C11 EDR - STRONGHOLD BUILDING STORM WATER QUALITY MANAGEMENT PLAN ROBSTOWN, TEXAS, COUNTY ROAD 69 MUNOZ ENGINEERING CIVIL STRUCTURAL MARINE

Similar documents
Stormwater Work Projects 2013

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY


STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

Hydrology Study Report

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

Hydrology and Hydraulics Design Report. Background Summary

PARADIGM ODP FORT COLLINS, CO 80525

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

How & Where does infiltration work? Summary of Geologic History Constraints/benefits for different geologic units

APPENDIX B WORKSHEETS & EXHIBITS

Drainage Analysis. Appendix F

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

Continuing Education Course #101 Drainage Design with WinTR-55

Preliminary Hydraulic Report

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

STORMWATER MANAGEMENT REPORT

APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS

UPPER COSUMNES RIVER FLOOD MAPPING

Construction Exits Vibration grids

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

WATER MANAGEMENT REPORT FOR PAGE ESTATES

Construction Exits Rock pads

Volume 1, Chapter 4 Rainfall

A HYDROLOGIC STUDY OF THE EFFECTS OF URBAN DEVELOPMENT ON STORM RUNOFF: A CASE STUDY IN QUEENS, NY ABSTRACT

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

Stormwater Capacity Analysis for Westover Branch Watershed

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

Annual TTFO Meeting April 10, 2018 Michael J. Wittman, P.S. Chief Surveyor / GIS Coordinator

Presented at the 78 th Annual Water Environment Federation Technical Exposition and Conference. Washington, D.C. Oct. 29 Nov. 2, 2005.

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

PART VI PREVAILING WAGE RATES DETERMINATION

TPDES: Soil, Erosion and Sedimentation Methods

Stormwater Drainage Design Report. Reeve & Associates, Inc. Maverik, Inc. 88th Avenue and Pecos Street. Thornton, CO

A p p l i c a t i o n D r a w i n g s : R e v i s i o n B Updated in response to submissions

BACKGROUND AND PROJECT DESCRIPTION

DOCUMENTATION WORKBOOK FY 2018

Table of Contents Project Description... 1 Summary of Existing Conditions... 1 Summary of Proposed Conditions... 1 Stormwater Compliance... 2 Collecti

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design

Advanced Geologic Exploration, Inc.

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

How Can DOT Operations and Maintenance Prepare for Extreme Weather Events?

PRELIMINARY CULVERT ANALYSIS REPORT FOR CULVERT NO. 008-C OREGON AVENUE OVER PINEHURST CREEK

HYDROLOGY REPORT Tentative Tract No. 5978

C1.0 HOP IN FUEL STATION BENCHMARKS PARKING SUMMARY TABLE SITE PAVING: NOTES: SITE LOCATION MAP LEGEND DESCRIPTION PROPOSED EXISTING

Custom Soil Resource Report for Victoria County, Texas

D. B. G R A Y E N G I N E E R I N G I N C.

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

Sample Plan Sample Plan CONSTRUCTION PLAN DETAILS CHECKLIST CONSTRUCTION PLAN DETAILS NARRATIVE. References: General Information:

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES

A regular meeting of the Village of Victor Planning Board was held on Wednesday, July 26, 2017, at the Village Hall, 60 East Main Street.

Analysis of Hydraulic Impacts on the Schuylkill River

APPENDIX Q. Updated Storm Drain Demands

Emergency Action Plan (EAP) Tata Pond Dam


Materials. Use materials meeting the following.

Aqua Dome Express Car Wash

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

Wellsgate Terrace SPECIFICATIONS.

