in fine grained soils

Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method. S. Soleymani 1, A. Akhtarpur 2

Advanced model for soft soils. Modified Cam-Clay (MCC)

THE EFFECT OF RESERVOIR WATER LEVEL FLUCTUATION TO THE SEEPAGE ON EARTH DAM

Compression and swelling. Mechanisms of compression. Mechanisms Common cases Isotropic One-dimensional Wet and dry states

Finite Deformation Analysis of Dynamic Behavior of Embankment on Liquefiable Sand Deposit Considering Pore Water Flow and Migration

J. Paul Guyer, P.E., R.A.

5. TWO-DIMENSIONAL FLOW OF WATER THROUGH SOILS 5.1 INTRODUCTION

Review of static and seismic stability of a cross-valley sand tailings embankment in a high rainfall, high seismicity setting

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

Deformation And Stability Analysis Of A Cut Slope

Settlement and Bearing Capacity of a Strip Footing. Nonlinear Analyses

Attachment D-7: Rebound and Uplift of the Stilling Basin, Deep Soil Mixing Design

3-D DYNAMIC ANALYSIS OF TAIYUAN FLY ASH DAM

Hydraulics Prof. Dr. Arup Kumar Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati

10 Steady-State Fluid Flow with a Free Surface

NUMERICAL ANALYSIS OF INFLUENCE OF CAVITIES ON SEEPAGE THROUGH EARTH DAMS

LIQUEFACTION OF EARTH EMBANKMENT DAMS TWO CASE HISTORIES: (1) LIQUEFACTION OF THE EMBANKMENT SOILS, AND (2) LIQUEFACTION OF THE FOUNDATIONS SOILS

Numerical Study of Relationship Between Landslide Geometry and Run-out Distance of Landslide Mass

Safety analyses of Srinagarind dam induced by earthquakes using dynamic response analysis method.

Changes in soil deformation and shear strength by internal erosion

Drained Against Undrained Behaviour of Sand

(Refer Slide Time: 01:15)

Monitoring of underground construction

1 Slope Stability for a Cohesive and Frictional Soil

3D and 2D Formulations of Incremental Stress-Strain Relations for Granular Soils

Landslide FE Stability Analysis

Determination of Excess Pore Pressure in Earth Dam after Earthquake

Geology 229 Engineering Geology. Lecture 5. Engineering Properties of Rocks (West, Ch. 6)

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Water in Soil Sections in Craig

IGC. 50 th. 50 th INDIAN GEOTECHNICAL CONFERENCE

Seepage. c ZACE Services Ltd. August 2011

Transcription:

Elevation - m 1 Introduction Rapid Drawdown This example is about the rapid drawdown of a reservoir and the excess pore-pressures that remain in the ground once the ponded water has been removed. The excess pore-pressures can cause slope instability and, consequently, this is an important issue in the operation of water retention structures such as embankment dams. There are many ways to approach rapid drawdown, as indicated by the significant number of papers in the research literature. The purpose here is not to do a review of what has been done in the past, but to demonstrate how this issue can be addressed using GeoStudio 007. One way of computing the changes in pore-pressures resulting from the drawdown is to do a SEEP/W analysis. Another way is to do a fully coupled stress/pore-pressure analysis using SIGMA/W. The results from these two types of analyses are presented and compared here. Problem configuration The problem configuration is shown in Figure 1. The embankment has a height of 10 m with h:1v side slopes and sits on 10 m of foundation soil. The reservoir depth is 9 m. On the downstream toe is a granular under-drain which keeps the watertable at the tail water elevation for a distance of 5 m under the embankment toe (the actual granular layer is not required to achieve this effect; the desired effect can be achieved with a specified boundary condition). 0 18 16 14 Drawdown 1 10 8 6 4 0 - - 0 4 6 8 10 1 14 16 18 0 4 6 8 30 3 34 36 38 40 4 44 46 48 50 5 54 56 58 60 6 64 66 68 70 7 74 76 Distance - m Figure 1 Problem configuration and setup The + mark on the drawing is a reference point for later discussion on the pore-pressure response. The embankment soil and foundation soil are, in essence, treated as being one and the same for this illustrative example. The soil has a saturated hydraulic conductivity K sat of 0.1 m/day (about 1x10-4 cm/sec). The E-modulus is 5000 kpa and Poisson s ratio ν is 0.334 (1/3). The equivalent m v is 0.000/kPa. 3 Long-term steady-state conditions The first step is to establish the long-term steady-state conditions using a SEEP/W analysis. Figure shows the long-term total head (H) contours. SIGMA/W Example File: Rapid drawdown.docx (pdf) (gsz) Page 1 of 10

