Etobicoke Exfiltration System: Monitoring and Evaluation. Tim Van Seters Ryerson University July 24, 2015

Similar documents
Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

Table 1 - Infiltration Rates

Coarse Sediment Traps

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

FUNCTIONAL SERVICING REPORT AND SWM REPORT

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

Sediment Capture in Pervious Concrete Pavement tsystems: Effects on Hydrological Performance and Suspended Solids

2012 Rainfall, Runoff, Water Level & Temperature Beebe Lake Wright County, MN (# )

D. B. G R A Y E N G I N E E R I N G I N C.

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

UK Flooding Feb 2003

Application of Real-Time Rainfall Information System to CSO control. 2 October 2011 Naruhito Funatsu METAWATER Co., Ltd.

CONSTRUCTION EXIT SEDIMENT BARRIER

Proposal to limit Namakan Lake to 1970 Upper Rule Curve for remainder of summer

SOLUTIONS TO SELECTED PROBLEMS

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

WEST NORRITON TOWNSHIP

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

SERVICING BRIEF & STORMWATER MANAGEMENT REPORT Colonial Road Sarsfield (Ottawa), Ontario. Report No June 15, 2017

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

STRUCTURAL STABILITY ASSESSMENT

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

STORMWATER MANAGEMENT REPORT

Stone Outlet Sediment Trap

CIE4491 Lecture. Hydraulic design

VILLAGE COUNCIL STORMWATER REPORT JULY 23, 2016 STORM EVENT

FHWA - HIGHWAY HYDROLOGY

City of Thornton Attn: Tim Semones Development Engineeering 9500 Civic Center Dr. Thornton, CO 80229

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

Stormwater Outlet Sediment Traps

Instream Sediment Control Systems

U-Shaped Sediment Traps

Rock & Aggregate Drop Inlet Protection

EROSION CONTROL NARRATIVE

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

January 22, Coronado National Forest 300 West Congress Street Tucson, AZ Jim Upchurch, Forest Supervisor. Dear Mr.

Clark Regional Wastewater District

Chapter 10 - Sacramento Method Examples

STORMWATER DESIGN CALCULATIONS

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

STORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 6% Sediment Load

Large-Scale Sediment Retention Device Testing (ASTM D 7351) SedCatch Sediment Basket Inlet Filter Exposed to 1.5% Sediment Load

CITY OF PUYALLUP TOSCANOS SINKHOLE EVALUATION

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

*Corresponding author,

STORMWATER MANAGEMENT ASSESSMENT TECHNICAL MEMORANDUM DRAFT FINAL FOSTER DRIVE AREA SANITARY SERVICING AND STORMWATER MANAGEMENT CLASS EA

ENGINEERING HYDROLOGY

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Haiti and Dominican Republic Flash Flood Initial Planning Meeting

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

WP2.1 BREACH FORMATION LARGE SCALE EMBANKMENT FAILURE

Storm Sewer Design [2]

WASTEWATER FLOW COMPONENTS

Public Inspection and Maintenance Checklist Sand Filters (Above Ground/Open)

Inflow and Infiltration. John Sorrell, P.E. City of Raleigh Public Utilities Department

Technical Note: Hydrology of the Lukanga Swamp, Zambia

Flow Monitoring in the Collection System September 11, 2014

Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils

Hydrology Study Report

Souris River Basin Spring Runoff Outlook As of March 15, 2018

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

WQ Outlet Design Single Orifice Orifice diameter = 24. Perforated riser/orifice Plate Outlet area per perforation row = 4

Future Weather in Toronto and the GTA

September 6, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Rainfall Analysis. Prof. M.M.M. Najim

HOTEL KANATA 160 HEARST WAY KANATA, ONTARIO SERVICING REPORT. Prepared for: David Johnston Architect. Prepared By:

The key natural hazards relevant to the Project area relate to seismic activity and flood risk.

