1 American Journal of Computational and Applied Mathematics, (4): DOI:.59/j.ajcam.4.6 Stochastic Modeling of Repairable Redundant System Comprising One Big Unit and Three Small Dissimilar Units Ibrahim Yusuf *, Nafiu Hussaini Department of Mathematical Sciences, Faculty of Science, Bayero University, Kano, Nigeria Abstract This paper deals with the stochastic modeling of system comprising two subsystems A and B in series. Subsystem A consists three active parallel units. Failure time and repair time are assumed exponential. We developed explicit expressions for mean time to system failure (MTSF), system availability, busy period and profit function using Kolmogorov s forward equations method and perform graphical analysis to see the behavior of failure rates and repair rates on measures of system effectiveness such MTSF, system availability and profit function. Keywords MTSF, System Availability, Profit Function, Active Parallel. Introduction Stochastic models of redundant systems as well as methods of evaluating system reliability indices such as mean time to system failure (MTSF), system availability, busy period of repairman, profit analysis, etc have been researched in order to improve the system effectiveness. There are systems of three units in which two units are sufficient to perform the entire function of the system. Such systems are called -out-of- redundant systems. These systems have wide application in the real world. The communication system with three transmitters can be sited as a good example of -out-of- redundant system. Many research results have been reported on reliability of -out-of- redundant systems. For example, Chander and Bhardwaj[], analyzed reliability models for -out-of- redundant system subject to conditional arrival time of the server. Chander and Bhardwaj[] present reliability and economic analysis of -out-of- redundant system with priority to repair. Bhardwaj and Malik[] studied MTSF and cost effectiveness of -out-of- cold standby system with probability of repair and inspection. Taneja el al[4] deals with the reliability and cost benefit analysis of a system consisting o a big unit and two identical small units. A single repair facility appears and disappears from the system randomly with constant rates, Malik et al[5] analyzed two reliability models for a system of non * Corresponding author: ibrahimyusif@yahoo.com (Ibrahim Yusuf) Published online at Copyright Scientific & Academic Publishing. All Rights Reserved identical units original and duplicate using regenerative point technique., Mahmoud and Moshrefa[6] deal with the study of the stochastic analysis of a two unit cold standby system considering hardware failure, human error failure and preventive maintenance, Yusuf and Bala[7], studied stochastic two models of two unit parallel system. In model I, the system can be normal, deterioration (slow, mild or fast deterioration), failure whereas in model II, the system can either be in normal of failure modes. Using linear first order linear differential equations, various measures of system effectiveness such as mean time to system failure (MTSF) and availability are obtained to see the effect of deterioration on such measures, Kumar and Kadyan[8] deal with profit analysis of two unit non identical system with degradation and replacement while Sureria et al[9] studied cost benefit analysis of a computer system with priority to software replacement over hardware repair, Bhardwaj and Malik[5] developed two models for -out-of- system to study cost benefit analysis using semi-markov and regenerative process... Objective In this paper, we study a system comprising of two subsystems A and B in series. Subsystem A consists of three active parallel units while subsystem B is a single unit. The system is attended by four repairmen and considered up when: () all the units of subsystem A and subsystem B are working () two units of subsystem A and subsystem B are working. The system is down when two units of subsystem A failed or at the failure of subsystem B. We analyzed the system behavior using kolmogorov s forward equation methods. Explicit expression for measures of system

2 75 American Journal of Computational and Applied Mathematics, (4): effectiveness like mean time to system failure (MTSF), system availability, busy period of repairman, and profit analysis have been developed. The objective is to study the effect of failure and repair rates parameters with respect to subsystems A and B on reliability indices such as MTSF, availability and profit. Graphs were plotted to see the behavior of failure and repair rates on system performance. Notations A Un it io i in subsystem A is operational i =,, A Failed unit in subsystem Ri A under type i repair A Un it ig i in subsystem A is good B Subsystem O B is operational B Subsystem R4 B is failed and under type 4 repair β Type i i failure rate of unit A in subsystem A i α Type i i repair rate of unit A in subsystem A i λ Failure rate of subsystem B µ Repair rate of subsystem B.. Model Description and Assumptions. The system consist of two non identical subsystems A and B. Subsystem A consist three active parallel units. Units in subsystem A and subsystem B can have two modes: operation and failure 4. The system is attended by four repairmen 5. The system is down when two units of subsystem A failed or at the failure of subsystem B 6. The system is up when all the units of subsystem A and subsystem B are operational or two units of subsystem A and subsystem B are operational 7. Units in subsystem A suffer three types of failures while subsystem B suffer one type of failure 8. Failure rates and repair rates are constant.. State of the S ystem Up states: S( A O, AO, AO, BO) S( AR, AO, AO, BO) S( A O, AR, AO, B O), S( A O, AO, AR, BO) Failed states: S4( A O, AO, AO, BR4) S5( AR, AR, AG, BG) S6( AR, AG, AG, BR4), S7( A G, AR, AR, BG) S8( A G, AR, AG, BR4) S9( AR, AG, AR, BG) S ( A, A, A, B ) G G R R4. Model Formulation µ β S 8 λ S α β α α S 7 α S 9 S 4 α λ µ β S α α β S µ λ µ β β S 6 λ S S 5 S α Figure. schematic diagram of the System.. Me an Ti me to System Failure for System Let Pt () be the probability row vector at time t, then the initial conditions for this problem are as follows: P() P (), P(), P (), P(), P (), P (), P (), P (), P(), P (), P (),,,,,,,,,, = [ ] = [ ] we obtain the following system of differential equations from Figure above:

