1 Chapter 1 Roadway Treatment Goals Treatment Goal Chart Treatment level Maps
2 Roadway Treatment Goals Due to the dynamic and diverse nature of winter weather and resultant road conditions, WSDOT maintenance personnel use a variety of methods and materials to help prevent snow and ice formation on state highways. Outcomes of snow and ice control treatments will vary, dependent upon severity of winter weather events, topography, traffic levels and speeds, and proximity to support facilities (i.e. liquid chemical storage tanks and salt stockpiles). While outcomes can be measured in a variety of ways, the motoring public most often measures maintenance efforts in terms of road conditions during and immediately after winter weather events. Maintenance personnel also rate roadway conditions during the winter season (see chapter ). This information is used to project expected road conditions associated with snow and ice treatment levels for different events. The unique nature of individual winter weather events limits the relevance of projected expectations on a given storm, but when ratings from an entire winter season are averaged, they become a good indicator of the Level of Service (LOS) provided by maintenance personnel over the entire season. Winter climates differ greatly between Eastern and Western Washington, so road treatment levels may vary on either side of the Cascades to match the ability to respond to those conditions. Limited funding also requires prioritization of roads for snow and ice control, so that different levels of service will be employed for individual roads and sections of roads. Eastern Washington Treatment Goals: In Eastern Washington periodic snowfall events are typical and freezing temperatures and relatively drier conditions may persist for the duration of the winter season. The winter maintenance program (labor, equipment, and materials) is sized and developed to facilitate the movement and safety of traffic under normal expected winter conditions. The exceptional winter weather event in Eastern Washington is typically a wide spread ice storm or a snowstorm of severe intensity and duration. The Snow and Ice program is funded and equipped based primarily on historical records and the average winter conditions collected and compared over time. When occasional extreme winter weather occurs, the program cannot provide the accustomed level of service because existing resources are insufficient for this type of event. Since these types of events happen infrequently, it would be inefficient management of resources to size and base a winter maintenance program for the exceptional winter weather event. Western Washington Treatment Goals: In Western Washington the winter season typically lasts from late November thru early March. The weather is generally cool and wet with occasional ice or snow events. The winter maintenance program (labor, equipment, and materials) is sized and based to facilitate the movement and safety of traffic under normal expected winter conditions. This will typically be when temperatures drop and create black ice or frost conditions. A light to moderate snowfall event may also occasionally take place. These are typically characterized by localized events. The exceptional winter weather event in Western Washington is going to be a heavy snowstorm, short in duration over a wide geographic area. The Snow and Ice program is funded and equipped based primarily on historical records and the average winter conditions collected and compared over time. When the occasional heavy snow storm occurs, the program cannot provide the accustomed level of service because existing resources are insufficient for this type of event. Since these types of events happen infrequently, it would be inefficient management of resources to size and base a winter maintenance program for the exceptional winter weather event. Page 1-1
3 Other Facilities: The primary function and mission of the Snow and Ice program is response to roadway conditions in order to keep traffic moving and to provide for the accustomed level of service. WSDOT recognizes that there are other facilities besides state highways that may rely upon state forces for winter response in order to keep those facilities functional. These can include WSDOT Ferries parking lots, Park & Ride lots, WSDOT regional and area facility lots and some sidewalks that were constructed using Federal Funds. In all cases, response to roadway conditions will take precedence over any such activities, and these facilities will be handled on a as conditions allow basis. This may mean that such facilities will remain unmaintained until such time that all roadways in any given region are clear, level of service goals are met, and normal movement of goods and services is restored. Page 1-
