FAR NORTH DISTRICT PLAN 2009

Similar documents
Prospect City Limits/Project Study Area. County Boundary

D14. Volcanic Viewshafts and Height Sensitive Areas Overlay

General Neighborhood Map

6 MACRAES MINING PROJECT MINERAL ZONE

D14. Volcanic Viewshafts and Height Sensitive Areas Overlay

BURROWAY TIMBREBONGIE TIMBREBONGIE FALLS. Department of Finance, Services & Innovation 2017

NATURE AND EXTENT OF PROPOSED DEVELOPMENT. Amount of Development Development Zones Distribution of Density Policies

SHORELINE PROVISIONS RESIDENTIAL LOT

The Wanaka High Density Residential Zone Monitoring Report

TAKE ROLL CALL TO DETERMINE IF THERE IS A QUORUM OF MEMBERS PRESENT

Map Reading 101: Using and Reading Maps and Plans

2267 N o r t h 1500 W C l i n t o n U T 84015

Section 14F Purpose of the Wairakei Residential Zone

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81

Daytona Beach International Airport Connector

D U P L E X D E S I G N G U I D E L I N E S

Local Area Key Issues Paper No. 13: Southern Hinterland townships growth opportunities

ZONING DISTRICT REGULATIONS. Table 4-2 Permitted Uses by Zoning Districts Use Types AG RR R-1 R-2 R-3 MH LC CC DC GC LI GI P Addl Reg

Bushfire Risk Management and how it affects Revegetation Design

Auckland Council District Plan Hauraki Gulf Islands Section Operative 2013 Proposed plan modification no. 1: Plan Change

Policy Title: Snow Removal & Ice Control Policy #: PW

Re: Draft OPA 320 Recommended Amendments to Various Neighbourhood Policies Statutory Public Meeting to be held on Monday 16 November 2015

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25

Use of Government Land Office Surveys in Tribal GIS Land Management. Dustin Holt GIS Technician Choctaw Nation of Oklahoma

NATIONAL SENIOR CERTIFICATE GRADE 12

Experiential and Visual Impacts of Energy on the Pennsylvania Landscape

SPORTING FIELDS FUTURE TOWN CENTRE K-6 PUBLIC SCHOOL. FUTURE ROAD CONNECTION Indicative Street Trees FUTURE ROAD CONNECTION TO WINDSOR ROAD

Seaton to Seaton Hole SUMMARY OF PREFERRED PLAN RECOMMENDATIONS AND JUSTIFICATION

COMMERCIAL LAND DEVELOPMENT OPPORTUNITY $1,800,000

Woodford County Erosion Prevention Plan and Permit. Application #

STAATSKOERANT, 7 APRIL 2017 No Environmental Affairs, Department of/ Omgewingsake, Departement van

Draft Urban Hamilton Official Plan. Amendment No. XX

PART 16: EXCEPTIONS. Uses Prohibited Special Provisions Location By-Law No. No future severance shall be Pt. Lot 22, Conc.

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year )

APPENDIX I: Traffic Forecasting Model and Assumptions

73-2 have been satisfied; and

BEFORE THE HEARINGS PANEL FOR THE QUEENSTOWN LAKES PROPOSED DISTRICT PLAN AND

2009 NOISE MANAGEMENT REPORT. Working with our Community for a Quieter Future

Riocan Centre Study Area Frontenac Mall Study Area Kingston Centre Study Area

Coastal Environment. Introduction. 4.1 Coastal Environment. Extent of Coastal Environment

A303 Stonehenge Highways England Consultation the response from Honouring the Ancient Dead

CORRIDORS OF FREEDOM Access Management (Ability) Herman Pienaar: Director City Transformation and Spatial Planning

(13 July 2018 to date) NATIONAL ENVIRONMENTAL MANAGEMENT ACT 107 OF 1998

System Impact Assessment Addendum #2 Greenfield & St. Clair Energy Centres

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division

Planning acres of. plat. RSF-7-PUD. 1. Proposed 2. Aerial Map. Area. Surrounding. Direction North. Land Use RSF-7-PUD.