3 Ibrahim Yusuf et al.: Stochastic Modeling of Repairable Redundant System Comprising One Big Unit 76 and Three Small Dissimilar Units dp = ( λ + β+ β+ β) P + αp + αp + α P + µ P4() t dp = ( λ + α + β) P + βp + α P5 + µ P6() t dp = ( λ + α + β) P + βp + α P7 + µ P8() t dp = ( λ + α + β) P + βp + α P9 + µ P dp4 = µ P4 + λp + αp6 + αp8() t dp5 = αpt 5() + βpt () dp6 = ( µ + α) Pt 6() + λpt () dp7 = αp7 + βp() t dp8 = ( µ + α) P8 + λp() t dp9 = αp9 + βp() t dp = µ P + λp () The differential equations above can be put in matrix form as P = AP where ( λ+ β+ β+ β) α α α µ β ( λ+ α+ β) α µ β ( λ+ α+ β) α µ β ( λ+ α+ β) α µ λ µ α α A = β α λ ( µ + α) β α λ ( µ + α) β α λ µ It is difficult to evaluate the transient solutions hence following El-Said[], Haggag[], El-Said and Shrbeny[], and Wang et al[4], we delete the rows and columns of absorbing state of matrix A and take the transpose to produce a new matrix, say Q. The expected time to reach an absorbing state is obtained from E T = P Q P() P( absorbing ) ()( ) λ β β β β β β α ( λ + α + β) α ( λ + α + β) α λ α β ( ) Where Q = ( + + ) This method is successful of the following relations:

4 77 American Journal of Computational and Applied Mathematics, (4): At E T P() P( absorbing) = P() e Expression for MTSF can therefore be obtain from Where E T At e = A MTSF, for N A < P() P( absorbing) = = D () N = ( λ + α + β )( λ + α + β )( λ + α + β ) + β ( λ + α + β )( λ + α + β ) + β ( λ + α + β )( λ + α + β ) β ( λ + α + β )( λ + α + β ) D = αβ λ+ ββ λ+ αββ + αβλ + αβ λ+ αβ λ+ βββ + ααβλ+ αααβ + ααββ + αααλ+ ααβλ+ αββλ+ ααβλ+ αββλ+ αββλ+ 4βββλ+ αββλ αααβ + αββλ+ αβββ + ααβλ+ αββλ+ ααλ + ααλ + λ + αλ + βλ + αλ + βλ + αλ + 4 βλ + β λ + β λ + β λ + αβλ + αβλ + ββλ + β βλ ααβ + β βλ+ β ββ + α β λ + α β λ + α β λ + β β λ + αα λ + α β λ + α β λ + β β λ + α β λ + α α β + α β β + β βλ+ αβ β + ββ β + ββ λ+ ββ λ+ αββλ+ ααββ + αβββ + αββλ+ ααβλ+ ααββ + αββλ + αβββ.. Steady state availability Analysis for System For the availability case of Figure following El-Said[], Haggag[], El-Said and Shrbeny[], and Wang et al[4], the initial conditions for this system are: P() = [ P (), P(), P (), P(), P (), P(), P (), P (), P(), P (), P ()] = [,,,,,,,,] The system of differential equations in for System above can be expressed as: P Pt () P P P4 P5 = P6 P7 P8 P9 () P ( λ+ β+ β+ β) α α α µ β ( λ+ α + β ) α µ P Pt () β ( λ+ α+ β) α µ P β ( λ+ α+ β) α µ P λ µ α α P4 β α P5 P6 λ ( µ + α) P7 β α P8 λ ( µ + α) P9 β α P λ µ The steady-state availability is given by A ( ) = P ( ) + P( ) + P ( ) + P ( ) + P ( ) () V 4 7 In the steady state, the derivatives of the state probabilities become zero so that

