VERY HIGH GRADE GOLD INTERSECTIONS CONTINUE TO UPGRADE THE POTENTIAL OF BOYD S DAM/BOYD NORTH AT FOUR EAGLES GOLD PROJECT
|
|
- Susan Paul
- 5 years ago
- Views:
Transcription
1 ASX ANNOUNCEMENT 28 APRIL 2017 VERY HIGH GRADE GOLD INTERSECTIONS CONTINUE TO UPGRADE THE POTENTIAL OF BOYD S DAM/BOYD NORTH AT FOUR EAGLES GOLD PROJECT Very high grade gold mineralisation ( g/t Au) intersected at Boyd s Dam Gold mineralisation confirmed over 1.8 kilometres at Boyd s Dam/Boyd North Visible gold in association with quartz and arsenopyrite recorded during drill rig sampling Hayanmi RC Drilling and Gravity Reconnaissance Air Core drilling in progress Bulk Leach confirmation assays still awaited Major new shareholder St Barbara Limited (SBM) site visit Catalyst Metals Limited (Catalyst or the Company) (ASX: CYL) advises that assays received from the Boyd s Dam and Boyd North Prospects at the Four Eagles Gold Project have shown the highest gold grades received to date. Within a six-metre intersection in FERC152 at Boyd s Dam that assayed 50.4g/t Au, a one-metre interval assayed 247g/t Au. Ten holes contained intersections greater than 20 gram metres and confirm that the structure has good gold grades throughout the 1.8 kilometre strike length. Catalyst s 2017 drilling programme is still in progress with two drill rigs currently working on the Tandarra Gold Project located about 15 kilometres to the south. The Four Eagles Gold Project drilling will resume after the completion of the Tandarra Gold Project drilling programme. This announcement only covers results that have been received for most of the RC Blade/Hammer programme at Boyd s Dam and also the Air Core programme at Boyd North and a northern section at Hayanmi. Assay results are still outstanding for RC Blade follow up drilling at Boyd North and for the major drilling programme at Hayanmi. Further announcements will be reported in the coming month as sufficient assay resultss are received from a project area to provide meaningful interpretation. Catalyst retains a 50% interest in the Four Eagles Gold Project whilst Gold Exploration Victoria Pty Ltd (GEV) (a subsidiary of Hancock Prospecting Pty Ltd) is earning up to a 50% interest from Providence Gold and Minerals Pty Ltd by spending $4.2 million on exploration. To date, GEV has already earned a 25% interest in the Four Eagles Gold Project by spending $2.1 million and should complete the remaining expenditure during The Four Eagles Gold Project and the Tandarra Gold Project are situated about 15 kilometres apart along the Whitelaw Fault Corridor which is considered to be a major structural control of gold mineralisation north of Bendigo. Catalyst manages the entire Whitelaw Gold Belt and has interests in eight Exploration Licences which extend for 75 kilometres along the Whitelaw and Tandarra Faults north of Bendigo in Victoria (Figure 1). 44 Kings Park Road, West Perth WA 6005 PO Box 778, Claremont WA 6910 Telephone: (61-8) Facsimile: (61-8) ABN
2 RC BLADE/HAMMER DRILLING This programme involves the drilling of angled large diameter air core holes (RC Blade/Hammer) on the Hayanmi and Boyd s Dam gold structures to give a better understanding of the shapes of the gold mineralisation. Approximately 10,000 metres of drilling will test strike lengths of 1.2 kilometres on Hayanmi and about 900 metres on Boyd s Dam (Figures 2a and 2b) at a traverse spacing of about 50 metres. This announcement refers mostly to the programme at Boyd s Dam and Boyd North. Boyd s Dam Boyd North Prospects Drilling on the Boyd s Dam and Boyd North Prospects commenced in January 2017 and was designed to test a 900 metre long strike length at Boyd s Dam at a traverse spacing of about 50 metres using RC Blade/Hammer. This spacing should enable gold mineralised shapes to be interpreted. In addition to the RC Blade/Hammer programme, air core drilling was carried out at Boyd North where two previous intersections 600 metres apart contained significant gold intersections (3 154g/t Au in FE732 and g/t Au in FE728). The objective of the air core programme was to test the 800 metre long structure at a traverse spacing of about 150 metres. A total of 3,510 metres of RC Blade in 24 holes at Boyd s Dam and a further 23 holes (2,427 metres) at Boyd North are reported in this announcement. A further 13 holes on the northern end of the Hayanmi trend using the smaller diameter air core rig are also discussed. Most of the assays quoted are from 25 gram samples using aqua regia digest and AAS but where available, the bulk leach assay on a 2 kilogram sample are used. These two assay methods have tended to show good correlation in the past and indicate that the gold is finely distributed and much less nuggetty than present at Bendigo. Although data is still pending and cross sections still need to be completed, the following significant intersections have been recorded. They are shown in plan view on Figure 3 and diagrammatically on the longitudinal projection as Figure 4. A full list of drill results is set out in Table 1 and Table 2: g/t Au including g/t Au from 114 metres (FERC152) 9.5g/t Au including 100.0g/t Au from 59 metres (FERC158) 20.0g/t Au including 70.6g/t Au from 110 metres (FE776) 6.4g/t Au from 42 metres (FERC147) 9.3g/t Au from 83 metres (FERC153) 7.97g/t Au from 50 metres (FE782) 3.4g/t Au from 109 metres (FERC154) 2.9g/t Au from 81 metres (FERC155) g/t Au from 91 metres and Au from 112 metres(ferc149) 6.3g/t Au from 95 metres (FERC146) 4.4g/t Au from 98 metres (FE766) 2.4g/t Au from 84 metres (FERC161) 1.7g/t Au including Au from 100 metres (FERC157) Au from 90 metres (FE816) These results show strong gold mineralisation in the core section of Boyd s Dam and also confirm the high gold grades obtained at Boyd North with air core in The total length of the Boyd s Dam Boyd North structure is now about 1.8 kilometres long with sporadic high gold grades scattered over the entire length. Boyd North is still only tested at 150 metre intervals and will require RC hammer drilling to penetrate the common quartz veins that occur along the structure Mr Bruce Kay, Catalyst s Technical Director, stated, The drilling programme at Boyd s Dam and Boyd North has produced some of the best intersections yet recorded at Four Eagles. Spectacular grades of greater than 100 g/t Au in an area where cover depth is only 20 to 40 metres deep are very encouraging. 2
