1 The Holmes Group BP Connect Development Turangi Preliminary Geotechnical Assessment Report

2 The Holmes Group BP Connect Development Turangi Preliminary Geotechnical Assessment Report Prepared By Opus International Consultants Ltd Reviewed By Daniel Vincent Geotechnical Engineer Tauranga Office Gartshore House, Level 3, 116 Cameron Road PO Box 646, Tauranga 3140 New Zealand Telephone: P.P Ash Bowtell Facsimile: Geotechnical Team Leader Date: 6 October 2017 Reference: 2-9Z Status: Issue 1 Approved for Release By Gareth Francis Business Manager - Tauranga Opus International Consultants Ltd 2017

3 BP Connect Development, Turangi - Preliminary Geotechnical Assessment Report i Contents 1 Introduction Site Description Local Geology Geotechnical Investigations Subsurface Conditions Overview Machine Boreholes Cone Penetration Tests Groundwater Geotechnical Considerations Overview Seismicity Compressible Subsoils Building Foundations Underground Fuel Tanks Forecourts & Pavements Stormwater Disposal Recommendations Further Work Building Foundations Conclusions Limitations Z October 2017 Opus International Consultants Ltd

4 BP Connect Development, Turangi - Preliminary Geotechnical Assessment Report 1 1 Introduction Opus International Consultants Limited (Opus) has been engaged by The Holmes Group Limited to undertake geotechnical investigations and preliminary reporting for the proposed BP Connect Development, Turangi. This report herein presents a high level geotechnical risk assessment of the proposed development and provides a preliminary geotechnical assessment of the in-situ ground conditions based on the recent site investigations undertaken at the site, with construction recommendations. This report maybe used to support an application for Resource Consent. 2 Site Description The proposed development site is located in Turangi at the intersection of State Highway 1 and Te Arahori Street. Based on the supplied Technitrades Architecture drawings titled Proposed Service Station Development, Proposed Scheme Plan C with Areas, Drawing No C1, it is understood that a new BP Store with associated underground petrol storage tanks, an 8-lane domino forecourt and a series of 27 carparks and 4 long-term truck parks are proposed. In addition, a new fast-food restaurant (titled QSR) is also proposed. 3 Local Geology The geology of the site is as depicted on the online GNZ Science New Zealand Geology Web Map 1 indicates that the proposed BP site is underlain by late Quaternary alluvium and colluvium, which typically comprises unconsolidated to poorly consolidated mud, sand, gravel and peat. The ground conditions encountered at the recent site investigation locations at the subject site are generally consistent with published geological maps. 4 Geotechnical Investigations The objectives of the preliminary geotechnical investigations was to collect subsoil and groundwater information at the proposed BP Connect site in order to provide information to facilitate preliminary analyses and reporting. The geotechnical investigations were planned and carried out by Opus between 28 August to 30 August 2017 and comprised the following: Three machine boreholes with associated standard penetration testing (SPT) up to 10.0m below ground level; Eight Cone Penetration Tests (CPT s) to 20.0m below ground level, the minimum required depth to assess effects of liquefaction; Installation of a groundwater monitoring standpipe, including one round of monitoring. The locations of the geotechnical investigations are presented on Sheet No C01 within Appendix A. 1 GNS Science New Zealand Geology Web Map, accessed [27 September 2017] 2-9Z October 2017 Opus International Consultants Ltd

5 BP Connect Development, Turangi - Preliminary Geotechnical Assessment Report 2 5 Subsurface Conditions 5.1 Overview The subsurface ground conditions have been interpreted by collating the Opus site investigation information, together with our local knowledge on the geological conditions. The underlying subsoil profile encountered at the exploratory test locations are summarised in the following sections. The machine boreholes are presented within Appendix B, with the CPT test results within Appendix C. 5.2 Machine Boreholes BH01 - BP Connect Location The surficial ground conditions encountered at test location BH01 from ground level to a depth of 6.1m BGL, generally comprised 200mm of topsoil, underlain by loose to medium dense sand, with the presence of some possible organic staining. The dark discolouration depict a possible organic content of these soils, however this has not been quantified at this stage. Typical recorded SPT N values within these materials ranged from 5 to 21 blows per 300mm of penetration. A 600mm layer of silt was encountered at 2.9m BGL, with a recorded SPT N value of 8. From 6.1m BGL, very dense sandy boulder gravel was encountered up to 10.5m BGL where the borehole was terminated. Typical recorded SPT N Values within these materials were >60 blows per 300mm of penetration BH02 Underground Fuel Tank Location The surficial ground conditions encountered at test location BH02 from ground level to a depth of 2.4m BGL, generally comprised 150mm of topsoil, underlain by loose sand with the presence of some possible organic staining. The dark discolouration depict a possible organic content of these soils, however this has not been quantified at this stage. Within the upper 2.4m of the soil column at 0.8m BGL, a 1.2m thick deposit of sandy silt with some possible organic staining was encountered, followed by a 400mm layer of silty sand up to 2.4m BGL. A SPT N value of 4 blows per 300mm of penetration was recorded within these materials. From 2.4m BGL, medium dense to dense silty sand/ sand and very dense fine to medium gravels were encountered up to 10.5m BGL where the borehole was terminated. Typical recorded SPT N values within these materials ranged from 50 to >60 blows per 300mm of penetration BH03 Fast-food Restaurant The ground conditions encountered at test location BH03 from ground level to a depth of 5.1m BGL, generally comprised 100mm of topsoil, underlain by very loose to loose sand with the presence of possible organic stained sand and a 100mm paleosol within the upper 1.0m of the soil column. The dark discolouration depict a possible organic content of these soils, however this has not been quantified at this stage.typical recorded SPT N Values within these materials ranged from 1 to 50 blows per 300mm of penetration. 2-9Z October 2017 Opus International Consultants Ltd

