Public Disclosure Authorized EAST ASIA AND PACIFIC Philippines Water Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 21-Dec-2017 ISR30930 Implementing Agencies: Department of Public Works and Highways, Department of Finance, Metro Manila Development Authority Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:28-Sep-2017 Planned Mid Term Review Date:03-Feb-2020 Original Closing Date:30-Nov-2024 Project Development Objectives Effectiveness Date:-- Actual Mid-Term Review Date:-- Revised Closing Date:30-Nov-2024 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The project development objective is to improve flood management in selected areas of Metro Manila. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name 1. Modernizing Drainage Areas:(Cost $375.20 M) 2. Minimizing Solid Waste in Waterways:(Cost $48.00 M) Public Disclosure Authorized 3. Participatory Housing and Resettlement:(Cost $55.75 M) 4. Project Management and Coordination:(Cost $20.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO -- Satisfactory Overall Implementation Progress (IP) -- Satisfactory Overall Risk Rating -- High 12/21/2017 Page 1 of 7
Implementation Status and Key Decisions The Metro Manila Flood Management Project was approved by the Bank's Board of Executive Directors on September 28, 2017. The Project is not yet effective, but the two implementing agencies are currently preparing the final designs and tender documents for the modernization of the first five drainage areas. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate -- Moderate Macroeconomic Low -- Low Sector Strategies and Policies Moderate -- Moderate Technical Design of Project or Program Moderate -- Moderate Institutional Capacity for Implementation and Sustainability High -- High Fiduciary Substantial -- Substantial Environment and Social High -- High Stakeholders Substantial -- Substantial Other -- -- -- Overall High -- High Results Project Development Objective Indicators Flood-prone areas that are free of water within 24 hours after a major rainfall event. (Hectare(Ha), Custom) Value 0.00 -- 0.00 4,900.00 Direct project beneficiaries, of which females. (Number, Custom) 12/21/2017 Page 2 of 7
Value 0.00 -- 0.00 1,700,000.00 Solid wastes collected at targeted existing pumping stations. (Cubic Meter(m3), Custom) Value 17,000.00 -- 17,000.00 8,500.00 Households successfully resettled from areas where they would obstruct proper O&M of the drainage systems. (Number, Custom) Value 0.00 -- 0.00 2,500.00 Beneficiaries satisfied with reduced vulnerability to flooding in Project areas. (Percentage, Custom) Value 0.00 -- 0.00 80.00 Overall Comments No change from the baseline numbers. Intermediate Results Indicators 12/21/2017 Page 3 of 7
Existing pumping stations rehabilitated. (Number, Custom) Value 0.00 -- 0.00 36.00 New pumping stations constructed and operational. (Number, Custom) Value 0.00 -- 0.00 20.00 Drainage waterways cleaned. (Kilometers, Custom) Value 0.00 -- 0.00 104.00 Barangays with improved solid waste management programs in place. (Number, Custom) Value 0.00 -- 0.00 200.00 12/21/2017 Page 4 of 7
Barangays receiving results-based financing (RBF) schemes. (Number, Custom) Value 0.00 -- 0.00 40.00 Community consultations undertaken. (Number, Custom) Value 3.00 -- 3.00 40.00 Home-owners' Associations (HOA) or Housing Cooperatives receiving TA for community organizing, mapping, and surveying. (Number, Custom) Value 0.00 -- 0.00 7.00 In-city resettlement sites developed and ready for occupation. (Number, Custom) Value 0.00 -- 0.00 7.00 12/21/2017 Page 5 of 7
Grievances registered related to delivery of project benefits that are actually addressed (core). (Percentage, Custom) Value 0.00 -- 0.00 90.00 Semi-annual progress reports submitted on time. (Number, Custom) Value 0.00 -- 0.00 13.00 Overall Comments No change from the baseline numbers. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P153814 IBRD-87840 Not Effective USD 207.60 207.60 0.00 0.00 207.60 0% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P153814 IBRD-87840 Not Effective 28-Sep-2017 -- -- 30-Nov-2024 30-Nov-2024 Cumulative Disbursements 12/21/2017 Page 6 of 7
Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 12/21/2017 Page 7 of 7