5 Ibrahim Yusuf et al.: Stochastic Modeling of Repairable Redundant System Comprising One Big Unit 78 and Three Small Dissimilar Units which in matrix form AP = (4) ( λ+ β + β + β ) α α α µ β ( λ+ α+ β) α µ P Pt () β ( λ+ α+ β) α µ P β ( λ+ α+ β) α µ P λ µ α α P4 β α P5 = P6 λ ( µ + α) P7 β α P8 λ ( µ + α) P9 β α P λ µ Using the following normalizing condition ( ) ( ) ( ) ( ) ( ) P ( ) + P( ) + P + P + P + P + P + P ( ) + P( ) + P ( ) + P ( ) = (5) We substitute (5) in any of the redundant rows in (4) to give ( λ+ β + β + β ) α α α µ β ( λ+ α+ β) α µ P ( ) P ( ) β ( λ+ α+ β) α µ P ( ) β ( λ+ α+ β) α µ P ( ) λ µ α α P4 ( ) β α P5 ( ) = P6 ( ) λ ( µ + α) P7 ( ) β α P8 ( ) λ ( µ + α) P9 ( ) β α P ( ) We solve for the system of equations in the matrix above to obtain the steady-state probabilit ies P ( ), P( ), P ( ), P( ) A V Where N = αα α µ ( µ + µλ + α µ + α µ + λ + α λ + α λ + αα ) + α α β µ ( µ + µλ + α µ + α µ + α λ + αα ) + = α α β µ ( µ + µλ + α µ + α µ + α λ + α α ) α α µ ( β µ + β µ β µ + β µλ β µλ β µλ α β µ + αβµ αβµ αβµ + αβµ αβµ βλ + βλ βλ αβλ+ αβλ αβλ αβλ+ αβλ N D αβλ ααβ + ααβ ααβ ) D = α α α λ + α α β µ λ + α α β µλ α β µ λ α β µλ α α β µλ + α α β µλ + α β β µ λ + ααββµλ+ αααβ + αααβλ αααβ + αααµ + αααµ + αααµ + αααµ + αα β µ + αα β µ + αα βµ + ααα ββ µ + α α βµλ+ αα βµ λ+ αα β µ λ+ α ββ µ + α α β β µ + α α β µ + α α β µλ + α α α β µλ + α α α µλ + α α β µ + α α β µλ + α α β β µ

6 79 American Journal of Computational and Applied Mathematics, (4): ααβµλ + αββµλ + αββµλ αα βµλ+ α ββµλ+ α ββµλ αα βµ + αα βµ + α αα β µ αα β µ + αα α β µ + αα ββ µ + αα α µλ+ ααα βµλ+ αα ββ µλ+ αα β µλ + αα β µλ + α α β µλ + α α β µλ + αα β β µ α α β λ + α α β λ + α α β λ + αααβλ+ αααλ ααβλ + ααβλ + ααβλ + αααλ ααβλ + ααβλ + αα β λ + ααα βλ + ααα β λ + ααα λ αα βλ + αα βλ + αα β λ + αα ββ µ + αααβµ + αββµ λ+ ααβµ + α ββµ + ααββµ ααβµ λ+ αββµ λ+ αββµ λ+ ααβµ ααβµ ααβµ + ααβµ αβµ + ααβµ + ααβµλ ααβµ + α α β µ + α β β µ + α α β β µλ α β µλ α α β µλ + α α β µλ + α α α µλ + α β β µ + ααβµ αβ µ + αββµ + αββµ + αββµ + ααββµ + αααβµ + αααµ λ ααβµ.. Busy Period Analysis Using the same in itial conditions as for the reliability case: = ( ) ( ) ( ) ( ) ( ) ( ) ( ) = [,,,,,,,,,, ] The differential equations can be expressed as P() [ P, P, P, P, P, P, P, P (), P(), P (), P ()] P Pt () P P P4 P5 = P6 P7 P8 P9 () P ( λ+ β + β + β ) α α α µ β ( λ+ α+ β) α µ P Pt () β ( λ+ α+ β) α µ P β ( λ+ α+ β) α µ P λ µ α α P4 β α P5 P6 λ ( µ + α) 7 () β α P t P8 λ ( µ + α) P9 β α P λ µ

