Silver Lake Resources Ltd Les Davis Managing Director
|
|
- Kelley Horton
- 5 years ago
- Views:
Transcription
1 Silver Lake Resources Ltd Les Davis Managing Director
2 2013 ASX Spot Light Small to Mid Caps Conference New York Les Davis - Managing Director ASX: SLR ABN:
3 Important Notice and Disclaimer Silver Lake Resources Limited has prepared this presentation based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation. All dollar terms expressed in this presentation are in Australian dollars unless otherwise stated. To the maximum extent permitted by law, none of Silver Lake Resources Limited, its directors, employees or agents, advisers, nor any other person accepts any liability, including, without limitation, any liability arising from fault or negligence on the part of any of them or any other person, for any loss arising from the use of this presentation or its contents or otherwise arising in connection with it. This presentation is not an offer, invitation, solicitation or other recommendation with respect to the subscription for, purchase or sale of any security, and neither this presentation nor anything in it shall form the basis of any contract or commitment whatsoever. This presentation may contain forward looking statements that are subject to risk factors associated with gold exploration, mining and production businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected by a variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially, including but not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results, reserve estimations, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory changes, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates. The information in this presentation that relates to mineral resources, mineral reserves and exploration results are based on information compiled by Mr Christopher Banasik who is a Member of the Australasian Institute of Mining and Metallurgy. Any statement herein, direct or implied, as to a potential gold deposit is conceptual in nature and a reference to the targeted gold potential and not to any JORC compliant Mineral Resource. Mr Banasik is a full time employee of Silver Lake Resources Ltd, and has sufficient experience which is relevant to the style of mineralisation under consideration to qualify as a Competent Person as defined in the 2004 edition of the JORC Code. Mr Banasik has given his consent to the inclusion in this presentation of the matters based on the information in the form and context in which it appears. The information in this presentation that relates to exploration and production targets refers to targets that are conceptual in nature, where there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. The information on exploration targets in this presentation are based on a conceptual range of targets as follows: Tonnage range: Grade range: Ounces: 80 million to 120 million tonnes ~3 g/t Au 7 million to 10 million Slide 3
4 Company Overview ASX Code: SLR Ordinary Shares - Fully Diluted million Market Cap: A$2.20 per share A$835 Finance - 31 December 2012 Range (12 month) Average Daily Volume (2013CY) A$28.2M cash & bullion A$75.0M finance facility A$ A$ M shares ($6.8M) Investor Shares (M) % Directors Dynamic Funds Sprott Asset Management Blackrock Acorn Capital Baker Steel Top 20 + Directors Directors Paul Chapman Les Davis Chris Banasik David Griffiths Peter Johnston Brian Kennedy Source: CommSec Chairman Managing Director Director Exploration and Geology Non Executive Director Non Executive Director Non Executive Director Slide 4
5 Company Performance & Key Milestones A$15M exploration programme commenced over large landholding not subjected to modern systematic exploration techniques 2007 Completes IPO in November for $30 million at $0.30 ps 1Moz AU resource base achieved following the acquisition of Comet Gold and Kurrajong nickel projects 2008 First gold bar produced at the Lakewood Gold Processing facility from Daisy Milano ore A$8M net cash flow; A$7.5mm pre-tax unaudited profit $10.7M NPAT in first full year of operation Raised $18M of equity (at $0.79 per share) to accelerate exploration 2009 Poured first pure tonne of gold Discovery of Daisy East and Emma at Mount Monger Discovery of Genesis in the Murchison Poured first 100,000 oz of gold bullion 2010 Awarded 2009 Gold Miner of the Year from Gold Mining Journal and Paydirt Admitted to ASX 300 list of companies Raised $70M of equity (at A$3.40 per share) to develop Murchison & advance base metal exploration 2011 Admitted to ASX 200 list of companies High grade copper discovery at Hollandaire Produced first 250,000 oz of gold Record quarter ounces poured & sold of 28,123 ounces at A$640 C1 Cost 2012 Commenced construction at Murchison Project Acquired Great Southern Assets $28.2M cash and bullion (31 December 2012) FY2009A Number of Operating Mines 1 Life of Mine (years) 3 Market Capitalisation A$M $108 Gold Production (koz) 47.3 Revenue A$M $58.1 EBITDA A$M $19.7 EBITDA Margin 34% NPAT A$M $10.7 FY2012E Number of Operating Mines 5 Life of Mine (years) ~10 Market Capitalisation A$M $700 Gold Production (koz) 83.4 Revenue A$M $135.4 EBITDA A$M $59.0 EBITDA Margin 44% NPAT A$M $ th January 2013: Scheme of arrangement completed with IGR to create a large Australian gold producer Slide 5
