1 ASX ANNOUNCEMENT 14 December 2010 ABN: Drilling Resuls Suppor Underground Poenial of Tuckabianna Wes Highlighs Tuckabianna Wes is delivering highly encouraging resuls: - Muliple mineralised zones conained wihin he deposi - Drilling o dae has defined he mineralised zones over a 300 mere verical deph beneah he previously mined open pi - Mineralisaion remains open o he norh, souh and a deph - Srike exen o dae averages 350 meres in lengh High grade resuls including: meres a 18.3 g/ Au from 143 meres meres a 15.4 g/ Au from 170 meres meres a 16.2 g/ au from 94 meres meres a 5.7 g/ Au from 370 meres meres a 7.9 g/ Au from 290 meres meres a 4.5 g/ Au from 329 meres Upgraded resource o be announced in January 2011 Silver Lake Resources Ld ( Silver Lake ) is pleased o announce assay resuls from he Tuckabianna Wes deposi a he Murchison projec. Silver Lake s acceleraed exploraion is argeing o significanly increase resources a is Murchison Projec in Wesern Ausralia (refer o figure 1). This projec already has a combined resource of 13.7 million onnes a 3.0 g/ Au for 1.3 million ounces (refer o able 2). The Tuckabianna deposis are based around he 13 km long main and parallel zones ha are subjec o an ongoing drill programme (refer o figure 2). These deposis already have a resource of 8.9 million onnes a 2.4 g/ Au for 680,000 oz (refer o able 2) and have previously produced 375,000 oz of gold from open pi mines. Curren resources have been consrained by limied drilling, paricularly a deph, as only 3% of drill holes in he area are deeper han 100 meres (refer o figure 3). The Tuckabianna Wes deposi was he highes yielding open pi gold mine in he field producing 157,000 oz and has a curren resource of 150,000 oz (refer o able 2). The open pi was mined o a deph of 110 meres (refer o figure 4). Assay resuls (refer o able 1) have been received from he ongoing surface drilling programme. These resuls indicae coninuous high grade mineralisaion on muliple lodes beneah he previously mined open pi. The high grade inersecions range from 94 meres o 420 meres below he surface and remain open o he norh, souh and a deph (refer o figures 4 and 5). Silver Lake Resources Ld (ASX: SLR) Page 1 of 7

2 The nex phase of drilling is designed o infill he curren mineralised envelope. A resource upgrade for his deposi will be announced as par of he company s nex resource upgrade in January Figure 1: Murchison projecs locaion plan. Silver Lake Resources Ld (ASX: SLR) Page 2 of 7

3 Tuckabianna Main Zone 13 km srike lengh Poenial 13 km parallel line of mineralisaion Figure 2: Aerial view of he 13km long Tuckabianna main and parallel zones where previous open pi mines on he main zone produced 375,000 oz of gold. 3 Figure 3: Schemaic view of Tuckabianna showing limied drilling below 100 meres deph. Silver Lake Resources Ld (ASX: SLR) Page 3 of 7

4 Figure 4: Tuckabianna Wes Long secion showing laes inerceps in muliple zones. Figure 5: Tuckabianna Wes cross secion 8300 mn showing inerpreed mineralised zones. Silver Lake Resources Ld (ASX: SLR) Page 4 of 7

5 Hole ID Mine Grid Mine Grid Mine Grid From (m) To (m) Down hole Norhing Easing mrl Inerval (m) g/ Au 10TURC TURC TURC TURC148A TURC TURC TURC TURC TURC TURC TURC TURC TURC TURC TURC Table 1: Drilling and assay resuls for Tuckabianna Wes greaer han 1 g/ Au. These laes resuls suppor our view ha large resources exis beyond he previous shallow drilling in he Murchison. This is he firs phase of deeper drilling a Tuckabianna Wes and we are highly encouraged on he underground poenial of his deposi said Silver Lake s Managing Direcor Les Davis. Ongoing exploraion is focusing on exending curren resources ha have previously been consrained by limied drilling paricularly below 100 meres deph. Our sraegy is o delineae sufficien resources o susain a 100,000 oz per annum operaion Mr Davis added. For more informaion abou Silver Lake and is projecs please visi our web sie a For furher informaion please conac Les Davis Managing Direcor conac@silverlakeresources.com.au Silver Lake Resources Ld (ASX: SLR) Page 5 of 7