Regression Analysis of the Variation in Rainfall Derived Inflow and Infiltration

Souris River Basin Spring Runoff Outlook As of March 1, 2019

Chapter 5 : Design calculations

DRAINAGE CALCULATIONS

2016 Fall Conditions Report

International Journal of Agriculture and Environmental Research

City of Madison Flooding Event AUGUST 20 TH, 2018-PRESENT

Vegetated Swales in Urban Stormwater Modeling and Management

Between 6 am to 4 pm the next day approximately 7.5 inches fell. Chesapeake Bay Bridge Tunnel NOAA Tide Gage

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

Geosynthetics Applications and Performance Reviews Select Case Histories

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017

Impact of Inflow and Infiltration on Wastewater Assets

Sewer, pressurization, differential pressure monitoring, fully dynamic hydraulic modeling, air displacement modeling.

Verification of Pervious Concrete Drainage Characteristics using Instrumentation

Notes: We all know that Toulmins Spring Branch is a sub-watershed of Three Mile Creek watershed. Some part of it is in Mobile area and rest of it is

WELCOME Lake Wabukayne OPEN HOUSE

2017 Fall Conditions Report

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

WATER MANAGEMENT REPORT FOR PAGE ESTATES

Estimating Sewage System Flows

September 18, 2017 Project No.: 5077

Climate Adaptation Challenges for Boston s Water and Sewer Systems

Monitoring Considerations and Costs

Determination of Urban Runoff Using ILLUDAS and GIS

Chapter 5 CALIBRATION AND VERIFICATION

Status Report on Polychlorinated Biphenyls in the Western Storm Drain University of California, Richmond Field Station Richmond, California

Transcription:

Etobicoke Exfiltration System: Monitoring and Evaluation Tim Van Seters Ryerson University July 24, 2015

Presentation Outline Summary of 1994 1995 Candaras Associates study Summary of 1996-1998 SWAMP Study Follow up monitoring in 2013 and 2014 Other exfiltration system designs

Performance Assessments Exfiltration system Princess Margaret Blvd Exfiltration system Queen Mary Drive Filtration System on Braecrest Avenue

Exfiltration and Filtration Systems Exfiltration System Filtration System

Etobicoke Exfiltration System

Princess Margaret Blvd Site MH 1 MH 2 ISLINGTON AVE. MH 3 MH 4A MH 4 KIPLING AVE. Princess Margaret Blvd. MH 68 MH 6 MH 5 Princess Ann Cres. MH 7 MH 69 MH 70 MH 8 THE KINGSWAY MH 71 MH 72 MH 73 Exfiltration sewer system Conventional storm sewer

Princess Margaret Blvd Site Characteristics and System Design 30.5 ha low density residential Clay to clay silt till over silty sand No groundwater interference Design storm was 15 mm, 1 hour AES storm, which was thought to be equivalent to the 90 th percentile event Peak rainfall intensity = 56 mm/h or 4.7 mm/5 minutes

Candaras Associates Study Princess Margaret Blvd 2 CATCHBASINS CONNECTED TO MH 1 2 CATCHBASINS CONNECTED TO SEWER PIPE 4 SEALED CATCHBASINS ROAD NATIVE BACKFILL MH 1 COMPACTED TO MH 2 100% SPD TEMPORARY PLUG STORM SEWER 16 mm CLEAR STONE PLUG V-NOTCH WEIR NATIVE BACKFILL COMPACTED TO 100% SPD STORM SEWER 16 mm CLEAR STONE PLUG MH 3 V-NOTCH WEIR NATIVE SOIL DATA LOGGER PERFORATED PVC PIPE (12 mm PERFORATIONS) WRAPPED WITH EXTERNAL 270R OR EQUIVALENT PRESSURE TRANSDUCER SCALE: N.T.S. SOURCE: A.M. CANDARAS ASSOCIATES INC. 1997