6 A Quality, Diversified, Western Australian Portfolio Producing Assets 5,000 sqkm of highly prospective under explored tenements containing gold, silver, copper & zinc Exploration Copper Lakes Rock chip samples: - 26% Cu, 10 g/t Au, 0.1% Co Murchison 1.9Moz gold resource 0.4Moz ore reserve Commissioning - first production March 2013 quarter 1.2mtpa processing facility 14 open pits and 4 underground feed sources Target production rate of 100koz p.a., 8-10 year mine life Eelya Complex 8 large geophysical surface electromagnetic conductors Hollandaire - high grade copper discovery Copper resource of 45.1kt (Supergene zone 4.7% Cu) A$20 million drilling program in progress Great Southern 0.9Moz gold resource 0.5Moz ore reserve Potential third production centre Includes Munglinup exploration project Mount Monger 3.8Moz gold resource 0.9Moz ore reserve In operation - 4 underground mines and 1 open pit mine 2 processing facilities with 2.1mtpa capacity with ability to expand Targeting sustained production of 300koz p.a Expected mine life >10 years 1: Refer to appendix - JORC Resource & Reserve Inventory 2: Mount Monger is inclusive of Aldiss Slide 6
7 Compelling Project Pipeline Producing Murchison Rosemary Daisy Milano Haoma Maxwells OP Stockpiles Wombola Dam Development Magic Haoma West Lorna Doone Majestic Santa UG Cock Eyed Bob UG Maxwells UG Imperial Advanced Exploration Great Southern Hollandaire Hammer & Tap Fingalls Santa Fly Camp Harry s Hill Greenfields Exploration Lake Austin Comet East Copper Lakes Vostok Mount Monger Other Mt Eelya Murchison Other Colonel Randalls Other QE1 Aldiss Other Karonie Spice Peters Dam French Kiss Queen Lapage 1: Size of bubble represents potential minable inventory Refer to disclaimer on slide 2 Slide 7
8 What Do Investors Want In A Gold Company? Management skin in the game SLR directors hold 6.8% Single Asset Risk Diversification Multiple mines & 3 mills Mine Life, Scale & Growth Project Delivery 6.6Moz resource inclusive of 1.8Moz reserves 8-10 year life of mine 2 large production centres targeting 400kozpa Development project & exploration upside Expanded Mount Monger & developed Murchison Gold Project Deliver Operationally Distinguish gold equities from an ETF Mining run rate always achieved Variable ore body difficult to accurately predict grade Managed costs, delivered YOY production & profit growth Diversification = Predictability Maiden dividend in 2014, then yield Slide 8
9 Merger Benefits The expanded Silver Lake becomes one of the largest all Australian gold producers Synergies and Cost Savings Operational Flexibility Outcome Reduction in corporate overheads Multiple underground & open pit operations Predictability Reduction in site overheads Operational efficiency Capacity to treat surface stockpiles and/or fast track project pipe line + = Optimised milling strategy at Mount Monger with 2.1mtpa milling capacity Risk diversification Economies of scale Shared infrastructure Next production centre in the Murchison online March Qtr 2013 Shareholder returns Tenement expenditure Contiguous tenement holding Common contractors Slide 9
10 Merger Synergies - Where are we at? Realised Work In Progress Item Savings per annum A$M Item Savings per annum A$M ~Timing Reduction in corporate overheads 5.0 Connect mains power to Daisy Milano mths Reduction in site overheads 3.5 Reduction in exploration spend at Mount Monger following review & prioritisation 15.0 Total to February Further operational reviews & optimisations mths Potential Target As Per Scheme Booklet = A$30 - A$40 Million per annum Slide 10
11 Mount Monger Operations - Overview + 30koz stockpile koz stockpile 1 1: As at 31 December 2012 Slide 11
12 Mount Monger Business Optimisation Current Production Rate: ~3.0 g/t Au = 190kozpa Enhancing Projects For Optimisation Mine Type Mine Type Daisy Milano Underground Majestic Open Pit Haoma Underground Magic 2 Underground Western Make / Rosemary Maxwells Stockpile Underground Open Pit Surface + Haoma West Wombola Dam Lorna Doone 3 Underground Open Pit Open Pit = Target 1 270koz Cock-Eyed Bob Underground Imperial Open Pit Santa Open Pit Maxwells Underground Lorna Doone 3 Underground Un-Optimised No Mill Expansion 1: Refer to disclaimer on slide 2 This target is not guidance going forward. Production rate going forward is subject to the optimisation results. 2: Requires sulphide flotation 3: Metallurgical test work in progress Results in June 2013 Quarter Slide 12 Optimised Mining Rate & Milling Strategy
13 Daisy Complex - Multiple Underground Mines Christmas Flats Ventilation Shaft Rosemary Dinnie Riggio Western Make East Haoma Open Haoma West Daisy Milano Currently Drilling Current depth of mine development ~640 metres West West Open All accessible from same infrastructure containing 1.1Moz of resource Multiple mines & structures all open at depth SLR production 7.0 g/t Au = 320koz Current endowment 2,000 to 3,000 ounces per vertical metre Mining rate: ~600,000 tonnes per annum Slide 13