6 Abou Silver Lake Resources Ld: Silver Lake is an ASX 300 gold producing and exploraion company wih a resource base of 2.5 million oz in highly prospecive regions including he Moun Monger goldfield and he Murchison (Tuckabianna, Come, and Moyagee). Silver Lake s sraegy is o develop large producion cenres a Moun Monger and a he Murchison wih muliple mines a each cenre. Silver Lake s Moun Monger Operaion conains he Daisy Milano and Daisy Eas underground mines and he Cosello open pi locaed 50 km souh eas of Kalgoorlie. Moun Monger has addiional muli mine poenial underpinned by emerging open pi producion from Wombola Dam, Wombola Pi and he Magic, deposi. Furhermore he exension of he Haoma and Rosemary lodes show poenial as near erm producion sources. Gold ore from Moun Monger is ranspored o Silver Lake s 600,000 pa Lakewood Gold Processing Faciliy locaed 5 km souh eas of Kalgoorlie and 45 km from he Daisy Milano mine. In he Murchison ongoing exploraion is focusing on exending curren resources ha have previously been consrained by limied drilling paricularly below 100 meres deph. Our sraegy is o delineae sufficien resources o susain a 100,000 oz per annum operaion. Silver Lake s exploraion programme is argeing 1 5 million oz Au in resource. Compeen Person s Saemen The informaion in his repor ha relaes o Exploraion Resuls and Mineral Resources is based on informaion compiled by Mr Chrisopher Banasik who is a Member of he Ausralasian Insiue of Mining and Meallurgy. Mr Banasik is a full ime employee of Silver Lake Resources Ld, and has sufficien experience which is relevan o he syle of mineralisaion under consideraion o qualify as a Compeen Person as defined in he 2004 ediion of he JORC Code. Mr Banasik has given his consen o he inclusion in he repor of he maers based on he informaion in he form and conex in which i appears. 1: Informaion ha relaes o exploraion and producion arges refers o arges ha are concepual in naure, where here has been insufficien exploraion o define a Mineral Resource and i is uncerain if furher exploraion will resul in he deerminaion of a Mineral Resource. Noes o Table 1: - Assay mehod is 40 gram fire assay. Silver Lake Resources Ld (ASX: SLR) Page 6 of 7

7 Deposi Measured Resources Indicaed Resources Inferred Resources Toal Resources g/ Au Toal g/ Au Toal g/ Au Toal g/ Au Toal Daisy Milano Daisy Eas Chrismas Fla Cosello Lorna Doone Magic , Wombola Pi Wombola Dam Toal Moun Monger , , , ,081.0 Causons Causons Souh Tuckabianna Wes Friars Jasper Queen Gil Edge Genesis Exodus Julies Reward Sherwood Jaffas Folly Lile John TMC/Kaies , , , , Toal Tuckabianna , , , Come , , , Moyagee Toal Murchison , , , ,321.6 Rohsay Toal Silver Lake , , , , , ,535.5 Table 2: June 2010 Resource Invenory Rounding may give rise o uni discrepancies in his able Silver Lake Resources Ld (ASX: SLR) Page 7 of 7

70% increase in high grade gold JORC Resource inventory to 2.5 million ounces

70% increase in high grade gold JORC Resource inventory to 2.5 million ounces ASX ANNOUNCEMENT 29 July 2010 ABN: 38 108 779 782 70% increase in high grade gold JORC Resource invenory o 2.5 million ounces Highlighs Moun Monger: Toal resource of 3.6 million onnes a 9.4 g/ Au for 1.1

