PROBA 1. F. Teston ESA/ESTEC D/TEC-EL

Size: px
Start display at page:

Download "PROBA 1. F. Teston ESA/ESTEC D/TEC-EL"

Transcription

1 PROBA 1 F. Teston ESA/ESTEC D/TEC-EL Frederic.Teston@esa.int

2 PROBA 1 launch PROBA 1 has been launched on 21 October 2001 Orbital parameters: Altitude: km Near polar (inclination of 97.9 ) Sun-synchronous Period 96.97min

3 PROBA 1 early activities start date stop date Activity 22 October 2001 Launch 22 October October 2001 LEOP 24 October 2001 April 2002 Commissioning April 2002 April 2003 Technology Demonstration mission April 2002 Start of CHRIS instrument calibration campaign & science mission Continuous Implementation and in-flight testing of improvements of the system and operations October 2002 Priority given to science mission Jan 2003 March 2003 Intensive campaign to further improve system stability and reliability in preparation of Scientific Utilisation Mission April 2003 now Scientific Utilisation Mission, main mission priority June 2003 Start of utilisation of Kiruna as additional downlink station

4 PROBA 1 Data (1) ESA technology demonstration program (GSTP) (1) In orbit demonstration of spacecraft technology (2) Payload complement CHRIS: Compact High Resolution Imaging Spectrometer HRC: High Resolution Telescope SREM, DEBIE, MRM: Earth environment monitors Operations centre located at ESA-Redu ground station (B)

5 PROBA 1 Data (2) Mass : 94 kg Volume : 80cm x 60cm x 60cm Power : 40 to 120 W High accuracy and agile ACNS

6 Mission management Main elements (related to CHRIS): PROBA 1 Steering Group (ESA) in charge of overall mission management CHRIS Steering Group (BNSC) in charge of CHRIS utilisation Campaign Unit (ESA) in charge of the definition and the organisation of the CHRIS Observation Plan RSAC (UK) in charge of CHRIS day to day planning SIRA (UK) in charge of level 0 processing and data distribution ESA Redu (B) in charge of spacecraft operations Industry in charge of technical project support

7 PROBA 1 status Spacecraft is operating on its nominal chain Degradation of power subsystem (solar arrays and battery) is compatible with the current mission and further extension is possible with some saving measures (limitation in summer of earth environment instruments) Degradation of radiation sensitive items (electronics, CCD) was observed but remains compatible with the mission and a possible extension Orbital natural decay and drift from SSO are very low (< 10 km semimajor axis) perigee height Ground segment status (addressed later) 6932 Drift of the orbital plane wrt the sun (i.e. drift from sun-synchronicity): <2 /year (< 8min) in the direction of noon. apogee height km km Sep Jan May Sep Jan May Sep Sep Jan May Sep- 02 date 15-Jan May Sep- 03 date

8 PROBA 1 EO related performances Spacecraft pointing performances are in line with expectations, Data link is nominal (some data loss on board), Thermal stability of CHRIS is adequate The main remaining issue is related to the spacecraft robustness which is acceptable but still includes anomalies causing losses of images (success rate addressed later).

9 Infant anomalies Platform stability, including onboard computer reboots The main problems still encountered on board after the end of the commissioning phase were the relatively frequent software reboots and the instable attitude control. Cold reboots resulting in the loss of not yet dumped image data and reconfiguration of the spacecraft into safe mode occurred typically once every 3-6 days or once every few weeks. Although the frequency of such events varied during the mission these events were found to be related and all had a potential impact on the spacecraft scientific return (less to the technology demonstration return). Depending on the case by case situation, this impact could consist in: the loss of planned imaging activities between two ground segment passes the loss of imaging data quality loss of imaging data Considerable effort has been put into the investigations of these events and into the definition and implementation of containment and corrective actions. As a result most of the mechanisms leading to these events were identified and corrected or worked-around, resulting finally in a complete resolution and a stable platform in April 1 st Centre times The CHRIS image times that the PPU manager takes from the ACNS represent centre times of the image. No factor was used to start the imaging sooner. Consequently, the selected target was not in the centre of the image, but always at the edge of the image (the image scan starts at the target). Therefore, the 5 images taken with CHRIS were not of the exact same area. Forward scans would show an area starting with the target and moving in the flight direction. Backward scans would also start at the target and move in the opposite of the flight direction. A patch in RAM has been uploaded with a configurable time offset, that will correct the values obtained from the ACNS. This patch successfully adjusts the start time of the CHRIS imaging, such that the target is located in the centre of the image. Depending on the image taken (e.g. number of lines), the time offset needed can be up to 5 seconds for a 10 second image. Furthermore, the presence of this patch provides the spacecraft operators to choose between overlapping images (images of the same area taken under different angles) or to pave the images in order to increase the actual field of view.

10 Thermal Subsystem (CHRIS) In orbit results: CHRIS Temperature Transient from Bdot to Terrestrial CHRIS temperature ( C) Measurements versus simulation results hours in terrestrial temperature ( C) COLD_MODEL_CHRIS 2.0 HOT_MODEL_CHRIS MEASURED_CHRIS orbit time (minutes)

11 Instruments

12 High Resolution Camera High Resolution Camera (HRC) Panchromatic 3D Packaging Technology CCD Fixed target pointing Strong requirements platform stability 8 m ground resolution Image size 4 x 4 km

13 Terrestrial : Fixed target pointing Fixed target pointing Used for HRC and WAC imaging and optimal ground contact HRC: 8 m resolution Off-track pointing of 25 possible HRC Image Line-of-sight of imager 4 km No scanning: ground speed = 0 m/sec

14 High Resolution Camera results

15 CHRIS Compact High Resolution Imaging Spectrometer (CHRIS) Bi-directional Reflectance Distribution Function measurements 19 spectral bands ( nm) Push-broom 20 m resolution Image size 15 x 15 km

16 Imaging mode: CHRIS BRDF images Terrestrial : Imaging 5 images per sequence in observation cone with 55 co-elevation angle Motion compensation of factor 5 wrt traditional push-broom! images takes 10 seconds 20 m resolution Off-track pointing of 25 possible Image5 Image4 Image3 Image2 Image1 End imaging Begin imaging Line-of-sight of imager 15km Scanning speed = 1/5 of spacecraft ground speed

17 Earth targetting Target prediction r r REL T cosγ = r r = REL T r r REL REL r T r T User-selected imaging target γ max Observation Cone γ Pitch r REL r Spacecraft Find the extrema of cosγ r T γ* d cosγ dt = 0 A( t)cosu( t) + B( t)sinu( t) = 0 α OBS Earth Prediction of the satellite flying by a target over the next day within some Roll constraints. Fine prediction and count down for fixed target pointing and CHRIS imaging. Used for sorting/selecting multiple targets and implement command sequence relative to fly-by (e.g switch on camera 100 sec before image taking).

