ECONOMIC AND FINANCIAL ANALYSIS

Similar documents
ECONOMIC AND FINANCIAL ANALYSIS

PROJECT ECONOMIC ANALYSIS

REVISED ECONOMIC AND FINANCIAL ANALYSIS

Snow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy

Implementation Status & Results Congo, Republic of Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) (P106975)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING LK WATER SUPPLY AND SANITATION IMPROVEMENT PROJECT APPROVED ON JUNE 24, 2015

Public Disclosure Copy

The World Bank Third National Urban Water Sector Reform Project (P123513)

Public Disclosure Copy

Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)

Second Tamil Nadu Road Sector Project (P143751)

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

Sri Lanka Strategic Cities Development Project (P130548)

The World Bank BiH Floods Emergency Recovery Project (P151157)

Implementation Status & Results Congo, Democratic Republic of Democratic Republic of Congo Emergency Social Action Project (P086874)

Implementation Status & Results Chad Urban Development Project (P072030)

Implementation Status & Results Chad Urban Development Project (P072030)

Public Disclosure Copy. Implementation Status & Results Report UGANDA North Eastern Road-corridor Asset Management Project (NERAMP) (P125590)

The World Bank Cities and Climate Change (P123201)

Cities and Climate Change (P123201)

Kiribati Adaptation Phase III (LDCF) (P112615)

Existing road transport network of the National Capital Region was examined for the existing connectivity, mobility and accessibility in the study.

City of Phoenix Pavement Management System. Ryan Stevens Civil Engineer III Street Transportation Department November 15, 2017

Subject: Note on spatial issues in Urban South Africa From: Alain Bertaud Date: Oct 7, A. Spatial issues

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384)

BRIDGING THE GEOSPATIAL DIGITAL DIVIDE: WORLD BANK-UNGGIM PARTNERSHIP

Public Disclosure Copy

The World Bank Second Rural Transport Improvement Project (P123828)

Implementation Status & Results Belize Municipal Development (P111928)

Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

BANGALORE METROPOLITAN TRANSPORT CORPORATION

The World Bank Transport Connectivity and Asset Management Project (P132833)

Revenue Estimating Conference Transportation Revenues March 6, 2009 Forecast, Adjusted for 2009 Law Changes Executive Summary

Sub-Saharan Africa Transport Policy Program. SSATP Working Paper No. 89-A. User Guide Version January Rodrigo Archondo-Callao

The World Bank Decentralized Community Driven Services Project (P117764)

User perceptions of highway roughness. Kevan Shafizadeh and Fred Mannering

The World Bank Ecuador Risk Mitigation and Emergency Recovery Project (P157324)

Public Disclosure Copy

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030)

Public Disclosure Copy

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

Economic Benefit Study on Value of Spatial Information Australian Experience

Mr. Chairman, Hon ble Ministers, Excellencies, Distinguished participants, Ladies and Gentlemen.

Implementation Status & Results Burundi Burundi - Emergency Energy Project from IDA CRW (P122217)

Public Disclosure Copy

The World Bank Dem Rep Congo - Western Growth Poles (P124720)

The World Bank Philippine Rural Development Project (P132317)

Forecasts from the Strategy Planning Model

NEWS RELEASE. Province boosts winter highway safety measures

Financial Review. No member of the Board of Directors has reported accepting any gifts or incentive from any vendor contracted by the association.