More information

Advanced Gold Exploration Project With Numerous Targets

Advanced Gold Exploration Project With Numerous Targets Suite 4, Level 3 South Shore Centre 85 South Perth Esplanade South Perth WA 6151 TEL +61 8 6313 3800 FAX +61 8 6313 3888 ABN 38 108 779 782 ASX ANNOUNCEMENT 24 January 2012 Silver Lake To Acquire 1Moz

More information

JORC Resource Increase & Upgrade. 10% increase in high grade JORC Resource to 3.3 million ounces

JORC Resource Increase & Upgrade. 10% increase in high grade JORC Resource to 3.3 million ounces ASX ANNOUNCEMENT 2 August 2011 ABN: 38 108 779 782 JORC Resource Increase & Upgrade 10% increase in high grade JORC Resource to 3.3 million ounces Highlights Mount Monger: Total resource of 5.1 million

More information

Paydirt s Gold Conference. Perth March Les Davis - Managing Director ASX: SLR ABN:

Paydirt s Gold Conference. Perth March Les Davis - Managing Director ASX: SLR ABN: Paydirt s Gold Conference Perth March 2010 Producing, Exploring & Growing Les Davis - Managing Director ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important Notice and Disclaimer Silver

More information

Diggers and Dealers Mining Forum. August Exploration success underpinning growth targets. Les Davis - Managing Director

Diggers and Dealers Mining Forum. August Exploration success underpinning growth targets. Les Davis - Managing Director Diggers and Dealers Mining Forum August 2011 Exploration success underpinning growth targets Les Davis - Managing Director ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important Notice and

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

EXPLORATION SUCCESS AT COYOTE GOLD MINE

EXPLORATION SUCCESS AT COYOTE GOLD MINE 19 November 2012 Jon Latto COMPANY SECRETARY Jane Bown EXECUTIVE ASSISTANT EXPLORATION SUCCESS AT COYOTE GOLD MINE COYOTE GOLD MINE HIGHLIGHTS Ongoing exploration drilling continues to return high grade

More information

New High Grade Lode Discovered at Wagtail South

New High Grade Lode Discovered at Wagtail South 23 April 2013 ASX Announcement New High Grade Lode Discovered at Wagtail South Bulletin Resources Limited (ASX: BNR) is pleased to announce the receipt of further assay results from the 5,000 metre reverse

More information

Investor Presentation. February Les Davis - Managing Director ASX: SLR ABN:

Investor Presentation. February Les Davis - Managing Director ASX: SLR ABN: Investor Presentation February 2014 Les Davis - Managing Director ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important Notice and Disclaimer Disclaimer: Silver Lake Resources Limited (

More information

ASX ANNOUNCEMENT 21 MARCH 2011

ASX ANNOUNCEMENT 21 MARCH 2011 ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights

More information

For personal use only

For personal use only ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project Bulletin Resources is the 100% owner of the Lamboo and Golden Crown Gold Projects located near Halls Creek in the East Kimberley region of Western Australia. The projects have a combined open pit and underground

More information

For personal use only

For personal use only Diggers & Dealers August 2013 Les Davis - Managing Director ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important Notice and Disclaimer Silver Lake Resources Limited has prepared this presentation

More information

High Grade Gold Intersections at Harry Smith Prospect

High Grade Gold Intersections at Harry Smith Prospect ABN: 82 138 358 728 ASX: TMZ Level 1, 80 Chandos Street, St Leonards, NSW 2065 PO Box 956, Crows Nest, NSW 1585 Tel: +61 2 9906 6225 Fax: +61 2 9906 5233 Web: www.thomsonresources.com.au ASX Release 16

More information

Silver Lake Resources Ltd Les Davis Managing Director

Silver Lake Resources Ltd Les Davis Managing Director Silver Lake Resources Ltd Les Davis Managing Director 2013 ASX Spot Light Small to Mid Caps Conference New York Les Davis - Managing Director ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au

More information

For personal use only

For personal use only 2 May 2013 No. of Pages: 7 ASX CODE: ORS Market Cap.: $12.2 m ($0.115 p/s) Shares on issue: 106,048,002 Cash: $2.4 m (31 March 2013) BOARD & MANAGEMENT Ian Gandel, Chairman Anthony Gray, Managing Director