6 BP Connect Development, Turangi - Preliminary Geotechnical Assessment Report 3 From 5.0m BGL, very dense andesite boulders and some gravels were encountered up to 10.5m BGL where the borehole was terminated. Typical recorded SPT N values within these materials ranged from 50 to >60 blows per 300mm of penetration. 5.3 Cone Penetration Tests The surficial ground conditions encountered at test locations CPT01 to CPT06 undertaken at the BP Connect building, forecourt and underground fuel tank locations generally recorded the following. From ground level up to a maximum depth of 1.4m below ground level (BGL) at CPT05 generally comprised loose sands, with some organic lenses. Typical cone resistance values (q c) within these materials ranged between 1.0 and 10.0 MPa. The underlying ground conditions encountered at test locations CPT01 to CPT06 from approximately 1.0m BGL up to a maximum of 6.0m BGL at CPT03, generally comprised medium to dense sands and gravelly sands. Typical cone resistance values (q c) within these materials ranged between 2.0 and 39 MPa. Test location CPT02 encountered clayey silt/ silty clay soils between 3.8m to 5.1m BGL, with typical cone resistance values (q c) within these materials ranging between 1.0 and 5.0 MPa. Test location CPT04 encountered clayey silt/ silty clay soils, with trace of organic soils between 4.8m to 7.5m BGL. Typical cone resistance values (q c) within these materials ranged between <1.0 to 4.0 MPa. Test location CPT07 and CPT08 encountered loose to medium dense sand to clayey sand/ sands from ground level up to a maximum of 2.6m BGL at CPT08. Typical cone resistance values (q c) within these materials ranged between 1.0 MPa and 8.4 MPa. Underlying these materials, soft clayey silt/ silty clay soils were encountered between 2.6m BGL up to a maximum of 4.2m BGL at CPT07, refusing thereafter. Typical cone resistance values (q c) within these materials ranged between <1.0MPa to 6.4MPa. 5.4 Groundwater At test locations CPT07 and CPT08, groundwater was encountered at 3.9m and 4.0m respectively BGL. This reading was undertaken upon completion of CPT probing. Immediately upon completion of drilling works whilst the casing was still present within the boreholes, the boreholes were dipped and groundwater was encountered at depths between 2.2m to 2.8m BGL at boreholes BH01, BH02 and BH03. We envisage the encountered water was remnant drilling fluid. Groundwater monitoring was carried out on 5 September 2017 one week after drilling. At test location BH02, groundwater was observed at 6.51m BGL. 6 Geotechnical Considerations 6.1 Overview Based on our desktop study, preliminary assessment and the results of the recent site investigations, the key geotechnical aspects for the proposed development are as follows: 2-9Z October 2017 Opus International Consultants Ltd

7 BP Connect Development, Turangi - Preliminary Geotechnical Assessment Report 4 Seismicity; Compressible Soils; Building Foundations; Underground Fuel Tanks; Forecourts & Pavements; Stormwater Disposal. 6.2 Seismicity Faulting The online New Zealand Active Faults Database 2 indicates there a two faults within close proximity to the proposed BP Connect Development. The Poutu Fault located approximately 5.0 km to the east of the site is listed as being a normal fault, with a recurrence interval of less than 2,000 years with an unknown slip rate. Another fault located approximately 1.5km to the west of the site named No is listed as being a normal fault with an unknown recurrence interval and slip rate Peak Ground Acceleration We have determined the peak ground acceleration (PGA) using the method outlined in the NZ Transport Agency (NZTA) Bridge Manual 3 as recommended by the New Zealand Geotechnical Society (NZGS) Module1.0 Guidelines 4. The PGA was calculated for both the SLS and ULS cases based on the following: Design Life = 50 years; Assumed Importance Level 2; Seismic subsoil class = Class C; Annual probability of exceedance (SLS) = 1/25; Annual probability of exceedance (ULS) = 1/1000. The calculated PGA for the ULS is case is 0.41g, and 0.10g for the SLS case Liquefaction Potential Based on the absence of groundwater encountered within test locations CPT01 to CPT06, and BH01, whilst considering the depth of groundwater encountered at the remaining test locations BH02, BH03, CPT07 and CPT08. We envisage there is a low risk of liquefaction potential within the surficial 2.5m to 6.0m of soils at the site. The very dense gravel materials encountered within the machine boreholes underlying the surficial soils at 6.0m BGL at CPT01, 2.4m at BGL at BH02 and 5.0m BGL are not considered liquefiable. 2 GNS Science New Zealand Active Fault Database, accessed [28 September 2017] 3 NZ Transport Agency Bridge Manual, May 2016 SP/M/022 4 New Zealand Geotechnical Society, March Earthquake geotechnical engineering practice. Module 1 Overview of the guidelines 2-9Z October 2017 Opus International Consultants Ltd

8 BP Connect Development, Turangi - Preliminary Geotechnical Assessment Report Compressible Subsoils Based on the results from our test locations, there are several layers of compressible soft to firm, loose, and the presence of possible organic stained materials within the surficial soil deposits. The most notable layers are the initial 1.0m-1.5m of compressible soft to firm, loose and possible organic soils which have been recorded at test locations CPT01 to CPT06, BH01 and BH02. In addition, at the location of the proposed fast-food restaurant, BH03 has recorded the surficial 5.1m of soil comprising very loose to loose sand with the presence of possible organic stained sand including a 100mm paleosol. These layers are likely to be highly compressible, which may lead to large static and differential settlements depending on the type of building foundations and loads. 6.4 Building Foundations The proposed building foundation types will be governed by low bearing capacity, static and differential settlement of the in-situ soils. In general, there are shallow and deep foundation options, the former of which will likely require some surficial ground improvement. At this preliminary stage, no detailed foundation design or analyses have been undertaken for the proposed building development, as this report is intend to highlight potential constraints to the proposed development. Once the proposed building footprint layout, detailed structural drawings and foundation loads are known, appropriate foundation recommendations can be assessed during the detailed design phase Shallow Foundations BP Connect Building Shallow foundations such as strip, pad or raft can be utilised if the surficial ground is improved to tolerate potential static and differential settlements, and the bearing capacity of these near surface soils is enhanced. The surficial compressible soft to firm, loose and possible organic stained materials encountered across the site are likely to exhibit large static and differential settlements, therefore it maybe be appropriate to excavate these materials. Based on the preliminary work undertaken, the foundations should not be cast within the 1.0m to 1.5m surficial soils. We anticipate within 1.0m to 1.5m BGL of the surficial soils, the proposed BP Connect building footprint will require some form of undercutting and reinstatement with engineered certified granular fill below the foundation elements. Alternatively, founding at 1.0m to 1.5m BGL if a shallow foundation option is adopted. This will need to be assessed during detailed design Deep Foundations Fast-food Restaurant A piled foundation option will allow the structural loads to be transferred to the ground with lower settlement risks and greater load bearing stratum. Piles would likely need to be embedded into competent ground which is inferred to be present at least 4.0m depth BGL at the fast-food restaurant building location. This will need to be assessed during detailed design. 2-9Z October 2017 Opus International Consultants Ltd