18 Conclusion The PROBA mission - although designed as a technology demonstrator with a lifetime of 1 year has demonstrated adequate capabilities for science, disaster monitoring, education and outreach by the Earth observation community. The life time can be further extended for a period of at least 2 years (this extension is based on the status of the limited life on board items not on reliability estimation). The extension would require adequate support to cover technical support from project at ESTEC and industry in addition to the operation of the ground segment elements at Redu, Sira, RSAC, ESRIN. Depending on the mode of operations PROBA can support EO needs with a capability ranging from 2 sets of 5 multi-spectral, multi-angle scientific images to 50 push-broom 3 bands pseudo-colour images per day (depending on viewing opportunities and ground station visibility). Additional capability would require modification of the ground station locations.

The AEOLUS Mission - In Orbit Commissioning and Verification

The AEOLUS Mission - In Orbit Commissioning and Verification The AEOLUS Mission - In Orbit Commissioning and Verification ADM-Aeolus CAL/VAL Workshop, ESRIN P McGoldrick, J Brewster, J Marshall, F Fabre Airbus Defence and Space, UK and France 12 th February 2015

More information

Update on the In-orbit Performances of GIOVE Clocks

Update on the In-orbit Performances of GIOVE Clocks Update on the In-orbit Performances of GIOVE Clocks Pierre Waller, Francisco Gonzalez, Stefano Binda, ESA/ESTEC Ilaria Sesia, Patrizia Tavella, INRiM Irene Hidalgo, Guillermo Tobias, GMV Abstract The Galileo

More information

Integral in Orbit* The Integral satellite was launched on 17 October 2002, at

Integral in Orbit* The Integral satellite was launched on 17 October 2002, at * The Integral satellite was launched on 17 October 2002, at 4:41 Universal Time, from Baikonur aboard a Proton rocket. The flawless launch marked the culmination of more than a decade of work for the

More information

SP-1291 June Mars Express. The Scientific Investigations

SP-1291 June Mars Express. The Scientific Investigations SP-1291 June 2009 Mars Express The Scientific Investigations Operations and Archiving Mars Express Science Planning and Operations R. Pischel & T. Zegers ESA/ESTEC, Research and Scientific Support Department,

More information

Five Years Orbit Experience of a Small Satellite Hyperspectral Imaging Mission

Five Years Orbit Experience of a Small Satellite Hyperspectral Imaging Mission SSC07-VIII-3 Five Years Orbit Experience of a Small Satellite Hyperspectral Imaging Mission Dr Mike A Cutter & Prof Sir Martin Sweeting Surrey Satellite Technology Ltd, Tycho House, 20 Stephenson Road,

More information

No End of Push-broom Operations

No End of Push-broom Operations Page 1 of 5 ESA Science & Technology 06-Mar-2006 17:30:17 No. 46 - End of Push-broom Operations 23 Dec 2005 Report for period 21 November to 18 December 2005 Smart-1 push-broom operations have continued

More information

The European Student Moon Orbiter (ESMO) A Small Mission for Education, Outreach, and Science

The European Student Moon Orbiter (ESMO) A Small Mission for Education, Outreach, and Science (ESMO) A Small Mission for Education, Outreach, and Science Roger Walker, Matthew Cross Education Projects Unit, ESA Education Office ESTEC, Noordwijk, The Netherlands LEAG-ILEWG-SRR Meeting Cape Canaveral,

More information

Figure 1. View of ALSAT-2A spacecraft

Figure 1. View of ALSAT-2A spacecraft ALSAT-2A TRANSFER AND FIRST YEAR OPERATIONS M. Kameche (1), A.H. Gicquel (2), D. Joalland (3) (1) CTS/ASAL, 1 Avenue de la Palestine, BP 13, Arzew 31200 Oran, Algérie, email:mo_kameche@netcourrier.com

More information

The post launch assessment review confirmed the following previous assertions about the mission status:

The post launch assessment review confirmed the following previous assertions about the mission status: 1 GRACE Newsletter No. 2 August 15, 2003 Topics: http://www.csr.utexas/grace/ http://www.gfz-potsdam.de/grace 1. Editorial 2. Major events in Mission Operations since last Newsletter 3. Current status

More information

Science planning and operations for Mars Express

Science planning and operations for Mars Express Science planning and operations for Mars Express René Pischel and Tanja Zegers ESA/ESTEC, Research and Scientific Support Department, Postbus 299, 2200 AG Noordwijk, The Netherlands I. Introduction The

More information

End of Life Re-orbiting The Meteosat-5 Experience

End of Life Re-orbiting The Meteosat-5 Experience End of Life Re-orbiting The Meteosat-5 Experience Milan EUMETSAT, Darmstadt, Germany This article illustrates the orbit maneuver sequence performed during Meteosat- 5 End of Life (EOL) re-orbiting operations

More information

Updates on CMA FENGYUN Meteorological Satellite Programs

Updates on CMA FENGYUN Meteorological Satellite Programs Updates on CMA FENGYUN Meteorological Satellite Programs Peng ZHANG National Satellite Meteorological Center, China Meteorological Administration (NSMC/CMA) 29 Nov. - 5 Dec. 2017, Darmstadt, Germany 1.