SHADOW IMPACT STUDY REPORT

MIAMI 21 PUBLIC HEARING-FIRST READING

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario

Winning Farm of Winchester

APPENDIX I - AREA PLANS

Feb :16Pm t

REQUEST FOR PROPOSALS CLOSING DATE:

Parking areas in all zoning districts shall comply with the following standards:

¾À 280. ESS Features Heritage. Points of Access* !( Proposed Access Point. !( Archaeological Water. Major Stream Crossing Abandoned Rail Crossing # #

CORPORATION OF THE CITY OF COURTENAY COUNCIL MEETING AGENDA

Planning & Zoning Commission

Appendix 2. Extracts from Ministry for the Environment Active Fault Guidelines 2003

Appendix A Zoning Ordinance

JCRD501: RURAL COUNTY ROADWAY SPECIFICATIONS

ATTENDANCE LEVELING AND ZONE PLANNING

Land Use and Zoning Page 1 of 10 LAND USE AND ZONING


VINEYARD ROAD HOUDINI DRIVE PLUMPTON ROAD DIGGERS REST DEVELOPMENT CONTRIBUTIONS PLAN. MARCH 2012 (Amended June 2017) DIGGERS R

VIKING INSPECTION PROPERTY 4921 U.S. Hwy. 85, Williston, ND 58801

City of Laramie, Wyoming SNOW AND ICE POLICY

GIS data classes used within the November 2013 Environmental Statement Engineering Maps

GEOGRAPHY. ATAR course examination, Question/Answer booklet. Time allowed for this paper Reading time before commencing work:

Considerations of Urban Design and Microclimate in Historical Buildings Environment under Climate Change

Transforming Johannesburg Towards a low carbon and inclusive metropolis

Clearance around powerlines.

1600 Prairie Drive , FAX

VILLAGE OF ORLAND PARK

1.1 What is Site Fingerprinting?

MUSKOGEE, MUSKOGEE COUNTY DEPARTMENT OF TRANSPORTATION. Railroad. Interstate. Corporate Limit. US Highway MUSKOGEE. State Highway.

Uniform Sign Plan (USP) Travis Park 89-USP-007

4. a b c d e 14. a b c d e. 5. a b c d e 15. a b c d e. 6. a b c d e 16. a b c d e. 7. a b c d e 17. a b c d e. 9. a b c d e 19.

PREAMBLE. Planning and Development staff are available to answer any questions that you may have concerning dark sky principles.

2267 N o r t h 1500 W C l i n t o n U T 84015

The Governance of Land Use

Please complete a separate form for each site. Complete each section clearly and legibly to the best of your knowledge.

CANTON COMMUNITY STREET MAP & VOTER PRECINCTS

CHAPTER 26 PLANNING AND ZONING ARTICLE XIV. AIRPORT OVERLAY ZONING

Evaluation of the Boundary for the Waiatarua Local Area Plan

Stabilization Study. Prepared For: The Town of Bethlehem. Henry Hudson Park Shoreline Stabilization Study. June 2011

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

Goodlette/Pine Ridge Commercial Infill Subdistrict. Exhibit IV.B Amendment Language. Revise the FUTURE LAND USE ELEMENT

8700 Xylon Avenue N CONTACT US. Brooklyn Park, MN OFFICE WAREHOUSE BUILDING FOR SALE > Erik Nordstrom

King City URA 6D Concept Plan

Heritage contributes towards community identity. It teaches us about the past and provides variety and contrast.

Appendixx C Travel Demand Model Development and Forecasting Lubbock Outer Route Study June 2014

225 Bush Street Suite 1700 San Francisco, CA phone fax

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

CREATING A REPORT ON FIRE (April 2011)

Map 10: Ayrshire Coast: Barassie to Prestwick North Map Content Descriptions

Planning & Zoning Commission

Reed School/Westover Library U USE PERMIT AMENDMENT. Staff Presentation to the County Board November 17, 2018

City of Surrey PLANNING & DEVELOPMENT REPORT File:

Archaeological Reconnaissance Survey of. Boundary, North Kona, Island of Hawai i (TMK:7 2 04:05)

The Role of Wilderness in Climate Change Adaptation

Transcription:

Plan hange 22 nlet state imited ttachment F TH TT P 2009 P HG 22 T TT T P HG TT 14 VB 2018 Far orth istrict Plan