7 Ibrahim Yusuf et al.: Stochastic Modeling of Repairable Redundant System Comprising One Big Unit 8 and Three Small Dissimilar Units In the steady state, the derivatives of the state probabilities become zero this will enable us to compute steady state busy : B( ) = P ( ) (6) AP = ( λ+ β+ β+ β) α α α µ β ( λ+ α+ β) α µ P Pt () β ( λ+ α+ β) α µ P β ( λ+ α+ β) α µ P λ µ α α P4 β α P5 = P6 λ ( µ + α) P7 β α P8 λ ( µ + α) P9 β α P λ µ We solve for P ( ) Using the following normalizing condition ( ) ( ) ( ) ( ) ( ) P ( ) + P( ) + P + P + P + P + P + P ( ) + P( ) + P ( ) + P ( ) = We substitute (5) in any of the redundant rows in (4) to give ( λ+ β + β + β ) α α α µ β ( λ+ α+ β) α µ P ( ) P ( ) β ( λ+ α+ β) α µ P ( ) β ( λ+ α+ β) α µ P ( ) λ µ α α P4 ( ) β α P5 ( ) = P6 ( ) λ ( µ + α) P7 ( ) β α P8 ( ) λ ( µ + α) P9 ( ) β α P ( ) The steady state busy period B( ) is therefore N B( ) = D N = αα β µ + αα β µ + αα βµ + ααα ββ µ + α α βµλ+ αα βµ λ+ αα β µ λ+ α ββ µ + α α β β µ + α α β µ + α α β µλ + α α α β µλ + α α α µλ + α α β µ + α α β µλ + α α β β µ ααβµλ + αββµλ + αββµλ αα βµλ+ α ββµλ+ α ββµλ αα βµ + αα βµ + α αα β µ αα β µ + αα α β µ + αα ββ µ + αα α µλ+ ααα βµλ+ αα ββ µλ+ αα β µλ + αα β µλ + α α β µλ + α α β µλ + αα β β µ α α β λ + α α β λ + α α β λ + αααβλ+ αααλ ααβλ + ααβλ + ααβλ + αααλ ααβλ + ααβλ + αα β λ + ααα βλ + ααα β λ + ααα λ αα βλ + αα βλ + αα β λ + αα ββ µ + αααβµ + αββµ λ+ ααβµ + α ββµ + ααββµ ααβµ λ+ αββµ λ+ αββµ λ+

8 8 American Journal of Computational and Applied Mathematics, (4): ααβµ ααβµ ααβµ + ααβµ αβµ + ααβµ + ααβµλ ααβµ + α α β µ + α β β µ + α α β β µλ α β µλ α α β µλ + α α β µλ + α α α µλ + α β β µ + ααβµ αβ µ + αββµ + αββµ + αββµ + ααββµ + αααβµ + αααµ λ ααβµ + α α α λ + α α β µ λ + α α β µλ α β µ λ α β µλ α α β µλ + α α β µλ + α β β µ λ +.4. Profit Analysis ααββµλ+ αααβ + αααβλ αααβ Following El-Said[], Haggag[], El-said and sherbeny[] and Wang et al[4], the expected profit per unit time incurred to the system in the steady-state is given by: Profit =total revenue generated from system using - total cost due to repair of failed unit or subsystem B Where PF : is the profit incurred to the system C : is the revenue per unit up time of the system C : is the cost per unit time which the system is under repair PF = CAV ( ) CB ( ) (6). Results The following particular cases are considered: Effect of α on Profit 5 Profit α Fi gure. effect of α on Profit

9 Ibrahim Yusuf et al.: Stochastic Modeling of Repairable Redundant System Comprising One Big Unit 8 and Three Small Dissimilar Units Effect of α on MTSF MTSF α Fi gure. effect of α on MT SF.5 Effect of α on Avalability. Avalability α Fi gure 4. effect of α on system availability

10 8 American Journal of Computational and Applied Mathematics, (4): Effect of β on Avalability Avalability β Fi gure 5. effect of β on system availability Effect of β on Profit 5 Profit β Fi gure 6. effect of β on Profit

11 Ibrahim Yusuf et al.: Stochastic Modeling of Repairable Redundant System Comprising One Big Unit 84 and Three Small Dissimilar Units Effect of β on MTSF MTSF β Fi gure 7. effect of β on MT SF Effect of λ on Avalability Avalability λ Fi gure 8. effect of λ on system availability

12 85 American Journal of Computational and Applied Mathematics, (4): Effect of λ on MTSF 7 6 MTSF λ Fi gure 9. effect of λ on MT SF Effect of λ on Profit 9 8 Profit λ Figure. effect of λ on Profit