More information

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA 28 NOVEMBER 2018 ASX/MEDIA RELEASE NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA Drilling underway targeting high-grade underground extensions of Zoroastrian

More information

Exploration Update: RC Drilling Commenced at Lucky Strike

Exploration Update: RC Drilling Commenced at Lucky Strike L efroy ASX Announcement LEFROY EXPLORATION LIMITED Western Australian Focused Gold Explorer ASX Code: LEX Shares on Issue: 64.5m Current Share Price: 17c Market Capitalisation: $11m Board of Directors

More information

For personal use only

For personal use only Annual General Meeting Perth 23 November 2012 ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Board of Directors Paul Chapman - Non Executive Chairman Les Davis - Managing Director Chris Banasik

More information

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME ASX ANNOUNCEMENT 28 March 2013 FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME Focus Minerals Ltd. (ASX: FML) is pleased to announce the first round of results

More information

BUNDARRA RESOURCE UPDATE

BUNDARRA RESOURCE UPDATE t Friday 15 April 2011 Company Announcement ASX ANNOUNCEMENT ASX CODE: TMX, TMXOA CAPITAL STRUCTURE TMX - Shares on Issue 217.98m TMXOA - Options on Issue 18.24m - Unlisted Options 56.81m DIRECTORS & KEY

More information

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com

More information

Diamond Drilling Extends the Netiana Lodes at Depth

Diamond Drilling Extends the Netiana Lodes at Depth ASX/Media Announcement 21 December 2012 Diamond Drilling Extends the Netiana Lodes at Depth New diamond hole intersections include: o 13m at 22.0 g/t gold from 42m, including 1m at 123 g/t gold from 42m

More information

TRENCHING CONFIRMS HIGH GRADE GOLD AT SUMBA

TRENCHING CONFIRMS HIGH GRADE GOLD AT SUMBA Thursday, 10 December 2009 TRENCHING CONFIRMS HIGH GRADE GOLD AT SUMBA Work has highlighted high grade gold in trenches in the Western Vein system at the Pahandanjal Prospect, with multiple veins striking

More information

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE ASX ANNOUNCEMENT 21 APRIL 2017 TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE RC Blade drilling commences at Tandarra Gold Project Up to 3,800 metres planned in 67

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 16 th January 2012 BLACKHAM CONFIRMS MATILDA RESOURCES Blackham completes review of existing Matilda Project Resources 601,000oz inferred resources contained within 6 deposits Includes

More information

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT ASX ANNOUNCEMENT 8 March 2011 LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT New true-width intercepts along strike from Katanning Deposit include: o BSRC0050-10m

More information

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

High Grade Gold Intercepts at Bangaba

High Grade Gold Intercepts at Bangaba 20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com

More information

EIS sponsored Diamond drilling to commence at Zanex

EIS sponsored Diamond drilling to commence at Zanex L efroy ASX Announcement LEFROY EXPLORATION LIMITED Western Australian Focused Gold Explorer ASX Code: LEX Shares on Issue: 64.5m Current Share Price: 16.5c Market Capitalisation: $10.6m Board of Directors

More information

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso ASX/Media Announcement 18 January 2013 Further Extensions to the Netiana Lodes at Balogo, Burkina Faso All assays from the recent diamond and reverse circulation drilling have been received. New intersections

More information

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

ROE HILLS COBALT AND GOLD DRILLING ADVANCES ASX ANNOUNCEMENT 22 June 2017 ROE HILLS COBALT AND GOLD DRILLING ADVANCES Aircore drilling completed to test ROE-1 cobalt prospect with assays awaited; RC drilling now underway targeting three high-priority

More information

For personal use only

For personal use only ACN 092 471 513 28 November 2016 ASX Release PENNY S FIND GOLD MINE UPGRADED POTENTIAL FOR MINE LIFE EXTENSION Empire Resources Limited ( Empire, ASX code: ERL) is pleased to give an update on the progress