9 BP Connect Development, Turangi - Preliminary Geotechnical Assessment Report Underground Fuel Tanks At this stage, we have not been provided with the structural details of the underground fuel tanks or foundation loads. It is important this information is provided in order to assess foundation requirements for the underground fuel tanks. Particular consideration will need to be given to potential static and differential settlements, bearing capacity and buoyancy uplift. Depending on the founding depth of the proposed fuel tanks, careful consideration will need to be given to the temporary works excavation for the proposed underground fuel tanks. Achieving the required embedment for sheetpiles in this environment maybe challenging to achieve required embedment depths due to very dense gravels, without the implementation of struts and cross bracing. Benching and battering of temporary works excavations maybe a more appropriate method. This will need to be considered by an experienced Contractor during construction. Whilst groundwater was absent from the majority of the site investigation locations, groundwater was encountered 6.1m depth during our groundwater monitoring at test location BH02, which we understand is the likely location of the underground fuel tanks. Depending on the founding depth of the underground fuel tanks, provision for dewatering will need to be considered during construction due to potential groundwater inflows within the temporary works excavation. 6.6 Forecourts & Pavements Based on the site investigation results, it is apparent there are variable compressible soft to firm, loose and possible organic stained materials present across the site. Consideration will need to be given to the design of the forecourts and pavements for the proposed development, as some form of subgrade improvement layer (SIL) or pavement strengthening maybe required. This is due to the heavy vehicle loadings, however this will need to be assessed during detailed design. In addition, site investigations such as Scala Penetrometer and test pit testing will be required to undertake the design of the forecourts and pavements for the proposed development. 6.7 Stormwater Disposal Stormwater requirements are addressed under a separate report undertaken by Opus, the date of issue will be confirmed in due course. Opus are currently in discussion with Taupo District Council regarding stormwater disposal and Council minimum requirements. Additional site specific soakage testing maybe a requirement, however this is yet to be confirmed. It should be noted however that site specific soakage testing will be required for detailed design of stormwater disposal systems. The site investigations indicate the presence of gravelly sand, therefore standard falling head soakage testing using a handauger will likely not penetrate these soils. As such, machine drilling rigs or excavators maybe required to perform this testing during the detailed design phase. 2-9Z October 2017 Opus International Consultants Ltd

10 BP Connect Development, Turangi - Preliminary Geotechnical Assessment Report 7 7 Recommendations 7.1 Further Work This preliminary geotechnical assessment report herein has been prepared to support an application for Resource Consent. As such, it will be necessary to undertake additional geotechnical detailed design and reporting during the next phase in order to support an allocation for Building Consent. Furthermore, detailed pavement and soakage design may need to be undertaken during the detailed design phase. In addition, site investigations such as Scala Penetrometer and test pit testing will be required to undertake the design of the forecourts and pavements for the proposed development. 7.2 Building Foundations At this preliminary stage, at the proposed BP Connect building it maybe more appropriate to undercut and improve the surficial soils 1.0m to 1.5m BGL below the foundation elements (not necessarily the entire building footprint) rather than adopting deep foundations. Whereas, for the proposed fast-food restaurant location it maybe more appropriate to adopt deeper pile foundations to suitable bearing stratum beyond 4.0m depth BGL. This will need to be assessed during detailed design. 8 Conclusions This assessment herein concludes that the proposed BP Connect project is suitable for the intended development, pending further detailed design and site specific investigations in order to support an application for Building Consent. We consider the proposed development addresses the geotechnical specific requirements of the Resource Management Act 1991, Section 106 provided that the risks highlighted herein are suitably managed or mitigated during the subsequent detailed design phase. 9 Limitations The interpretation of ground conditions presented in this report is based on the tests undertaken at discreet locations of the site. Ground conditions may change suddenly over short distances resulting in variations between test positions across the site. Data or opinions in this document may not be relied upon or used out if context, by any other party or for any other purpose without further reference to the Tauranga Geotechnical Section of Opus International Consultants Ltd. It is recognised that the passage of time affects the information and assessment provide in this Document. Opus s opinions are based upon information that existed at the time of the production of this Preliminary Geotechnical Assessment Report. It is understood that the services provided allowed Opus to form no more than an opinion on the actual conditions of the site at the time the site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the site, or its surroundings or any laws or regulations. 2-9Z October 2017 Opus International Consultants Ltd

11

12

13 SW SW SW W W W W W SW SW SW SW SW SW SW W SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SS FH S S S S S S S S S S S WWWW WWWW W W W W W W W W TE ARAHORI STREET STATE HIGHWAY 1 S S S S S S S S S S S S S S BP C STORE S S S S S S S S S S S S S S S S S S S S S S SS S S S SSSS SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SSS SSSS S S S S S S S S S SSSS S S S WWWW WWWW SSSS SITE WORKS Lake Taupo Turangi LOCALITY MAP NOT TO SCALE LEGEND CPT 01 CPT test location BH Machine borehole BH Machine borehole and standpipe piezometer W Notes: Plan based on data supplied by CKL: Coordinate Datum = NZGD 2000 (Tuhirangi Circuit) Original Sheet Size A3 [420x297] Plot Date at 4:15:08 PM Path G:\5project\9Z514.00_BPConnectTurangi\Drawings\(C)Civil\+Civil3D\9Z514_C02.dwg V01 Revision Amendment BH 02 CPT 02 CPT 05 CPT 04 CPT 01 CPT 08 CPT 06 CPT 03 CPT 07 BH 03 BH 01 Approved Revision Date TESTING LOCATION PLAN SCALE A3 1:1000 Designed Tauranga Office PO Box Tauranga 3140 New Zealand Approved Approved Date Project BP CONNECT TURANGI 3 WATER DESIGN STATE HIGHWAY 1 / TE ARAHORI STREET, TURANGI Sheet TEST & SITE LOCATION PLAN FOR INFORMATION D. VINCENT A. BOWTELL Drawn Scales Project No. Sheet. No. Revision H.KOBAYASHI/P. WOHLERS 2-9Z V01 A 0 10 mm mm