Plan hange 22 nlet state imited 1. Part 2 nvironment Provisions 1.1 esidential Zone 7.6.3 BJT 7.6.3.3 To protect the special amenity values of residential sites on the urban fringe, specifically ot 1 P 28017, ot 1 P 46656, ot 1 P 404507, ot 1 P 181291, ot 2 P 103531, ot 1 P 103531, ot 2 P 58333, Pt ot 1 P 58333 (and any sites created as a result of a subdivision of these lots), and those having frontage to erikeri oad between its intersection with H10 and annon rive. 7.6.4 P 7.6.4.11 That the built form of development allowed on residential sites on the urban fringe, specifically ot 1 P 28017, ot 1 P 46656, ot 1 P 404507, ot 1 P 181291, ot 2 P 103531, ot 1 P 103531, ot 2 P 58333, Pt ot 1 P 58333 (and any sites created as a result of a subdivision of these lots), and those with frontage to erikeri oad between its intersection with H10 and annon rive remains small in scale, set back from the road, relatively inconspicuous and in harmony with landscape plantings and shelter belts. 7.6.5.1 PTT TT 7.6.5.1.7 T B F B (a) The minimum building setback from road boundaries shall be 3m, except that; (i) (ii) no building shall be erected within 10m of the obham oad boundary on ot 1 P 28017 and ot 1 P 46656 or the erikeri nlet oad boundary of ot 1 P 404507 (and any sites created as a result of a subdivision of these lots) or the erikeri nlet oad boundary of ot 1 P 404507; (iii) no new buildings as of (date plan change operative) shall be erected within 10m of the erikeri nlet boundary of ot 2 P 103531, ot 1 P 103531, ot 2 P 58333 and Pt ot 1 P 58333. (b) The minimum set-back from any boundary other than a road boundary, on all sites other than ot 1 P 28017, ot 1 P 46656, ot 1 P 404507, and ot 1 P 181291, ot 2 P 103531, ot 1 P 103531, ot 2 P 58333 and Pt ot 1 P 58333 (and any sites created as a result of a subdivision of these lots), shall be 1.2m except that no set-back is required for a maximum total length of 10m along any one such boundary; and (c) ot less than 50% of that part of the site between the road boundary and a parallel line 2m there from (i.e. a 2m wide planting strip along the road boundary) shall be landscaped, on all sites other than ot 1 P 28017, ot 1 P 46656, ot 1 P 404507, and ot 1 P 181291, ot 2 P 103531, ot 1 P 103531, ot 2 P 58333 and Pt ot 1 P 58333 (and any sites created as a result of a subdivision of these lots). For the landscaping required on ot 1 P 28017, ot 1 P 46656, ot 1 P 404507, and ot 1 P 181291, ot 2 P 103531, ot 1 P 103531, ot 2 P 58333 and Pt ot 1 P 58333 (and any sites created as a result of a subdivision of these lots) refer to ule 7.6.5.1.10 (c) below; and (d) The minimum set back from any other boundary other than the road boundary on ot 1 P 28017, ot 1 P 46656, ot 1 P 404507, and ot 1 P 181291, ot 2 P 103531, ot 1 P 103531, ot 2 P 58333 and Pt ot 1 P 58333 (and any sites created as a result of a subdivision of these lots) shall be 3m 7.6.5.1.10 V T (a) (b) (c) Prior to any building work on ot 1 P 404507, and ot 1 P 181291, ot 2 P 103531, ot 1 P 103531, ot 2 P 58333 and Pt ot 1 P 58333 located on erikeri nlet oad, erikeri (and any sites Far orth istrict Plan