More information

For personal use only

For personal use only ASX Release 2 February 2012 ENCOURAGING DIAMOND DRILLING RESULTS CONTINUE AT THE FEKOLA PROJECT Papillon Resources Limited ( Papillon or the Company ) is pleased to release the assay results from two additional

More information

Co-O MINE MINERAL RESOURCE UPDATE

Co-O MINE MINERAL RESOURCE UPDATE MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

For personal use only

For personal use only ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non

More information

Annual General Meeting

Annual General Meeting Annual General Meeting 20 November 2015 ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important notices Disclaimer - Silver Lake Resources Limited ( Silver Lake or the Company ) has prepared

More information

FIRST RESULTS FROM RC DRILLING AT KONONGO

FIRST RESULTS FROM RC DRILLING AT KONONGO ASX Release Monday 29 March 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 FIRST RESULTS FROM RC DRILLING AT KONONGO Signature

More information

76,000 Ounce Gold Resource at Akoko North

76,000 Ounce Gold Resource at Akoko North 31 st March 2009 76,000 Ounce Gold Resource at Akoko North 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Scoping study (assuming toll milling) estimates $A24M

More information

High Grade Gold Drill Results Extend Buccaneer

High Grade Gold Drill Results Extend Buccaneer ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 14 June, 2012 High Grade Gold Drill Results Extend 31 metres averaging 3.68g/t gold including 14 metres averaging 7.56g/t gold ABM Resources NL ( ABM or The Company

More information

High-grade Gold in First Drilling Undertaken at Productora South

High-grade Gold in First Drilling Undertaken at Productora South ASX ANNOUNCEMENT Wednesday 10th October 2012 High-grade Gold in First Drilling Undertaken at Productora South Shallow, high-grade, narrow-vein gold area adds further up-side to Productora Sierra Zapallo

More information

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE ASX ANNOUNCEMENT 2 MARCH 2018 FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE Mineralisation Report for Four Eagles Gold Project accepted by DEDJTR RC and Diamond drilling to recommence

More information

Malachite Resources Limited ABN

Malachite Resources Limited ABN Malachite Resources Limited ABN 86 075 63 268 ASX Announcement ASX Code: MAR 27 October 20 NEW DRILLING RESULTS AT LORENA SUPPORT COMMENCEMENT OF MINING FEASIBILITY STUDY Malachite Resources Limited (

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 23 May 2017 KAIROS SET TO COMMENCE NEXT PHASE OF GOLD DRILLING AT ROE HILLS AHEAD OF SCHEDULE Highlights: 5,000m aircore/rc drilling campaign to begin immediately following current cobalt

More information

Maiden Kandia Gold Resource of 107,500 Ounces

Maiden Kandia Gold Resource of 107,500 Ounces ASX RELEASE 5 th December 2011 Maiden Kandia Gold Resource of 107,500 Ounces Mineral Resource estimate for the Kandia prospect totals 3.3mt @ 1.0g/t gold for 107,500 ounces Resource outcrops at surface

More information

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

More information

Disclaimer. Forward-Looking Statements. Competent Person s Statement

Disclaimer. Forward-Looking Statements. Competent Person s Statement Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director Resources Rising Stars, May 29-30 2018 Disclaimer Forward-Looking Statements Some statements

More information

ASX and Media Release

ASX and Media Release ASX and Media Release Outstanding walk-up drill targets identified at Tarcoola Highlights High priority mineralised zones identified under existing high-grade Tarcoola open pit which are open along strike

More information

Hann Prospect New Gold Discovery Confirmed

Hann Prospect New Gold Discovery Confirmed 1 st July 2010 Company Announcements Office Australian Securities Exchange Level 4 20 Bridge Street SYDNEY NSW 2000 Dear Sir / Madam Hann Prospect New Gold Discovery Confirmed Eleckra Mines Limited ( Eleckra

More information

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

High Grade Gold Results from RAB Drilling at the Central Bore Prospect 16 th July 2009 Company Announcements Office Australian Securities Exchange Level 4 20 Bridge Street SYDNEY NSW 2000 Dear Sir / Madam High Grade Gold Results from RAB Drilling at the Central Bore Prospect