Total Head (m) 18 13 Drawdown 17 16 15 11 Figure Long-term steady-state conditions 4 SEEP/W only drawdown The next step is to complete a transient SEEP/W analysis to investigate the changes in pore-pressure with time during and after the drawdown of the reservoir. It is assumed that the reservoir will be drained over a period of five (5) days. This is modeled with the time-dependant boundary condition shown in Figure 3. 19 18 17 Reservoir level with time 16 15 14 13 1 11 10 0 1 3 4 5 Figure 3 Reservoir elevation with time during drawdown The process is modeled for 30 days after the reservoir has been removed using 10 exponentially spaced time steps. The previous Parent steady-state conditions become the initial or starting conditions for the transient drawdown analysis. SIGMA/W Example File: Rapid drawdown.docx (pdf) (gsz) Page of 10

Figure 4 shows the dissipation of the excess pore-pressures.5 days after the start of the drawdown. Of interest is the flow in the upstream direction into the remaining reservoir and the continuing flow in the downstream direction towards the toe under-drain. Figure 4 Conditions.5 days after start of the drawdown The resulting positions of the watertable (zero pressure contours) with time is shown in Figure 5. Figure 5 Changing positions of the water table after reservoir drawdown The following graph (Figure 6) shows the decreasing pressure-head at Point + during and after the drawdown. SIGMA/W Example File: Rapid drawdown.docx (pdf) (gsz) Page 3 of 10

Factor of Safety Pressure Head (m) PWP at Point + 9 8 7 6 5 4 3 1 0 10 0 30 Figure 6 Pressure head at Point + during and after the drawdown The following graph (Figure 7) shows how SLOPE/W can compute the factor of safety with time for the changing pore-pressure conditions. Factor of Safety vs Time 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1. 1.1 0 10 0 30 Figure 7 Factors of safety during and after drawdown The key to doing this type of analysis is to select all time steps in the Parent Analysis. The final step is to use the Draw Slip Surfaces command in SLOPE/W CONTOUR and click on the Factor of Safety vs Time Graph button. SIGMA/W Example File: Rapid drawdown.docx (pdf) (gsz) Page 4 of 10

Elevation - m 5 Insitu stress state To do a coupled stress/pore-pressure analysis we need to first establish the insitu stress state conditions. The pore-pressure conditions come from the Parent steady-state SEEP/W analysis. This is done with a SIGMA/W Insitu type of analysis. An important component of this type of analysis is to ensure that the reservoir pressure (weight) is included. This is applied as a fluid-pressure type of boundary condition. The effect is illustrated in Figure 8 by the small arrows normal to the surface at the bottom of the reservoir. This is important in order to compute the correct total and effectives stresses. The contours in Figure 8 are the insitu vertical effective stress contours. 0 18 16 14 1 Drawdown 0 40 80 10 10 8 6 4 160 0 - - 0 4 6 8 10 1 14 16 18 0 4 6 8 30 3 34 36 38 40 4 44 46 48 50 5 54 56 58 60 6 64 66 68 70 7 74 76 Figure 8 Fluid-pressure boundary condition representing the reservoir weight 6 SIGMA/W coupled drawdown Distance - m Now that the long-term steady-state and insitu conditions have been established, a couple stress-porepressure type of analysis can be completed, which simulates the removal of the reservoir. Removing the reservoir is like removing a weight from the upstream face of the structure. This can be done with a fluid pressure type of boundary function (Figure 9). Recall that the reservoir is being drawdown over a period of 5 days. This is like applying an uplift force which represents the unloading. The uplift force per day is (10-19)/5 = -1.8 m /day. Due to the incremental formulation in SIGMA/W, the surface pressure change is the current elevation minus the previous elevation. And since the current elevation is lower than the previous elevation it is a negative fluid pressure, or a negative normal stress. SIGMA/W Example File: Rapid drawdown.docx (pdf) (gsz) Page 5 of 10

Fluid Boundary Elevation (m) Reservoir elevation with time 19 18 17 16 15 14 13 1 11 10 0 1 3 4 5 Figure 9 Fluid boundary function representing the reservoir drawdown Two boundary function need to be applied on the upstream face of the dam and the ground surface under the reservoir. These are the stress-strain fluid pressure boundary function and the hydraulic boundary function representing the changing pore-pressures conditions. 7 Results Generally, the resulting behavior of the SEEP/W-alone analysis and a fully coupled SIGMA/W analysis is very similar. The pore-pressures at Point + for these analyses are compared in Figure 10. Initially, the pore-pressures from the coupled analysis are slightly lower than from the SEEP/W-alone analysis. This is due to the rebound associated with the unloading. The tendency for the volumetric expansion is offset by a greater decrease in the pore-water pressure. The SEEP and SIGMA analyses produce nearly identical results at later times as the same pore-water pressure distribution is obtained. SIGMA/W Example File: Rapid drawdown.docx (pdf) (gsz) Page 6 of 10

Factor of safety Pressure head - m 9 8 SEEP-alone SIGMA coupled 7 6 5 4 3 1 0 5 10 15 0 5 30 Figure 10 Comparison of pore pressures at Point + from the two types of analyses The lower pore-pressure from the coupled analysis is reflected in the variation in the factors of safety with time as shown in Figure 11. The minimum factor of safety for from the coupled analysis is 1.66 while the minimum from the SEEP/W-alone analysis is 1.115.. SEEP-alone SIGMA coupled 1.8 1.6 1.4 1. 1 0 5 10 15 0 5 30 Time - days Figure 11 Comparison of factors of safety from the two types of analyses SIGMA/W Example File: Rapid drawdown.docx (pdf) (gsz) Page 7 of 10