13 Ibrahim Yusuf et al.: Stochastic Modeling of Repairable Redundant System Comprising One Big Unit 86 and Three Small Dissimilar Units Effect of µ on Avalability.5. Avalability µ Figure. effect of µ on system availability Effect of µ on MTSF.4..8 MTSF µ Figure. effect of µ on MT SF

14 87 American Journal of Computational and Applied Mathematics, (4): Effect of µ on Profit Profit Discussion µ Case I: α =.5, α =., β =.5, β =.6, β =., λ =.6, µ =.5, C =, C = and vary α for Figure to 4. Case II: α =., α =., α =., β =.6, β =.9, λ =.6, µ =.5, C = 5, C = and vary β for Figure 5 to 7. Case III: α =.9, α =.5, α =., β =.5, β =.6, β =., µ =.5, C = 5, C = and vary λ for Figure 8 to. Case IV: α =.5, α =.5, α =., β =.5, β =.6, β =., λ =.6, C = 5, C = and vary µ for Figure to. Figure to 4 provides description of profit function, MTSF and system availability with respect to α. Fro m these figures, it is clear that both profit function, MTSF and system availability increase as α increases. In Figure 5 to 7, the behavior of system availability, profit function and MTSF are shown with respect to β. It is observed that system availability decrease as β increases. In Figure 8 to, the behavior of system availability, MTSF and profit Figure. effect of µ on Profit function with respect toλ. The results in these figures have shown that system availability, MTSF and profit function decrease as λ increases. Figure to provides description of system availability, MTSF and profit function with respect to µ. System availability and profit in Figure and increase with increase in µ while MTSF in Figure is constant with respect to µ. 5. Conclusions In this paper, we developed the explicit expressions for the mean time to system failure (MTSF), system availability, busy period and profit function for the system and performed graphical study to see the behavior of failure rates and repair rates parameters on system performance. It is observed that from graphical study system performance increase with repair rates and decrease with failure rates. REFERENCES [] Bhardwj, R.K. and Chander, S. (7). Reliability and cost benefit analysis of -out-of- redundant system with general distribution of repair and waiting time. DIAS- Technology review- An Int. J. of business and IT. 4(), 8-5 [] Chander, S. and Bhardwaj, R.K. (9). Reliability and economic analysis of -out-of- redundant system with priority to repair. African J. of Maths and comp. sci, (), -6. [] Bhardwj,R.K., and S.C. Malik. (). MTSF and Cost effectiveness of -out-of- cold standby system with

15 Ibrahim Yusuf et al.: Stochastic Modeling of Repairable Redundant System Comprising One Big Unit 88 and Three Small Dissimilar Units probability of repair and inspection. Int. J. of Eng. Sci. and Tech. (), [4] Taneja, G., A. Goyal and D.V. Singh (). Reliability and Cost benefit analysis of a system comprising one big unit and two small identical units with priority for operation/repair to big unit. Mathematical Sciences, Vol. 5 No., 5-48 [5] Malik, S.C., Bharwaj, R.K. and Grewal, A.S. (). Probabilistic analysis of a system of two non identical parallel units with priority to repair to repair subject to inspection. Journal of reliability and statistical studies, vol. (), pp - [6] Mahmoud, M.A.W. and Moshref, M.E. (). On a two unit cold standby system considering hardware, human error failures and preventive maintenance, Mathematics and Computer modeling, 5(5-6), pp [7] Yusuf, I. and Bala, S.I. (). Stochastic modeling of a two unit parallel system under two types of failures. International Journal of Latest trends in Mathematics, Vol. (), pp 44-5 [8] Kumar, J. and Kadyan, M.S. (). Profit analysis of a system of non identical units with degradation and replacement. International journal of computer application, vol. 4 (), pp 9-5 [9] Sureria, J.K., Malik, S.C. and Anand, J. (). Cost benefit analysis of a computer system with priority to software replacement over hardware repair. Applied Mathematical Sciences, vol. 6 (75), pp [] El-Said, K.M.,. ( 8).Cost analysis of a system with preventive maintenance by using Kolmogorov s forward equations method. Ame. J. of App. Sci. 5(4), 45-4 [] Haggag, M.Y., (9). Cost analysis of a system involving common cause failures and preventive maintenance.j. Maths. And Stat. 5(4), 5- [] El-Said, K.M., and M.S. El-Sherbeny. ( 5).Profit analysis of a two unit cold standby system with preventive maintenance and random change in units. J. Maths and Stat., () 7-77 [] El-Said, K.M., and M.S. El-Sherbeny. (5).Evaluation of reliability and availability characteristics of two different systems by using linear first order differential equations. J. Maths and Stat., () 9- [4] Wang, K., Hseih, C., and Liou, C. H. (6). Cost benefit analysis of series systems with cold standby components and a repairable service station. Quality technology and quantitative management. Vol. (), pp [5] Bhardwaj., R.K., and S.C. Malik (). MTSF and cost effectiveness of -out-of- cold standby system with probability of repair and inspection. International Journal of engineering, science and technology, vol. (),