14 Maxwells Deposit Large scale open pit: 1.6km long planned to ~140 vertical metres depth grade increasing with depth Mining Reserve (June 2012): 4.3 g/t Au = 115,710 oz Potential underground mine Drilling below planned pit shell includes: 3.4 metres at 12.8 g/t Au from 150 metres 4.6 metres at 21.4 g/t Au from 189 metres 3.0 metres at 39.2 g/t Au from 221 metres Maxwells Open Pit Looking North (December 2012) 2.2 metres at 9.9 g/t Au from 404 metres (deepest drill hole to date) Slide 14
15 Can Mount Monger Become A Gold Camp? Mount Monger Region Produced 0.9Moz c Produced 0.6Moz Golden Mile Produced 55Moz Res s/res v 12Moz Produced 4Moz Res s/res v 2Moz Fragmented for 100 years now unified under SLR ownership Produced 1.5Moz Res s/res v 3.8Moz 1 Produced 11Moz Res s/res v 5Moz 1. Refer to Appendix - JORC Resource & Reserve Inventory Other statistics quoted from public sources Slide 15
16 Feed Sources,000 Murchison - Overview Location Stage First Gold Production Milling & Surface Infrastructure (to Dec 12) 600km North of Perth Commissioning March 2013 Quarter A$67.8 million to 3 production sources at any given time Feed Sources Mining - Planned Feed Sources 14 open pit mines 4 underground mines 1000 Caustons, Comet, Tuckabianna West, Lena Processing 1.2 mtpa g/t Au to 4.5 g/t Au Blended Feed Grade Blended Recovery 92.7% Production FY13: g/t Au LOM: g/t Au FY13: 35koz to 45koz Tuckabianna Pits x 6 Comet Pits x 5 Lena Pits x 3 Resource 1 Reserve 1 1.9Moz 0.45Moz g/t Au to 3.0 g/t Au Mine Life ~8 to 10 years Av. C1 Cash Cost oz A$720 - A$770 0 FY13 FY14 FY15 FY16 FY17 Av.Waste Development (Capital & Pre-Paid) A$26 million per annum Open Pit Underground Sustaining Capital A$4 million per annum 1: Refer to appendix - JORC Resource & Reserve Inventory Slide 16
17 Murchison Mill - Commissioning in Progress Commissioning First gold bar poured 22 February 2013 Multiple ore sources feeding a centralised processing facility Slide 17
18 Eelya Complex - Overview Location Stage Regional Geology 4km North of Tuckabianna Exploration Felsic Volcanic Rocks Potential for VMS mineralisation Copper/Gold Previous Exploration Limited base metal exploration in the 1970 s No meaningful exploration since 1981 Zinc SLR Exploration 8 large electromagnetic conductors over 50 sqkm area Current Exploration $20 million exploration programme in progress Priority Targets Hollandaire, Rapier, Mt Eelya, Colonel Gold Copper/Gold Next Steps Continue exploration Metallurgical test work as drilling progresses Strategy Add copper circuit to Murchison gold mill Modest capex to bring into production Production circa 2015/ : Subject to further exploration and development Refer to disclaimer on slide 2 Slide 18
19 Hollandaire Copper / Gold Discovery Discovered September 2011 Pre-feasibility study due in June 2013 quarter Strategy: develop project for marginal capital cost produce a concentrate for marginal operating cost enhance economics of the Murchison project Current resource Drill core showing supergene chalcocite with copper grades up to 45% Supergene zone averages 4.7% grade Inferred Domain Tonnes Cu Au Ag Cu Metal Au Metal Ag Metal Hollandaire JORC resource as of September 2012 T % g/t g/t Tonnes Ounces Ounces Oxide Au 220, ,900 19,400 Oxide Cu 280, , ,700 Supergene 390, ,500 11, ,700 Primary 1,910, ,700 13, ,000 Total 2,800, ,100 34, ,800 Slide 19
20 Great Southern - Overview Location Stage Regional Geology 450km south east of Perth Advanced exploration Proterozoic & Archean litholigies (Kundip) Volcanic successions (Munglinup) Broome Projects Kundip Gold & Copper Trilogy Polymetallic (Cu, Au, Ag, Zn, Pb) Munglinup Gold Resource 1 Reserves 1 Priority Targets 1.9 g/t Au 20.5 g/t Ag 0.6% Cu 1.8 g/t Au 34.8 g/t Ag 0.8% Cu Kundip Mining Centre Munglinup Next Steps Ramp up exploration in 2013 Resource to Reserve conversion Assess low capital milling options Geraldton Port Hedland Carnarvon Mt Magnet PERTH Leonora Newman Kalgoorlie Laverton Esperance Great Southern Strategy Third production centre Production circa 2016/ : Refer to appendix - JORC Resource & Reserve Inventory 2: Subject to further exploration and development Refer to disclaimer on slide 2 Slide 20
21 Kundip Mining Centre - DFS Outputs Kaolin Open Pit Flag Open Pit Kaolin Underground Harbour View Open Pit Flag Underground Area Mining Reserve 1 Kaolin Open Pit Kaolin Underground Harbour View Open Pit Harbour View Underground Flag Open Pit Flag Underground Total g/t Au 4.4 g/t Au 3.2 g/t Au 3.5 g/t Au 4.0 g/t Au 5.0 g/t Au 3.4 g/t Au Harbour View Underground 1: Refer to appendix - JORC Resource & Reserve summary Excludes Trilogy 2: Rounding may give discrepancies in this table Slide 21