Candaras Associates Study Princess Margaret Results Date Event Size Peak Inflow Peak Outflow Trench Peak Water Level Upstream Trench Peak Water Level Downstream Water Level at which overflow occurs May 26, 1994 28 mm over 22.5 hours 9.7 L/s 0.3 L/s 0 mm 65 mm 650 mm May 31, 1994 11 mm over 0.5 hours 8.1 L/s 1.5 L/s 0 mm 5 mm 650 mm June 24, 1994 24 mm over 24 hours 2.2 L/s 0.1 L/s 0 mm 3 mm 650 mm Oct 5-6, 1995 63 mm over 18 hours 10 L/s 3.3 L/s 380 mm 500 mm 650 mm

SWAMP Study Princess Margaret Monitoring Lay-out AUTOMATIC SAMPLER MH 73 CATCHBASIN CATCHBASIN LEAD MH 72 MH 71 CONVENTIONAL SEWER TO KIPLING AVE. SAMPLER INTAKE V-NOTCH WEIR AREA-VELOCITY PROBE AND DEPTH SENSOR DEPTH SENSOR ACTUATOR GRAVEL TRENCH MAIN SEWER PIPE PERFORATED EXFILTRATION PIPE SCALE: N.T.S.

SWAMP Study Princess Margaret Results: 1996-1998 No overflows in 1996 2 rain events above 15 mm No overflows in 1997 7 rain events above 15 mm 3 events caused overflow in 1998, no overflow from 2 events > 15 mm 20.2 mm followed by 3.6 mm two days later 14.9 mm followed by 11.9 mm the same day (26.8 mm total) 15.3 mm, high intensity (9.7 mm in 5 minutes) 98% of rainfall runoff infiltrated Mean TSS concentrations in sewer were 164 mg/l and 81 mg/l in summer and winter, respectively

SWAMP Study PM Large Event Summary Date Duration 1 Total Depth Maximum Maximum Overflow 5-minute hour MH 72 (min) (mm) (mm) (mm) Oct. 18, '96 840 26.7 n/a 14.0 N Nov. 7-8, '96 600 18.0 n/a 5.9 N Aug. 15, '97 240 20.8 n/a 11.0 N Aug. 20-21, '97 1,140 40.4 n/a 5.6 N Sep. 10, '97 600 16.0 n/a 3.6 N Nov. 1, '97 660 23.0 n/a 5.0 N May 10-11, '98 2,885 42.8 0.5 3.6 N June 11-13, '98 420 20.2 1.4 4.6 N June 13, '98 55 3.6 0.7 2.8 Y June 30, '98 170 26.8 4.2 10.7 Y Sept. 6, '98 45 15.3 9.7 14.8 Y

Queen Mary s Drive Site Characteristics and System Design 13.3 ha low density residential Sand and silty sand native soils Roof and foundation drains directly connected to sewer Groundwater at 1.2 m from surface

Queen Mary s Drive Site

Candaras Associates Study Queen Mary s Drive Study 5 CATCHBASINS CONNECTED TO MH 12 4 CATCHBASINS CONNECTED TO MAIN SEWER ROAD ROAD MH 12 NATIVE BACKFILL COMPACTED TO 100% SPD MH 14 NATIVE BACKFILL COMPACTED TO 100% SPD MH 15 TEMPORARY PLUG STORM SEWER 16 mm CLEAR STONE PLUG V-NOTCH WEIR STORM SEWER PLUG V-NOTCH WEIR 16 mm CLEAR STONE NATIVE SOIL PERFORATED PVC PIPE (12 mm PERFORATIONS) WRAPPED WITH EXTERNAL 270R OR EQUIVALENT DATA LOGGER PRESSURE TRANSDUCER SCALE: N.T.S. SOURCE: A.M. CANDARAS ASSOCIATES INC. 1997