4 Treatment Level Goals Washington State Department of Transportation Description of Roadway Treatment Actions 1. Pre-event: Pre-treat roadway with anti-icing chemicals if conditions are appropriate for such treatment. Monitor the treatment for effectiveness and for the need to reapply. Level 1. During event: Apply deicing chemicals to roadway during a snow event to keep snow and ice from accumulating and bonding to the pavement and to expedite the process of mechanical removal. If compact snow or black ice forms on the roadway, apply pre-wet solid chemicals to break the snow/ice bond and to assist the process of mechanical removal. 3. Post-event: Continue snow and ice removal operations including chemical and mechanical methods until bare pavement is achieved. 1. Pre-event: Maintain the same as higher priority roadways after those roadways have been treated and as resources allow. Level. During event: Apply deicing chemicals to roadway during a snow event to keep snow and ice from accumulating and bonding to the pavement and to expedite the process of mechanical removal. If compact snow or black ice forms on the roadway, apply pre-wet solid chemicals to break the snow/ice bond and to assist the process of mechanical removal. 3. Post Event: Return pavement to bare and wet condition as soon as practical using plowing as the primary operation with moderate use of pre-wet materials to assist snow and ice removal. 1. Pre-event: Maintain the same as higher priority roadways after those roadways have been treated and as resources allow. Level 3. During event: Apply deicers on first passes when and where necessary to keep snow and ice from accumulating. Subsequent passes should rely primarily on plowing with the moderate use of pre-wet materials to assist mechanical snow and ice removal. 3. Post event: Return pavement to bare and wet condition as soon as practical using plowing as the primary operation with moderate use of pre-wet materials to assist snow and ice removal. 1. Pre-event: Maintain the same as higher priority roadways after those roadways have been treated and as resources allow. Level 4. During event: Apply deicers on first passes when and where necessary to keep snow and ice from accumulating. Subsequent passes should rely primarily on plowing with the moderate use of pre-wet materials to assist mechanical snow and ice removal. 3. Post event: Return pavement to bare and wet condition as soon as practical using plowing as the primary operation with moderate use of pre-wet materials to assist snow and ice removal. Page 1-3
5 1. Pre-event: Maintain the same as higher priority roadways after those roadways have been treated and as resources allow. Level (Until closed for the season.). During event: Apply deicers on first passes when and where necessary to keep snow and ice from accumulating. Subsequent passes should rely primarily on plowing with the moderate use of pre-wet materials to assist mechanical snow and ice removal. 3. Post event: Return to bare and wet as resources allow. Note: The use of abrasives, either alone or in combination with salt is allowable at all levels when conditions are appropriate for such use. This would include, but not be limited to conditions too cold for the effective use of salt, heavy snow or black ice where maintaining traction is a concern and on subsequent passes. Page 1-4
6 PUGET SOUND REGION TREATMENT LEVEL GOALS Island 8 9 DISCOVERY BAY 116 Clallam 19 9 EVERETT Snohomish MONROE Jefferson WALKER MT. LOFALL BALLINGER NWR HQ NW Kitsap SPOKANE ST. 0 BELLEVUE 0 King OL PORT ORCHARD CORSON RENTON PRESTON 18 30s Mason KENT SHELTON 10 TNB LAKE GENEVA ENUMCLAW 410 TACOMA WILLOWS Thurston BUCKLEY Latest version: 11/01/01 Supersedes Previous Editions MOTTMAN WSDOT HQ Miles Treatment Level Goals City Responsibility Level 1 Level WSDOT Maintenance Facility Level 3 Regional Boundary Level 4 Level County Boundary Puget Sound Region Snow and Ice Plan Roadway Treatment Goals
7 WESTERN WASHINGTON TREATMENT LEVEL GOALS 9 48 BELLINGHAM MAPLE FALLS 4 Whatcom SHUKSAN 9 ALGER NEWHALEM 0 San Juan 11 0s 36 MT VERNON COAL CREEK 0 Skagit SEKIU PORT ANGELES 3 COUPEVILLE 34 9 ARLINGTON HAZEL FORKS Clallam DISCOVERY BAY Island EVERETT Snohomish MONROE LOFALL WALKER MT Jefferson 40 SKYKOMISH Kitsap AMANDA PARK 119 Mason King Grays Harbor ABERDEEN 107 ELMA 10 SHELTON MOTTMAN 11 WSDOT HQ 10 OR HQ TACOMA 70 WILLOWS Pierce ENUMCLAW BUCKLEY 410 GREENWATER 1 07 YELM 7 10 RAYMOND Thurston ALDER Lewis Pacific 401 NASELLE 6 Wahkiakum CHEHALIS TOLEDO MT ST HELENS 04 MORTON CATHLAMET KELSO Cowlitz 03s Skamania WOODLAND VANCOUVER 0 FARGHER LAKE Clark SWR HQ 00 1 BINGEN Klickitat 1 GOLDENDALE WASHOUGAL Latest version: 10/31/011 Supersedes Previous Editions 0 1. Miles Treatment Level Goals City Maintained Level 1 Level Level 3 Level 4 Level WSDOT Maintenance Facility Regional Boundary County Boundary Western Washington Snow and Ice Plan Roadway Treatment Goals