Las Colonias Subdivision September 2010 Flood Study

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

T his map is for illus trative purpos es only and does not repres ent a s urvey. I t is provided 'as is ' without warranty or any repres entation of

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

Soil Map Boulder County Area, Colorado (Planet Blue Grass) Web Soil Survey National Cooperative Soil Survey

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

COMMUNITY EMERGENCY RESPONSE TEAM FLOODS INTRODUCTION

Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

Sales Date Grantor Convey No. Convey Typ # Parcels Sales Price

Approve or disapprove Concept Plan as presented. (II A)

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

Measuring and GIS Referencing of Network Level Pavement Deterioration in Post-Katrina Louisiana March 19, 2008

10 May Rod Walls - Director Facilities New Construction, Sustainability Hays CISD IH 35 Kyle, Texas 78640

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

CITY OF PERRIS FLOOD CONTROL MAINTENANCE DISTRICT NO. 1. ANNUAL ENGINEER S REPORT FISCAL YEAR 2011/2012 April 26, 2011

Watershed Detectives:

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

Floods. Floods COMMUNITY EMERGENCY RESPONSE TEAM FLOODS CONTENT INSTRUCTOR GUIDANCE

CIVIL CONSULTING ENGINEERS

Pressure Head: Pressure head is the height of a column of water that would exert a unit pressure equal to the pressure of the water.

Rainwater storage facilities

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

Sales Date Grantor Convey No. Convey Typ # Parcels Sales Price

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

APPENDIX B DRAINAGE REPORT

Suitable Applications Sediment traps should be considered for use:

Title: ArcMap: Calculating Soil Areas for Storm Water Pollution Prevention Plans Authors: Brandy Woodcock, Benjamin Byars

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation

TOWN OF GARDEN CITY 150 SOUTH STREET BEACH ACCESS PARKING

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29

Appendix C. Questionnaire Summary of Responses Geographic Information Systems

Transcription:

RMIII 6/3/7 U I U I TENTION POND REV ISSUED FOR CONSTRUCTION PHONE: 36-946-4848 38 ANDREA LN CORPUS CHRISTI, TX, 7844 TBPE FIRM No. F-4 TENTION DITCH LEGEND PROPOSED STORMWATER / DRAINAGE FLOW DIRECTION EXISTING STORMWATER / DRAINAGE FLOW DIRECTION ABBREVIATIONS AND FINITIONS A AC C I I5 I I5 I5 I Q Q5 Q Q5 Q5 Q Tc CFS CFT FEMA AREA ACRES RUNOFF COEFFICIENT RAINFALL INTENSITY (INCHES/HOUR) SIGN RAINFALL INTENSITY FOR A 5-YEAR STORM SIGN RAINFALL INTENSITY FOR A -YEAR STORM SIGN RAINFALL INTENSITY FOR A 5-YEAR STORM SIGN RAINFALL INTENSITY FOR A 5-YEAR STORM SIGN RAINFALL INTENSITY FOR A -YEAR STORM PEAK RUNOFF FLOW PEAK RUNOFF FOR A 5-YEAR STORM PEAK RUNOFF FOR A -YEAR STORM PEAK RUNOFF FOR A 5-YEAR STORM PEAK RUNOFF FOR A 5-YEAR STORM PEAK RUNOFF FOR A -YEAR STORM TIME OF CONCENTRATION CUBIC FOOT PER SECOND CUBIC FOOT FERAL EMERGENCY MANAGEMENT AGENCY STORM WATER QUALITY MANAGEMENT PLAN 48 COUNTY ROAD 69 ROBSTOWN, TEXAS, 7838 TENTION POND 74 C