22 Million Ounces Exploration Plan Mount Monger, Murchison & Great Southern: 8 tenement boundary constraints removed 7 6 infill, extensional & green fields 5 Objectives: Moz 1 Au target over time 2 1 Significant gold resource upside: highly prospective, underexplored tenement holding 0 Nov 2007 (IPO) Jun-08 Jun-09 Jun-10 Jun-11 Jun-12 Jan-13 Future Years Mount Monger Murchison Great Southern results to date support this view continue with A$27 million per annum programme Advance base metal exploration at Eelya Complex: A$20 million exploration programme 1. Refer to Appendix - JORC Resource & Reserve Inventory 2. Refer to disclaimer on slide 2 Slide 22
23 Why Silver Lake Resources? Growth profile to 400,000 oz: excludes production from Great Southern excludes gold production from Hollandaire Risk diversification: multiple mines and mills operational flexibility Financial: substantial cost savings delivered through clear synergies cashflow to internally fund growth plans robust profitable business Large gold resource base with significant upside: 6.6Moz resource inclusive of 1.8Moz of reserves highly prospective, underexplored tenement holding long term commitment to exploration Outcome: one of the largest Australian gold producers well positioned for further growth maiden dividend in 2014 Geraldton Port Hedland Carnarvon Mt Magnet PERTH Broome Leonora Newman Murchison Kalgoorlie Laverton Mount Monger Esperance Great Southern 1: Refer to appendix - JORC Resource & Reserve Inventory 2: Refer to slide 2 - Exploration Targets Slide 23
24 Presentation Appendix ASX: SLR ABN:
25 Gold Resources & Ore Reserves M easured Resources Indicated Resources Inferred Resources T otal Resources Ore Grade T otal Ore Grade T otal Ore Grade T otal Ore Grade T otal Deposit t g/t Au O z Au t g/t Au O z Au t g/t Au O z Au t g/t Au O z Au 000s 000s 000s 000s 000s 000s 000s 000s T otal M ount M onger 3, , , , , , ,756.8 Hollandaire , , T otal M urchison , , , , ,907.7 T otal G reat S outhern , , , T otal 3, , , , , , ,616.8 Proved Reserves Probable Reserves Total Reserves Ore Ore Ore tonnes Grade Total tonnes Grade Total tonnes Grade Total 000s 000s 000s 000s 000s 000s Mount Monger 2, , , Murchison , , Great Southern , , Total Ore Reserve 2, , , , ,792.4 As at June 2012 Gold resources are inclusive of ore reserves Slide 25
26 SLR JORC Base Metal Resource Measured Resources Indicated Resources Inferred Resources Total Resources Ore Ore Ore Ore tonnes Grade Increment Total Unit tonnes Grade Increment Total Unit tonnes Grade Increment Total Unit tonnes Grade Increment Total Unit 000s 000s 000s 000s 000s 000s 000s 000s Kundip Project Silver - - g/t Ag - oz 4, g/t Ag oz 4, g/t Ag oz 8, g/t Ag oz Copper - - % Cu - t 4, % Cu 15.6 t 4, % Cu 14.7 t 8, % Cu 30.2 t Trilogy Project Silver g/t Ag oz 5, g/t Ag 8,859.6 oz g/t Ag 73.4 oz 6, g/t Ag 9,339.7 oz Copper % Cu 0.9 t 5, % Cu 62.3 t % Cu 1.4 t 6, % Cu 64.6 t Hollandaire Silver oz oz 2, g/t Ag oz 2, g/t Ag oz Copper t t 2, % Cu 45.1 t 2, % Cu 45.1 t Total Resource Silver g/t Ag oz 10, g/t Ag 9,213.5 oz 4, g/t Ag oz 17, g/t Ag 10,465.5 oz Copper % Cu 0.9 t 10, % Cu 77.8 t 7, % Cu 61.2 t 17, % Cu t As at September 2012 Slide 26
27 Silver Lake Resources Ltd Les Davis Managing Director
Advanced Gold Exploration Project With Numerous Targets
Suite 4, Level 3 South Shore Centre 85 South Perth Esplanade South Perth WA 6151 TEL +61 8 6313 3800 FAX +61 8 6313 3888 ABN 38 108 779 782 ASX ANNOUNCEMENT 24 January 2012 Silver Lake To Acquire 1Moz
More informationFor personal use only
Diggers & Dealers August 2013 Les Davis - Managing Director ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important Notice and Disclaimer Silver Lake Resources Limited has prepared this presentation
More informationFor personal use only
Annual General Meeting Perth 23 November 2012 ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Board of Directors Paul Chapman - Non Executive Chairman Les Davis - Managing Director Chris Banasik
More informationInvestor Presentation. February Les Davis - Managing Director ASX: SLR ABN:
Investor Presentation February 2014 Les Davis - Managing Director ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important Notice and Disclaimer Disclaimer: Silver Lake Resources Limited (
More informationPaydirt s Gold Conference. Perth March Les Davis - Managing Director ASX: SLR ABN:
Paydirt s Gold Conference Perth March 2010 Producing, Exploring & Growing Les Davis - Managing Director ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important Notice and Disclaimer Silver
More informationDiggers and Dealers Mining Forum. August Exploration success underpinning growth targets. Les Davis - Managing Director
Diggers and Dealers Mining Forum August 2011 Exploration success underpinning growth targets Les Davis - Managing Director ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important Notice and
More information$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre
ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce
More informationFor personal use only
Building an Australian Copper House Resources Rising Stars Investor Luncheon Series, 3-5 December 2012 Disclaimer Competent Persons Statement The information in this announcement that relates to Exploration
More informationBass Metals records further positive drill results & progress at 3 prospects.