More information

Chalice, Higginsville Drilling

Chalice, Higginsville Drilling Chalice, Higginsville Drilling 31 May 2006 Eastern Goldfields Higginsville Chalice First results from Chalice Gold Mines Limited s (Chalice Gold Mines or Company) drilling program have been received. Chalice

More information

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

MARKET UPDATE ON URANIUM AND GOLD PROJECTS ASX Announcement 1 March 2011 MARKET UPDATE ON URANIUM AND GOLD PROJECTS HIGHLIGHTS 5,000 metre drilling programme to commence at Rio Puerco uranium project within the next two weeks. Drilling to commence

More information

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL ASX ANNOUNCEMENT 16 SEPTEMBER 2011 Phillips River Mining NL ABN 61 004 287 790 Unit 46/328 Albany Highway VICTORIA PARK WA 6100 T: 08 6250 4600 F: 08 6250 4699 info@phillipsriver.com.au CONTACT Jason Stirbinskis

More information

Kalman Mineral Resource Update

Kalman Mineral Resource Update 10 September 2008 The Manager Company Announcements Office stralian Stock Exchange Via Online Electronic Lodgement Kalman Mineral source Update The Directors are pleased to announce an updated mineral

More information

Math 111 Midterm I, Lecture A, version 1 -- Solutions January 30 th, 2007

Math 111 Midterm I, Lecture A, version 1 -- Solutions January 30 th, 2007 NAME: Suden ID #: QUIZ SECTION: Mah 111 Miderm I, Lecure A, version 1 -- Soluions January 30 h, 2007 Problem 1 4 Problem 2 6 Problem 3 20 Problem 4 20 Toal: 50 You are allowed o use a calculaor, a ruler,

More information

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT ABN 17 124 444 122 10 June 2009 The Manager Company Announcements Office Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 Dear Sir/Madam HIGHLIGHTS TWO HIGH-GRADE GOLD ZONES DISCOVERED AT

More information

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

704,000 OUNCE MIYABI GOLD PROJECT UPDATE 704,000 OUNCE MIYABI GOLD PROJECT UPDATE ASX/ RELEASE 21 April 2016 ASX code RVY Board of Directors: Geoff Gilmour Managing Director Greg Cunnold Technical Director Graeme Clatworthy Non-Executive Director

More information

For personal use only

For personal use only 18 April 2013 ASX CODE: KAS OUR PRIME COMMODITY IS TIN HIGHLIGHTS Drilling Confirms Continuity & Grade at Achmmach Drilling on sections 3130mE, 3170mE and 3290mE has successfully confirmed position, continuity

More information

Setting a new course. 28 August 2015 ASX: SLR ABN:

Setting a new course. 28 August 2015 ASX: SLR ABN: Setting a new course 28 August 2015 ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important notices Disclaimer - Silver Lake Resources Limited ( Silver Lake or the Company ) has prepared

More information

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide

Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide 9 th July 2008 Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide Castle Minerals Limited (ASX:CDT) is pleased to advise that further sampling at its Wa project has confirmed

More information

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS Heron Resources Limited ABN: 30 068 263 098 Level1, 37 Ord Street, West Perth WA 6005 Phone: +61 (0) 8 9215 4444 Website: www.heronresources.com.au Email: info@heronresouces.com.au ASX: HRR ASX Release

More information

Bass Metals records further positive drill results & progress at 3 prospects.