3 Hayanmi North Air Core Drilling Thirteen Air Core holes were drilled at the northern end of the Hayanmi Trend to test a 300 metre long section of the strike length (Figure 5). Most holes were drilled at a 60 degree angle to the west with one vertical hole (FE792). Gold mineralisation was present on most traverses with one hole west of the structure showing a significant gold intersection ( g/t Au in FE797). Significant drill intersections from the 2017 drill programme are highlighted on the Hayanmi Longitudinal Projection in Figure 6. Assays received from the three holes show the following intersections: 2.1 g/t Au from 79 metres (FE789) 4.6 g/t Au including 17.7g/t Au from 76 metres (FE797) 2.0m@ 3.1g/t Au from 118 metres (FE787) 4.9g/t Au from 107 metres (FE791) A complete interpretation will not be possible on the Hayanmi Structure until the RC Blade/Hammer programme is completed and all assays are received. This is unlikely to be before the end of May Full location data on the RC Blade/Hammer holes is shown on Table 1 and a Summary of Sampling Techniques and Reporting of Exploration Results according to the JORC Code 2012 Edition are tabulated in Appendix 1. Previous intersections shown on Figures 2a and 2b have been reported under the 2004 JORC Code. Maximum gold values in each hole are tabulated in Appendix 1. Location data is also included for the air core drill holes in Table 2a and 2b and a Summary of Sampling Techniques and Reporting of Exploration Results according to the JORC Code 2012 Edition are tabulated in Appendix 2. Maximum gold values in each hole are tabulated in Appendix 2. Regional Air Core Drilling Air core drilling is also in progress on the Discovery Zone and to test regional gravity geophysical targets at the Four Eagles Gold Project. This programme will not be completed until mid-may 2017 and very few assays are currently available. For further information contact: Steve Boston Bruce Kay Chairman Technical Director Telephone: Competent person s statement The information in this report that relates to exploration results is based on information compiled by Mr Bruce Kay, a Competent Person, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Kay is a non-executive director of the Company and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mr Kay consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Much of the historical information relating to the Four Eagles project was prepared and first disclosed under the JORC Code This information has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was reported. 3
4 Figure 1: Whitelaw Gold Belt Tenement Holdings showing major Catalyst managed projects 4
5 Figure 2a: Four Eagles Gold Project showing areas of RC Blade/Hammer and Air Core Drilling in current programme (excludes 2017 drill collar locations) 5
6 Figure 2b: Four Eagles Gold Project showing pre-2017 intersections for Figure 2a 6
7 Figure 3: Plan View of Boyd s Dam Boyd North showing 2017 Drillholes and intersections 7
8 Figure 4: Longitudinal Projection of Boyd s Dam-Boyd North highlighting 2017 drill intersections (in blue) 8
9 Figure 5: Hayanmi Prospect plan view showing gold trends and recent air core drill holes 9
10 Figure 6: Longitudinal Projection of Hayanmi Prospect showing areas of RC drilling proposed for Drill intersections from recent Air Core drilling are highlighted in blue. 10
11 APPENDIX 1: RC BLADE/HAMMER DRILLING Table 1 RC Drill Hole Collars Hole ID East North RL Depth Grid Collar (MGA) (MGA (AHD) (m) Azimuth Declination FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC FERC Table 1 Drill Assay Results RC Blade/Hammer Hole ID From To Interval Au (ppm) FERC FERC Including FERC
12 Hole ID From To Interval Au (ppm) FERC FERC FERC including FERC FERC FERC FERC Including FERC FERC FERC
13 Hole ID From To Interval Au (ppm) Including FERC FERC Including and FERC Including and FERC Including Including
14 Hole ID From To Interval Au (ppm) FERC FERC FERC Including and FERC Including FERC FERC FERC
15 Hole ID From To Interval Au (ppm) JORC 2012 Edition, Table 1 Checklist RC Blade/Hammer RC Sampling Techniques and Data Criteria Explanation Sampling techniques Samples collected at cyclone at one-metre intervals with no subsampling. Cover sequence samples collected in buckets and arranged as piles on the ground; basement material samples collected in individual numbered plastic bags; chip trays collected by hand from piles and bags (uncomposited) Assay laboratory samples selected using Jones riffle splitter into calico sample bags to a mass of >2kg (if sufficient sample is available) and<3kg. Cover sequence is understood to be unmineralised and thus not sampled for laboratory submission. Drilling techniques Holes are initiated using 120mm air core blade drilling. This method provides reverse-circulation face sampling of sufficiently soft material. On bit-refusal, a four-inch diameter RC hammer with 110mm button bit is utilised to progress the hole to design depth or where groundwater inflows compromise sample quality. All drilling utilises three-metre reverse circulation drill rods and handled in six-metre lengths where rig format allows; truckmounted drill rig; 400psi 900cfm compressor and booster; plus auxiliary compressor where dictated by water in-flows. Sufficient drillhole casing is used to stabilise the foundation of the drill rig. Drill sample recovery Holes were terminated where sample quality was compromised by groundwater inflow Sample water content assessed by rig geologist as being dry/wet Sample bags collected at the rig were weighed prior to sample splitting. Sample weight was used to assess the splitting requirements (number of riffle tiers required) to deliver a subsample to the desired mass constraint (>2kg and <3kg). Calico bag masses recorded by laboratory contractor Geological control maintained at the drill site at all times, to ensure drilling and sampling was to standard. 15