8 EASTERN WASHINGTON TREATMENT LEVEL GOALS 4 1 ORIENT 39 NORTHPORT 31 0 OKANOGAN TONASKET 0 REPUBLIC 0 COLVILLE 0 IONE PEND OREILLE TWISP 0 1 OKANOGAN 1 FERRY 39 0 CHELAN 13 BREWSTER 1 STEVENS HUNTERS GROUSE CREEK 9 11 NEWPORT CAMP MASON 6 HYAK EASTON COTTONWOOD 1 BERNE BULLFROG BLEWETT YAKIMA RIMROCK LEAVENWORTH 83 SCR HQ NCR HQ KITTITAS ELLENSBURG 81 TOPPENISH 8 a 8 EAST SELAH WATERVILLE 41 CHELAN DOUGLAS GEORGE 4 6 EPHRATA 83 GRANT PROSSER 1 17 MANSFIELD MOSES LAKE 40 BENTON ELECTRIC CITY 8 1 COULEE CITY OTHELLO FRANKLIN PASCO WILBUR KELLER FERRY ODESSA 39 CONNELL 60 1 WALLA WALLA 1 8 LINCOLN 61 1 SPRAGUE ADAMS WASHTUCNA DAVENPORT 31 WALLA WALLA 6 DAYTON WHITMAN 39 SPOKANE ER HQ COLUMBIA GEIGER GARFIELD POMEROY 1 39 COLFAX N. SPOKANE PINES ROAD OAKESDALE RITZVILLE ASOTIN ANATONE PULLMAN 19 CLARKSTON Latest version: 11/1/01 Supersedes Previous Editions 0 1. Miles Treatment Level Goals Level 1 Level Level 3 WSDOT Maintenance Facility Level 4 Regional Boundary Level County Boundary Eastern Washington Snow and Ice Plan Roadway Treatment Goals
Fireworks Ban or Restricted Sales/Use. State Fireworks Law RCW
Fireworks Ban or Sales/Use Fireworks Ban or Sales/Use by County and City RCW 70.77.395 State Law Fireworks sales and discharge laws. Dates and times common fireworks may be sold or discharged. State Fireworks
More informationAverage Additnl Salary. Total FTE
1 01109 Washtucna 1 0 1.00 32,393 4,029 260.0 25,531 01147 Othello 5 0 3.75 34,701 4,976 260.0 35,987 01158 Lind 1 0 0.36 20,609 5,261 260.0 21,925 01160 Ritzville 1 0 1.00 36,504 4,220 260.0 36,504 02250
More informationSee introduction for explanation of column headings, glossary for explanation of terms, and appendix for explanation of duty codes.
~~~~~~~~~~~~~ Annualized ~~~~~~~~~~~~~ 01109 Washtucna 1 601 1.00 36,405 9,803 260.0 42,202 01147 Othello 5 0 4.52 60,892 11,324 260.0 60,896 01158 Lind 2 0 1.00 38,811 8,585 260.0 38,596 01160 Ritzville
More information2014 Levy Authority, Rollbacks, and Local Effort Assistance
State Total/Average: 2,257,657,771 2,368,487,239 2,138,425,187 119,232,584 29.34% 26.79% 323,910,257 320,081,191 1.542 Adams Co. 01109 Washtucna 150,000 340,117 150,000 0 28.00% 18.14% 199,681 199,681
More informationWashington State School Districts General Fund Long-Term Debt Per Pupil Fiscal Years Through
State Total 5,680,250,121 959,540.81 5,919.76 5,233,439,835 949,349.09 5,512.66 4,811,999,983 936,394.71 5,138.86 20,000 and Over Seattle 26,826,589 45,708.23 586.91 26,826,589 45,441.15 590.36 18,536,025
More informationWashington DECA Voting Delegates
2017-2018 Chapters earn one voting delegate for every 18 members registered by 5:00 p.m. November 15. If a chapter did not have any registered members at that time, the chapter has 0 voting delegates.
More informationOffice of the Washington State Climatologist
Office of the Washington State Climatologist March 2017 Report and Outlook March 8, 2017 February Event Summary Mean February temperatures were colder than normal throughout the state, but the amount of
More informationWASHINGTON DECA COMPETITIVE EVENT ALLOCATIONS 5:08 P.M.
Area Students Advisors Alumni Professional Total Members Percentage of Total Members for: Individual Series and Team Decision Making 70 Total Rounded Up Min 2 for: EIP, ESB, ADC, FMP, SEPP, FCE, HTPS,
More informationOffice of the Washington State Climatologist
Office of the Washington State Climatologist December 3, 2009 November Precipitation Records Western WA was extremely wet this November, and some monthly records were broken. Table 1 shows the precipitation
More informationCITY OF ORILLIA POLICY MANUAL. Winter Operations. Table of Contents. WINTER CONTROL Objectives 2. WINTER CONTROL Season 3
Page 1 of 12 Winter Operations Table of Contents WINTER CONTROL Objectives 2 WINTER CONTROL Season 3 SNOW ACCUMULATION Road Plowing 4,5 ICY ROADWAYS Application of Deicers/Abrasives 6 SNOW ACCUMULATION
More informationSnow and Ice. All Hazards Emergency Response and Continuity of Operations Plan. For Official Use Only
Snow and Ice All Hazards Emergency Response and Continuity of Operations Plan For Official Use Only APPENDIX J Snow and Ice Response Plan INTRODUCTION The mission of Pierce County Public Works and Utilities,
More informationOffice of the Washington State Climatologist
Office of the Washington State Climatologist December 5, 2011 November Event Summary In an overall sense, Washington State experienced cool and dry conditions during November. Precipitation amounts were
More informationCITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY
CITY OF BEAVER DAM SNOW & ICE REMOVAL POLICY Revised January, 2016 Approved by Operations Committee: February 1, 2016 This snow and ice removal policy guides Public Works personnel with deicing, plowing,
More informationJohn A. Carlson Snow and Ice Removal
John A. Carlson Snow and Ice Removal A. Introduction 1. The purpose of the Snow and Ice Removal Operation Plan is to provide all personnel who are involved in snow and ice removal a single source document,
More informationOffice of the Washington State Climatologist