16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret
More informationQUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL
ASX ANNOUNCEMENT 16 SEPTEMBER 2011 Phillips River Mining NL ABN 61 004 287 790 Unit 46/328 Albany Highway VICTORIA PARK WA 6100 T: 08 6250 4600 F: 08 6250 4699 info@phillipsriver.com.au CONTACT Jason Stirbinskis
More informationFor personal use only
ASX ANNOUNCEMENT 16 NOVEMBER 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Non-Executive Director
More informationASX:TLM. Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011
ASX:TLM Closing in on world-class copper-gold deposits Resources Rising Stars, September 2011 Disclaimer and Competent Person s Statements 2 Disclaimer This presentation is not a prospectus nor an offer
More informationASX:TLM. Closing in on world-class copper-gold deposits Annual General Meeting, November 2011
ASX:TLM Closing in on world-class copper-gold deposits Annual General Meeting, November 2011 Disclaimer and Competent Person s Statements 2 Disclaimer This presentation is not a prospectus nor an offer
More informationNew Drilling Program Commences at Mutiny s Deflector Deposit
New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern
More informationFor personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012
OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written
More informationKing of the Hills Gold Project, Leonora, to commence production in Q2 2011
King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher
More informationDisclaimer. Forward-Looking Statements. Competent Person s Statement
Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director Resources Rising Stars, May 29-30 2018 Disclaimer Forward-Looking Statements Some statements
More informationFor personal use only
ASX ANNOUNCEMENT 07 JUNE 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Mr Peter Farris Mr Peter
More informationFor personal use only
ASX ANNOUNCEMENT 27 AUGUST 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Non-Executive Director
More informationAnnual General Meeting
Annual General Meeting 20 November 2015 ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important notices Disclaimer - Silver Lake Resources Limited ( Silver Lake or the Company ) has prepared
More informationThe Manager Companies ASX Limited 20 Bridge Street
ABN 79 106 879 690 10 July 2012 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, 1.54 Moz Gold Equivalent Maiden Gold/Copper Resource at Wonogiri The Directors
More informationFor personal use only
Ground-breaking exploration in one of Australia s last underexplored greenstone belts Corporate Presentation 29 November 2018 ASX: MZN Simon Lawson, Managing Director Page I 1 Disclaimer General Disclaimer
More informationOctober 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts
October 2017 Investor Presentation Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts 2 Disclaimer Forward-Looking Statements Some statements in this report regarding
More informationAnnual General Meeting
Slide 1 Annual General Meeting 8 November 2010 Slide 2 INVESTMENT HIGHLIGHTS Boddington South Gold Project Located within the Southwest Yilgarn region of Western Australia Gold mineralisation similar to
More informationSetting a new course. 28 August 2015 ASX: SLR ABN:
Setting a new course 28 August 2015 ASX: SLR ABN: 38 108 779 782 www.silverlakeresources.com.au Important notices Disclaimer - Silver Lake Resources Limited ( Silver Lake or the Company ) has prepared
More informationGASCOYNE RESOURCES LIMITED
GASCOYNE RESOURCES LIMITED A Developing Australian Gold Focused Company March 2012 1 DISCLAIMER & COMPETENT PERSON STATEMENT This presentation contains forward looking statements that are subject to risk
More informationConfirmed mineralised porphyry discovery in maiden drill hole Near surface gold (>3g/t Aueq) resource potential confirmed
Disclaimer This presentation has been prepared by Inca Minerals Limited (ICG). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information
More informationNickel discovery in a world class region Gold discovery in a 20 million ounce Greenstone Belt. February 2013
. Nickel discovery in a world class region Gold discovery in a 20 million ounce Greenstone Belt February 2013 2 Disclaimer & Competent Persons Statement This presentation has been prepared to provide information
More informationFor personal use only
ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon
More informationASX announcement 16 May 2016
ASX announcement 16 May 2016 Adelaide Resources Limited ABN: 75 061 503 375 Corporate details: ASX Code: ADN Cash: $0.701million (at 31 Mar 2016) Issued Capital: 357,922,352 ordinary shares 37,222,104
More informationEMU NL Annual General Meeting
EMU NL Annual General Meeting Big Targets in the Maricunga Gold Belt Encouraging Results Getting the job done 9 November 2017 Investment proposition EMU is an ASX listed company seeking to deliver tangible
More informationAn ASX listed Perth-based gold explorer focused on Ghana in West Africa
An ASX listed Perth-based gold explorer focused on Ghana in West Africa Africa Down Under Conference August 2012 www.vikingashanti.com Disclaimer and Competent Person s Statement This presentation has
More informationASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects
ASX Release 14 th September 2010 Corporate Update Divestment of Gold, Copper and Nickel Projects The Directors of ADX Energy Ltd (ASX Code: ADX) are pleased to provide an update in relation to the proposed
More informationFor personal use only
ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non
More informationSILVER CITY MINERALS LIMITED ABN Silver City Minerals Investor Update
ABN 68 130 933 309 ASX Code: SCI Silver City Minerals Investor Update May 2018 1 Important Disclaimer This presentation is provided to you for the sole purpose of providing background technical, financial
More informationFor personal use only
18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand
More informationHERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA
ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire
More informationUlysses Gold Project, WA
Ulysses Gold Project, WA Growing and developing a new high-grade Australian gold project in a Tier-1 location December 2018 Investor Luncheon Series Melbourne, Monday 10 th Sydney, Wednesday 12 th Disclaimer
More informationGeneral Meeting today Marks transition to Phillips River Mining Ltd Company presentation attached
Fast Facts Cap Structure June 2011 Issued Shares 513Mil Market Cap A$36Mil Highlights 29 August 2011 SHAREHOLDER MEETING COMPANY PRESENTATION General Meeting today Marks transition to Phillips River Mining
More informationMerger Presentation April 2009
Chalice Gold Mines Limited Sub-Sahara Sahara Resources NL Merger Presentation April 2009 www.chalicegold.com www.subsahara.com.au Disclaimer The material used in this presentation is intended to be a summary
More informationFor personal use only
1 ASX: BRW Drilling for Exploration Success Building an Australian Base Metal Company Resources Rising Stars 27 September 2011 David Hutton, Managing Director Disclaimer 2 Certain oral and written statements
More informationFor personal use only
ASX ANNOUNCEMENT 16 th January 2012 BLACKHAM CONFIRMS MATILDA RESOURCES Blackham completes review of existing Matilda Project Resources 601,000oz inferred resources contained within 6 deposits Includes
More informationCash-flow, exploration and growth in WA s premier gold districts. Resources Rising Stars, May 2017 / Michael Fowler, Managing Director
Cash-flow, exploration and growth in WA s premier gold districts Resources Rising Stars, 30-31 May 2017 / Michael Fowler, Managing Director 2 Disclaimer Forward-Looking Statements Some statements in this
More informationFINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT
September 18 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT Two tier one Australian banks mandated to arrange
More informationFor personal use only Heemskirk Tin Project - Tasmania
Heemskirk Tin Project - Tasmania CEO Peter Blight International Tin Conference 24-25 April 2012 Focused on Tin Rapidly advancing Heemskirk Tin near Zeehan, Tasmania single commodity - single project focus
More information2010 RIU Sydney Resources Round-up
ASX: PEX 2010 RIU Sydney Resources Round-up 11 May 2010 Managing Director Rob Tyson Disclaimer & Competent Persons Statement Disclaimer The views expressed here other than historical fact constitute forward-looking
More informationFor personal use only
Alloy Regains Control of the Horse Well Gold Project ASX Release 29 January 2018 Capital Structure ABN 20 109 361 195 ASX Code AYR Issued Shares 1,266,993,360 Unlisted Options 29,000,000 Corporate Directory
More informationSignificant Copper-Gold JORC Exploration Target
12 March 2013 Highlights: ASX & MEDIA ANNOUNCEMENT Significant Copper-Gold JORC Exploration Target ü JORC i Exploration Target 1 of 4.8-6.2Mt @ 2.00-2.78% Cu and 1.23-2.23g/t Au confirmed. ü Opportunity
More informationNaltagua Copper District CHILE
Naltagua Copper District CHILE March 2013 Cash and liquid assets.. Ordinary Shares: 246.7M Options: 4.46M 0.46M @ 30 cents, expiring 31 Oct 2013 4.0M @ 7.5 to 25 cents, expiring 13 Nov 2015 Share Price:
More informationCORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.
16 March 2018 Company Announcement Officer ASX Limited 20 Bridge Street SYDNEY NSW 2000 Highlights CORPORATE UPDATE Inaugural Bowdens Reserve Statement due early April. Feasibility Study being finalised
More informationEXPLORATION ACTIVITY TO RECOMMENCE AT KOURI GOLD PROJECT IN BURKINA FASO
ASX/Media Announcement 26 April 2017 EXPLORATION ACTIVITY TO RECOMMENCE AT KOURI GOLD PROJECT IN BURKINA FASO Exploration program targeting the definition of a maiden JORC Mineral Resource by the end of
More informationMAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES
ASX ANNOUNCEMENT ASX CODE: MMX 3 September 2009 MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL 400-1000 MILLION TONNES Murchison Metals Limited (Murchison) is
More informationPegasus Metals Limited AGM PRESENTATION
Pegasus Metals Limited AGM PRESENTATION November 2018 Disclaimer Competent Persons Statement 1 The information in this report that relates to the geology and Exploration Results relating to the Dablo Project
More informationNew World Gold A high-grade investment opportunity. Mark Papendieck Managing Director
New World Gold A high-grade investment opportunity Mark Papendieck Managing Director ASX:OGX December 2012 Disclaimer This presentation does not constitute investment advice. Neither this presentation