Public Disclosure Copy

The World Bank Local and Regional Competitiveness Project (P154263)

EC Ibarra Transport Infrastructure Improvement Project (P147280)

ECON 427: ECONOMIC FORECASTING. Ch1. Getting started OTexts.org/fpp2/

Public Disclosure Copy

Globalization, Interdependence, & Interconnectedness

Decentralisation and its efficiency implications in suburban public transport

The World Bank OECS Regional Tourism Competitiveness (P152117)

The World Bank Third Northern Uganda Social Action Fund (NUSAF 3) (P149965)

EUROPEAN INVESTMENT BANK

November 29, World Urban Forum 6. Prosperity of Cities: Balancing Ecology, Economy and Equity. Concept Note

COUNCIL POLICY MANUAL

Financing Urban Transport. UNESCAP-SUTI Event

STATUS OF PROJECTS IN EXECUTION FY09 SOPE

Public Disclosure Copy

Impact Evaluation of Rural Road Projects. Dominique van de Walle World Bank

E C O N O M I C R E V I E W

Leveraging Urban Mobility Strategies to Improve Accessibility and Productivity of Cities

P4: Pacific Regional Connectivity Program Phase 4: KI: Connectivity Project (P159632)

Cost-Benefit Analysis of the Pooled- Fund Maintenance Decision Support System: Case Study

BRITISH VIRGIN ISLANDS SECTORAL GROSS DOMESTIC PRODUCT MARKET PRICES (current prices) (US$M)

Urban Water Supply Project (P156739)

Climate changes in Norway: Factors affecting pavement performance

The transport skeleton as a part of spatial planning of Tatarstan Republic

Background and History

The World Bank Community Development Program Support Project-Phase III (P144637)

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Public Disclosure Copy

LOGISTICS CLUSTER SOUTH SUDAN ASSESSMENT

Indicator: Proportion of the rural population who live within 2 km of an all-season road

Transportation Revenue Estimating Conference November 4, 2005 Executive Summary

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report CN Yunnan Honghe Prefecture Diannan Center Urban Transport (P101525)

Forecasting Australian Transport

Planning for Economic and Job Growth

The World Bank Ethiopia: Transport Systems Improvement Project (TRANSIP) (P151819)

Contents. Ipswich City Council Ipswich Adopted Infrastructure Charges Resolution (No. 1) Page

Public Disclosure Copy

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

Puerto Rico Transportation Asset Management Plan

Foreword. Vision and Strategy

The World Bank Ho Chi Minh City Green Transport Development (P126507)

City of Eagleville Budget Presentation Fiscal Year 2018

Winter Maintenance on Provincial Highways

The World Bank Community Development Program Support Project-Phase III (P144637)

Transcription:

Additional Financing of Road Rehabilitation Project (RRP KIR 44281-014) ECONOMIC AND FINANCIAL ANALYSIS 1. Base and project scenarios. Without urgent rehabilitation works, it is expected that sections targeted under the Road Rehabilitation Project will quickly deteriorate to an unmaintainable level. Road provider and road user costs are compared between with- and without-project scenarios. The with-project case involves reconstruction and strengthening of the existing pavement, double bitumen surface treated chip seal pavement, and improvements to the vertical profile to ensure proper drainage. 2. Additional financing. Final bid prices received for the project road sections were much higher than originally appraised, necessitating previous additional financing from the Asian Development Bank (ADB) and other development partners in 2015. 1 The currently proposed additional financing will fund network missing links in highly trafficked areas in Betio and Bairiki. This includes rehabilitation of (i) 4.9 kilometers (km) of the Betio loop road, (ii) 0.6 km of the Betio link road, (iii) 1.4 km of the Bairiki main road, and (iv) 0.5 km of feeder roads in Bairiki. In total, the proposed additional scopes of work are estimated to cost $6.8 million. In particular, this analysis focuses on the economic viability of the Betio Loop Road and Betio Link Road sections targeted by the proposed additional financing (Table 1). These roads represent vital transportation links that connect residences with places of employment and government offices in Kiribati s main population center in South Tarawa. Table 1: Betio Loop Road and Betio Link Road Sections Section Length (meters) Estimated cost ($) Betio loop road 4,900 4,311,000 Betio link road 600 269,000 Total 5,500 4,580,000 3. Economic costs. Project economic costs exclude price contingencies, taxes, duties, royalties, and subsidies. Kiribati uses the Australian dollar (A$) as its domestic currency, and Australia is also the country s main trading partner. Comparative data on price levels between the two countries suggest that Kiribati s real exchange rate vis-à-vis Australia is overvalued by about 12%. Given a shadow exchange rate factor (SERF) of 1.12 and the use of a world price numeraire, a standard conversion factor (SCF) of 0.89 is applied to all non-tradable inputs. Further, a shadow wage rate factor (SWRF) of 0.90 is applied to the unskilled labor component, which is 8% of additional capital costs. 2 Project roads are projected to have an economic life of 20 years, assuming periodic maintenance and strengthening. 4. Economic benefits. The benefits to road users were estimated by comparing road user costs between the base and project scenarios. Quantified road user benefits include vehicle 1 ADB. 2010. Report and Recommendation of the President to the Board of Directors: Proposed Loan to the Republic of Kiribati for the Road Rehabilitation Project. Manila; ADB. 2015. Report and Recommendation of the President to the Board of Directors: Proposed Grant for Additional Financing to the Republic of Kiribati for the Road Rehabilitation Project. Manila. While the project s original plans included a section for rehabilitating the Betio causeway road, the causeway and revetment were further damaged by extreme spring tides in January March 2014 and by the impacts of Cyclone Pam in March 2015. As the revetment is already considered past its design life and exhibits significant deterioration, the Betio causeway pavement and asphalt resurfacing section of the project were deleted from the civil works contract. As these works were removed from the scope, the bridge rehabilitation works were excluded from the economic analysis. 2 The shadow wage rate factor of 0.90 is consistent with the economic analysis undertaken for the ongoing South Tarawa Sanitation Improvement Sector Project.