Reliability analysis of a linear consecutive 2-out-of-3 system in the presence of supporting device and repairable service station

Reliability analysis of a linear consecutive 2-out-of-3 system in the presence of supporting device and repairable service station International Journal of Operations Research International Journal of Operations Research Vol. 3, o., 3 4 (6) Reliability analysis of a linear consecutive -out-of-3 system in the presence of supporting

More information

Reliability Analysis of a Two Dissimilar Unit Cold Standby System with Three Modes Using Kolmogorov Forward Equation Method

Reliability Analysis of a Two Dissimilar Unit Cold Standby System with Three Modes Using Kolmogorov Forward Equation Method Available online at http://www.ajol.info/index.php/njbas/index Nigerian Journal of Basic and Applied Science (September, 03), (3): 97-06 DOI: http://dx.doi.org/0.434/njbas.vi3.5 ISSN 0794-5698 Reliability

More information

COMPARATIVE RELIABILITY ANALYSIS OF FIVE REDUNDANT NETWORK FLOW SYSTEMS

COMPARATIVE RELIABILITY ANALYSIS OF FIVE REDUNDANT NETWORK FLOW SYSTEMS I. Yusuf - COMARATIVE RELIABILITY ANALYSIS OF FIVE REDUNDANT NETWORK FLOW SYSTEMS RT&A # (35) (Vol.9), December COMARATIVE RELIABILITY ANALYSIS OF FIVE REDUNDANT NETWORK FLOW SYSTEMS I. Yusuf Department

More information

Stochastic Modelling of a Computer System with Software Redundancy and Priority to Hardware Repair

Stochastic Modelling of a Computer System with Software Redundancy and Priority to Hardware Repair Stochastic Modelling of a Computer System with Software Redundancy and Priority to Hardware Repair Abstract V.J. Munday* Department of Statistics, Ramjas College, University of Delhi, Delhi 110007 (India)

More information

Evaluation of Mean Time to System Failure of a Repairable 3-out-of-4 System with Online Preventive Maintenance

Evaluation of Mean Time to System Failure of a Repairable 3-out-of-4 System with Online Preventive Maintenance American Journal of Applied Mahemaics and Saisics, 0, Vol., No., 9- Available online a hp://pubs.sciepub.com/ajams/// Science and Educaion Publishing DOI:0.69/ajams--- Evaluaion of Mean Time o Sysem Failure

More information

Markov Chain Profit Modelling and Evaluation between Two Dissimilar Systems under Two Types of Failures

Markov Chain Profit Modelling and Evaluation between Two Dissimilar Systems under Two Types of Failures Available at http://pvamu.edu/aam Appl. Appl. Math. SSN: 9-966 Vol., ssue (December 06), pp. 89-50 Applications and Applied Mathematics: An nternational Journal (AAM) Markov Chain Profit Modelling and

More information

OPTIMIZATION OF COST MAINTENANCE AND REPLACEMENT FOR ONE-UNIT SYSTEM RELIABILITY MODEL WITH POST REPAIR

OPTIMIZATION OF COST MAINTENANCE AND REPLACEMENT FOR ONE-UNIT SYSTEM RELIABILITY MODEL WITH POST REPAIR Int. J. Mech. Eng. & Rob. Res. 23 Sanjay Gupta and Suresh Kumar Gupta, 23 Research Paper ISSN 2278 49 www.ijmerr.com Vol. 2, No. 4, October 23 23 IJMERR. All Rights Reserved OPTIMIZATION OF COST MAINTENANCE

More information

STOCHASTIC MODELLING OF A COMPUTER SYSTEM WITH HARDWARE REDUNDANCY SUBJECT TO MAXIMUM REPAIR TIME

STOCHASTIC MODELLING OF A COMPUTER SYSTEM WITH HARDWARE REDUNDANCY SUBJECT TO MAXIMUM REPAIR TIME STOCHASTIC MODELLING OF A COMPUTER SYSTEM WITH HARDWARE REDUNDANCY SUBJECT TO MAXIMUM REPAIR TIME V.J. Munday* Department of Statistics, M.D. University, Rohtak-124001 (India) Email: vjmunday@rediffmail.com