More information

Toshinori Kuwahara*, Yoshihiro Tomioka, Yuta Tanabe, Masato Fukuyama, Yuji Sakamoto, Kazuya Yoshida, Tohoku University, Japan

Toshinori Kuwahara*, Yoshihiro Tomioka, Yuta Tanabe, Masato Fukuyama, Yuji Sakamoto, Kazuya Yoshida, Tohoku University, Japan Toshinori Kuwahara*, Yoshihiro Tomioka, Yuta Tanabe, Masato Fukuyama, Yuji Sakamoto, Kazuya Yoshida, Tohoku University, Japan The 3 rd Nano-Satellite Symposium Micro/Nano Satellite & Debris Issues December

More information

The Interstellar Boundary Explorer (IBEX) Mission Design: A Pegasus Class Mission to a High Energy Orbit

The Interstellar Boundary Explorer (IBEX) Mission Design: A Pegasus Class Mission to a High Energy Orbit The Interstellar Boundary Explorer (IBEX) Mission Design: A Pegasus Class Mission to a High Energy Orbit Ryan Tyler, D.J. McComas, Howard Runge, John Scherrer, Mark Tapley 1 IBEX Science Requirements IBEX

More information

SREM: 8 years experience of radiation monitoring with a standard instrument

SREM: 8 years experience of radiation monitoring with a standard instrument SREM: 8 years experience of radiation monitoring with a standard instrument H.D.R. Evans 1, E.J. Daly 1, P. Nieminen 1, W. Hajdas 2, A. Mohammadzadeh 1, D. Rodgers 1 1 ESA/ESTEC, The Netherlands, 2 PSI,

More information

DETERMINATION OF SCIAMACHY LINE-OF-SIGHT MISALIGNMENTS

DETERMINATION OF SCIAMACHY LINE-OF-SIGHT MISALIGNMENTS DETERMINATION OF SCIAMACHY LINE-OF-SIGHT MISALIGNMENTS Manfred Gottwald (1), Eckhart Krieg (1), Sander Slijkhuis (1), Christian von Savigny (2), Stefan Noël (2), Heinrich Bovensmann (2), Klaus Bramstedt

More information

Calibration of MERIS on ENVISAT Status at End of 2002

Calibration of MERIS on ENVISAT Status at End of 2002 Calibration of MERIS on ENVISAT Status at End of 2002 Bourg L. a, Delwart S. b, Huot J-P. b a ACRI-ST, 260 route du Pin Montard, BP 234, 06904 Sophia-Antipolis Cedex, France b ESA/ESTEC, P.O. Box 299,

More information

Venus Express: Results, Status and Future Plans

Venus Express: Results, Status and Future Plans Venus Express: Results, Status and Future Plans Håkan Svedhem ESA/ESTEC Present Status The spacecraft and its payload in general is in a good condition, with the following remarks: One of the two coolers

More information

OptElec: an Optimisation Software for Low-Thrust Orbit Transfer Including Satellite and Operation Constraints

OptElec: an Optimisation Software for Low-Thrust Orbit Transfer Including Satellite and Operation Constraints OptElec: an Optimisation Software for Low-Thrust Orbit Transfer Including Satellite and Operation Constraints 7th International Conference on Astrodynamics Tools and Techniques, DLR, Oberpfaffenhofen Nov

More information

A Concept of Nanosatellite Small Fleet for Earth Observation

A Concept of Nanosatellite Small Fleet for Earth Observation A Concept of Nanosatellite Small Fleet for Earth Observation Prof. Janusz Narkiewicz jnark@meil.pw.edu.pl Sebastian Topczewski stopczewski@meil.pw.edu.pl Mateusz Sochacki msochacki@meil.pw.edu.pl 10-11

More information

F. Letterio, S. Tonetti, S. Cornara, G. Vicario presented by Mariano Sánchez Nogales

F. Letterio, S. Tonetti, S. Cornara, G. Vicario presented by Mariano Sánchez Nogales DESEO Design Engineering F. Letterio, S. Tonetti, S. Cornara, G. Vicario presented by Mariano Sánchez Nogales DEIMOS Space S.L.U., Spain - 1 - Table of Contents DESEO Overview Toolkit Heritage Software

More information

Orbit Design Marcelo Suárez. 6th Science Meeting; Seattle, WA, USA July 2010

Orbit Design Marcelo Suárez. 6th Science Meeting; Seattle, WA, USA July 2010 Orbit Design Marcelo Suárez Orbit Design Requirements The following Science Requirements provided drivers for Orbit Design: Global Coverage: the entire extent (100%) of the ice-free ocean surface to at

More information

Angelika Dehn Rob Koopman 10 Years GOME on ERS-2 Workshop

Angelika Dehn Rob Koopman 10 Years GOME on ERS-2 Workshop Angelika Dehn (ADehn@serco.it), Rob Koopman (Rob.Koopman@esa.int), Overview I. ERS-2 Mission History 1. Mission Plan Highlights 2. GOME Special Operations II. GOME-1 Engineering Performance 1. Routine

More information

The In-Orbit Commissioning of MSG-1

The In-Orbit Commissioning of MSG-1 Earth Observation The In-Orbit Commissioning of MSG-1 MSG Project Team, Earth Observation Projects Department, ESA Directorate of Earth Observation, ESTEC, Noordwijk, The Netherlands 80 esa bulletin 114

More information

BRITE One Year in Orbit

BRITE One Year in Orbit BRITE One Year in Orbit O. Koudelka, M.Unterberger, P.Romano Graz University of Technology W.Weiss, R.Kuschnig University of Vienna 1 Contents Scientific Goals Mission Description Commissioning Science

More information

BOWSER Balloon Observatory for Wavelength and Spectral Emission Readings

BOWSER Balloon Observatory for Wavelength and Spectral Emission Readings COSGC Space Research Symposium 2009 BOWSER Balloon Observatory for Wavelength and Spectral Emission Readings BOWSER 1 Mission Premise 4.3 km above sea level 402.3km above sea level BOWSER 2 Information

More information

The Orbit Control of ERS-1 and ERS-2 for a Very Accurate Tandem Configuration

The Orbit Control of ERS-1 and ERS-2 for a Very Accurate Tandem Configuration The Orbit Control of ERS-1 and ERS-2 for a Very Accurate Tandem Configuration Mats Rosengren European Space Operations Centre Robert Bosch Str 5 D64293 Darmstadt Germany Email: mrosengr@esoc.esa.de Abstract

More information

HYPER Industrial Feasibility Study Final Presentation Orbit Selection

HYPER Industrial Feasibility Study Final Presentation Orbit Selection Industrial Feasibility Study Final Presentation Orbit Selection Steve Kemble Astrium Ltd. 6 March 2003 Mission Analysis Lense Thiring effect and orbit requirements Orbital environment Gravity Atmospheric

More information

Anomaly Investigations. The following anomalies have occurred since Launch : SDPSS DPC4 error