Office of the Washington State Climatologist May 3, 2013 April Event Summary Average April temperatures were below normal for a majority of the state. Total precipitation was above normal for western and
More informationTown of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan
Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county
More informationDunn County Snow Removal Policy
Dunn County Snow Removal Policy OVERVIEW With the advent of another winter season in the northern plains comes the possibility of snow, freezing rain and slippery roadways, and area resident s concern
More informationWinter Roads Maintenance
Winter Roads Maintenance Reducing the Use of Chlorides for Snow and Ice Control (Utilizing Smart Salting Methods and Technologies) Richard M. Balgowan, PE, PP, CPWM Township of Hamilton, Mercer County,
More informationOffice of the Washington State Climatologist
Office of the Washington State Climatologist May 2, 2014 April Event Summary April mean temperatures were near-normal with some tendency for the monthly anomalies to come in on the warmer side. Total April
More informationSNOW CONTROL OPERATIONS
SNOW CONTROL OPERATIONS PUBLIC WORKS TEAM STREET MAINTENANCE DIVISION SNOW CONTROL OPERATIONS Standard Operating Procedures for Snow Removal Operations. 1. Plowing operations will be initiated when snow
More informationOffice of the Washington State Climatologist
Office of the Washington State Climatologist December 2016 Report and Outlook December 8, 2016 http://www.climate.washington.edu/ November Event Summary Mean November temperatures were much above normal
More informationACCUMULATED PRECIPITATION IN INCHES
4 3 CUMULATIVE PRECIPITATION WATER YEAR 7 COLUMBIA BASIN ABOVE GRAND COULEE 18% of Normal 1971- Average ACCUMULATED PRECIPITATION IN INCHES 1 3 1 4 3 1 8 6 4 94% of Normal 17% of Normal 118% of Normal
More informationTown of Bowden Province of Alberta Policy Document ( ) SNOW REMOVAL POLICY
Town of Bowden Box 338, 2101 20 th Ave Bowden, Alberta, T0M 0K0 Town of Bowden Province of Alberta Policy Document (2019-01) SNOW REMOVAL POLICY 1 INTRODUCTION The purpose of this policy is to establish
More informationCITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY
CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of
More informationEducational Objectives
MDSS and Anti-Icing: How to Anti-Ice with Confidence Wilf Nixon, Ph.D., P.E. IIHR Hydroscience and Engineering University of Iowa Iowa City And Asset Insight Technologies, LLC Educational Objectives At
More informationTown of Oconomowoc Snow & Ice Control Policy
Town of Oconomowoc Snow & Ice Control Policy Introduction The purpose of this policy is to provide a detailed overview of the Town s snow & ice control operations including its goals and objectives. All
More informationSnow Response in an Urban Setting
Snow Response in an Urban Setting Pat Kennedy, PE Denver Street Maintenance Road and Street Supervisors Conference October 15, 2013 Yakima, WA 2 Denver Agenda Population ~600,000 Metropolitan area 2.5
More informationTOWN OF GRAND FALLS WINDSOR
TOWN OF GRAND FALLS WINDSOR DEPARTMENT OF ENGINEERING AND WORKS FREQUENTLY ASKED QUESTIONS FOR WINTER OPERATIONS... What streets are the first to be plowed & salted/sanded? The roads crews are each assigned
More informationWinter Maintenance on Ontario s Highways
Ministry of Transportation Winter Maintenance on Ontario s Highways MTO Eastern Region November 18, 2015, Northumberland County Council Outline 1. Winter Maintenance Areas - Eastern Region 2. Winter Maintenance
More informationJefferson County Department of Emergency Management 81 Elkins Road, Port Hadlock, Washington 98339 - Phone: (360) 385-9368 Email: jcdem@co.jefferson.wa.us TABLE OF CONTENTS PURPOSE 3 EXECUTIVE SUMMARY
More information1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots
City of Mt. Pleasant Administrative Memo #1-85 Issued: January 1, 1985 SUBJECT: Snow and Ice Control Policy SUMMARY: The intent of this policy is to construct a basic guideline to effectively and efficiently
More informationCity of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016
Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist
More informationDeicing Chemicals - State of Practice
Methods of Operation Deicing Chemicals - State of Practice Ron Wright Chemist Supervisor Idaho Transportation Department Traditional Methods Plow and antiskid Anti-icing Deicing Pre-wetting Anti-icing
More informationRESEARCH HIGHLIGHTS: Columbia Basin Ground Water Management Area HYDROLOGIC GROUNDWATER MODELING PROJECT Interim Report December, 2010
RESEARCH HIGHLIGHTS: Columbia Basin Ground Water Management Area HYDROLOGIC GROUNDWATER MODELING PROJECT Interim Report December, 21 City of Warden Wells RESEARCH HIGHLIGHTS: Reduction in Groundwater Storage
More informationCity of Camrose Winter Road Maintenance Policy
City of Camrose Winter Road Maintenance Policy The purpose of this policy is to outline the level of service that the City of Camrose delivers regarding the maintenance of roads in winter conditions. 1.