More informationFor personal use only
Renascor Resources Limited ASX code: RNU The Eastern Eyre Copper Project Presented at the Australian Copper Conference Brisbane, 16 June 2015 David Christensen, Managing Director Renascor Resources 1 Renascor
More informationGold Discovery at Tasiast South in Mauritania. May 2012
. Gold Discovery at Tasiast South in Mauritania May 2012 Company interests Corporate profile ASX Code: Share price:* DRK 19c Shares on issue: 82.5M Market capitalisation: Cash position: A$16.5M A$6.18M
More informationBuilding an African Gold Mining Powerhouse
ASX: CHN Development targeted for2011 104,000 oz per year producer Huge exploration upside Building an African Gold Mining Powerhouse Africa Down Under September 2010 www.chalicegold.com Disclaimer and
More informationHillgrove Resources Limited Overview
COPPER PROJECT SA Explorers Conference NOVEMBER 2009 Hillgrove Resources Limited Overview Kanmantoo Copper Mine: 2.0Mtpa copper gold operation targeted for 2011 production. Current 6.5 year mine life with
More informationASX ANNOUNCEMENT 26 August 2016 MINERAL RESOURCES AND ORE RESERVES UPDATE
ASX ANNOUNCEMENT 26 August 2016 MINERAL RESOURCES AND ORE RESERVES UPDATE COMPANY SUMMARY AT 30 JUNE 2016 Total Mineral Resources are estimated at: 54.8 Mt @ 2.8 g/t Au for 4.92 Moz of contained gold,
More informationACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA
ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA HIGHLIGHTS New claims staked covering ~9km 2 to secure a 100% interest in the McCleery Copper-Cobalt Project in the Yukon Territory, Canada ABN
More informationTriAusMin Limited LEWIS PONDS PROJECT
TriAusMin Limited LEWIS PONDS PROJECT TSX: TOR November 2010 ASX: TRO Disclaimer The Information contained in this presentation has been prepared using the information available to TriAusMin at the time
More informationFor personal use only
Matsa Resources Limited Symons Hill Project Update March 2013 ASX: MAT Forward Looking Statements The material used in this presentation is intended to be a summary of selected geological data, current
More information2018 Drilling Underway at Juruena Gold Project
2018 Drilling Underway at Juruena Gold Project Crusader Resources (ASX:CAS) ( Crusader ) is pleased to announce the commencement of its initial 2018 exploration program over its highly prospective and
More informationPortia Gold Mine Update
1 Portia Gold Mine Update South Australian Resources & Energy Investment Conference 20 April 2016 Dr Chris Giles Managing Director Havilah Resources LimitedDr Chris Giles, MD 20 April 2016 Dr Chris Giles
More informationFor personal use only
Tellus Resources Ltd ABN: 35 144 733 595 Suite 301, Level 3 66 Hunter Street, SYDNEY NSW 2001 21 NOVEMBER 2011 HIGHLIGHTS TELLUS RESOURCES TO ACQUIRE ADVANCED NORTH QUEENSLAND GOLD PROJECT Chillagoe Project
More informationMaximising Gold Resources in Senegal
ASX: BSR Maximising Gold Resources in Senegal Senegal International Mining Conference, Dakar 6-8 Disclaimer & Competent Persons Statement This presentation has been prepared by Bassari Resources Limited
More informationAnnual General Meeting. 23 November 2011
Annual General Meeting 23 November 2011 Disclaimer The purpose of this presentation is to provide general information about Gold Road Resources Limited (the Company ). Unless otherwise stated herein, the
More information2018 South Australian Exploration & Mining Conference
2018 South Australian Exploration & Mining Conference Richard Holmes Head of Exploration & Growth 7 DECEMBER 2018 Forward Looking Statements This presentation has been prepared by OZ Minerals Limited (OZ
More informationSHARE PURCHASE PLAN AND COMPANY UPDATE
Company Announcements Office Australian Securities Exchange 2 The Esplanade PERTH WA 6000 16 August 2011 SHARE PURCHASE PLAN AND COMPANY UPDATE Anglo Australian Resources NL ( the Company ) (ASX: AAR)
More informationThe Yamarna Gold Belt:
The Yamarna Gold Belt: Exploration Upside - Funded From Production ASX Small to Mid Caps Asia - May 2012 Disclaimer Important Notices Nature of this document: The purpose of this presentation is to provide
More informationAusgold awarded EIS grant for Jinkas deep drilling
ASX Release 21 June 2018 Ausgold awarded EIS grant for Jinkas deep drilling Highlights: EIS grant will support drilling at the Katanning Gold Project to a value of $150,000 Grant will partly fund four
More informationSCIENCE DISCOVERY GROWTH. Investor Presentation. Miga Arc Western Victoria s newly emerging copper belt
SCIENCE DISCOVERY GROWTH Investor Presentation Miga Arc Western Victoria s newly emerging copper belt 23 October 2013 Forward-looking statement & disclaimer The information contained in this presentation
More informationSTEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE
November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE
More informationUlysses: Genesis of a significant new underground gold mine near Leonora, WA. Michael Fowler, Managing Director. 22 February 2018
Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director 22 February 2018 Disclaimer Forward-Looking Statements Some statements in this report regarding
More information60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.