Anomaly Investigations. The following anomalies have occurred since Launch : SDPSS DPC4 error User Workshop ESRIN 2005 Anomaly Investigations The following anomalies have occurred since Launch : SDPSS DPC4 error Anomaly Investigations The following anomalies have occurred since Launch : SDPSS DPC4

More information

FLEX MISSION: FLORIS Instrument

FLEX MISSION: FLORIS Instrument FLEX MISSION: FLORIS Instrument Primo Workshop su Data Exploitation della missione PRISMA, precursore delle missioni iperspettrali nazionali ASI Roma, 2 Marzo 2017 An ESA Earth Explorer Mission to observe

More information

ADVANCES AND LIMITATIONS IN A PARAMETRIC GEOMETRIC CORRECTION OF CHRIS/PROBA DATA

ADVANCES AND LIMITATIONS IN A PARAMETRIC GEOMETRIC CORRECTION OF CHRIS/PROBA DATA ADVANCES AND LIMITATIONS IN A PARAMETRIC GEOMETRIC CORRECTION OF CHRIS/PROBA DATA Luis Alonso, José Moreno LEO Group, Dpt. de Termodinamica, Univ. Valencia, Dr. Moliner 50, 46100 Burjassot, Spain, Email:luis.alonso@uv.es

More information

Spacecraft Bus / Platform

Spacecraft Bus / Platform Spacecraft Bus / Platform Propulsion Thrusters ADCS: Attitude Determination and Control Subsystem Shield CDH: Command and Data Handling Subsystem Payload Communication Thermal Power Structure and Mechanisms

More information

OUT-OF-PLANE MANOEUVRE CAMPAIGNS FOR METOP-A: PLANNING, MODELLING, CALIBRATION AND RECONSTRUCTION. +49(0) ,

OUT-OF-PLANE MANOEUVRE CAMPAIGNS FOR METOP-A: PLANNING, MODELLING, CALIBRATION AND RECONSTRUCTION. +49(0) , OUT-OF-PLANE MANOEUVRE CAMPAIGNS FOR METOP-A: PLANNING, MODELLING, CALIBRATION AND RECONSTRUCTION Francisco Sancho (1), David Lázaro (2), Pier Luigi Righetti (3) (1) GMV at EUMETSAT, Eumetsat-Allee 1,

More information

Newsletter of the INTEGRAL Science Operations Centre

Newsletter of the INTEGRAL Science Operations Centre Newsletter of the INTEGRAL Science Operations Centre No. 4 January 2002 Foreword Christoph Winkler - Project Scientist Status of spacecraft and payload Astrid Orr - Operations Scientist During the past

More information

JUICE/Laplace Mission Summary & Status

JUICE/Laplace Mission Summary & Status JUICE/Laplace Mission Summary & Status C. Erd JUICE Instrument WS, Darmstadt 9/11/2011 Activities during the Reformulation Phase 1. Feasible JGO s/c as a starting point a. no re-design of s/c necessary

More information

FIBER OPTIC GYRO-BASED ATTITUDE DETERMINATION FOR HIGH- PERFORMANCE TARGET TRACKING

FIBER OPTIC GYRO-BASED ATTITUDE DETERMINATION FOR HIGH- PERFORMANCE TARGET TRACKING FIBER OPTIC GYRO-BASED ATTITUDE DETERMINATION FOR HIGH- PERFORMANCE TARGET TRACKING Elias F. Solorzano University of Toronto (Space Flight Laboratory) Toronto, ON (Canada) August 10 th, 2016 30 th AIAA/USU

More information

GOME-2 processor version 7 for reprocessing campaign R3 - Lessons learnt from CalVal

GOME-2 processor version 7 for reprocessing campaign R3 - Lessons learnt from CalVal GOME-2 processor version 7 for reprocessing campaign R3 - Lessons learnt from CalVal Ruediger Lang, Gabriele Poli, Christian Retscher, Rasmus Lindstrot, Roger Huckle, Martin Tschimmel and Rosemary Munro

More information

ACHIEVING THE ERS-2 ENVISAT INTER-SATELLITE INTERFEROMETRY TANDEM CONSTELLATION.

ACHIEVING THE ERS-2 ENVISAT INTER-SATELLITE INTERFEROMETRY TANDEM CONSTELLATION. ACHIEVING THE ERS-2 ENVISAT INTER-SATELLITE INTERFEROMETRY TANDEM CONSTELLATION M. A. Martín Serrano (1), M. A. García Matatoros (2), M. E. Engdahl (3) (1) VCS-SciSys at ESA/ESOC, Robert-Bosch-Strasse

More information

DE-ORBITATION STUDIES AND OPERATIONS FOR SPIRALE GTO SATELLITES

DE-ORBITATION STUDIES AND OPERATIONS FOR SPIRALE GTO SATELLITES DE-ORBITATION STUDIES AND OPERATIONS FOR SPIRALE GTO SATELLITES François BONAVENTURE (1), Slim LOCOCHE (2), Anne-Hélène GICQUEL (3) (1) Tel. (+33) (0)5 62 19 74 27, E-mail. francois.bonaventure@astrium.eads.net

More information

THE MICRO ADVANCED STELLAR COMPASS FOR ESA S PROBA 2 MISSION

THE MICRO ADVANCED STELLAR COMPASS FOR ESA S PROBA 2 MISSION THE MICRO ADVANCED STELLAR COMPASS FOR ESA S PROBA 2 MISSION P.S. Jørgensen (1), J.L. Jørgensen (1), T. Denver (1), Pieter van den Braembuche (2) (1) Technical University of Denmark, Ørsted*DTU, Measurement

More information

ESA Radiation, Charging, Meteoroid and Debris Monitors

ESA Radiation, Charging, Meteoroid and Debris Monitors ESA Radiation, Charging, Meteoroid and Debris Monitors G. Drolshagen (TOS-EMA) A. Ciccolella (TOS-EEE) A. Mohammadzadeh (TOS-QCA) D. Raboso (TOS-ETL) P. Nieminen (TOS-EMA) 7 December 2001 SW Final Presentation,

More information

The E-SAIL programme. 10th IAA Symposium on Small Satellites for Earth Observation April 20-24, 2015 Berlin LuxSpace s.à.r.