More information

COST-BENEFIT ANALYSIS OF A SYSTEM OF NON- IDENTICAL UNITS UNDER PREVENTIVE MAINTENANCE AND REPLACEMENT

COST-BENEFIT ANALYSIS OF A SYSTEM OF NON- IDENTICAL UNITS UNDER PREVENTIVE MAINTENANCE AND REPLACEMENT Journal of Reliability and Statistical Studies; ISSN (Print): 0974-8024, (Online): 2229-5666 Vol. 9, Issue 2 (2016): 17-27 COST-BENEFIT ANALYSIS OF A SYSTEM OF NON- IDENTICAL UNITS UNDER PREVENTIVE MAINTENANCE

More information

Stochastic Analysis of a Two-Unit Cold Standby System with Arbitrary Distributions for Life, Repair and Waiting Times

Stochastic Analysis of a Two-Unit Cold Standby System with Arbitrary Distributions for Life, Repair and Waiting Times International Journal of Performability Engineering Vol. 11, No. 3, May 2015, pp. 293-299. RAMS Consultants Printed in India Stochastic Analysis of a Two-Unit Cold Standby System with Arbitrary Distributions

More information

Reliability Analysis of Two-Unit Warm Standby System Subject to Hardware and Human Error Failures

Reliability Analysis of Two-Unit Warm Standby System Subject to Hardware and Human Error Failures Reliability Analysis of Two-Unit Warm Standby System Subject to Hardware and Human Error Failures Pravindra Singh 1, Pankaj Kumar 2 & Anil Kumar 3 1 C. C. S. University, Meerut,U.P 2 J.N.V.U Jodhpur &

More information

Reliability and Economic Analysis of a Power Generating System Comprising One Gas and One Steam Turbine with Random Inspection

Reliability and Economic Analysis of a Power Generating System Comprising One Gas and One Steam Turbine with Random Inspection J Journal of Mathematics and Statistics Original Research Paper Reliability and Economic Analysis of a Power Generating System Comprising One Gas and One Steam Turbine with Random Inspection alip Singh

More information

Cost-Benefit Analysis of a System of Non-identical Units under Preventive Maintenance and Replacement Subject to Priority for Operation

Cost-Benefit Analysis of a System of Non-identical Units under Preventive Maintenance and Replacement Subject to Priority for Operation International Journal of Statistics and Systems ISSN 973-2675 Volume 11, Number 1 (216), pp. 37-46 esearch India ublications http://www.ripublication.com Cost-Benefit Analysis of a System of Non-identical

More information

Comparative study of two reliability models on a two -unit hot standby system with unannounced failures

Comparative study of two reliability models on a two -unit hot standby system with unannounced failures IJREAS VOLUME 5, ISSUE 8 (August, 205) (ISS 2249-3905) International Journal of Research in Engineering and Applied Sciences (IMPACT FACTOR 5.98) Comparative study of two reliability models on a two -unit

More information

Stochastic analysis of edible oil refinery industry

Stochastic analysis of edible oil refinery industry 2018; 3(1): 0412 ISSN: 24561452 Maths 2018; 3(1): 0412 2018 Stats & Maths www.mathsjournal.com Received: 08102017 Accepted: 11112017 Sunita Thori Research Scholar, J.J.T. University, Jhunjhnu, Rajasthan,

More information

by: Mohammad El-Moniem Soleha

by: Mohammad El-Moniem Soleha Reliability and Availability Characteristics of A Two-Dissimilar-Unit Cold Standby System With three Modes by Using Linear First Order Differential Equations by: Mohammad El-Moniem Soleha ABSTRACT : This

More information

Comparison between four dissimilar solar panel configurations

Comparison between four dissimilar solar panel configurations J Ind Eng Int () 49 48 DOI./s49--9-8 ORIGINAL RESEARCH Comparison between four dissimilar solar panel configurations K. Suleiman U. A. Ali, Ibrahim Yusuf A. D. Koko S. I. Bala Received 9 December 4 / Accepted

More information

Stochastic Analysis of a Cold Standby System with Server Failure

Stochastic Analysis of a Cold Standby System with Server Failure International Journal of Mathematics and Statistics Invention (IJMSI) E-ISSN: 2321 4767 P-ISSN: 2321-4759 Volume 4 Issue 6 August. 2016 PP-18-22 Stochastic Analysis of a Cold Standby System with Server

More information

Reliability Analysis of a Fuel Supply System in Automobile Engine

Reliability Analysis of a Fuel Supply System in Automobile Engine ISBN 978-93-84468-19-4 Proceedings of International Conference on Transportation and Civil Engineering (ICTCE'15) London, March 21-22, 2015, pp. 1-11 Reliability Analysis of a Fuel Supply System in Automobile