16 RC Sampling Techniques and Data Criteria Explanation Logging Chip samples geologically logged at 1m intervals for lithology, alteration, quartz veining and to a standard acceptable for subsequent interpretation for use in interpretation. Logging aspects are qualitative with exception of quartz vein content which is estimated semi-quantitatively All logged intervals represent entire one-metre sample segregation intervals Sub-sampling techniques and sample preparation Quality of assay data and laboratory tests Verification of sampling and assaying Lab submission samples collected as described any mass reduction required for assay purposes performed by laboratory contractor; consisting of drying and riffle-splitting. Samples dispatched to ALS Pty Ltd (Adelaide); samples dried and pulverised in entirety, with 25g aliquot split for analysis (laboratory repeat splits historically demonstrate acceptable reproducibility and hence accuracy for this mineralisation) Gold assay determined by ICPMS via aqua regia digestion (ALS code Au-OG43). Experience has shown this method to be applicable for fine grained gold population of the mineralisation due to the completion of digestion. There is a technical constraint in that coarse-grained gold may not completely enter solution resulting in conservative assay. Laboratory and client certified reference materials (up to four x CRMs plus blanks) generally demonstrate on-par or biased-low assays. Data management procedures are under development. Data management has been performed by an experienced individual and not by several individuals. There has been no verification of significant intersections by independent nor alternative company personnel. Drillhole sampling and geological data documented on paper logs in preparation for database entry. There have been no adjustments to data as supplied and certified by the commercial assay laboratory. Location of data points All drillhole location coordinates were measured using differential GPS to MGA94 and AHD estimated from terrain model created from publicly-available land survey data Collar locations to within an estimated precision of 1m. All drillholes were downhole surveyed. When available, nonmagnetic drill rods were implemented to allow azimuth surveys down-the-hole. Drilling orientation established prior to collaring with clinometer and compass. 16
17 RC Sampling Techniques and Data Criteria Explanation Data spacing and distribution RC holes drilled on sections located between existing RC and air core traverses providing 50-metre spacing along the strike of mineralisation. The sections consist of holes spaced at a nominal 25m in orientations that provide the best geometry for interpretation This spacing is designed to be of a sufficient density to ultimately be included in the estimation of a mineral resource. For the purpose of reporting, assays have been aggregated to reflect continuously sampled zones of significant anomalism for gold. Orientation of data in relation to geological structure Drillhole sections were aligned approximately normal to the strike of mineralisation. Holes were generally inclined 60 degrees to the east to provide cross-strike investigation within holes and to establish continuity of sub-vertical mineralisation between holes. A number of west-azimuth holes were drilled to test for tensional vein arrays, and vertical holes to investigate the near-hinge environment at depth. Sample security All samples were controlled by the responsible geologist, and stored in secured facility prior to despatch to laboratory. Samples were transported by a specialist contractor with chain-ofcustody protocols. Sample number receipt information from laboratory crossreferenced and rationalised against sample number dispatch information. Audits or reviews No processes or data used in developing the release of exploration results have been subject to audit or review by non-company personnel or contractors so as to reduce costs and timelines for reporting. Catalyst Metals Limited currently reserve this process for release of JORC-compliant Mineral Resource and Ore Reserve estimates. Reporting of Exploration Results Criteria Mineral tenement and land tenure status Explanation The Four Eagles Project is within EL4525 in the vicinity of Mitiamo Victoria, 50% owned by Catalyst Metals Ltd., 25% owned by Providence Gold and Minerals, and 25% owned by Gold Exploration Victoria EL4525 is currently operable under a retention licence application lodged in December 2016 Exploration activities were confined to free-hold farm land As of 2015, activities are funded with Gold Exploration Victoria Ltd (GEV) through a farm-in agreement. 17
18 Reporting of Exploration Results Criteria Explanation Exploration done by other None in the area drilled parties Geology Gold-arsenic bearing narrow veins in Ordovician sandstone in the vicinity of a regional-scale anticline. Deposit assessed as being northern extension of Bendigo Goldfield, with potential for post-mineralisation influence/redistribution by proximal granitic intrusion. Potential for some supergene gold enrichment in paleoweathering profile. Drill hole Information All information material to the understanding of the exploration results of all last-phase drill holes are tabulated: Appendix 1, Table 1: Collar location coordinates, downhole depths, azimuths, declinations Appendix 1, Table 2: Downhole intervals of significance, gold grade of intervals Data aggregation methods Data aggregation using downhole length-weighting No top-cutting applied to assay data Zones of significance identified as those with assays in excess of 0.4ppm Au and internal dilution of two consecutive assays or less. Reported zones are continuous, with no sample or assay gaps. Relationship between mineralisation widths and intercept lengths The strike of mineralisation is demonstrated to be generally northsouth and sub-parallel with grid. The dip of mineralisation is expected to be both east-dipping and west-dipping as was the case in the Bendigo Goldfield. Drillholes were oriented to provide effective geometry in the context of the eastern limb of an anticline. The dip of mineralisation has not been definitively proven, and the true width of mineralisation has not been resolved. As such, significant mineralised intersections have been reported as downhole intervals. Diagrams Figure 3 shows the plan of recent drillhole collars including previous drillholes. Balanced reporting Figure 3 shows all new drilling inclusive of holes which did not encounter significant mineralisation Other substantive exploration data No other exploration results that have not previously been reported, are material to this report. The assay results for RC drillholes recently completed in the adjacent Hayanmi prospect are pending. Further work The RC program designed for Hayanmi in 2017 is in progress, and is planned for completion in May. 18
19 APPENDIX 2: AIR CORE DRILLING Table 2 Air Core Drill Hole Collars Hole ID East North RL Depth Grid Collar (MGA) (MGA (AHD) (m) Azimuth Declination FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE FE
20 Table 2a Drill Assay Results Air Core Four Eagles EL4525 Hole ID From To Interval Au (ppm) FE FE Including Including Including FE FE FE FE Including FE FE FE FE FE FE Including and FE FE FE FE FE FE Including and FE FE FE FE FE FE