The E-SAIL programme. 10th IAA Symposium on Small Satellites for Earth Observation April 20-24, 2015 Berlin LuxSpace s.à.r. The E-SAIL programme 10th IAA Symposium on Small Satellites for Earth Observation April 20-24, 2015 Berlin LuxSpace s.à.r.l An OHB company Contents LuxSpace Background Consortium Spacecraft Specific issues

More information

CHAPTER 3 PERFORMANCE

CHAPTER 3 PERFORMANCE PERFORMANCE 3.1 Introduction The LM-3A performance figures given in this chapter are based on the following assumptions: Launching from XSLC (Xichang Satellite Launch Center, Sichuan Province, China),

More information

Usage of IGS TEC Maps to explain RF Link Degradations by Spread-F, observed on Cluster and other ESA Spacecraft

Usage of IGS TEC Maps to explain RF Link Degradations by Spread-F, observed on Cluster and other ESA Spacecraft Usage of IGS TEC Maps to explain RF Link Degradations by Spread-F, observed on Cluster and other ESA Spacecraft J. Feltens, J. Dow, G. Billig, D. Fornarelli, S. Pallaschke, B. Smeds, H.-J. Volpp, P. Escoubet,

More information

Proba-3 mission and the ASPIICS coronagraph

Proba-3 mission and the ASPIICS coronagraph Proba-3 mission and the ASPIICS coronagraph Marek Stęślicki 1 and the Proba-3 SWT 1 Space Research Centre Polish Academy of Sciences General objectives The Proba-3 project aims: To develop and demonstrate

More information

Aeolus ESA s Wind Lidar Mission: Objectives, Design & Status

Aeolus ESA s Wind Lidar Mission: Objectives, Design & Status Aeolus ESA s Wind Lidar Mission: Objectives, Design & Status Anne Grete Straume on behalf of Anders Elfving European Space Agency/ESTEC Working Group on Space-based Lidar Winds Boulder, 28/04/2015 Atmospheric

More information

Solar Cycle 24 Variability Observed by Aura OMI Matthew DeLand and Sergey Marchenko Science Systems and Applications, Inc. (SSAI)

Solar Cycle 24 Variability Observed by Aura OMI Matthew DeLand and Sergey Marchenko Science Systems and Applications, Inc. (SSAI) Solar Cycle 24 Variability Observed by Aura OMI Matthew DeLand and Sergey Marchenko Science Systems and Applications, Inc. (SSAI) 2014 SORCE Science Meeting Cocoa Beach, FL 28-31 January 2014 Solar Measurements

More information

Formation Flying and Rendezvous and Docking Simulator for Exploration Missions (FAMOS-V2)

Formation Flying and Rendezvous and Docking Simulator for Exploration Missions (FAMOS-V2) Formation Flying and Rendezvous and Docking Simulator for Exploration Missions (FAMOS-V2) Galder Bengoa, F. Alonso, D. García, M. Graziano (GMV S.A.) Dr. Guillermo Ortega (ESA/ESTEC) 2nd ESA Workshop on

More information

Herschel Science/Instrument Planning and Scheduling. Jon Brumfitt (ESAC) SCIOPS September 2013

Herschel Science/Instrument Planning and Scheduling. Jon Brumfitt (ESAC) SCIOPS September 2013 Herschel Science/Instrument Planning and Scheduling Jon Brumfitt (ESAC) SCIOPS-2013 11 September 2013 Herschel Space Observatory Far infrared & sub-mm Telescope diameter Instruments Launch date End of

More information

SciBox, a Proven Automated Planning and Commanding System

SciBox, a Proven Automated Planning and Commanding System SciBox, a Proven Automated Planning and Commanding System Teck Choo, Edward Russell, Michael Kim February 25, 2014 2014 by The Johns Hopkins University/Applied Physics Laboratory. Published by The Aerospace

More information

mission status & ISRU related activity in Japan

mission status & ISRU related activity in Japan SELENE mission status & ISRU related activity in Japan JAXA SELENE project Oct. 2, 2007 SELENE Kaguya overview Plasma Energy Angle and Composition Experiment (PACE) Upper Atmosphere and Plasma Imager (UPI)

More information

RELATIVE MISSION ANALYSIS FOR PROBA 3: SAFE ORBITS AND CAM

RELATIVE MISSION ANALYSIS FOR PROBA 3: SAFE ORBITS AND CAM 5TH INTERNATIONAL CONFERENCE ON SPACECRAFT FORMATION FLYING MISSIONS AND TECHNOLOGIES RELATIVE MISSION ANALYSIS FOR PROBA 3: SAFE ORBITS AND CAM Munich, 31 st May 2013 T. V. Peters D. Escorial Presented

More information

Presentation by Indian Delegation. to 49 th STSC UNCOPUOS. February 2012 Vienna

Presentation by Indian Delegation. to 49 th STSC UNCOPUOS. February 2012 Vienna Presentation by Indian Delegation to 49 th STSC UNCOPUOS February 2012 Vienna ASTROSAT Astrosat is India s first dedicated multiwavelength astronomy satellite with a capability to observe target sources

More information

CHAPTER 3 PERFORMANCE

CHAPTER 3 PERFORMANCE PERFORMANCE 3.1 Introduction The LM-3B performance figures given in this chapter are based on the following assumptions: Launching from XSLC (Xichang Satellite Launch Center, Sichuan Province, China),

More information

A CubeSat Mission for Exoplanet Transit Detection and Astroseismology

A CubeSat Mission for Exoplanet Transit Detection and Astroseismology A CubeSat Mission for Exoplanet Transit Detection and Astroseismology Jeremy Bailey (UNSW, Physics) Steve Tsitas (UNSW, ACSER) Daniel Bayliss (RSAA, ANU) Tim Bedding (Univ. Sydney) ESO Very Large Telescope

More information

CHRIS HYPERSPECTRAL MISSION FIVE YEARS SINCE LAUNCH

CHRIS HYPERSPECTRAL MISSION FIVE YEARS SINCE LAUNCH CHRIS HYPERSPECTRAL MISSION FIVE YEARS SINCE LAUNCH Paul Stephens Dr Mike Cutter Fordate Island, Indonesia Mission Overview Instrument Overview Observation Programme Applications Snapshots Future Plans