30 April 2008 60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. Perilya Limited (ASX: PEM) is pleased to announce a 60% increase in the mineral resource estimate for the
More informationHigh-grade Copper in the Cobar Superbasin. Rob Tyson, Managing Director - Broken Hill Conference
High-grade Copper in the Cobar Superbasin Rob Tyson, Managing Director - Broken Hill Conference Disclaimer The views expressed here other than historical fact constitute forward-looking statements. Forward-looking
More informationASX ANNOUNCEMENT 21 MARCH 2011
ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights
More informationMANGANESE DISCOVERY AT KONONGO PROJECT
ASX Release Wednesday 8 September 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill Oliver (Managing Director) E-mail:
More informationGLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006
GLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006 Our Business Agenda The Gloucester Coal 3 Ticks Rule Operations Profitability Growth Gloucester Coal delivers record profit, sales
More informationHits of up to 150gpt reinforce forecasts for increased grades, production and cashflow
Hits of up to 150gpt reinforce forecasts for increased grades, production and cashflow Fresh results come from high-grade zone at heart of projected CY13 cash surplus of $65-85 million ASX ANNOUNCEMENT
More informationFor personal use only
ASX Announcement 15 March 2017 HIGHLIGHTS Drill contractors have been engaged with drilling to commence April 2017 pending access approvals Two mineralised lodes within the oxide volcanogenic massive sulphide
More informationMAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY
24 April 2013 ASX: AOH, FSE: A2O MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY 1,000 hole RAB drilling programme directed at large copper-gold anomalies Altona Mining Limited ( Altona ) has commenced
More informationArtemis Resources Ltd ASX: ARV
Artemis Resources Ltd ASX: ARV Emerging High Grade Cobalt and Conglomerate Gold all within 40km of Processing Plant. Conglomerate Gold, and Cobalt/Gold and Copper. Karratha-West Pilbara - Western Australia
More informationBeyond Broken Hill.. Len Jubber Chief Executive Officer. SA Resources & Energy Investment Conference 30 April 2007
Beyond Broken Hill.. Len Jubber Chief Executive Officer SA Resources & Energy Investment Conference 30 April 2007 Agenda Positioning for growth Broken Hill Operation funding growth Flinders zinc project
More informationCoburn Zircon Project
Coburn Zircon Project Europe/North America Presentation David Harley, 10-21 Capital Structure & Shareholders Finance Cash and Equivalents $A 2.6M Debt nil Hedging nil Markets Issued Capital Issued Shares
More informationSilver City Minerals
ABN 68 130 933 309 ASX Code: SCI Silver City Minerals Annual General Meeting 15 November 2016 1 Important Disclaimer This presentation is provided to you for the sole purpose of providing background technical,
More information24 October Dear Shareholders, 2014 ANNUAL REPORT
Azumah Resources Limited ABN 72 112 320 251 Suite 2, 11 Ventnor Avenue West Perth WA 6005 PO Box 1073 West Perth WA 6872 P +618 9486 7911 F +618 9481 4417 W www.azumahresources.com.au E info@azumahresources.com.au
More informationFor personal use only
For personal use only RIU Conference - Sydney 12 May 2011 ASX:MDS Disclosure Statement DISCLAIMER Nothing in this material should be construed as an invitation or an offer to purchase or subscribe for
More informationSILVER CITY MINERALS LIMITED ABN Silver City Minerals
ABN 68 130 933 309 ASX Code: SCI Silver City Minerals Annual General Meeting 20 November 2014 SILVER CITY MINERALS SNAPSHOT BROKEN HILL (Ag-Pb-Zn) Project Review and Prioritization: Focus and Plan Razorback
More informationPursuing Large Gold Discoveries in WA s Eastern Goldfields
Pursuing Large Gold Discoveries in WA s Eastern Goldfields Perth PMIS: October 2018 Peter Schwann- Managing Director ASX : AAJ ARUMA RESOURCES ASX : AAJ www.arumaresources.com 1 DISCLAIMER The information
More informationExploration Program planned at White Rock s Red Mountain zinc project in Alaska
ASX and Media Release: 18 December 2017 ASX Code: WRM Exploration Program planned at White Rock s Red Mountain zinc project in Alaska ASX Code: WRM Issued Securities Shares: 907.7 million Options: 206.9
More informationASX:LEG. Prospective Fraser Range. Investor Presentation July 2018
ASX:LEG Prospective Fraser Range Investor Presentation July 2018 DISCLOSURE This is not a disclosure document. Any material used in this presentation is a summary of selected data, and any investor in
More informationQuarterly Activities Report For the Period Ended March HIGHLIGHTS
Quarterly Activities Report For the Period Ended March 31 2008 HIGHLIGHTS Merceditas Project, Chile Genesis Minerals Limited secured an Option to acquire a 100% interest in the significant Merceditas copper
More informationExploration Update: RC Drilling Commenced at Lucky Strike
L efroy ASX Announcement LEFROY EXPLORATION LIMITED Western Australian Focused Gold Explorer ASX Code: LEX Shares on Issue: 64.5m Current Share Price: 17c Market Capitalisation: $11m Board of Directors
More informationSECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT
ABN 17 124 444 122 9 November 2009 SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT HIGHLIGHTS Non-JORC code compliant gold resource of 553,000t @ 2.5g/t gold identified as being hosted
More informationEXCELLENT FIRST DRILL RESULTS FROM WELD RANGE
27 th October 2008 EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE Atlas Iron Limited (ASX Code: AGO) is pleased to announce a number of high grade results from the first drilling programme completed at
More informationFor personal use only
ASX Announcement ASX: ERM ABN: 53 117 086 745 June 18, 2015 Seismic Survey to underpin future gold discoveries at Tennant Creek First application of seismic geophysics to the Tennant Creek Mineral Field
More informationSandfire Exercises Option to Enter Joint Venture on Red Mountain
ASX and Media Release: 27 December 2018 ASX Code: WRM Sandfire Exercises Option to Enter Joint Venture on Red Mountain ASX Code: WRM Issued Securities Shares: 1,636 million Options: 570 million Cash on
More informationNEW DISCOVERIES AT THE RED OCTOBER MINE
23 July 2013 ASX & MEDIA RELEASE NEW DISCOVERIES AT THE RED OCTOBER MINE The Directors of Saracen Mineral Holdings Limited (the Company ) are pleased to provide an update on the Red October underground
More informationASX/Media Announcement
ASX/Media Announcement 25 March 2013 MAIDEN HIGH-GRADE JUDY LODE RESOURCE INDICATES POTENTIAL TO INCREASE ANDY WELL MINE LIFE 106,000 ounce high-grade resource (Indicated & Inferred) Judy South (137,000t
More information