14

15

16

17 Proposed Turangi BP Project No: 2-9Z BH-01 Core Photos Page 1 of 2

18 Proposed Turangi BP Project No: 2-9Z BH-01 Core Photos Page 2 of 2

19

20

21 Proposed Turangi BP Project No: 2-9Z BH-02 Core Photos Page 1 of 2

22 Proposed Turangi BP Project No: 2-9Z BH-02 Core Photos Page 2 of 2

23

24

25 Proposed Turangi BP Project No: 2-9Z BH-03 Core Photos Page 1 of 2

26 Proposed Turangi BP Project No: 2-9Z BH-03 Core Photos Page 2 of 2

27

28 Cone resistance (qc) in MPa Sleeve friction (fs) in MPa Dynamic pore pressure (u2) in MPa <- Depth in m to reference level > > > > > > Ref usal ( qc 40+ MPa ) EOH - Dipped - 5.2m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 01 1/6

29 Corrected cone resistance (qt) in MPa Friction ratio (Rf) in % Excess pore pressure (du) in MPa <- Depth in m to reference level > > > > > > Ref usal ( qc 40+ MPa ) EOH - Dipped - 5.2m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 01 2/6

30 Cone resistance (qc) in MPa Sleeve friction (fs) in MPa Dynamic pore pressure (u2) in MPa <- Depth in m to reference level > > 12 -> Ref usal ( qc 40+ MPa ) EOH - Dipped - Collapsed 5.1m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 02 1/6

31 Corrected cone resistance (qt) in MPa Friction ratio (Rf) in % Excess pore pressure (du) in MPa <- Depth in m to reference level > > > Ref usal ( qc 40+ MPa ) EOH - Dipped - Collapsed 5.1m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 02 2/6

32 Cone resistance (qc) in MPa Sleeve friction (fs) in MPa Dynamic pore pressure (u2) in MPa > > > <- Depth in m to reference level > > > > > Ref usal ( qc 40+ MPa ) EOH - Dipped - 6.2m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 03 1/6

33 Corrected cone resistance (qt) in MPa Friction ratio (Rf) in % Excess pore pressure (du) in MPa > > > <- Depth in m to reference level > > > > > Ref usal ( qc 40+ MPa ) EOH - Dipped - 6.2m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 03 2/6

34 Cone resistance (qc) in MPa Sleeve friction (fs) in MPa Dynamic pore pressure (u2) in MPa > > > > <- Depth in m to reference level > Ref usal ( qc 40+ MPa ) EOH - Dipped - Collapsed 7.5m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 04 1/6

35 Corrected cone resistance (qt) in MPa Friction ratio (Rf) in % Excess pore pressure (du) in MPa > > > > <- Depth in m to reference level > Ref usal ( qc 40+ MPa ) EOH - Dipped - Collapsed 7.5m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 04 2/6

36 Cone resistance (qc) in MPa Sleeve friction (fs) in MPa Dynamic pore pressure (u2) in MPa > > <- Depth in m to reference level Ref usal ( qc 40+ MPa ) EOH - Dipped - 4.0m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 05 1/6

37 Corrected cone resistance (qt) in MPa Friction ratio (Rf) in % Excess pore pressure (du) in MPa > > <- Depth in m to reference level Ref usal ( qc 40+ MPa ) EOH - Dipped - 4.0m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 05 2/6

38 Cone resistance (qc) in MPa Sleeve friction (fs) in MPa Dynamic pore pressure (u2) in MPa <- Depth in m to reference level > > > > Ref usal ( qc 40+ MPa ) EOH - Dipped - 3.8m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 06 1/6

39 Corrected cone resistance (qt) in MPa Friction ratio (Rf) in % Excess pore pressure (du) in MPa <- Depth in m to reference level > > > > Ref usal ( qc 40+ MPa ) EOH - Dipped - 3.8m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 06 2/6

40 Cone resistance (qc) in MPa Sleeve friction (fs) in MPa Dynamic pore pressure (u2) in MPa <- Depth in m to reference level Ref usal ( qc 40+ MPa ) EOH - Dipped - 3.9m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 07 1/6

41 Corrected cone resistance (qt) in MPa Friction ratio (Rf) in % Excess pore pressure (du) in MPa <- Depth in m to reference level Ref usal ( qc 40+ MPa ) EOH - Dipped - 3.9m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 07 2/6

42 Cone resistance (qc) in MPa Sleeve friction (fs) in MPa Dynamic pore pressure (u2) in MPa <- Depth in m to reference level Ref usal ( qc 40+ MPa ) EOH - Dipped - 4.0m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 08 1/6

43 Corrected cone resistance (qt) in MPa Friction ratio (Rf) in % Excess pore pressure (du) in MPa <- Depth in m to reference level Ref usal ( qc 40+ MPa ) EOH - Dipped - 4.0m 1.44 u Project: Location: Position: Test according ASTM D & ISO :2012 Predrill: 0.00 m Predrilled G.L.: 0.00 m MSL W.L.: m Date: 29/08/2017 BP Connect Turangi Proposed S/S Cnr SH1 & Te Arahori St - Turangi Cone no.: Project no.: C10CFIIP.C Z514.00_HA , NZTM CPT no.: 08 2/6

44 Opus International Consultants Ltd Gartshore House, Level 3, 116 Cameron Road PO Box 646, Tauranga 3140 New Zealand t: f: w:

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council Lake Rotoiti Wastewater Scheme - Stage 1 Investigations Rotorua Lakes Council i Contents 1 Introduction...1 2 Site Description...1 3 Geological Setting...1 4 Geotechnical Investigation...1 4.1 Borehole

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

14 Geotechnical Hazards

14 Geotechnical Hazards Volume 2: Assessment of Environmental Effects 296 14 Geotechnical Hazards Overview This Chapter provides an assessment of the underlying geotechnical conditions to identify: any potential liquefaction

More information

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road LEGEND ra R aku Ru BUSINESS ZONE NORTH OF Powells Road oad AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE 3 mm TEST PIT AS121 SCPT12 TP18 BH13 TP15 2 AS125 AS126 TP14 BH12 AGRESEARCH CPT13 TP17 INNOVATION