More information

SCIAMACHY OPERATIONS IN AN EXTENDED MISSION UP TO 2010

SCIAMACHY OPERATIONS IN AN EXTENDED MISSION UP TO 2010 SCIAMACHY OPERATIONS IN AN EXTENDED MISSION UP TO 2010 Manfred Gottwald (1), Eckhart Krieg (1), Stefan Noël (2), Klaus Bramstedt (2), Heinrich Bovensmann (2) (1) German Aerospace Center, Remote Sensing

More information

EUROSTAR 3000 INCLINED ORBIT MISSION : LIFETIME OPTIMISATION IN CASE OF INJECTION WITH A LOW INCLINATION

EUROSTAR 3000 INCLINED ORBIT MISSION : LIFETIME OPTIMISATION IN CASE OF INJECTION WITH A LOW INCLINATION EUROSTAR 3000 INCLINED ORBIT MISSION : LIFETIME OPTIMISATION IN CASE OF INJECTION WITH A LOW INCLINATION Franck Raballand (1), Julie De Lamarzelle (2), François Bonaventure (3), Anne-Hélène Gicquel (4)

More information

BravoSat: Optimizing the Delta-V Capability of a CubeSat Mission. with Novel Plasma Propulsion Technology ISSC 2013

BravoSat: Optimizing the Delta-V Capability of a CubeSat Mission. with Novel Plasma Propulsion Technology ISSC 2013 BravoSat: Optimizing the Delta-V Capability of a CubeSat Mission with Novel Plasma Propulsion Technology Sara Spangelo, NASA JPL, Caltech Benjamin Longmier, University of Michigan Interplanetary Small

More information

Operational Aspects of Space Weather-Related Missions

Operational Aspects of Space Weather-Related Missions Operational Aspects of Space Weather-Related Missions Richard G. Marsden, ESA/SCI-SH Outline SOHO: Example of Near-Earth Observatory-class Mission Ulysses: Example of Deep Space Monitor-class Mission Solar

More information

On-Orbit Performance of KOMPSAT-2 AOCS Korea Aerospace Research Institute Seung-Wu Rhee, Ph. D.

On-Orbit Performance of KOMPSAT-2 AOCS Korea Aerospace Research Institute Seung-Wu Rhee, Ph. D. SSC07-VII-9 On-Orbit Performance of AOCS 2007. 8. Korea Aerospace Research Institute Seung-Wu Rhee, Ph. D. 1 Program - is Low Earth Orbit Satellite - Mission : Cartographic Mission of Korean Peninsula

More information

TRUTHS-Lite: A Microsatellite Based Climate Benchmark Mission

TRUTHS-Lite: A Microsatellite Based Climate Benchmark Mission IAA-B10-0404 TRUTHS-Lite: A Microsatellite Based Climate Benchmark Mission Craig Underwood 1, Nigel Fox 2, Javier Gorroño 2 1 Surrey Space Centre, University of Surrey, Guildford, Surrey, GU2 7XH, UK 2

More information

The Air Force Association 1501 Lee Highway, Arlington, Virginia

The Air Force Association 1501 Lee Highway, Arlington, Virginia The Air Force Association 1501 Lee Highway, Arlington, Virginia 22209-1198 www.afa.org Sample Exercise Synopsis Teams will be required to select a mission orbit for a satellite to measure the height of

More information

GCOM-C/SGLI and its Lunar Calibration

GCOM-C/SGLI and its Lunar Calibration GCOM-C/SGLI and its Lunar Calibration Lunar Calibration Workshop December 1-4, 2014 JAXA/GCOM Proj. Yoshihiko Okamura (okamura.yoshihiko@jaxa.jp) 1. Overview of GCOM-C satellite and SGLI (1) Global Change

More information

SCIAMACHY REFLECTANCE AND POLARISATION VALIDATION: SCIAMACHY VERSUS POLDER

SCIAMACHY REFLECTANCE AND POLARISATION VALIDATION: SCIAMACHY VERSUS POLDER SCIAMACHY REFLECTANCE AND POLARISATION VALIDATION: SCIAMACHY VERSUS POLDER L. G. Tilstra (1), P. Stammes (1) (1) Royal Netherlands Meteorological Institute (KNMI), P.O. Box 201, 3730 AE de Bilt, The Netherlands

More information

BepiColombo. Project and MPO Status. Comprehensive Explora1on of Planet Mercury

BepiColombo. Project and MPO Status. Comprehensive Explora1on of Planet Mercury BepiColombo Project and MPO Status Comprehensive Explora1on of Planet Mercury Joe Zender BepiColombo Deputy PS, ESA/ESTEC BepiColombo Previously: Ø Proba2 Science Coordinator, until 12/2013 Ø ProbaV, Project

More information

Orbit Evolution of the Swarm Mission Detlef Sieg

Orbit Evolution of the Swarm Mission Detlef Sieg Orbit Evolution of the Swarm Mission Detlef Sieg Content Orbit history absolute Aerodynamic scale factors from orbit determination Altitude history and prediction RAAN/LTAN (orbit plane rotation) Orbital

More information

Sentinel-5 Precursor: Preparing the first Copernicus Atmospheric Mission

Sentinel-5 Precursor: Preparing the first Copernicus Atmospheric Mission Sentinel-5 Precursor: Preparing the first Copernicus Atmospheric Mission Herbert Nett 1, Kevin McMullan 1, Paul Ingmann 1, Thorsten Fehr 2 (1) ESA/ESTEC, Keplerlaan 1, NL-2201 AZ Noordwijk (2) ESA/ESRIN,

More information

Goddard Space Flight Center

Goddard Space Flight Center 1 Solar Coronagraphs Observe off-disk coronal emissions from Sun. Dominant noise source: Diffraction of on-disk light around the occulter Vignetting on externally occulted coronagraphs Noise inversely

More information

HICO Mission Planning and Operations

HICO Mission Planning and Operations HICO Mission Planning and Operations Ellen J. Wagner and Marcos Montes Naval Research Laboratory ellen.wagner@nrl.navy.mil Oregon State Selecting Targets: Part 1 Request through OSU web site Choose coordinates

More information

Aerobraking A mission enabling and fuel saving technique for orbit changes - Venus Express and ExoMars TGO. Håkan Svedhem ESA/ESTEC

Aerobraking A mission enabling and fuel saving technique for orbit changes - Venus Express and ExoMars TGO. Håkan Svedhem ESA/ESTEC ILEWG Aerobraking A mission enabling and fuel saving technique for orbit changes - Venus Express and ExoMars TGO Håkan Svedhem ESA/ESTEC ILEWG Earth Venus Trajectory 2 ILEWG Reducing Apocentre altitude