More informationOffice of the Washington State Climatologist
Office of the Washington State Climatologist March 5, 2013 February Event Summary February was warmer than normal, on average, and extremely In this Issue dry for most of Washington State. Figure 1 shows
More informationSNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION
SNOW CONTROL OPERATIONS 2017 PUBLIC SERVICES DEPARTMENT MAINTENANCE DIVISION 1 SNOW CONTROL OPERATIONS The following are the standard operating procedures f snow removal operations. 1. Plowing operations
More informationCITY OF MINOT SNOW REMOVAL PLAN October 2018
CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationDefinitionofAlternatives
4. DefinitionofAlternatives After approximately two years of outreach and public input, PSRC has identified four alternatives for evaluation in this Draft Environmental Impact Statement: Growth Targets
More informationA Guideline for Training Patrol Staff Ontario Good Roads Association
A Guideline for Training Patrol Staff Ontario Good Roads Association A Guideline for Training Patrol Staff Rationale A patroller is required to observe both weather and road conditions either in the field
More informationCity of Laramie, Wyoming SNOW AND ICE POLICY
City of Laramie, Wyoming SNOW AND ICE POLICY 11/02/89; rev 10/15/2007 I. INTRODUCTION The intention of this Policy is to set reasonable goals and general practices as a guide for the conduct of snow and
More informationCITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION
CITY OF EAST PEORIA SNOW AND ICE CONTROL PROGRAM INTRODUCTION The responsibility for providing snow and ice control on East Peoria s 240 lane miles of streets and alleys rests with the Street Divisions
More informationOne of the tasks of the Floods Study Team was to determine if any new facilities
8. Development and Enhancement of Interpretive Facilities One of the tasks of the Floods Study Team was to determine if any new facilities would be needed to help interpret the Floods story, or if any
More informationCITY OF MINOT SNOW REMOVAL PLAN November 2017
CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More information20 18CEHA Fall Chloride Workshop
20 18CEHA Fall Chloride Workshop Moving Forward Overview Design Practices Level of Service Comparison of ConnDOT vs. New England States Pre-Storm/Planning Application Rates Inventory Control Complaint
More informationWINTER STORM Annex II
WINTER STORM Annex II I. PURPOSE A. This annex has been prepared to ensure a coordinated response by state agencies to requests from local jurisdictions to reduce potential loss of life and to ensure essential
More informationCLEARING THE WAY CAUTION. brampton.ca/snow
CLEARING THE WAY CAUTION brampton.ca/snow Who clears the roads? Not all roads in Brampton are the responsibility of the City of Brampton. The Region of Peel does winter maintenance on the major roads highlighted
More informationMajor Winter Storm to impact Western Washington. 17 January 2012 National Weather Service Seattle/Tacoma
Major Winter Storm to impact Western Washington 17 January 2012 National Weather Service Seattle/Tacoma Current Warnings Winter Storm Warning for all of Western Washington, except: Northwest interior Extreme
More informationACCUMULATED PRECIPITATION IN INCHES
40 30 CUMULATIVE PRECIPITATION WATER YEAR 2010 COLUMBIA BASIN ABOVE GRAND COULEE 164% of Normal 1971-2000 Average ACCUMULATED PRECIPITATION IN INCHES 20 10 0 30 20 10 0 40 30 20 10 0 80 60 40 154% of Normal
More informationTOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES
TOWN OF THORNTON, NEW HAMPSHIRE WINTER AND INCLEMENT WEATHER POLICY AND PRIORITIES Pursuant to RSA 231:92 a, the Thornton Board of Selectmen hereby establishes the following policy and procedure for winter
More informationPlows Truck Drivers. tations. Winter Maintenance Report. 30,546 Lane Miles 87% 174,000 40,000. Total Cost of Winter $ Million