21 Hole ID From To Interval Au (ppm) FE Including FE FE Including FE FE Including FE FE FE FE FE FE Including FE
22 JORC 2012 Edition, Table 2 Checklist: Air Core Drilling Air Core Sampling Techniques and Data Criteria Sampling techniques Drilling techniques Drill sample recovery Logging Sub-sampling techniques and sample preparation Explanation Samples collected at cyclone at one-metre intervals Cover sequence samples collected in buckets and arranged as piles on the ground; basement material samples collected in individual numbered plastic bags; chip trays collected by hand from piles and bags (uncomposited) Assay laboratory samples collected by hand from bags (no routine cover sequence sampling) into calico sample bags to a mass of <3kg (composited to three-metre intervals corresponding with drill rods). Cover sequence is understood to be unmineralised and thus not sampled for assay laboratory submission. Three-inch diameter air core blade drill bit; three-metre reverse circulation drill rods; truck-mounted drill rig; 300psi 700cfm compressor. All holes uncased Penetration into basement to depth of bit refusal (often against quartz). Sample water content assessed by rig geologist as being dry/ wet Calico bag masses recorded by laboratory contractor Geological control maintained at the drill site at all times, to ensure drilling and sampling standards maintained. Chip samples geologically logged at one-metre intervals for lithology, alteration, quartz veining and to a standard acceptable for subsequent interpretation and RC drillhole planning. Logging aspects are qualitative with exception of quartz vein content which is estimated semi-quantitatively All logged intervals represent entire one-metre sample segregation intervals Samples selected (composited) by hand-grab at drill site when materials were dry or wet; duplicate samples taken approximately every 30 samples (one per drillhole). Samples dispatched to ALS Pty Ltd (Adelaide); samples dried and pulverised in entirety, with 25g aliquot split for analysis (laboratory repeat splits historically demonstrate acceptable reproducibility and hence accuracy for this mineralisation) Analysis of duplicate samples collected at the drill site provided acceptable confidence that sampling was appropriate for the level for the intended (non-resource estimation) use of the assay data. Where zones of significant gold mineralisation have been identified by initial sample assay, corresponding one-metre sample bags were recovered from storage and split for laboratory analysis. The analysis used employs a four-hour bottle-roll BLEG process which is considered the definitive assay for each one-metre interval; due to the nominal 2kg aliquot mass. 22
23 Air Core Sampling Techniques and Data Criteria Quality of assay data and laboratory tests Verification of sampling and assaying Location of data points Data spacing and distribution Explanation Gold assay determined by ICPMS via aqua regia digestion (ALS code Au-TL43). Experience has shown this method to be applicable for fine grained gold population of the mineralisation due to the completion of digestion. There is a technical constraint in that coarse-grained gold may not completely enter solution resulting in conservative assay. All samples returning a >10ppm value were re-assayed using an ore-grade analytical process which provides precision up to a value of 100ppm. Data management procedures are under development. Data management has been performed by an experienced individual and not by several individuals. There has been no verification of significant intersections by independent nor alternative company personnel. There has been substantial RC drillhole twinning during 2015 and 2016 to verify the reliability of the air core drilling method at Four Eagles. Drillhole sampling and geological data documented on paper logs in preparation for database entry. There have been no adjustments to data as supplied and certified by the commercial assay laboratory. All drillhole location coordinates were measured using differential GPS to MGA94 and AHD estimated from terrain model created from publicly-available land survey data Collar locations to within an estimated precision of 1m. All drillholes were downhole surveyed. When available, nonmagnetic drill rods were implemented to allow azimuth surveys down-the-hole. Drilling orientation established prior to collaring with clinometer and compass. Holes drilled on traverses located between existing traverses providing 100m - 150m spacing along the strike of mineralisation at Boyd North, and 50m spacing along the strike of mineralisation at Hayanmi. Traverses consist of holes spaced on undrilled or previously-drilled lines to provide a resultant spacing of 30m on both Boyd North and Hayanmi Mineralisation. This spacing is not of sufficient density to allow the estimation of a mineral resource. One-metre samples were composited to three-metre samples for the purpose of submission to the laboratory. For the purpose of reporting, assays have been aggregated to reflect continuously sampled zones of significant anomalism for gold. 23
24 Air Core Sampling Techniques and Data Criteria Orientation of data in relation to geological structure Sample security Audits or reviews Further work Explanation Drillhole traverses were aligned normal to the strike of mineralisation. Holes on Boyd North mineralisation were generally vertical and on occasion inclined 60 degrees to the east to provide cross-strike investigation within holes and to establish continuity of sub-vertical mineralisation between holes. To this end, holes at Hayanmi were inclined 60 degrees to the west, with the exception of one vertical hole. All samples were controlled by the responsible geologist, and stored in secured facility prior to despatch to laboratory. Samples were transported directly to laboratory by a commercial transportation contractor with chain-of-custody protocols in place. Sample number receipt information from laboratory crossreferenced and rationalised against sample number dispatch information. No processes or data used in developing the release of exploration results have been subject to audit or review by non-company personnel or contractors so as to reduce costs and timelines for reporting. Catalyst Metals Limited currently reserve this process for release of Mineral Resource and Ore Reserve estimates. The air core program designed for Discovery and district-scale gravity geophysics targets in 2017 is in progress, and is planned for completion in May. 24