More information

Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton

Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton REPORT Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton REPORT Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton Report

More information

Guidelines for Geotechnical Site Investigation for Residential Building Consents in Hastings District. (Draft)

Guidelines for Geotechnical Site Investigation for Residential Building Consents in Hastings District. (Draft) Guidelines for Geotechnical Site Investigation for Residential Building Consents in Hastings District (Draft) December 2017 Acknowledgements These guidelines have been prepared with assistance from Tonkin

More information

Omaroro Lower Playing Field - Geotechnical Interpretive Report

Omaroro Lower Playing Field - Geotechnical Interpretive Report Report Omaroro Lower Playing Field - Geotechnical Interpretive Report Prepared for Wellington Water Limited Prepared by Beca Limited 1 December 2017 Omaroro Lower Playing Field - Geotechnical Interpretive

More information

Performance and Post Earthquake Assessment of CFA Pile Ground Improvement 22 February 2011 Christchurch, New Zealand Earthquake

Performance and Post Earthquake Assessment of CFA Pile Ground Improvement 22 February 2011 Christchurch, New Zealand Earthquake Performance and Post Earthquake Assessment of CFA Pile Ground Improvement 22 February 2011 Christchurch, New Zealand Earthquake K. M. Murahidy, S. W Sutherland & M. E. Jacka Tonkin & Taylor Ltd, Christchurch,

More information

Rosemerryn Subdivision, Lincoln Stages 10 to 18 Geotechnical Investigation Report Fulton Hogan Land Development Limited

Rosemerryn Subdivision, Lincoln Stages 10 to 18 Geotechnical Investigation Report Fulton Hogan Land Development Limited This information Memorandum, title or other supplementary property information (the Information ) has been prepared by Whalan and Partners Limited, trading as Bayleys ( Bayleys ) as agent for the Vendor.

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

GUIDANCE D. Part D: Guidelines for the geotechnical investigation and assessment of subdivisions in the Canterbury region.

GUIDANCE D. Part D: Guidelines for the geotechnical investigation and assessment of subdivisions in the Canterbury region. GUIDANCE D CONTENTS Part D: Guidelines for the geotechnical investigation and assessment of subdivisions in the Canterbury region Minimum requirements for geotechnical assessment for land development (

More information

Free Range Broiler Farm, Arapohue: Geotechnical assessment

Free Range Broiler Farm, Arapohue: Geotechnical assessment Free Range Broiler Farm, Arapohue: Geotechnical assessment Prepared for Date September 2017 Job Number 1003028 Document Control Title: Date Version Description Prepared by: Reviewed by: Authorised by:

More information

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Sinclair Knight Merz 25 Teed Street

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

Earthquake Commission. Darfield Earthquake Recovery Geotechnical Factual Report Avondale

Earthquake Commission. Darfield Earthquake Recovery Geotechnical Factual Report Avondale REPORT Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report Avondale REPORT Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report Avondale Report prepared

More information

REPORT. Housing Re-Zone. Middle Road and Iona Road - Geotechnical Investigation Report

REPORT. Housing Re-Zone. Middle Road and Iona Road - Geotechnical Investigation Report REPORT Housing Re-Zone Middle Road and Iona Road - Geotechnical Investigation Report Prepared for Hastings istrict Council Prepared by Tonkin & Taylor Ltd ate April 06 Job Number 464.000 istribution: Hastings

More information

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0)

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0) This Cone Penetration Test (CPT) Sounding follows ASTM D 5778 and was made by ordinary and conventional methods and with care deemed adequate for the Department's design purposes. Since this sounding was

More information

Liquefaction induced ground damage in the Canterbury earthquakes: predictions vs. reality

Liquefaction induced ground damage in the Canterbury earthquakes: predictions vs. reality Bowen, H. J. & Jacka, M. E. () Proc. th NZGS Geotechnical Symposium. Ed. CY Chin, Queenstown Liquefaction induced ground damage in the Canterbury earthquakes: predictions vs. reality H J Bowen & M E Jacka

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0)

Minnesota Department of Transportation Geotechnical Section Cone Penetration Test Index Sheet 1.0 (CPT 1.0) This Cone Penetration Test (CPT) Sounding follows ASTM D 778 and was made by ordinary and conventional methods and with care deemed adequate for the Department's design purposes. Since this sounding was

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1

GEOTECHNICAL ENGINEERING II. Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 GEOTECHNICAL ENGINEERING II Subject Code : 06CV64 Internal Assessment Marks : 25 PART A UNIT 1 1. SUBSURFACE EXPLORATION 1.1 Importance, Exploration Program 1.2 Methods of exploration, Boring, Sounding

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

Geotechnical issues in seismic assessments: When do I need a geotechnical specialist?

Geotechnical issues in seismic assessments: When do I need a geotechnical specialist? Geotechnical issues in seismic assessments: When do I need a geotechnical specialist? B.H. Rama & S.J. Palmer Tonkin & Taylor Ltd (T+T), Wellington, New Zealand. 2016 NZSEE Conference ABSTRACT: The Canterbury

More information

New Plymouth CBD Site Subsoil Class: Results from ground investigation

New Plymouth CBD Site Subsoil Class: Results from ground investigation Alexander, G.J., Chin, C.Y., Kayser, C. & Bradshaw, J. (2017) New Plymouth CBD Site Subsoil Proc. 20 th NZGS Geotechnical Symposium. Eds. GJ Alexander & CY Chin, Napier New Plymouth CBD Site Subsoil Class:

More information

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. SOIL INVESTIGATION REPORT PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. Prepared for: FCS Consultants 7a Barbados Avenue Kingston 5, Jamaica Prepared by: NHL Engineering Limited

More information

Christchurch CBD: Lessons Learnt and Strategies for Foundation Remediation 22 February 2011 Christchurch, New Zealand, Earthquake

Christchurch CBD: Lessons Learnt and Strategies for Foundation Remediation 22 February 2011 Christchurch, New Zealand, Earthquake Christchurch CBD: Lessons Learnt and Strategies for Foundation Remediation 22 February 2011 Christchurch, New Zealand, Earthquake K.M. Murahidy & A.F. Sleight Tonkin & Taylor Ltd, Christchurch, New Zealand