2014-15 Winter Maintenance Report 30,546 Lane Miles At A Glance Total Cost of Winter $ 87.9 Million 87% Frequency Achieving Bare Lanes 1,514 Full-time 327 Backup Drivers 839 Plows 39.4 Statewide Snowfall
More informationACCUMULATED PRECIPITATION IN INCHES
CUMULATIVE PRECIPITATION WATER YEAR COLUMBIA BASIN ABOVE GRAND COULEE 84% of Normal 1971- Average ACCUMULATED PRECIPITATION IN INCHES 8 6 82% of Normal 85% of Normal 82% of Normal SNAKE RIVER BASIN ABOVE
More informationSetting the Stage UNIT
1 UNIT T o see the earth as it truly is, small and blue and beautiful in that eternal silence where it floats, is to see ourselves as riders on the earth together, brothers on that bright loveliness in
More informationSnow and Ice Control POLICY NO. P-01/2015. CITY OF AIRDRIE Snow and Ice Control Policy
Page 1 CITY OF AIRDRIE Snow and Ice Control Effective Date: Approved By: Approved On: March 17, 2015 City Council March 16, 2015 Revision Date: Resolution #: ------ PURPOSE: The City of Airdrie is responsible
More informationOrganized Chain-Up and VSL
Organized Chain-Up and VSL Jim Mahugh, PE WSDOT SC Region Traffic Engineer North/West Passage VSL Peer Exchange January 28, 2015 Snoqualmie Pass 2 Limits of VSL EB: MP 48.12 to 66.56 WB: MP 46.69 to 66.90
More information1st Annual Southwest Ohio Snow Conference April 8, 2010 Abner F. Johnson, Office of Maintenance - RWIS Coordinator
1st Annual Southwest Ohio Snow Conference April 8, 2010 Abner F. Johnson, Office of Maintenance - RWIS Coordinator The Ohio Department of Transportation ODOT has approximately 5500 full-time employees
More informationSnow Removal Winchester Department of Public Works
Snow Removal Winchester Department of Public Works Town of Winchester Board of Selectmen Meeting Neil H. Amwake, P.E. November 4, 2013 Presentation Outline Goals and Objectives 1. Connecticut snowfall
More informationDeicing (Winter Operations) on Porous and Permeable Pavements. Laura Fay October 27, 2016
Deicing (Winter Operations) on Porous and Permeable Pavements Laura Fay October 27, 2016 Permeable pavements Porous and permeable pavement (PPP) Pavement surfaces with porous, permeable or high macrotexture
More informationCity of Brainerd, Minnesota Snowplowing Policy
City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control
More informationH IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY. Revised January 4, 2016
! H IG HWAY WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Adopted January 11, 2010 Revised January 4, 2016 Pol icy It is the goal and intent of the Town of Sullivan to provide timely, efficient
More informationSalt Reduction using Innovative
Salt Reduction using Innovative Technology 2018 Road Salt Symposium Bill Schneider Winter Maintenance Problem Transportation agencies are tasked with treating roadways during snow and ice events ODOT spends
More informationWinter Maintenance Report
98.4 Official State Snowfall 150 Truck Stations 1,813 Full-time and Backup Snowfighters 840 Plow trucks - includes 47 reserve plows 30,585 Lane Miles 85% Frequency Achieving Bare Lanes 2017-18 Winter Maintenance
More informationState of Washington RiskMAP Business Plan
State of Washington RiskMAP Business Plan - 2011 WA State RiskMAP Business Plan 2011 1 Washington State Department of Ecology Shorelands and Environmental Assistance Program Washington State Department
More informationPILOT STUDY: PAVEMENT VISUAL CONDITION AND FRICTION AS A PERFORMANCE MEASURE FOR WINTER OPERATIONS
1 PILOT STUDY: PAVEMENT VISUAL CONDITION AND FRICTION AS A PERFORMANCE MEASURE FOR WINTER OPERATIONS Nishantha Bandara, Ph.D., P.E. Department of Civil Engineering Lawrence Technological University 21000
More informationOffice of the Washington State Climatologist
Office of the Washington State Climatologist May 2017 Report and Outlook May 8, 2017 April Event Summary April mean temperatures were near-normal with some tendency for the monthly anomalies to come in
More informationAPWA New England Chapter 2015 Winter Snow Stories. Winter Snow Stories