2 operating costs (VOC) and journey time savings, as well as reductions in traffic delay. VOC benefits considered mostly tradable (e.g., imported replacement vehicles and vehicle parts, fuel and oil), except for a small labor component. Time savings are non-tradable and are adjusted accordingly by the SWRF and SCF, consistent with the use of a world price numeraire. 5. Economic modeling. Annual streams of economic capital and operating costs are compared with annual economic VOC and time savings benefits to derive net present values (at a discount rate of 12%) and economic internal rates of return (EIRRs). All costs and benefits are expressed in 2016 constant prices. The period of analysis is 20 years, from 2016 to 2035. Sensitivity testing was applied to the EIRR against construction cost, base traffic level, traffic growth rate, and a 1-year delay to project construction. 6. Road user costs: vehicle operation and time. Unit cost data for vehicle replacement, tire replacement, fuel, and oil were collected from local suppliers. In the case of gasoline and diesel, the economic cost was assessed using current retail prices excluding duties and taxes. Fuel forms a significant component of VOC. A summary of economic VOC is in Table 2, while estimated with- and without-project VOC are contrasted in Table 3. The economic value of passenger time savings derived from faster travel times on smoother roads are valued using latest available estimates of hourly passenger time costs. Table 2: Economic Road User Passenger Passenger Light Item Car Van Truck Vehicle cost ($) 29,500 41,250 83,250 Tire cost ($) 230 95 165 Fuel cost ($/liter) 1.02 1.02 1.24 Lubricant oil cost ($/liter) 4.50 4.50 4.50 Crew cost ($/hour) 1.83 1.83 1.83 Maintenance labor ($/hour) 13.76 13.76 13.76 Passenger time cost ($/hour) 0.46 0.46 $0.46 Annual utilization (km/year) 15,000 60,000 60,000 Number of passengers 3 8 4 km = kilometer. Sources: Asian Development Bank and World Bank estimates. Table 3: Vehicle Operating With and Without Project Without Project With Project Passenger Passenger Light Passenger Passenger Light Car Van Truck Car Van Truck Betio loop road and Betio link road 0.52 0.53 0.99 0.46 0.44 0.84 Note: Estimated with- and without-project vehicle operating costs for the St. Anne Airport Intersection segment of the ongoing project are assumed for these additional sections, given similar pre-rehabilitation characteristics (i.e., international roughness indexes and number of potholes). Sources: Asian Development Bank and World Bank estimates. 7. Financial sustainability. Project roads are non-revenue-earning, and were constructed and are operated by the Ministry of Public Works and Utilities (MPWU) a noncommercial unit that receives annual budget allocations for operation and maintenance of infrastructure assets. During 2013-2016, the MPWU has consistently had A$500,000 allocated for annual maintenance of infrastructure assets. Of this, around one-fifth (A$102,000) is allocated for road maintenance. Such allocations are about double the required annual maintenance funding for