More information

REPORT. Ngai Tahu Property Ltd. Wigram Skies Subdivision Geotechnical Assessment

REPORT. Ngai Tahu Property Ltd. Wigram Skies Subdivision Geotechnical Assessment REPORT Ngai Tahu Property Ltd Wigram Skies Subdivision Geotechnical Assessment REPORT Ngai Tahu Property Ltd Wigram Skies Subdivision Geotechnical Assessment Report prepared for: Ngai Tahu Property Ltd

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

GEOLOGY, SOILS, AND SEISMICITY

GEOLOGY, SOILS, AND SEISMICITY 4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration

More information

LSN a new methodology for characterising the effects of liquefaction in terms of relative land damage severity

LSN a new methodology for characterising the effects of liquefaction in terms of relative land damage severity van Ballegooy, S., Lacrosse, V., Jacka, M. & Malan, P. (2013) Proc. 19 th NZGS Geotechnical Symposium. Ed. CY Chin, Queenstown LSN a new methodology for characterising the effects of liquefaction in terms

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

Hydraulic uplift forces on basements subject to liquefaction

Hydraulic uplift forces on basements subject to liquefaction Hydraulic uplift forces on basements subject to liquefaction N.S. Luxford Babbage Consultants Ltd 2014 NZSEE Conference ABSTRACT: As a result of the 22 February 2011 earthquake in Christchurch a building

More information

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION Consulting Geotechnical Engineers & Engineering Geologists P.O.Box 3557 Cramerview 2060. Tel: (011) 465-1699. Fax: (011) 465-4586. Cell 082 556 7302 & 076 966 8445 REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL

More information

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project.

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project. 9 GEOLOGY AND SOILS INTRODUCTION This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project. This chapter utilizes information from the following reports prepared

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

NZ Transport Agency s Detailed Design Guidance for Piled Bridges at Sites Prone to Liquefaction and Lateral Spreading

NZ Transport Agency s Detailed Design Guidance for Piled Bridges at Sites Prone to Liquefaction and Lateral Spreading Keepa, C., Adhikari, G., Murashev, A., Cubrinovski, M. & Lloyd, N. (2017) NZ Transport Agency s Detailed Design Guidance for Piled Bridges at Sites Prone to Liquefaction and Lateral Spreading Proc. 20

More information

Geotechnical Completion Report Knights Stream Park Stage3A Development (Lots 107 to 148)

Geotechnical Completion Report Knights Stream Park Stage3A Development (Lots 107 to 148) Aurecon New Zealand Limited Unit 1, 150 Cavendish Road Casebrook Christchurch 8051 PO Box 1061 Christchurch 8140 New Zealand T F E W +64 3 366 0821 +64 3 379 6955 christchurch@aurecongroup.com aurecongroup.com

More information

Cone Penetration Testing in Geotechnical Practice

Cone Penetration Testing in Geotechnical Practice Cone Penetration Testing in Geotechnical Practice Table Of Contents: LIST OF CONTENTS v (4) PREFACE ix (2) ACKNOWLEDGEMENTS xi (1) SYMBOL LIST xii (4) CONVERSION FACTORS xvi (6) GLOSSARY xxii 1. INTRODUCTION

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

(THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM

(THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM C A U T I O N!! (THIS IS ONLY A SAMPLE REPORT OR APPENDIX OFFERED TO THE USERS OF THE COMPUTER PROGRAM EQLique&Settle2. THE AUTHOR IS HEREBY RELEASED OF ANY LIABILITY FOR ANY INCORRECT USE OF THIS SAMPLE

More information

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.)

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.) Run 027 RNZ Full Bridge Simulation Run Plots Final Report Be-Software August 2016 Prepared for Royal Haskoning DHV on behalf of Refining New Zealand Limited 27 Run 028 (Note: error in UKC at start of exercise

More information

Preston Downs Lot 295/296 Geotechnical Subdivision Report GW West Melton Limited

Preston Downs Lot 295/296 Geotechnical Subdivision Report GW West Melton Limited Preston Downs Lot 295/296 Geotechnical Subdivision Report GW West Melton Limited 17 March 2017 Revision: 1 Reference: 253852 Document control record Document prepared by: Aurecon New Zealand Limited Unit

More information

Case Study - Undisturbed Sampling, Cyclic Testing and Numerical Modelling of a Low Plasticity Silt

Case Study - Undisturbed Sampling, Cyclic Testing and Numerical Modelling of a Low Plasticity Silt 6 th International Conference on Earthquake Geotechnical Engineering 1-4 November 2015 Christchurch, New Zealand Case Study - Undisturbed Sampling, Cyclic Testing and Numerical Modelling of a Low Plasticity

More information

GEOTECHNICAL REPORT AT 29 PETRIES ROAD, WOODEND. KIRK ROBERTS CONSULTING ENGINEERS LTD

GEOTECHNICAL REPORT AT 29 PETRIES ROAD, WOODEND. KIRK ROBERTS CONSULTING ENGINEERS LTD GEOTECHNICAL REPORT KIRK ROBERTS CONSULTING ENGINEERS LTD AT 29 PETRIES ROAD, WOODEND. P a g e 1 KIRK ROBERTS CONSULTING ENGINEERS LTD GEOTECHNICAL REPORT 29 PETRIES ROAD, WOODEND ISSUE 1 Date 9 th March

More information

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario Prepared For: The Federal Bridge Corporation Limited SPL Project No.: 10001084 Report Date: January

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

Soil type identification and fines content estimation using the Screw Driving Sounding (SDS) data

Soil type identification and fines content estimation using the Screw Driving Sounding (SDS) data Mirjafari, S.Y. & Orense, R.P. & Suemasa, N. () Proc. th NZGS Geotechnical Symposium. Eds. GJ Alexander & CY Chin, Napier Soil type identification and fines content estimation using the Screw Driving Sounding

More information

PRELIMINARY GEOTECHNICAL EXPLORATION Additional MeadWestvaco Ridgeville Property 331 acres Dorchester County, South Carolina S&ME Project No. 1131-09-259A Prepared For: BP Barber & Associates Post Office

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS Except where otherwise noted, the following Section is based on the Preliminary Geotechnical Investigation, Proposed Medical Office Buildings and Mixed-Use