Factor of Safety The minimum factor of safety tends to occur just before the completion of the reservoir drawdown as illustrated in the next diagram. 1.66 Figure 1 Minimum stability conditions 8 Instantaneous drawdown Often the assumption is made in a rapid drawdown analysis that the reservoir disappears instantaneously. This can be readily modeled but the results are unrealistic and unnecessarily conservative. A reservoir can never be drained instantaneously. Figure 13 shows the factors of safety with time under instantaneous drawdown conditions. Immediately the factor of safety is very low because the stabilizing effect of the weight of the water has been removed but the pore-pressures remain very high. 1.6 1.5 1.4 1.3 Factor of Safety vs Time 1. 1.1 1 0.9 0.8 0.7 0.6 0.5 0 10 0 30 Figure 13 Factors of safety with time with instantaneous drawdown SIGMA/W Example File: Rapid drawdown.docx (pdf) (gsz) Page 8 of 10

The minimum factor of safety from a coupled analysis is 1.7 while from an instantaneous analysis the minimum factor of safety is 0.7. A value of 1.7 maybe quite acceptable but a value of 0.7 obviously is not. The objective of comparing the instantaneous drawdown analysis with the drawdown over time is not to suggest the appropriate procedure. Rather, the objective is to demonstrate that GeoStudio has the capability to model the drawdown in various ways. 9 Bulk modulus and conductivity The SIGMA/W coupled formulation requires values for the coefficient of volume change m v and the stiffness properties E and. The coefficient m v is computed internally from the stiffness properties to ensure compatibility between the properties. SEEP/W only requires the specification of m v ; therefore, a compatible comparison between SEEP/W and SIGMA/W can only be accomplished if the user enters the corresponding compatible value of m v. The relationship is: m v 1 1 E 1 which reduces to 1/E when Poisson s ratio is 0.334, resulting in m v = 0.000/kPa for E = 5000 kpa. To do a SEEP/W-alone and SIGMA/W coupled comparison it mandatory to ensure that the Volumetric Water Content function has a specified m v that is consistent with the stiffness modulus E in SIGMA/W. It is also always necessary to be mindful of the link between time step size and the accuracy of the computed pore-water pressure response. Numerical problems can be avoided by selecting a time step in accordance with the hydraulic conductivity and average element size. The procedure for selecting appropriate time steps is discussed is in the SIGMA/W Engineering Book. Generally, very small time steps together with very low K sat values can lead to numerical noise and/or erroneous results. 10 Commentary on Rapid Drawdown Analyses As noted in the introduction, many different methods have been proposed over the years in the research literature for evaluating the effects of rapid drawdown. Some are based on dealing with effective stresses, while others attempt to use total stresses and undrained strengths. The purpose here is not to review all of the methods that have been proposed, but to briefly comment on the methods available in GeoStudio, which range from the simple to the complex. There are essentially four methods available in GeoStudio which are: SLOPE/W alone with an assumption about the post-drawdown piezometric line position SLOPE/W alone with total stress staged analysis SEEP/W computed pore-pressures in a SLOPE/W analysis SIGMA/W stress/pore-pressure computed results in a SLOPE/W analysis The latter two methods are presented in this document. The other two methods are discussed and presented in the SLOPE/W Engineering Book. The simplest approach in SLOPE/W is to remove the weight of the reservoir water and assume that the post-drawdown water table is at the ground surface where the reservoir was in contact with the ground SIGMA/W Example File: Rapid drawdown.docx (pdf) (gsz) Page 9 of 10

surface, and keep the watertable inside the earth structure at the long-term steady-state condition. This procedure, in essence, means the change in pore-pressure is equal to the vertical change in water level, and it means that the total stress change is equal to the pore-pressure change so that the effective stress remains unchanged. Another way to describe this simple approach is that it is equivalent to a B-bar of 1.0. The following equation is a common way of looking at changes in pore-pressure with changes in total stress. u B v So when B-bar is 1.0, the change in pore-pressure is equal to the change in vertical total stress. The simplest SLOPE/W-alone analysis is based on an instantaneous drawdown assumption. As we have demonstrated above, this may result in a highly conservative picture of the stability condition after drawdown. Fortunately, in this case simplicity errs on the safe side. 11 Concluding remarks This is not an exhaustive study of rapid drawdown and care must be exercised about drawing too many firm conclusions from the results presented here. This example does, however, demonstrate and discuss what can be done with integrated GeoStudio analyses. There should be sufficient information and ideas presented herein for you to do perform a drawdown analysis in a manner that is appropriate to the project. SIGMA/W Example File: Rapid drawdown.docx (pdf) (gsz) Page 10 of 10