3 project roads, which cover most of the road network in the population center of South Tarawa. This would leave substantial resources for maintaining other minor roads outside the scope of the project. Recent and ongoing policy reforms are refocusing scarce resources toward funding of essential government functions and services, including infrastructure operation and maintenance. 8. Road geometry and condition. The terrain in South Tarawa is flat, with the road positioned about 3 meters above the mean sea level. The existing road is well aligned through its length, and realignment is not necessary. The condition of the existing pavement is generally poor. The average international roughness indexes (IRI) per section was estimated conservatively; derived values correspond to road conditions observed after a period of dry weather and repairs. 3 Periods of wet weather cause rapid deterioration of poorly drained sections, many of which have reverted to gravel pavement. In sealed sections, potholes proliferate during wet conditions, and it is evident that the base roughness values will rise significantly unless the pavement is urgently rehabilitated. However, the coral limestone forms a good subgrade, and pavement failure in the form of rutting, heaving, or shoving is absent. 9. Traffic forecast. The vehicle fleet using the project roads has grown rapidly since 2010. However, since population growth in South Tarawa is slowing, traffic growth is expected to moderate. Some increase in vehicle numbers is expected to result from significantly improved road conditions upon completion of the project (Table 4). Table 4: Traffic Forecast (%) Passenger Passenger Car Van Light Truck Item Share of daily traffic 28 40 32 Traffic growth: 2010 2015 4 4 4 Traffic growth: 2015 2025 3 3 3 Traffic growth: after 2025 2 2 2 Sources: Asian Development Bank estimates and World Bank estimates. 10. Economic viability. The additional project sections yield an overall EIRR of 35.6%. Robust economic viability is driven by a combination of high traffic volumes and lower costs per kilometer for these sections relative to other roads previously rehabilitated under the project. As the additional financing funds network missing links in highly trafficked areas, the same high returns reflecting significant transport cost savings from the 6,000 vehicles per day utilizing a much improved pavement wearing course also accrue to these additional sections. 4 Sensitivity analyses shows that the additional project sections maintain EIRRs well above the standard benchmark of 12% even under adverse scenarios, where (i) capital costs increase by as much as 20%, (ii) benefits in the form of cost savings for road users are lower by 20%, (iii) traffic growth is 20% less than projected in the base scenario, thereby reducing the number of target beneficiaries, or (iv) project construction is delayed by 1 year (Table 5). 3 At an IRI of 6, roads are generally still usable by two-wheel-drive vehicles, albeit at low speeds; an IRI of 8 indicates rough and slow travel that is commonly damaging to two-wheel-drive vehicles. 4 To put these high rates of return in perspective, consider that South Tarawa roughly has the same population density as Hong Kong or Tokyo. However, whereas these advanced cities have various land-based transportation options, the main road network in South Tarawa represents the only link (there are not even any alternate routes or side streets) connecting people with places of employment, basic services, and markets. High economic viability therefore reflects high demand and benefits from usage of this crucial road network.