Candaras Associates Study Queen Mary s Drive Study Results Date Event Size Peak Inflow Sept 25, 1994 19.1 mm over 6 hours Peak Outflow Trench Peak Water Level Upstream Trench Peak Water Level Downstream Water Level at which overflow occurs 52 L/s 6.5 L/s 220 mm 180 mm 650 mm Oct. 5-6, 1995 63 mm over 18 hours 17.5 L/s 10 L/s 150 mm 550 mm 650 mm

Inconclusive Results of SWAMP EES monitoring Queen Mary s Drive

Follow up Monitoring in 2013-14

Princess Margaret Blvd Sewer Inspection

Limited maintenance Still infiltrating well after 14 years PM Water Level Drawdown Rate in 1998 and 2013 (MH 72) Water Level (mm) 500 450 400 350 300 250 200 150 100 50 0 September 6, 1998 July 7, 2013 0 20 40 60 80 100 Time after peak (minutes) Storm sewer invert Perforated pipe invert

Princess Margaret Blvd Large Event Summary Date Duration 1 Total Depth Maximum 5-minute Overflow MH 72 Overflow MH 71 (hh:mm) (mm) (mm) June 12, 2014 3:45 24.8 4.8 Y Y June 17, 2014 0:50 13.4 3.6 Y Y June 25, 2014 1:15 19.6 4.8 Y Y July 7, 2014 4:25 12.0 0.6 N N July 8, 2014 6:10 14.6 4.2 N N July 27. 2014 13:10 35.0 2.6 N Y August 12, 2014 1:50 10.0 1.4 N Y Sept 2, 2014 5:10 20.8 4.4 N Y Sept 5, 2014 10:55 25.2 0.8 N Y Sept 10, 2014 11:45 35 2.2 Y Y Sept 21, 2014 2:05 13 3.2 N Y Oct 3, 2014 12:50 16 3.6 N Y Nov 24, 2014 13:05 22.4 1.4 N N

Queen Mary

Queen Mary Sewer Inspection

Queen Mary Clean Out

Queen Mary Water Level Drawdown Before and After Maintenance Average water level drawdown rate roughly doubled after maintenance Water Level (mm) 900 800 700 600 500 400 300 200 100 0 Before After 0 20 40 60 80 100 Time from end of rain (minutes)

Queen Mary Large Event Summary 2014 Date Duration 1 Total Depth Maximum 5-minute Overflow (hh:mm) (mm) (mm) June 12, 2014 3:45 24.8 4.8 Y June 17, 2014 0:50 13.4 3.6 Y June 25, 2014 1:15 19.6 4.8 Y July 7, 2014 4:25 12.0 0.6 Y July 8, 2014 6:10 14.6 4.2 Y July 27. 2014 13:10 35.0 2.6 Y August 12, 2014 1:50 10.0 1.4 Y Sept 2, 2014 5:10 20.8 4.4 Y Sept 5, 2014 10:55 25.2 0.8 Y Sept 10, 2014 11:45 35 2.2 Y Sept 21, 2014 2:05 13 3.2 Y Oct 3, 2014 12:50 16 3.6 N Nov 24, 2014 13:05 22.4 1.4 Y

General Conclusions PM exfiltration system continues to meet design target Overflows often occurred due to limited through put capacity rather than inadequate trench storage availability Higher density of perforations and/or larger pipes to facilitate rapid conveyance of runoff into trench Improved pre-treatment within the catchbasin or manhole would help reduce clogging of perforated pipes Trench dams preventing flow between trench sections may need further consideration Maintenance frequency variable depending on design and catchment characteristics inspections required every 5 years

Other Exfiltration System Designs

Exfiltration system, North York

Exfiltration system, North York

Curbless system with pretreatment through a grass swale Exfiltration Systems, Ottawa After 20 years, and limited maintenance, the system continued to function very well J.F. Sabourin & Associates, 2008

Edwards Gardens Before Biofilter system Courtesy: Schollen & Co. Inc.

Thank You Tim Van Seters Phone: 289-268-3902 Email: tvanseters@trca.on.ca STEP website: www.sustainabletechnologies.ca