Plan hange 22 nlet state imited created as a result of a subdivision of these lots or any amalgamation of the lots) a landscaping plan that has been approved by ouncil showing: creening of the entire length of the erikeri nlet oad boundary, other than the access point, with a pittosporum hedge (or similar dense foliage evergreen hedge, or mix of species) capable of achieving a minimum height of 3m and a minimum of twenty trees capable of achieving a height of 5m within the 10m setback area behind the required hedge. Visually impermeable fencing can be installed on the road side of the hedge; creening of the eastern boundary of ot 1 P 404507 with an evergreen hedge capable of growing to a minimum height of 3m; hedge of Griselinia littoralis or similar along the western boundary of ot 1 P 404507 where it adjoins ot 2 P 103531 and ot 1 P 181291 to achieve a minimum height of 2.5m; Tree planting along the northern boundary, and within the northern third of ot 1 P 404507 and ot 1 P 181291. The proposed species must reflect the character of the area and the proximity to the stream, be capable of attaining a minimum height of 10.0 metres, and shall be resistant to yrtle ust. The trees shall be planted as pb95 specimens. The objective of the tree planting is to soften and fragment views of the site from the north rather than screen views. ll planting shall be implemented and maintained in perpetuity. 7.6.5.3 TT T TT 7.6.5.3.7 TB F B n assessing an application resulting from a breach of ule 7.6.5.1.7 etback from Boundaries the matters to which the ouncil will restrict its discretion are: (a) (d) (e) for ot 1 P 28017, ot 1 P 46656, ot 1 P 404507, and ot 1 P 181291, ot 2 P 103531, ot 1 P 103531, ot 2 P 58333 and Pt ot 1 P 58333 (and any sites created as a result of a subdivision of these lots) and sites having frontage with erikeri oad between its intersection with H10 and annon rive 2. Part 3 istrict ide Provisions 2.1 15.1 Traffic, Parking and ccess 15.1.6 15.1.6.1 PTT TT 15.1.6.1.1 PT Z (a) (d) (e) ccess shall not be permitted: (i) (v) (vi) onto erikeri nlet oad from ot 1 P 404507 or ot 1 P 181291 (and any sites created as result of a subdivision of these lots), except from a single vehicle crossing or intersection at least 30m from the adjoining boundary with ot 2 P 103531 and with at least 115m visibility in each direction Far orth istrict Plan

H 99 rongo Bay pecial Purpose G Point Veronica T ail ecreational ctivities esidential oad F T F253 F168 ural iving ural Production ussell Township outh erikeri nlet Zone outh erikeri nlet Zone ensitive rea Pedestrian Frontage TH H P FH201 æ FF F169 F T T Quail idge ountry lub P 60 ake aingaro T245 B G B akes & ivers auri liffs otoroa sland ndustrial inerals Horticultural Processing oastal arine General oastal T oastal iving H 84 G arrington state B ailway T244 121 otable Tree Heritage Precinct H P High Voltage Power Pole oastal esidential V 59 81 Top nergy High Voltage Power ine istrict Boundary V P G B B T P P 87 82 H P 34 T128 ZP137 68 93 57 92 91 30 74 71 Historic ite onservation H FV 131 emetery ommercial G H T 96 HP 2 ee H F251 F186 æ T 83 F251 86 T T G P B 26 G T B F V B T204 T P B esignations 82 251 P P ational Grid ine P FF G T P G Q T P F TH GPH T B J G P G H P P T 80 79 78 F H B T cale1:50000 ate: 21/04/2017 ocument ame: P_Zone28_P T P P T ake anuwai H 28 V 0 P 1 GH ake anuwai H T T 243 243 Far orth istrict Plan - Zone ap P 22 ± 0 0.5 1 kilometers 2 ote: oads carry the same zoning as the adjoining land. f the boundary between zones follows a road, the zone boundary is located on the centerline of the formed road, or where unformed, the centerline of the legal road. isclaimer: onsderable care has been taken to avoid errors and omissions, and the latest information has been included in these istrict plan maps. However, even with the greatest care inaccuracies may occur and therefore the Far orth istrict ouncil cannot accept any responsibility for such errors and omissions.

Zone onservation ommercial splanade Priority ndustrial akes and ivers esidential ecreational ctivities ural iving ural Production oad esignations Pedestrian Frontage erikeri Visual Buffer otable Tree T ote :- oads carry the same zoning as the adjoining land. f a boundary between zones follows a road, the zone boundary is located on the centreline of the formed road, or where unformed, the centreline of the legal road onsiderable care has been taken to avoid errors and omissions, and the latest information has been included in these istrict Plan maps. However, even with the greatest care inaccuracies may occur and therefore the Far orth istrict ouncil cannot accept any responsibility for such errors and omissions. P T T J P H H H H BH T HPH HPH T TTH T T GT P T P F HT BH BT BH T HB V 29 70 69 T128 31 82 P G P T BH F P G V HTT P P P BTT V G P G GT V H F186 ZP137 T244 59 Far orth istrict Plan - Zone aps 81 121 0 200 400 600 m cale 1:10,000 78 82 86 79 83 87 ap ndex ap 87 T 80 84 28 Zs B igital icence o 350/1 rown opyright eserved Feb 2012