Bass Metals records further positive drill results & progress at 3 prospects. 16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret

More information

ASX ANNOUNCEMENT FURTHER EXPLORATION SUCCESS AT NULLAGINE

ASX ANNOUNCEMENT FURTHER EXPLORATION SUCCESS AT NULLAGINE WEDGETAIL MINING LTD ABN 85 3 257 556 Ground Floor, 24 Outram St West Perth WA 65 ASX ANNOUNCEMENT Postal: PO Box 117, West Perth WA 6872 Phone: +61 8 9488 88 Fax: +61 8 9481 288 Website: www.wedgetail.net.au

More information

Consolidated Tin Mines Limited

Consolidated Tin Mines Limited Snapshot: Current CSD Share Price: $0.060 Current LME Tin Price: $22,950 Key Points Detailed information at www.csdtin.com.au Additional Tin Resource Acquired at Jeannie River Additional 13,440 tonne tin

More information

ASX ANNOUNCEMENT 26 August 2016 MINERAL RESOURCES AND ORE RESERVES UPDATE

ASX ANNOUNCEMENT 26 August 2016 MINERAL RESOURCES AND ORE RESERVES UPDATE ASX ANNOUNCEMENT 26 August 2016 MINERAL RESOURCES AND ORE RESERVES UPDATE COMPANY SUMMARY AT 30 JUNE 2016 Total Mineral Resources are estimated at: 54.8 Mt @ 2.8 g/t Au for 4.92 Moz of contained gold,

More information

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA ASX Release 4 th November 2009 SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce commencement of site works at the A1 Gold Mine in eastern

More information

******************* *******************

******************* ******************* This announcement lifts the trading halt requested by the Company on the 13 September 2012 Announcement to the Australian Securities Exchange Monday 17 September 2012 COMPANY UPDATE PARTIALLY UNDERWRITTEN

More information

The Manager Companies ASX Limited 20 Bridge Street

The Manager Companies ASX Limited 20 Bridge Street ABN 79 106 879 690 10 July 2012 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, 1.54 Moz Gold Equivalent Maiden Gold/Copper Resource at Wonogiri The Directors

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 07 JUNE 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Mr Peter Farris Mr Peter

More information

For personal use only

For personal use only 15 October 2010 ASX/Media Release 17 July 2012 Paste Fill Approval and New Drilling Program at Dargues Reef Initial focus on high priority near-mine gold targets Approval received for use of paste-fill

More information

Annual Report Amended Additional Information

Annual Report Amended Additional Information ASX Announcement 13 October 2017 Annual Report Amended Additional Information ASX Code: VKA Viking Mines Ltd (Viking or the Company) hereby releases amended commentary to relevant sections of its annual

More information

NEW DISCOVERIES AT THE RED OCTOBER MINE

NEW DISCOVERIES AT THE RED OCTOBER MINE 23 July 2013 ASX & MEDIA RELEASE NEW DISCOVERIES AT THE RED OCTOBER MINE The Directors of Saracen Mineral Holdings Limited (the Company ) are pleased to provide an update on the Red October underground

More information

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit ACN 121 539 375 Principal Office: Level 2, 23 Ventnor Avenue West Perth 6005 Western Australia Phone: + 61894817344 Fax: + 61894817355 Email: info@westafricanresources.com Web: www.westafricanresources.com

More information

ASX/Media Announcement

ASX/Media Announcement ASX/Media Announcement 25 March 2013 MAIDEN HIGH-GRADE JUDY LODE RESOURCE INDICATES POTENTIAL TO INCREASE ANDY WELL MINE LIFE 106,000 ounce high-grade resource (Indicated & Inferred) Judy South (137,000t

More information

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Excellent Results Received for the Six BZ Holes Highest grade intercepted was 1 metre at 58 g/t gold

More information

For personal use only

For personal use only 10 July 2012 Encouraging New Gold Results from Gunung Rosa Drilling Highlights Assay results from three drill holes at depth under the Cap Palu section confirm significantly wider intercepts of gold-copper-base

More information

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes ASX ANNOUNCEMENT/MEDIA RELEASE 7 January 2019 Drill testing of gold zones at Albury Heath intersect impressive quartz lodes Focused drill testing of bonanza grade gold at Albury Heath completed Seven holes

More information

For personal use only

For personal use only ABN 77 141 335 364 ASX: AAJ For the quarter ending 30 September 2014 HIGHLIGHTS Bulloo Downs Copper Project exploration 2,000km 2 HyMap survey at Bulloo Project completed Increased lengths of mineralisation