SCALE: " = 5' 89. 9. 87. 88. 89. 86. 86.. 9 89. 88. 87. 9. 89.5 9. 3. 9.5.3 3.4 9 9.5.. 9.5. 93..5 88..5 9..4 4. 9. 3. 93. 88.5 9. 9. 89. 89. 88. 87. 87.. 9.5.5 9.5 9. 88. 4. 88. 93. 4.. 93..5. 9.5 9. 9.5 9. 89.5 89. 89. 9. 9. 9..5 9.5.7.7..5.4 3.7 93. 93. 93. 9.5 9. 93. 88.5 9. 9.5 9. 93..5. SCALE: " = ' 9.5. 9. 9.5. 9. 9. 88. 89. 87. 86. 9. 86. 87. 88. 9. GRADING, PAVING, AND JOINT PLAN 9.5 INSET A. 9..5 9. 9 48 COUNTY ROAD 69 ROBSTOWN, TEXAS, 7838.5 3.7 T 89. 89.5 89. 88.5 88. 93..5. 9.5 9. 9.5 9. 89.5 87. 87. UGT NOTES: E 3.7 ST 6'' E 4'' SS.5 3.7.5 88.. 9.5..6 9.5.6.5.5 9. 9 9.5...5... 9.5 9.. PHONE: 36-946-4848 38 ANDREA LN CORPUS CHRISTI, TX, 7844 E 6'' S T TBPE FIRM No. F-4. 9 E 6'' S 4 89. PAVEMENT REVISION/ADDITION - SHEET REISSUED 3 PAVEMENT REVISION 88. 85. 87. PAVEMENT REVISION 86. 86. 87. 88. 84. 85. 83. PAVEMENT REVISION/ADDITION - SHEET REISSUED 83. 84. PAVEMENT, POND, BARROW PIT REVISION - SHEET REISSUED RMIII 6/3/7 RMIII 6/7 5 RMIII 6/7 RMIII 6/7 89. SCALE: " = 4' 8 84. 83. RMIII 5/7 4 85. 88. 87. 86. 85. 84. 83. 86. REV 88. 87. 74 C

E W E W UGT E W E W 9 PARKING SPACES @ 9.' = 8. 5 SCALE: " = 5' 45..78 A 4.6 TAIL A 6. 9.67 PARKING SPACES @ 9.' = 9.. 45. 9. 9 74 C3 48 COUNTY ROAD 69 ROBSTOWN, TEXAS, 7838 STRIPING AND SIGNAGE PLAN TBPE FIRM No. F-4 PHONE: 36-946-4848 38 ANDREA LN CORPUS CHRISTI, TX, 7844 PAVEMENT REVISION RMIII 5/7 PAVEMENT REVISION RMIII 6/7

TYPICAL LIGHT DUTY CONCRETE PAVEMENT TAIL TYPICAL HEAVY DUTY CONCRETE PAVEMENT TAIL TYP CONCRETE PAVEMENT EXPANSION JOINT TAIL TYP CONCRETE PAVEMENT CONTROL JOINT TAIL 48 COUNTY ROAD 69 ROBSTOWN, TEXAS, 7838 MISCELLANEOUS TAILS I TBPE FIRM No. F-4 PHONE: 36-946-4848 38 ANDREA LN CORPUS CHRISTI, TX, 7844 TYP REINFORCEMENT TAIL AT PROP CONCRETE PAVEMENT CORNER PROP CONCRETE PAVEMENT TO EXIST BLDING FOUNDATION TAIL EXPANSION JOINT TIE-IN AT EXISTING CONCRETE PROP CONCRETE DRIVAY TIE-IN TO EXIST ASPHALT PAVEMENT 6" MONOLITHIC CURB CONC CURB TAIL TYP SIDALK TAIL TYP SIDALK TAIL TYPICAL HEAVY DUTY CONCRETE PAVEMENT TAIL SECTION SECTION 74 C4

TAIL @ CAP SEAL N CONCRETE TO N CONC TAIL @ CAP SEAL N CONCRETE TO FOUNDATION TYP EXP JT TAIL TYP STRIPING 48 COUNTY ROAD 69 ROBSTOWN, TEXAS, 7838 MISCELLANEOUS TAILS II TBPE FIRM No. F-4 PHONE: 36-946-4848 38 ANDREA LN CORPUS CHRISTI, TX, 7844 BOLLARD TAIL 74 C5