APWA New England Chapter 2015 Winter Snow Stories APWA North American Snow Conference, Hartford, CT May 25, 2016 Winter Snow Stories 1 Winter Snow Stories Today s Team of Public Works Experts Tom Collins,
More informationCITY OF LANSING SNOW AND ICE REMOVAL OPERATION PLAN, VERSION 2008
CITY OF LANSING SNOW AND ICE REMOVAL OPERATION PLAN, VERSION 2008 A. INTRODUCTION B. GENERAL POLICY STATEMENTS C. STORM CLASSIFICATIONS D. IMPLEMENTATION PROCEDURES 1. WEATHER/STORM DECISIONS 2. PERSONNEL
More informationWhy Now is the Time to Use Organic-Based Performance Enhancers to Treat Winter Roads Purdue Road School
Why Now is the Time to Use Organic-Based Performance Enhancers to Treat Winter Roads 2017 Purdue Road School Presenters: Diane Watkins Jay Walerstein Rod Waltman Presentation agenda: Winter Products Organics
More informationACCUMULATED PRECIPITATION IN INCHES
CUMULATIVE PRECIPITATION WATER YEAR 9 COLUMBIA BASIN ABOVE GRAND COULEE 87% of Normal 1971- Average ACCUMULATED PRECIPITATION IN INCHES 8 6 97% of Normal 94% of Normal 77% of Normal SNAKE RIVER BASIN ABOVE
More informationMONTGOMERY COUNTY SNOW PLAN
2018 2019 MONTGOMERY COUNTY SNOW PLAN COMMUNICATION DURING SNOW/ICE SITUATIONS Communication will be established prior/during all winter storms between the Sheriff s Office, Public Works Department, and
More informationOperational Snow and Ice Control Plan
CITY AND COUNTY OF BROOMFIELD Operational Snow and Ice Control Plan For Streets, Parks, and Facilities DEPARTMENT OF PUBLIC WORKS 11/1/2014 Snow and Ice Control Plan for 2014-2015 Winter Season TABLE OF
More informationSample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)
Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH 45249 Phone: (800) 280-5153 Email: goisales@gisdynamics.com Service Address Corporate America Jim Smith 1 Corporate Way Cincinnati,
More informationResolution Number: (2) Resolution Title: Snow Policy Date Signed: 11/26/12. DAVIS COUNTY Snow Policy Resolution
Resolution Number: 112612(2) Resolution Title: Snow Policy Signed: 11/26/12 DAVIS COUNTY Snow Policy Resolution A RESOLUTION TO ESTABLISH THE POLICY AND LEVEL OF SERVICE IN RESPECT TO CLEARANCE OF SNOW
More informationCITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015
CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining
More informationACCUMULATED PRECIPITATION IN INCHES
4 3 CUMULATIVE PRECIPITATION WATER YEAR 29 COLUMBIA BASIN ABOVE GRAND COULEE 94% of Normal 1971-2 Average ACCUMULATED PRECIPITATION IN INCHES 2 1 3 2 1 4 3 2 1 8 6 4 113% of Normal 99% of Normal 87% of
More informationCEDAR COUNTY ORDINANCE NO. 6
CEDAR COUNTY ORDINANCE NO. 6 AN ORDINANCE TO ESTABLISH THE POLICY AND LEVEL OF SERVICE IN RESPECT TO CLEARANCE OF SNOW OR ICE AND MAINTENANCE OF THIS COUNTY'S SECONDARY ROADS DURING THE WINTER MONTHS.
More informationWinter Plowing and Deicing: Saving Money, Salt and Labor by Distinguishing Best Practices From Urban Legends. Stephen J. Druschel, PhD, PE, F.
Winter Plowing and Deicing: Saving Money, Salt and Labor by Distinguishing Best Practices From Urban Legends Stephen J. Druschel, PhD, PE, F. ASCE Winter Roadway Maintenance Winter Roadway Maintenance
More informationWinter Weather Safety Tips. From your friends at South Brunswick Township Department of Public Works
Winter Weather Safety Tips From your friends at South Brunswick Township Department of Public Works South Brunswick Township Department of Public Works is committed to providing timely, efficient, and
More informationPOLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced.
POLICY MANUAL Legal References: Policy department: Public Works Department Cross References: N7 Adoption Date: January 19, 2005 Revision Date: June 20, 2005 Motion# 06/662/2005 October 20, 2014 Motion#
More informationDELAWARE COUNTY ORDINANCE NO. 3
DELAWARE COUNTY ORDINANCE NO. 3 AN ORDINANCE TO ESTABLISH THE POLICY AND LEVEL OF SERVICE IN RESPECT TO CLEARANCE OF SNOW OR ICE AND MAINTENANCE OF THIS COUNTY'S SECONDARY ROADS DURING THE WINTER MONTHS.