NEW ZONE OF GOLD MINERALISATION INTERSECTED AT CUNNEENS PROSPECT ON FOUR EAGLES GOLD PROJECT
ASX ANNOUNCEMENT 3 SEPTEMBER 2018 NEW ZONE OF GOLD MINERALISATION INTERSECTED AT CUNNEENS PROSPECT ON FOUR EAGLES GOLD PROJECT Reconnaissance air core drilling intersects new zone of gold mineralisation
More informationHIGH GRADE GOLD MINERALISATION IN RC AND AIRCORE DRILLING AT FOUR EAGLES GOLD PROJECT
ASX ANNOUNCEMENT 29 APRIL 2016 HIGH GRADE GOLD MINERALISATION IN RC AND AIRCORE DRILLING AT FOUR EAGLES GOLD PROJECT Further high grade gold mineralisation intersected at Hayanmi and Boyd s Dam Prospects
More informationFor personal use only
ASX ANNOUNCEMENT 22 JUNE 2015 DRILLING DELIVERS BEST GOLD INTERSECTIONS TO DATE AT FOUR EAGLES GOLD PROJECT Broad gold intersections with high grade intervals recorded in drilling at Four Eagles Gold Project
More informationBULK LEACH ASSAYS CONFIRM HIGH GRADE GOLD ASSAYS AT FOUR EAGLES AND TANDARRA GOLD PROJECTS
ASX ANNOUNCEMENT 23 AUGUST 2017 BULK LEACH ASSAYS CONFIRM HIGH GRADE GOLD ASSAYS AT FOUR EAGLES AND TANDARRA GOLD PROJECTS Hayanmi Zone bulk cyanide leach assays confirm very high-grade gold intersections
More informationBEST-EVER GOLD INTERSECTIONS RECORDED AT FOUR EAGLES GOLD PROJECT
ASX ANNOUNCEMENT 25 JUNE 2018 BEST-EVER GOLD INTERSECTIONS RECORDED AT FOUR EAGLES GOLD PROJECT Boyd s Dam Zone produces best gold intersection ever recorded at Four Eagles Gold Project 16m @ 63.0g/t Au
More informationTANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE
ASX ANNOUNCEMENT 21 APRIL 2017 TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE RC Blade drilling commences at Tandarra Gold Project Up to 3,800 metres planned in 67
More informationFURTHER GOLD INTERSECTIONS FROM DIAMOND AND RC DRILLING AT FOUR EAGLES GOLD PROJECT
ASX ANNOUNCEMENT 29 JANUARY 2019 FURTHER GOLD INTERSECTIONS FROM DIAMOND AND RC DRILLING AT FOUR EAGLES GOLD PROJECT Diamond drilling has commenced at Pickles Gold Zone (formerly Discovery) to test high
More informationFOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE
ASX ANNOUNCEMENT 2 MARCH 2018 FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE Mineralisation Report for Four Eagles Gold Project accepted by DEDJTR RC and Diamond drilling to recommence
More informationDIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT
ASX ANNOUNCEMENT 17 OCTOBER 2017 DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT Reconnaissance Air Core drilling to commence at Macorna Bore and Sebastian Projects Diamond drilling planned
More informationQuarterly Activities Report
ASX: CYL Quarterly Activities Report Quarter ended 30 June 2018 SUMMARY Boyd s Dam Zone produces best gold intersection ever recorded at Four Eagles Gold Project 16m @ 63.0g/t Au (including 12m @ 84g/t
More informationQuarterly Activities Report
ASX: CYL Quarterly Activities Report Quarter ended 31 December 2018 SUMMARY Four Eagles Project Compilation of first half 2018 drilling results provided first evidence of multiple, vertically stacked zones
More informationQuarterly Activities Report
ASX: CYL Quarterly Activities Report Quarter ended 30 June 2018 SUMMARY Boyd s Dam Zone produces best gold intersection ever recorded at Four Eagles Gold Project 16m @ 63.0g/t Au (including 12m @ 84g/t
More informationQuarterly Activities Report
ASX: CYL Quarterly Activities Report Quarter ended 31 March 2018 HIGHLIGHTS The grant of Retention Licence RL4622 over the Four Eagles Gold Project provides secure 10-year title over Catalyst's most advanced
More informationHigh Grade Gold Intersections at Harry Smith Prospect
ABN: 82 138 358 728 ASX: TMZ Level 1, 80 Chandos Street, St Leonards, NSW 2065 PO Box 956, Crows Nest, NSW 1585 Tel: +61 2 9906 6225 Fax: +61 2 9906 5233 Web: www.thomsonresources.com.au ASX Release 16
More informationWANDEAN GOLD DISCOVERY
ASX ANNOUNCEMENT 17 JULY 2014 WANDEAN GOLD DISCOVERY Nagambie Mining (ASX: NAG) is delighted to declare Wandean, 9 km north west of the Nagambie Mine, a virgin gold discovery following the receipt of assays
More informationNEW COBAR-STYLE COPPER DISCOVERY IN NSW
ASX / MEDIA RELEASE 2 AUGUST 2011 NEW COBAR-STYLE COPPER DISCOVERY IN NSW Broad zone of copper-polymetallic mineralisation intersected at 4-Mile prospect Highlights: Wide zone of copper-silver-gold-lead-zinc
More informationFor personal use only
ASX Announcement 2 June 2015 STRONG GOLD ANOMALIES DEFINED AT ST PIERRE Soil sampling defines two strong gold-in-soil anomalies within the St Pierre exploration licence. Soil sampling conducted to follow
More informationASX Announcement ASX Code: MAR 10 April 2018
ASX Announcement ASX Code: MAR 10 April 2018 Significant Exploration Results - Lorena Gold Project Drill hole LMR110 increases the potential for a resource extension at depth HIGHLIGHTS: Drillhole LMR108
More informationHIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT
The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width
More informationASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER
ASX / MEDIA RELEASE 6 MAY 2011 4-MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER Highlights: Silver-lead-zinc discovery at 4-Mile; mineralisation intersected in all
More informationSpargoville Resource Definition Drilling Delivers Further High Grade Gold Results
ASX Announcement 25 August 2016 Spargoville Resource Definition Drilling Delivers Further High Grade Gold Results HIGHLIGHTS Significant, shallow gold intersections reported in several holes including
More informationHits of up to 123gpt show Chesterfield emerging as a high grade gold project
ASX ANNOUNCEMENT 22 August 2013 General Mining Corporation ABN: 95 125 721 075 Hits of up to 123gpt show Chesterfield emerging as a high grade gold project Prospects are ideally located close to existing
More informationASX ANNOUNCEMENT 20 JANUARY 2014
ASX ANNOUNCEMENT 20 JANUARY 2014 EXCITING GOLD INTERSECTIONS AT WANDEAN 21.1 grams per tonne (g/t) gold intersected at Wandean, the highest gold grade ever for the Nagambie region. The previous best oxide
More informationFor personal use only
BOARD OF DIRECTORS Mr Oscar Aamodt Non-Executive Chairman Ms Sofia Bianchi Non-Executive Director Mr Lindsay Dudfield Non-Executive Director Mr Anthony Ho Non-Executive Director ISSUED CAPITAL SHARES 156,852,955
More informationNarembeen Drilling Result. Assay results have been received from the diamond drilling program at Narembeen.