More information

Attitude Control Simulator for the Small Satellite and Its Validation by On-orbit Data of QSAT-EOS

Attitude Control Simulator for the Small Satellite and Its Validation by On-orbit Data of QSAT-EOS SSC17-P1-17 Attitude Control Simulator for the Small Satellite and Its Validation by On-orbit Data of QSAT-EOS Masayuki Katayama, Yuta Suzaki Mitsubishi Precision Company Limited 345 Kamikmachiya, Kamakura

More information

New Worlds Observer Final Report Appendix J. Appendix J: Trajectory Design and Orbit Determination Lead Author: Karen Richon

New Worlds Observer Final Report Appendix J. Appendix J: Trajectory Design and Orbit Determination Lead Author: Karen Richon Appendix J: Trajectory Design and Orbit Determination Lead Author: Karen Richon The two NWO spacecraft will orbit about the libration point created by the Sun and Earth/Moon barycenter at the far side

More information

Study Participants: T.E. Sarris, E.R. Talaat, A. Papayannis, P. Dietrich, M. Daly, X. Chu, J. Penson, A. Vouldis, V. Antakis, G.

Study Participants: T.E. Sarris, E.R. Talaat, A. Papayannis, P. Dietrich, M. Daly, X. Chu, J. Penson, A. Vouldis, V. Antakis, G. GLEME: GLOBAL LIDAR EXPLORATION OF THE MESOSPHERE Project Technical Officer: E. Armandillo Study Participants: T.E. Sarris, E.R. Talaat, A. Papayannis, P. Dietrich, M. Daly, X. Chu, J. Penson, A. Vouldis,

More information

Team X Study Summary for ASMCS Theia. Jet Propulsion Laboratory, California Institute of Technology. with contributions from the Theia Team

Team X Study Summary for ASMCS Theia. Jet Propulsion Laboratory, California Institute of Technology. with contributions from the Theia Team Team X Study Summary for ASMCS Theia Jet Propulsion Laboratory, California Institute of Technology with contributions from the Theia Team P. Douglas Lisman, NASA Jet Propulsion Laboratory David Spergel,

More information

ILWS Related Activities in Germany (Update) Prague, June 11-12, 2008

ILWS Related Activities in Germany (Update) Prague, June 11-12, 2008 ILWS Related Activities in Germany (Update) Prague, June 11-12, 2008 ILWS, DLR, Dr. Frings Overview Update is based on previous ILWS Presentations Focus on recent developments and achievements SOL-ACES

More information

Status of the European Student Moon Orbiter (ESMO) Project:

Status of the European Student Moon Orbiter (ESMO) Project: Status of the European Student Moon Orbiter (ESMO) Project: Roger Walker, Project Manager Education Projects Unit, ESA Education Office, ESTEC 1 What is ESMO? Fourth mission in the ESA Education Satellite

More information

System engineering approach toward the problem of required level of in-orbit autonomousoperation of a LEO microsatellite mission

System engineering approach toward the problem of required level of in-orbit autonomousoperation of a LEO microsatellite mission System engineering approach toward the problem of required level of in-orbit autonomousoperation of a LEO microsatellite mission H.Bonyan Amirkabir University of Technology (AUT) H.Bonyan@dena.aut.ac.ir

More information

A Regional Microsatellite Constellation with Electric Propulsion In Support of Tuscan Agriculture

A Regional Microsatellite Constellation with Electric Propulsion In Support of Tuscan Agriculture Berlin, 20 th - 24 th 2015 University of Pisa 10 th IAA Symposium on Small Satellites for Earth Observation Student Conference A Regional Microsatellite Constellation with Electric Propulsion In Support

More information

AN UPDATE OF MICROCARB PROJECT PROGRESS AND PERSPECTIVE.

AN UPDATE OF MICROCARB PROJECT PROGRESS AND PERSPECTIVE. AN UPDATE OF MICROCARB PROJECT PROGRESS AND PERSPECTIVE. PROJECT STATUS Francois BUISSON CNES Francois-Marie BREON - LSCE June 8th, 2017 1 13th IWGGMS Helsinki June 6-8, 2017 PROJECT IMPLEMENTATION STATUS

More information

Rosetta Optical Navigation

Rosetta Optical Navigation Rosetta Optical Navigation Mathias Lauer ESA / ESOC / Flight Dynamics Page 1 Overview Rosetta: Mission and Spacecraft Asteroid Flybys (Steins): - Scenario - Navigation Strategy - Image Processing - Autonomous

More information

NAVIGATION & MISSION DESIGN BRANCH

NAVIGATION & MISSION DESIGN BRANCH c o d e 5 9 5 National Aeronautics and Space Administration Michael Mesarch Michael.A.Mesarch@nasa.gov NAVIGATION & MISSION DESIGN BRANCH www.nasa.gov Outline Orbital Elements Orbital Precession Differential

More information

Flight S4-002 Status of Hayabusa2: Asteroid Sample Return Mission to C-type Asteroid Ryugu. Yuichi Tsuda, Makoto Yoshikawa (ISAS/JAXA)

Flight S4-002 Status of Hayabusa2: Asteroid Sample Return Mission to C-type Asteroid Ryugu. Yuichi Tsuda, Makoto Yoshikawa (ISAS/JAXA) Flight S4-002 Status of Hayabusa2: Asteroid Sample Return Mission to C-type Asteroid Ryugu Yuichi Tsuda, Makoto Yoshikawa (ISAS/JAXA) Highlights of Hayabusa2 Hayabusa2 is the 2nd Japanese sample return

More information

Announcement of Opportunity AKARI (ASTRO-F)

Announcement of Opportunity AKARI (ASTRO-F) Announcement of Opportunity AKARI (ASTRO-F) CALL FOR OBSERVING PROPOSALS for the AKARI Post-Helium (phase 3) mission 2 nd year of Operations (October 2009 October 2010) Policies and procedures 27 May 2009

More information

624 SNPP VIIRS Solar Diffuser BRDF Degradation Trend Changes in Early Evan Haas* and Frank De Luccia The Aerospace Corporation, El Segundo CA