4 Table 5: Summary of Economic Analysis Base Capital Road User Traffic Delay Item 20% +20% 20% +20% 20% +20% (+1-yr) Betio Loop Road EIRR (%) 36.3 43.1 31.4 33.3 39.2 35.1 47.4 34.1 ENPV ($ million) 8.9 9.6 8.1 7.5 10.2 9.5 16.3 7.6 Betio Link Road EIRR (%) 24.9 28.9 21.8 20.5 29.0 24.5 36.6 21.3 ENPV ($ million) 0.3 0.4 0.3 0.2 0.4 0.4 0.8 0.2 Total EIRR (%) 35.6 42.1 30.8 32.5 38.6 34.4 46.7 33.1 ENPV ($ million) 9.2 10.0 8.4 7.8 10.6 9.9 17.1 7.8 (Switching value) 3 3 +228.0% (128.6%) 3 3 3 3 () = negative, EIRR = economic internal rate of return, ENPV = economic net present value. 11. Details of project costs and benefits. The projected net benefit stream under the base scenario for the design life of the Betio loop road and the Betio link road are presented in Tables 6 and 7, respectively. These provide further context regarding the expected magnitudes of annual costs and benefits associated with road rehabilitation works on these additional project sections. Table 6: Net Benefit Stream of Rehabilitated Betio Loop Road ($ million) Year Capital Maintenance VOC Savings Passenger Time Net Benefits 2016 (4.24) (0.04) (0.43) (0.42) (5.13) 2017 0.00 (0.04) 0.89 0.87 1.72 2018 0.00 (0.04) 0.92 0.90 1.77 2019 0.00 (0.04) 0.94 0.92 1.83 2020 0.00 (0.04) 0.97 0.95 1.88 2021 0.00 (0.04) 1.00 0.98 1.94 2022 0.00 (0.04) 1.03 1.01 2.00 2023 0.00 (0.04) 1.06 1.04 2.06 2024 0.00 (0.04) 1.09 1.07 2.13 2025 0.00 (0.04) 1.13 1.10 2.19 2026 0.00 (0.04) 1.15 1.12 2.24 2027 0.00 (0.04) 1.17 1.15 2.28 2028 0.00 (0.04) 1.20 1.17 2.33 2029 0.00 (0.04) 1.22 1.19 2.37 2030 0.00 (0.04) 1.24 1.22 2.42 2031 0.00 (0.04) 1.27 1.24 2.47 2032 0.00 (0.04) 1.29 1.27 2.52 2033 0.00 (0.04) 1.32 1.29 2.57 2034 0.00 (0.04) 1.35 1.32 2.63 2035 0.00 (0.04) 1.37 1.34 2.68 EIRR 36.34% () = negative, EIRR = economic internal rate of return, VOC = vehicle operating cost. Table 7: Net Benefit Stream of Rehabilitated Betio Link Road

5 ($ million) Maintenance VOC Savings Year Capital Passenger Time Net Benefits 2016 (0.26) (0.04) (0.04) (0.02) (0.36) 2017 0.00 (0.04) 0.08 0.03 0.08 2018 0.00 (0.04) 0.08 0.03 0.08 2019 0.00 (0.04) 0.09 0.03 0.08 2020 0.00 (0.04) 0.09 0.04 0.09 2021 0.00 (0.04) 0.09 0.04 0.09 2022 0.00 (0.04) 0.09 0.04 0.10 2023 0.00 (0.04) 0.10 0.04 0.10 2024 0.00 (0.04) 0.10 0.04 0.10 2025 0.00 (0.04) 0.10 0.04 0.11 2026 0.00 (0.04) 0.11 0.04 0.11 2027 0.00 (0.04) 0.11 0.04 0.11 2028 0.00 (0.04) 0.11 0.04 0.12 2029 0.00 (0.04) 0.11 0.04 0.12 2030 0.00 (0.04) 0.11 0.05 0.12 2031 0.00 (0.04) 0.12 0.05 0.13 2032 0.00 (0.04) 0.12 0.05 0.13 2033 0.00 (0.04) 0.12 0.05 0.13 2034 0.00 (0.04) 0.12 0.05 0.14 2035 0.00 (0.04) 0.13 0.05 0.14 EIRR 24.86% () = negative, EIRR = economic internal rate of return, VOC = vehicle operating cost.