Date: 31 July 2014 Narembeen Drilling Result Highlights Assay results have been received from the diamond drilling program at Narembeen. Assay Results International Resources Ltd () is pleased to announce
More informationFor personal use only
ASX ANNOUNCEMENT 31 July 2018 For personal use only ASX: ASN, ASNOB Anson Application to Drill for Lithium Brine Approved Highlights: Notice of Intent (NOI) to drill Long Canyon A1 site approved by BLM
More informationTable 1 - Checklist of Assessment and Reporting Criteria (The JORC Code, 2012 Edition)
DINGO (PEARL CREEK) PROJECT JORC RESOURCE Table 1 - Checklist of Assessment and Reporting Criteria (The JORC Code, 2012 Edition) The following table provides a summary of important assessment and reporting
More informationASX Announcement 29 July 2015
ASX Announcement 29 July 2015 Further assays received from historic drill core at the Porte-aux-Moines VMS deposit within the Merléac exploration licence. A number of high grade intersections recorded
More informationVictory plans gravity survey for Bonaparte after encouraging rock-chip results
ASX ANNOUNCEMENT 18 September 2017 Victory plans gravity survey for Bonaparte after encouraging rock-chip results Highlights Rock-chip sampling program at Bonaparte Project returns highly encouraging results
More informationFor personal use only
Miyabi Gold Project Update Rift Valley Resources Limited ( Rift Valley or Company ) (ASX: RVY) is pleased to announce first assay results from current drilling at its 100% owned Miyabi Gold Project in
More informationFor personal use only
PRIMARY INTERSECTS BROAD ZONES OF GOLD MINERALISATION AT MOUNT BUNDY INCLUDING 117M AT 1.5G/T GOLD HIGHLIGHTS Initial results from Rustlers Roost shows 117m at 1.5 g/t gold including 8m at 6.9 g/t gold
More informationCobalt up to 0.87% from drilling at Olary Project
Cobalt up to 0.87% from drilling at Olary Project ASX RELEASE November 27, 2017 Renascor Resources Ltd ABN 90 135 531 341 HEAD OFFICE 36 North Terrace Kent Town, SA 5067 Australia CONTACT T: +61 8 8363
More informationFor personal use only
22 December 2015 ASX Code: POZ Laverton Gold Project, WA: Phase 1 Drill Results HIGHLIGHTS 40 hole aircore drilling program for 1,619 metres completed on E38/3038 eastern targets. Assay results received:
More informationFor personal use only
22 December 2016 Tyranna reports further consistent gold grades, strengthening Greenewood Prospect with Phase II drill program completed Highlights Consistent gold results strengthens geological model
More informationFor personal use only
17 July 2017 Quarterly Report June 2017 Ilgarari Copper Project The Ilgarari project contains an Inferred Mineral Resource (JORC 2004) estimated to be 1,100,000 tonnes averaging 1.9% Cu (refer ASX announcement
More informationFor personal use only
12 July 2018 ASX ANNOUNCEMENT ASX: ASN, ASNOB Anson Produces First LCE Product Highlights: First lithium carbonate product extracted from Cane Creek 32-1 brine LCE produced by precipitation process Test
More informationFor personal use only
ASX RELEASE 18 December 2014 ASX Code: CAE High Gold Results from Recent Stream Sediment Sampling Program Stream sediment sampling identified 3 catchments of highly anomalous gold results including a new
More informationFor personal use only
ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon
More informationDrilling and geophysics to test Kurnalpi nickel targets
ASX Release 30 May 2018 Drilling and geophysics to test Kurnalpi nickel targets Two nickel targets prioritised for drill testing and EM geophysics Targets comprise an undrilled strong downhole EM conductor
More informationRemaining assay results Tisová Co Au Cu Project Czech Republic
8 January 2018 Market Announcements Platform ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 Remaining assay results Tisová Co Au Cu Project Czech Republic Auroch Minerals Limited (Auroch
More informationHIGH-GRADE LITHIUM CONFIRMED IN MINCOR S WIDGIEMOOLTHA PEGMATITES
22 February 2017 HIGH-GRADE LITHIUM CONFIRMED IN MINCOR S WIDGIEMOOLTHA PEGMATITES Initial results support interpretation of 4.5km long LCT corridor at Widgiemooltha Presence of lithium-rich pegmatites
More informationGold Intersected in Drilling at Canegrass (WA)
ASX ANNOUNCEMENT 22 May 2015 Gold Intersected in Drilling at Canegrass (WA) highlights Gold intersected in Aircore drilling at Canegrass Mt Magnet Perth WA Canegrass Gold Project 500km Best intersection
More informationFor personal use only
ACN 092 471 513 27 December 2017 ASX Release HIGH GRADE OPEN-PIT GOLD CONFIRMED AT EMPIRE S PENNY S FIND GOLD MINE Further in-pit high grade gold has been confirmed by gold miner, Empire Resources Ltd
More informationINFERRED RESOURCE INFILL DRILLING RESULTS
1 September 2016 INFERRED RESOURCE INFILL DRILLING RESULTS Hillgrove Resources Limited (ASX:HGO) advises that the Company has completed ten RC drill holes within the Giant Pit area to infill gaps in the
More informationHigh grade cobalt confirms Polinga Project as a significant new discovery
ABN 64 123 993 233 ASX Announcement 22 February ABN 64 123 2017 993 233 High grade cobalt confirms Polinga Project as a significant new discovery Highlights First drill holes assayed at Polinga Project
More informationNorwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project
ASX ANNOUNCEMENT 4 December 2018 ASX: NWM Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project Norwest Minerals listed on the ASX 29 th November following its successful $6.6
More informationFor personal use only
29 July 2011 ASX RELEASE ACN 008 901 380 ABN 35 008 901 380 Level 1 460 Roberts Road Subiaco, Western Australia 6008 P.O. Box 66 Floreat Forum WA 6014 Email:wally@stratmin.com.au Website: www.stratmin.com.au
More informationNew Gold Target Identified at Leonora
New Gold Target Identified at Leonora ASX ANNOUNCEMENT 12 September 2017 HIGHLIGHTS 2km long, 400m wide gold anomaly identified from historic drilling on Metallum s newly granted tenement E37-1281 Historic
More informationFor personal use only
2 May 2013 No. of Pages: 7 ASX CODE: ORS Market Cap.: $12.2 m ($0.115 p/s) Shares on issue: 106,048,002 Cash: $2.4 m (31 March 2013) BOARD & MANAGEMENT Ian Gandel, Chairman Anthony Gray, Managing Director
More informationENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA
ASX / MEDIA RELEASE 5 JULY 2010 ENCOURAGING GOLD-BASE METALS AT MAY DAY, MOLY- GOLD AT ATTUNGA Peel Exploration is pleased to announce that recent drilling at the Company s Attunga and May Day projects
More informationAnson Successfully Samples Clastic Zone 31 Brine
30 January 2018 ASX ANNOUNCEMENT ASX: ASN, ASNOB Anson Successfully Samples Clastic Zone 31 Brine Highlights: Brine successfully extracted from Clastic Zone 31 during Gold Bar Unit 2 drilling Samples collected
More informationHigh Grade Gold Intercepts at Bangaba
20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com
More informationWestern Queen Gold Project Drilling Results
Exploration Office Level 3, 100 Pirie Street ADELAIDE SA 5000 ABN: 96 110 336 733 Tel: +61 8 8232 8320 Fax: +61 8 8232 8811 www.monaxmining.com.au 4 January 2018 Western Queen Gold Project Drilling Results
More informationApollo Hill Produces More Robust Extensional Drilling Results
31 May 2018 Apollo Hill Produces More Robust Extensional Drilling Results Highlights: Apollo Hill drilling returns significant near-surface extensional intersections including: AHRC0029, 22m @ 1.01g/t
More informationHigh Grade Gold Drill Results Extend Buccaneer
ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 14 June, 2012 High Grade Gold Drill Results Extend 31 metres averaging 3.68g/t gold including 14 metres averaging 7.56g/t gold ABM Resources NL ( ABM or The Company