624 SNPP VIIRS Solar Diffuser BRDF Degradation Trend Changes in Early Evan Haas* and Frank De Luccia The Aerospace Corporation, El Segundo CA 624 SNPP VIIRS Solar Diffuser BRDF Degradation Trend Changes in Early 2014 1. INTRODUCTION Evan Haas* and Frank De Luccia The Aerospace Corporation, El Segundo CA The Visible Infrared Imaging Radiometer

More information

Improving Space Surveillance with Space-Based Visible Sensor

Improving Space Surveillance with Space-Based Visible Sensor Improving Space Surveillance with Space-Based Visible Sensor Jayant Sharma, Andrew Wiseman, and George Zollinger MIT Lincoln Laboratory Abstract The Midcourse Space Experiment satellite was launched in

More information

Sub-millimeter size debris monitoring system with IDEA OSG 1

Sub-millimeter size debris monitoring system with IDEA OSG 1 Sub-millimeter size debris monitoring system with IDEA OSG 1 Masahiko Uetsuhara, Mitsunobu Okada, Yasunori Yamazaki, Astroscale Pte. Ltd. Toshiya Hanada Kyushu University ABSTRACT The 20-kg class microsatellite

More information

VNREDSat-1. Vietnam Natural Resources, Environment and Disaster monitoring Satellite. Lai Anh Khoi SPACE TECHNOLOGY INSTITUTE

VNREDSat-1. Vietnam Natural Resources, Environment and Disaster monitoring Satellite. Lai Anh Khoi SPACE TECHNOLOGY INSTITUTE VNREDSat-1 Vietnam Natural Resources, Environment and Disaster monitoring Satellite Lai Anh Khoi SPACE TECHNOLOGY INSTITUTE JPTM2014 Yangon, Nov. 19-21, 2014 General information (1) Project Owner: Vietnam

More information

BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN. Jose Sergio Almeida INPE (Brazil)

BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN. Jose Sergio Almeida INPE (Brazil) BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN Jose Sergio Almeida INPE (Brazil) 1 st International Academy of Astronautics Latin American Symposium on Small

More information

Julia Figa-Saldaña & Klaus Scipal

Julia Figa-Saldaña & Klaus Scipal Julia Figa-Saldaña & Klaus Scipal julia.figa@eumetsat.int klaus.scipal@esa.int C. Anderson, F. Fois, C. Lin, M. Loiselet, F. Ticconi, J.J.W. Wilson Meeting, Outline Overview and objectives of European

More information

Appendix O. Implementation of the Equation of Time in Sun Synchronous Orbit Modelling and ESARAD Planet Temperature Mapping Error at the Poles

Appendix O. Implementation of the Equation of Time in Sun Synchronous Orbit Modelling and ESARAD Planet Temperature Mapping Error at the Poles 197 Appendix O Implementation of the Equation of Time in Sun Synchronous Orbit Modelling and ESARAD Planet Temperature Mapping Error at the Poles Arne Sauer (EADS Astrium, Germany) 198 Abstract The Equation

More information

Venus Express Aerobraking and End of Mission

Venus Express Aerobraking and End of Mission Venus Express Aerobraking and End of Mission Håkan Svedhem ESA/ESTEC Pericentre velocity vs Orbital Period Examples (VEX): Delta-V needed for Reduction of orbital period: 24h-18h 90m/s 18h-16h 42m/s 18h-12h

More information

Julia Figa-Saldaña & Klaus Scipal

Julia Figa-Saldaña & Klaus Scipal Julia Figa-Saldaña & Klaus Scipal julia.figa@eumetsat.int klaus.scipal@esa.int Meeting, Outline MetOp/EPS status MetOp/EPS Second Generation status 2016 scatterometer conference Other European ocean programme

More information

The ACES Mission. Fundamental Physics Tests with Cold Atom Clocks in Space. L. Cacciapuoti European Space Agency

The ACES Mission. Fundamental Physics Tests with Cold Atom Clocks in Space. L. Cacciapuoti European Space Agency The ACES Mission Fundamental Physics Tests with Cold Atom Clocks in Space L. Cacciapuoti European Space Agency La Thuile, 20-27 March 2011 Gravitational Waves and Experimental Gravity 1 ACES Mission Concept

More information

Your Partner in Environment Monitoring

Your Partner in Environment Monitoring Your Partner in Environment Monitoring Radiation Environment in Space The ionizing radiation in space represents one of the most severe environmental loads to space hardware and can cause a large number

More information

Laser de-spin maneuver for an active debris removal mission - a realistic scenario for Envisat

Laser de-spin maneuver for an active debris removal mission - a realistic scenario for Envisat Laser de-spin maneuver for an active debris removal mission - a realistic scenario for Envisat Daniel Kucharski Space Environment Research Centre, Mt Stromlo Observatory, Weston Creek ACT, 2611, AUSTRALIA

More information

Improvement of Himawari-8 observation data quality

Improvement of Himawari-8 observation data quality Improvement of Himawari-8 observation data quality 3 July 2017 Meteorological Satellite Center Japan Meteorological Agency The Japan Meteorological Agency (JMA) plans to modify its Himawari-8 ground processing

More information

The Compact Infrared Imager and Radiometer

The Compact Infrared Imager and Radiometer The Compact Infrared Imager and Radiometer Earth System Science from a 6U nanosat? Neil Bowles (Univ. Oxford) On behalf of the CIIR Consortium. 22 April 2015 CEOI-ST Technology 1 The Why study a tightly

More information

VIIRS SDR Cal/Val: S-NPP Update and JPSS-1 Preparations

VIIRS SDR Cal/Val: S-NPP Update and JPSS-1 Preparations VIIRS SDR Cal/Val: S-NPP Update and JPSS-1 Preparations VIIRS SDR Cal/Val Posters: Xi Shao Zhuo Wang Slawomir Blonski ESSIC/CICS, University of Maryland, College Park NOAA/NESDIS/STAR Affiliate Spectral

More information

Exploring the Mysteries of the Cosmos on the MOST Microsatellite Mission

Exploring the Mysteries of the Cosmos on the MOST Microsatellite Mission Exploring the Mysteries of the Cosmos on the MOST Microsatellite Mission Dr. Simon Grocott Dr. Robert E Zee Dr. Jaymie Matthews Dynacon Inc UTIAS SFL UBC 13 August 2003 Outline MOST (Microvariability and

More information