More information

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project ASX ANNOUNCEMENT 22 August 2013 General Mining Corporation ABN: 95 125 721 075 Hits of up to 123gpt show Chesterfield emerging as a high grade gold project Prospects are ideally located close to existing

More information

ASX/Media Announcement 14 July 2010

ASX/Media Announcement 14 July 2010 ASX/Media Announcement 14 July 2010 HIGH-GRADE DRILL RESULTS FROM ANDY WELL EXTEND WILBER LODE Diamond drilling at Andy Well intersects visible gold in quartz lodes below MNRC006, extending the depth of

More information

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso ASX/Media Announcement 10 July 2012 More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso New reverse circulation (RC) hole intersections include: o 12m at 20.5 g/t gold from 73m,

More information

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT ASX ANNOUNCEMENT 17 OCTOBER 2017 DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT Reconnaissance Air Core drilling to commence at Macorna Bore and Sebastian Projects Diamond drilling planned

More information

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width

More information

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011 4 July 2011 ASX Announcement New economic gold results confirm Dave East as an exciting new discovery Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com

More information

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. 30 April 2008 60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. Perilya Limited (ASX: PEM) is pleased to announce a 60% increase in the mineral resource estimate for the

More information

Drilling Program Commences on Iron Oxide Copper Gold Targets

Drilling Program Commences on Iron Oxide Copper Gold Targets 3 June 2008 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 ABN 42 082 593 235 Electronic delivery No of pages: 6 Drilling

More information

ASX Announcement. Bulletin grows resource base and tenement position

ASX Announcement. Bulletin grows resource base and tenement position Bulletin Resources is the 100% owner of the Nicolson s Gold Project located near Halls Creek in the Kimberley region of Western Australia. The project has a combined open pit and underground Mineral Resource

More information

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE

CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE 29 August 2011 CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE Outstanding drill results extend scope of Mining Study for Jambreiro Iron Ore Project,

More information

LATEST RESULTS FROM RC DRILLING

LATEST RESULTS FROM RC DRILLING ASX Release Tuesday 6 July 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 LATEST RESULTS FROM RC DRILLING Signature Metals Limited

More information

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS Magmatic Resources Ltd Level 1, 11 Lucknow Place West Perth WA 6005 Phone: +61 8 6102 2709 www.magmaticresources.com ASX / MEDIA ANNOUNCEMENT 21 August 2017 RC DRILLING TO RESUME THIS WEEK AT CARLISLE

More information

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso ASX/Media Announcement 24 May 2013 New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso A new zone of high grade gold mineralisation has been discovered 1km NE along strike from

More information

Aurora Tank Gold Drilling Update

Aurora Tank Gold Drilling Update ASX ANNOUNCEMENT 19 December 2016 Marmota Limited (ASX: MEU) ( Marmota ) Aurora Tank Gold Drilling Update Marmota is pleased to advise that 31 RC holes at Aurora Tank have now been completed. KEY POINTS

More information

For personal use only

For personal use only Alloy Regains Control of the Horse Well Gold Project ASX Release 29 January 2018 Capital Structure ABN 20 109 361 195 ASX Code AYR Issued Shares 1,266,993,360 Unlisted Options 29,000,000 Corporate Directory

More information

Auger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor

Auger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor ACN 121 539 375 Principal Office: Level 2, 23 Ventnor Avenue West Perth 6005 Western Australia Phone: + 61894817344 Fax: + 61894817355 Email: info@westafricanresources.com Web: www.westafricanresources.com

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 24 April 2012 COMPANY SNAPSHOT LODESTAR MINERALS LIMITED ABN: 32 127 026 528 CONTACT DETAILS Bill Clayton, Managing Director +61 8 9423 3200 41 Stirling Highway, Nedlands, WA, 6009 PO

More information

MARCH 2010 QUARTERLY REPORT

MARCH 2010 QUARTERLY REPORT MARCH 2010 QUARTERLY REPORT ASX Release HIGHLIGHTS Friday 30 April 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 16 NOVEMBER 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Non-Executive Director