More informationYILGANI DRILLING OUTLINES POTENTIAL BEDROCK GOLD TARGET
7 February 2018 YILGANI DRILLING OUTLINES POTENTIAL BEDROCK GOLD TARGET Phase 2 aircore drilling identifies potential 3km long bedrock gold target at Yilgani Drilling results up to 8m @ 507ppb Au (YLAC0224)
More informationMEDIA / ASX RELEASE JORC TABLE 1 ANNEXURE - REVISED. Tuesday 22 April 2014
MEDIA / ASX RELEASE Tuesday 22 April 2014 JORC TABLE 1 ANNEXURE - REVISED Regal Resources Limited ( Regal or the Company ) (ASX:RER) releases a revised JORC Table 1 Annexure which relates to the announcement
More informationDrill Results Confirm Depth Extension at Greenewood Gold Prospect
18 October 2016 Drill Results Confirm Depth Extension at Greenewood Gold Prospect ASX CODE: TYX DIRECTORS Joseph S. Pinto Non-Executive Chairman Bruno Seneque Managing Director Nick Revell Technical Director
More informationTrouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development
ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com
More informationFor personal use only
18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand
More information******************* *******************
This announcement lifts the trading halt requested by the Company on the 13 September 2012 Announcement to the Australian Securities Exchange Monday 17 September 2012 COMPANY UPDATE PARTIALLY UNDERWRITTEN
More informationFurther Outstanding Drill Results at Bygoo Tin
ABN: 82 138 358 728 ASX: TMZ Level 1, 80 Chandos Street, St Leonards, NSW 2065 PO Box 956, Crows Nest, NSW 1585 Tel: +61 2 9906 6225 Fax: +61 2 9906 5233 Web: www.thomsonresources.com.au ASX Release 28
More informationFor personal use only
ASX ANNOUNCEMENT ACN 123 567 073 3 July 2014 NEW FRASER RANGE PROJECT AREA AT KITCHENER New 100%-owned exploration licence application covers 203km 2, situated on the Fraser Range Gravity High Enterprise
More informationMount Gibson Iron Limited ABN
Mount Gibson Iron Limited ABN 87 008 670 817 Level 1, 2 Kings Park Road West Perth 6005, Western Australia PO Box 55, West Perth WA 6872 Telephone: 61-8-9426-7500 Facsimile: 61-8-9485 2305 E-mail: admin@mtgibsoniron.com.au
More informationASX Announcement ASX Code: MAR 19 June 2018
ASX Announcement ASX Code: MAR 19 June 2018 Lorena Gold Project Update: Additional Gold to be Mined from Open Cut Malachite Resources Limited (ASX Code: MAR) ( Malachite or the Company ) is pleased to
More informationLATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT
ASX ANNOUNCEMENT 8 March 2011 LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT New true-width intercepts along strike from Katanning Deposit include: o BSRC0050-10m
More informationFor personal use only
21 December 2017 MASSIVE SULPHIDES INTERSECTED IN DRILLING 15 hole, 2270m diamond drill program completed at Midrim Thick zones of massive sulphides intersected Core being logged and sampled with assays
More informationFor personal use only
ASX/Media Release (ASX: MZN) 16 November 2017 Marindi Metals Ltd ABN 84 118 522 124 Level 3, 35 Havelock Street West Perth WA 6005 Australia Contact: Joe Treacy Managing Director Phone: 08 9322 2338 Email
More informationFurther Visible Gold within completed Diamond Drilling Program at Redback Prospect
Australian Securities Exchange Announcement 23 March 2015 ASX Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 Further Visible Gold within completed Diamond Drilling
More informationBANANGHILIG GOLD DEPOSIT: STERILISATION DRILLING UPDATE
MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:
More informationFor personal use only
ASX/ MEDIA RELEASE 28/03/ 2012 Exciting developments for GBM Gold at its Wedderburn Resource Project Highlights of this announcement: Details Exciting results from recent Diamond drill programme at Gowks
More informationFor personal use only
ASX Release 2 February 2012 ENCOURAGING DIAMOND DRILLING RESULTS CONTINUE AT THE FEKOLA PROJECT Papillon Resources Limited ( Papillon or the Company ) is pleased to release the assay results from two additional
More informationSTRICKLAND GOLD PROJECT UPDATE: DRILLING AT T1 IDENTIFIES MULTIPLE MINERALISED STRUCTURES
ASX: AMD 30 August 2018 STRICKLAND GOLD PROJECT UPDATE: DRILLING AT T1 IDENTIFIES MULTIPLE MINERALISED STRUCTURES HIGHLIGHTS: Aircore drilling at T1 has intersected bedrock gold mineralisation in multiple
More informationFigure 1: Coarse Visible Gold in Pan (combined from multiple drill holes; staple = 1 cm length)
Cora Gold Limited / EPIC: CORA.L / Market: AIM / Sector: Mining 22 March 2018 Cora Gold Limited ( Cora Gold, Cora or the Company ) Stage 2 Drilling Completed at Sanankoro Gold Discovery; Assay Results
More informationFor personal use only
Tanga Resources Limited Ground Floor 63 Hay Street Subiaco WA 6008 t: +61 (8) 9 381 5686 ASX Code : TRL ASX Announcement 03 March 2016 Singida Project Update Winston Prospect Results of Detailed Ground
More informationFor personal use only
ASX ANNOUNCEMENT Date: 6 January 2015 Exploration Programme Update Highlights Initial geochemical soil sampling programmes completed Elevated copper and nickel anomalies defined on interpreted geological
More informationFor personal use only
ASX ANNOUNCEMENT 24 April 2012 COMPANY SNAPSHOT LODESTAR MINERALS LIMITED ABN: 32 127 026 528 CONTACT DETAILS Bill Clayton, Managing Director +61 8 9423 3200 41 Stirling Highway, Nedlands, WA, 6009 PO
More informationDeep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia
ASX Announcement ASX Code: DYL 29 October 2010 Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia HIGHLIGHTS Deep Yellow received a Mineral Resource estimate for the INCA uranium
More informationATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005
ABN 63 110 396 168 FOR THE PERIOD ENDED 31 About Atlas Gold Limited The Company has four projects at varying stages of exploration located at Farrel Well, Pardoo, Mt Minnie and Pearana in the Pilbara region,
More informationASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011
4 July 2011 ASX Announcement New economic gold results confirm Dave East as an exciting new discovery Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com
More informationDrilling Program Commences on Iron Oxide Copper Gold Targets
3 June 2008 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 ABN 42 082 593 235 Electronic delivery No of pages: 6 Drilling
More informationSaturn Accelerates RC Resource Drilling with Two Drill Rigs at the Apollo Hill Gold Project
ASX Announcement 20 July 2018 Saturn Accelerates RC Resource Drilling with Two Drill Rigs at the Apollo Hill Gold Project A second phase of RC resource drilling is underway at Apollo Hill near Leonora,
More informationHigh Grade Gold Drill Results and Successful Soil Sample Programme
Sula Iron & Gold plc / Index: AIM / Epic: SULA / Sector: Natural Resources 26 September 2017 Sula Iron & Gold plc ("Sula" or the "Company") High Grade Gold Drill Results and Successful Soil Sample Programme
More informationHIGH GRADE ZINC DISCOVERY AT TEENA
ROX RESOURCES LIMITED 22 December 2011 Highlights ASX/MEDIA RELEASE HIGH GRADE ZINC DISCOVERY AT TEENA First drill hole intersected a 116m interval of variable mineralisation from 1,012m Multiple zones
More informationA1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS
Heron Resources Limited ABN: 30 068 263 098 Level1, 37 Ord Street, West Perth WA 6005 Phone: +61 (0) 8 9215 4444 Website: www.heronresources.com.au Email: info@heronresouces.com.au ASX: HRR ASX Release
More information102 metres strike length averaging 32.62g/t Gold extends overall surface vein sampling to date to 726 metres strike length averaging 24.
ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 8 th February 2012 Old Pirate Phase 4 Longitudinal Trenching Results for veins on the Western Limb Lodes 102 metres strike length averaging 32.62g/t Gold extends
More informationHigh Grade Lithium Samples from Solonopole
ASX/Media Release 2 October 2017 High Grade Lithium Samples from Solonopole Results returned from first pass mapping, rock chip, soil and grab sampling of the Solonopole Lithium Project, Brazil 10 small
More informationExtensions confirmed at Wingina and Amanda
ASX Announcement 08 March 2019 Extensions confirmed at Wingina and Amanda Extensions beyond existing resource model defined at both Wingina and Amanda Potential to expand resources with further drilling
More informationCOMPLETION OF INITIAL COPPER/GOLD DRILLING PROGRAM AT MILLENIUM LARGE MINERAL SYSTEM IDENTIFIED
Chinalco Yunnan Copper Resources Limited ABN 29 070 859 522 Level 5, 10 Market Street Brisbane QLD 4000 GPO Box 216 Brisbane QLD 4001 Tel: +61 7 3212 6204 Fax: +61 7 3212 6250 ASX Release 4 December 2013
More informationASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION
Ramelius Resources Limited ACN 001 717 540 140 Greenhill Road, Unley SA 5061 GPO Box 1373, Adelaide SA 5001 DX 52003, Unley Telephone (08) 8373 6473 / (08) 8373 5588 Facsimile (08) 8373 5917 ASX RELEASE
More informationSuccessful Exploration Program - Metallum Identifies Multiple Bedrock Conductors at Teutonic
Successful Exploration Program - Metallum Identifies Multiple Bedrock Conductors at Teutonic ASX ANNOUNCEMENT 23 May 2017 HIGHLIGHTS Multiple bedrock conductors have been identified from the recently completed
More informationMaximus intersects significant widths of high grade gold at Larkinville Deposit in Western Australia
ASX Announcement 21 st December 2016 Maximus intersects significant widths of high grade gold at Larkinville Deposit in Western Australia HIGHLIGHTS Recent drill program identifies high grade intercepts
More informationDe Grey Mining Ltd. High Grade Zinc mineralisation defined at Tabba Tabba Highlights. Turner River Unlocking Shareholder Value
De Grey Mining Ltd ASX Announcement 12 September 2016 ASX Code DEG ABN 65 094 206 292 COMPANY DIRECTORS Simon Lill Executive Chairman Davide Bosio Non-executive Director Steve Morris Non-executive Director
More informationDiamond Drilling Extends the Netiana Lodes at Depth
ASX/Media Announcement 21 December 2012 Diamond Drilling Extends the Netiana Lodes at Depth New diamond hole intersections include: o 13m at 22.0 g/t gold from 42m, including 1m at 123 g/t gold from 42m
More informationLarge-scale coincident copper and gold anomalism at Blue Hills
ASX Announcement (ASX:AXE) 26 June 2018 Large-scale coincident copper and gold anomalism at Blue Hills Highlights Discovery of large gold anomaly at Blue Hills with gold grades up to 0.42 g/t. Gold anomaly
More informationDrill testing of gold zones at Albury Heath intersect impressive quartz lodes
ASX ANNOUNCEMENT/MEDIA RELEASE 7 January 2019 Drill testing of gold zones at Albury Heath intersect impressive quartz lodes Focused drill testing of bonanza grade gold at Albury Heath completed Seven holes
More informationRC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS
Magmatic Resources Ltd Level 1, 11 Lucknow Place West Perth WA 6005 Phone: +61 8 6102 2709 www.magmaticresources.com ASX / MEDIA ANNOUNCEMENT 21 August 2017 RC DRILLING TO RESUME THIS WEEK AT CARLISLE
More informationFor personal use only
ASX Announcement 27 June 2016 MULTIPLE NEW GOLD ZONES IDENTIFIED IN AIRCORE DRILLING AT ULYSSES KEY POINTS Significant new gold zones intersected at Ulysses East and Ulysses West outside of the existing
More informationFor personal use only
ASX Announcement (ASX: MDS) Date: January 17 2014 High-Grade Copper Hits at Overlander North and South HIGHLIGHTS RC drilling at both Overlander North and Overlander South confirmed further high-grade
More information704,000 OUNCE MIYABI GOLD PROJECT UPDATE
704,000 OUNCE MIYABI GOLD PROJECT UPDATE ASX/ RELEASE 21 April 2016 ASX code RVY Board of Directors: Geoff Gilmour Managing Director Greg Cunnold Technical Director Graeme Clatworthy Non-Executive Director
More information