More information

www.novotechsoftware.com The standard penetration test (SPT) is an in-situ dynamic penetration test designed to provide information on the geotechnical engineering properties of soil. The test procedure

More information

Liquefaction potential of Rotorua soils

Liquefaction potential of Rotorua soils Pearse-Danker, E. (2013) Liquefaction potential of Rotorua soils Proc. 19 th NZGS Geotechnical Symposium. Ed. CY Chin, Queenstown Liquefaction potential of Rotorua soils E Pearse-Danker Coffey Geotechnics

More information

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon By the Oregon Board of Geologist Examiners and the Oregon

More information

FROST HEAVE. GROUND FREEZING and FROST HEAVE

FROST HEAVE. GROUND FREEZING and FROST HEAVE FROST HEAVE The temperature of soils near the ground surface reflects the recent air temperatures. Thus, when the air temperature falls below 0 C (32 F) for extended periods, the soil temperature drops

More information

Distribution: Tonkin & Taylor Ltd (FILE) 1 copy 1 copy

Distribution: Tonkin & Taylor Ltd (FILE) 1 copy 1 copy REPORT Proposed Second Runway Geotechnical Environmental Baseline Report Prepared for Prepared by Tonkin & Taylor Ltd Date October 2015 Job Number 29777.2000.v3 Distribution: Tonkin & Taylor Ltd (FILE)

More information

(C) Global Journal of Engineering Science and Research Management

(C) Global Journal of Engineering Science and Research Management GEOTECHNCIAL ASSESSMENT OF PART OF PORT HARCOURT, NIGER DELTA FOR STRUCTURAL ANALYSIS Warmate Tamunonengiyeofori Geostrat International Services Limited, www.geostratinternational.com. *Correspondence

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION. Marion County Industrial Park Lot 4. Marion County, South Carolina S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION. Marion County Industrial Park Lot 4. Marion County, South Carolina S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION Marion County Industrial Park Lot 4 Marion County, South Carolina S&ME Project No. 1633-12-332 Prepared By: 133 Highway 1 Business Conway, South Carolina

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA

IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA David Harro The G3 Group, 2509 Success Drive, Suite 1, Odessa, FL 33556, david.harro@geo3group.com

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE

More information

REGARDING SOME DYNAMIC CHARACTERISTICS OF THE SOILS AND THE LIQUIFACTION POTENTIAL OF SANDS IN SOFIA

REGARDING SOME DYNAMIC CHARACTERISTICS OF THE SOILS AND THE LIQUIFACTION POTENTIAL OF SANDS IN SOFIA REGARDING SOME DYNAMIC CHARACTERISTICS OF THE SOILS AND THE LIQUIFACTION POTENTIAL OF SANDS IN SOFIA Chief Ass. Prof. Ivailo Ivanov University of Architecture, Civil Engineering and Geodesy Department

More information

TABLE OF CONTENTS CHAPTER TITLE PAGE TITLE PAGE DECLARATION DEDIDATION ACKNOWLEDGEMENTS ABSTRACT ABSTRAK

TABLE OF CONTENTS CHAPTER TITLE PAGE TITLE PAGE DECLARATION DEDIDATION ACKNOWLEDGEMENTS ABSTRACT ABSTRAK TABLE OF CONTENTS CHAPTER TITLE PAGE TITLE PAGE DECLARATION DEDIDATION ACKNOWLEDGEMENTS ABSTRACT ABSTRAK TABLE OF CONTENTS LIST OF TABLE LIST OF FIGURES LIST OF SYMBOLS LIST OF APENDICES i ii iii iv v

More information

Evaluation of the Liquefaction Potential by In-situ Tests and Laboratory Experiments In Complex Geological Conditions

Evaluation of the Liquefaction Potential by In-situ Tests and Laboratory Experiments In Complex Geological Conditions Evaluation of the Liquefaction Potential by In-situ Tests and Laboratory Experiments In Complex Geological Conditions V. Sesov, K. Edip & J. Cvetanovska University Ss. Cyril and Methodius, Institute of

More information

10. GEOTECHNICAL EXPLORATION PROGRAM

10. GEOTECHNICAL EXPLORATION PROGRAM Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in

More information

Comparison between predicted liquefaction induced settlement and ground damage observed from the Canterbury earthquake sequence

Comparison between predicted liquefaction induced settlement and ground damage observed from the Canterbury earthquake sequence Power, P.M. & Jacka, M. (2013) the Canterbury earthquake sequence Proc. 19 th NZGS Geotechnical Symposium. Ed. CY Chin, Queenstown Comparison between predicted liquefaction induced settlement and ground

More information

Impact : Changes to Existing Topography (Less than Significant)

Impact : Changes to Existing Topography (Less than Significant) 4.2 Land Resources 4.2.1 Alternative A Proposed Action Impact 4.2.1-1: Changes to Existing Topography (Less than Significant) Development of the project site would involve grading and other earthwork as

More information

GEOTECHNICAL INVESTIGATION FOSTER BLOCK, GOULDS ROAD ROLLESTON

GEOTECHNICAL INVESTIGATION FOSTER BLOCK, GOULDS ROAD ROLLESTON GEOTECHNICAL INVESTIGATION FOSTER BLOCK, GOULS ROA ROLLESTON SUBMITTE TO: R.. HUGHES EVELOPMENTS LT PO BOX 848 CHRISTCHURCH 8140 21 ecember 2011 ISTRIBUTION 2 Copies R.. Hughes evelopments Ltd 1 Copy Geoscience

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Telephone : G. Ntaka : Fax : M. Bénet :

Telephone : G. Ntaka : Fax : M. Bénet : Our Ref: P 24058 Your Ref: Drennan Maud cc. CK 95/54198/23 Consulting Geotechnical Engineers & Engineering Geologists VAT Reg ¹ 4770223594 P.O. Box 22997 Unit 7, Gayridge Business Park ¹ 2 MARGATE 13 Wingate

More information

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed

More information

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6

IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 Regional Workshop on Volcanic, Seismic, and Tsunami Hazard Assessment Related to NPP Siting Activities and

More information

The LSN Calculation and Interpolation Process

The LSN Calculation and Interpolation Process Appendix I : The LSN Calculation and Interpolation Process I1. Introduction Cone Penetration Tests (CPTs) can be used in the assessment of the liquefaction vulnerability. The CPTs available from the Canterbury

More information

SURFACE GEOLOGY AND LIQUEFACTION SUSCEPTIBILITY IN THE INNER RIO GRANDE VALLEY NEAR ALBUQUERQUE, NEW MEXICO

SURFACE GEOLOGY AND LIQUEFACTION SUSCEPTIBILITY IN THE INNER RIO GRANDE VALLEY NEAR ALBUQUERQUE, NEW MEXICO SURFACE GEOLOGY AND LIQUEFACTION SUSCEPTIBILITY IN THE INNER RIO GRANDE VALLEY NEAR ALBUQUERQUE, NEW MEXICO Keith I. Kelson, Christopher S. Hitchcock, and Carolyn E. Randolph William Lettis & Associates,

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION. Marion County Industrial Park. Marion County, South Carolina S&ME Project No.