More informationHIGHWAY DEPARTMENT POLICIES Center Harbor, New Hampshire
HIGHWAY DEPARTMENT POLICIES Center Harbor, New Hampshire No: 2007-01 Date: August 22, 2007 Policy: Snow Removal and Ice Control Governing Laws: RSA 231:92-a, RSA 507-B: 2-b, Approval Date: August 22, 2007
More informationCOUNCIL POLICY MANUAL
COUNCIL POLICY MANUAL SECTION: PUBLIC WORKS SUBJECT: SNOW & ICE CONTROL POLICY 2012/2013 GOAL: Pages: 1 of 10 Approval Date: Dec. 3, 2012 Res. # 1001/2012 To annually identify the winter maintenance costs
More informationWINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas)
WINTER OPERATIONS SNOW REMOVAL AND ICE CONTROL POLICY Rochester, NH (Includes Highway, Sidewalks, Parking Areas) 1.0 PURPOSE: It is the goal and intent of the City of Rochester to provide timely, efficient
More informationFROZEN ROAD DECLARATION, MID SEASON THAW, ENDING THE DECLARATION, AND SPRING WEIGHT RESTRICTION DECISION PROCESS
FROZEN ROAD DECLARATION, MID SEASON THAW, ENDING THE DECLARATION, AND SPRING WEIGHT RESTRICTION DECISION PROCESS Frozen Road Declaration: State highways in Wisconsin are determined to be frozen at the
More informationRESOLUTION NO INTRODUCTION
RESOLUTION NO. 0824 A RESOLUTION TO ESTABLISH THIS CITY S SNOW AND ICE CONTROL POLICY DURING WINTER MONTHS, SPECIFICALLY DEFINED AS NOVEMBER THROUGH MARCH. BE IT RESOLVED BY THE CITY COUNCIL OF SOLON,
More informationSNOWPLOWING/ICE CONTROL POLICY
SNOWPLOWING/ICE CONTROL POLICY BACKGROUND: The Town of White Bear, Minnesota, finds that in the best interest of the residents of the Town to assume basic responsibility for the control of snow and ice
More informationEvaluation of Epoke Bulk Spreader for Winter Maintenance
Evaluation of Epoke Bulk Spreader for Winter Maintenance State Job Number: 134651 William H. Schneider, IV Christopher M. Miller William A. Holik Mallory Crow Research Objectives 1. Evaluate existing data
More informationThe Climate of Oregon Climate Zone 4 Northern Cascades
/05 E55 Unbound issue No. 9/ is Does not circulate Special Report 916 May 1993 The Climate of Oregon Climate Zone 4 Property of OREGON STATE UNIVERSITY Library Serials Corvallis, OR 97331-4503 Agricultural
More informationSNOW CREW CALL IN SHEET
Western State Colorado University Snow Removal The purpose of the Campus Snow Removal Information is to educate the campus, community as to the standard operating procedures used in the control of winter
More informationCommunity and Infrastructure Services Committee
REPORT TO: DATE OF MEETING: November 7, 2016 Community and Infrastructure Services Committee SUBMITTED BY: Cynthia Fletcher, Interim Executive Director INS 519-741- PREPARED BY: WARD(S) INVOLVED: 2600
More informationIOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY
IOWA COUNTY ORDINANCE NO. 22 IOWA COUNTY SNOW & ICE POLICY AN ORDINANCE REPEALING ESTABLISHING THE POLICY AND LEVEL OF SERVICE IN RESPECT TO CLEARANCE OF SNOW AND ICE AND MAINTENANCE OF IOWA COUNTY S SECONDARY
More informationNational Symposium on Extreme Weather Event Impacts on Transportation Infrastructure
National Symposium on Extreme Weather Event Impacts on Transportation Infrastructure May 22, 2013 Extreme Winter Lake Effect Operations and Maintenance Gregory C. Johnson, PE Chief Operations Officer Michigan
More information17 th Annual Snow & Ice Symposium Columbus, OH. Snow & Ice Management Association Copyright 2014 SALT BRINE & SNOW AND ICE CONTROL.
SALT BRINE & SNOW AND ICE CONTROL Agenda Goals and Objectives Storm Management Surface Temperatures How Materials Work Liquids in S&I Control Brine Production Pre wetting Anti icing Building Blocks Clearly
More information10 th Annual Road Salt Symposium. Thursday, February 3, 2011
10 th Annual Road Salt Symposium Thursday, February 3, 2011 Where We Were Where We Are Where We re Going... David Redig, Maintenance Operations Superintendent - Mn/DOT District 6 Snow Plow Evolution 1973
More informationMotorists are urged to drive wisely and cautiously in all winter weather situations:
Snow and Ice Snow and ice control is a central winter activity of the Milford Township road crew, especially during a rough winter. Milford Township is responsible for keeping 76.45 miles of roads passable
More informationTown of Grand Falls Windsor Snow Clearing Policy Department of Engineering and Works
Town of Grand Falls Windsor Snow Clearing Policy Department of Engineering and Works 1. The Town is responsible for the removal of snow and providing ice control on Town streets as well as road to the
More informationSNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT
ITASCA COUNTY TRANSPORTATION DEPARTMENT Effective Date: November 1, 1989 Revised: November 18, 2014 Policy Number: Operations 89-4 Distribution: Commissioner's Office Engineer's Office All Garages Number
More informationNOAA s National Weather Service Philadelphia/Mt. Holly NJ. Summary. Changes
Summary A crippling and potentially historic east coast snow storm will lead to blizzard conditions and major coastal flooding for portions of the area this weekend. Changes Blizzard Warning has been expanded
More informationSNOW & ICE CONTROL Winter Operations Conference. October 18, 2017 Renae Kuehl, SRF Consulting Group
SNOW & ICE CONTROL 2017 Winter Operations Conference October 18, 2017 Renae Kuehl, SRF Consulting Group LOCAL ROAD RESEARCH BOARD Serves local agencies to: Develop new initiatives Apply new knowledge Implement
More informationCost-Benefit Analysis of the Pooled- Fund Maintenance Decision Support System: Case Study
Cost-Benefit Analysis of the Pooled- Fund Maintenance Decision Support System: Case Study Zhirui Ye (WTI) Xianming Shi (WTI) Christopher K. Strong (City of Oshkosh) 12 th AASHTO-TRB TRB Maintenance Management
More information