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION. Marion County Industrial Park. Marion County, South Carolina S&ME Project No. REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION Marion County Industrial Park Marion County, South Carolina S&ME Project No. 1633-12-186 Prepared By: 133 Highway 1 Business Conway, South Carolina 2926 August

More information

3.4 Typical Soil Profiles

3.4 Typical Soil Profiles SEI.UoC.0002.11 Figure 4. Streams in central Christchurch as mapped in March 1850, superposed on aerial photography captured on 24 February 2011. Streams digitised from the Black Map of Christchurch (March

More information

Geotechnical Engineering and Resilience

Geotechnical Engineering and Resilience Chapter 14 Part G VOLUME 2 Geotechnical Engineering and Resilience Page 192 Overview Key geotechnical aspects of the Project include: Cut slopes in dune sand, including erodibility and erosion protection;

More information

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD GEOTECHNICAL INVESTIGATION REPORT Client : TAEIN CONSTRUCTION & INFRASTRUCTURE PVT LTD Office address : Flat No.104, A -Wing,1st floor,gloria Park, Paranjape Scheme, Bavdhan Khurd, Chandni Chowk, Pune

More information

GEOTECHNICAL SITE CHARACTERIZATION

GEOTECHNICAL SITE CHARACTERIZATION GEOTECHNICAL SITE CHARACTERIZATION Neil Anderson, Ph.D. Professor of Geology and Geophysics Richard W. Stephenson, P.E., Ph.D. Professor of Civil, Architectural and Environmental Engineering University

More information

The Preliminary Study of the Impact of Liquefaction on Water Pipes

The Preliminary Study of the Impact of Liquefaction on Water Pipes The Preliminary Study of the Impact of Liquefaction on Water Pipes Jerry J. Chen and Y.C. Chou ABSTRACT Damages to the existing tap-water pipes have been found after earthquake. Some of these damages are

More information

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533

Roy Pyle March 24, 2017 Chief Facilities Planner Contra Costa Community College District 500 North Court Street Martinez, CA 94533 State of California Natural Resources Agency Edmund G. Brown Jr., Governor Department of Conservation John G. Parrish, Ph.D., State Geologist California Geological Survey 801 K Street MS 12-31 Sacramento,

More information

An application of liquefaction hazard evaluation in urban planning

An application of liquefaction hazard evaluation in urban planning An application of liquefaction hazard evaluation in urban planning Clive Anderson Principal Geotechnical Engineer, URS New Zealand Limited, 287 Durham Street, Christchurch, New Zealand Tim McMorran Senior

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

The development of design guidance for bridges in New Zealand for liquefaction and lateral spreading effects July 2014

The development of design guidance for bridges in New Zealand for liquefaction and lateral spreading effects July 2014 The development of design guidance for bridges in New Zealand for liquefaction and lateral spreading effects July 2014 A Murashev, D Kirkcaldie and C Keepa, Opus International Consultants, Wellington M

More information

BELFAST SEWERS PROJECT

BELFAST SEWERS PROJECT BELFAST SEWERS PROJECT Adam Green - Atkins Tunnelling Scheme Overview New stormwater interceptor Tunnel Scheme within Belfast City Centre to alleviate flooding and divert storm water flows from existing

More information

Keywords: CPTu, pore water pressure, liquefaction analysis, Canterbury earthquake sequence

Keywords: CPTu, pore water pressure, liquefaction analysis, Canterbury earthquake sequence Hébert, M. C. (2013) Proc. 19 th NZGS Geotechnical Symposium. Ed. CY Chin, Queenstown The importance of accurate pore water pressure measurements when conducting CPTu as exemplified using data collected

More information

A practical seismic liquefaction zoning system for risk management of urban development

A practical seismic liquefaction zoning system for risk management of urban development Halliday, G.S, Faulkner, P, Salt, G. & Clements, R. (2013) Proc. 19th NZGS Geotechnical Symposium. Ed. CY Chin, Queenstown A practical seismic liquefaction zoning system for risk management of urban development

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

BR-01 PAINT BRIDGE NO. 55 C GENERAL PLAN 720'-0" VC 605'-0" VC 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE "INDEX TO PLANS" SHEET.

BR-01 PAINT BRIDGE NO. 55 C GENERAL PLAN 720'-0 VC 605'-0 VC 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE INDEX TO PLANS SHEET. 2'-" VC 6'-" VC BB EB 1 1 1 1 1 TV - " TV CONDUITS (COX E 8 - " ELECTRIC CONDUITS (SDG & E T - " TELEPHONE CONDUITS 1. FOR INDEX TO PLANS, QUANTITIES, AND GENERAL NOTES, SEE "INDEX TO PLANS" SHEET. 2.

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

Foundations on Deep Alluvial Soils

Foundations on Deep Alluvial Soils Canterbury Earthquakes Royal Commission Hearings 25 October 2011, Christchurch GEO.CUB.0001.1-35.1 Foundations on Deep Alluvial Soils Misko Cubrinovski, Ian McCahon, Civil and Natural Resources Engineering,

More information

CPT Data Interpretation Theory Manual

CPT Data Interpretation Theory Manual CPT Data Interpretation Theory Manual 2016 Rocscience Inc. Table of Contents 1 Introduction... 3 2 Soil Parameter Interpretation... 5 3 Soil Profiling... 11 3.1 Non-Normalized SBT Charts... 11 3.2 Normalized

More information