More information

Stochastic Modeling of a Computer System with Software Redundancy

Stochastic Modeling of a Computer System with Software Redundancy Volume-5, Issue-, February-205 International Journal of Engineering and Management Research Page Number: 295-302 Stochastic Modeling of a Computer System with Software Redundancy V.J. Munday, S.C. Malik

More information

RELIABILITY ANALYSIS OF A FUEL SUPPLY SYSTEM IN AN AUTOMOBILE ENGINE

RELIABILITY ANALYSIS OF A FUEL SUPPLY SYSTEM IN AN AUTOMOBILE ENGINE International J. of Math. Sci. & Engg. Appls. (IJMSEA) ISSN 973-9424, Vol. 9 No. III (September, 215), pp. 125-139 RELIABILITY ANALYSIS OF A FUEL SUPPLY SYSTEM IN AN AUTOMOBILE ENGINE R. K. AGNIHOTRI 1,

More information

3-Unit System Comprising Two Types of Units with First Come First Served Repair Pattern Except When Both Types of Units are Waiting for Repair

3-Unit System Comprising Two Types of Units with First Come First Served Repair Pattern Except When Both Types of Units are Waiting for Repair Journal of Mathematics and Statistics 6 (3): 36-30, 00 ISSN 49-3644 00 Science Publications 3-Unit System Comrising Two Tyes of Units with First Come First Served Reair Pattern Excet When Both Tyes of

More information

Comparative Analysis of Two-Unit Hot Standby Hardware-Software Systems with Impact of Imperfect Fault Coverages

Comparative Analysis of Two-Unit Hot Standby Hardware-Software Systems with Impact of Imperfect Fault Coverages International Journal of Statistics and Systems ISSN 0973-2675 Volume 12, Number 4 (2017), pp. 705-719 Research India Publications http://www.ripublication.com Comparative Analysis of Two-Unit Hot Standby

More information

Reliability Analysis of a Single Machine Subsystem of a Cable Plant with Six Maintenance Categories

Reliability Analysis of a Single Machine Subsystem of a Cable Plant with Six Maintenance Categories International Journal of Applied Engineering Research ISSN 973-4562 Volume 12, Number 8 (217) pp. 1752-1757 Reliability Analysis of a Single Machine Subsystem of a Cable Plant with Six Maintenance Categories

More information

Research Article Stochastic Analysis of a Two-Unit Cold Standby System Wherein Both Units May Become Operative Depending upon the Demand

Research Article Stochastic Analysis of a Two-Unit Cold Standby System Wherein Both Units May Become Operative Depending upon the Demand Journal of Quality and Reliability Engineering, Article ID 896379, 13 pages http://dx.doi.org/1.1155/214/896379 Research Article Stochastic Analysis of a Two-Unit Cold Standby System Wherein Both Units

More information

Analysis for Parallel Repairable System with Degradation Facility

Analysis for Parallel Repairable System with Degradation Facility American Journal of Mathematics and Statistics 212, 2(4): 7-74 DOI: 1.5923/j.ajms.21224.2 Analysis for Parallel Repairable System with Degradation Facility M. A. El-Damcese *, N. S. Temraz Department of

More information

COMPARISON OF SOME RELIABILITY CHARACTERISTICS BETWEEN REDUNDANT SYSTEMS REQUIRING SUPPORTING UNITS FOR THEIR OPERATIONS

COMPARISON OF SOME RELIABILITY CHARACTERISTICS BETWEEN REDUNDANT SYSTEMS REQUIRING SUPPORTING UNITS FOR THEIR OPERATIONS Avalable onlne at http://sck.org J. Math. Comput. Sc. 3 (3), No., 6-3 ISSN: 97-537 COMPARISON OF SOME RELIABILITY CHARACTERISTICS BETWEEN REDUNDANT SYSTEMS REQUIRING SUPPORTING UNITS FOR THEIR OPERATIONS

More information

Stochastic and Cost-Benefit Analysis of Two Unit Hot Standby Database System

Stochastic and Cost-Benefit Analysis of Two Unit Hot Standby Database System International Journal of Performability Engineering, Vol. 13, No. 1, January 2017, pp. 63-72 Totem Publisher, Inc., 4625 Stargazer Dr., Plano, Printed in U.S.A. Stochastic and Cost-Benefit Analysis of

More information

Probabilistic Analysis of a Desalination Plant with Major and Minor Failures and Shutdown During Winter Season

Probabilistic Analysis of a Desalination Plant with Major and Minor Failures and Shutdown During Winter Season Probabilistic Analysis of a Desalination Plant with Major and Minor Failures and Shutdown During Winter Season Padmavathi N Department of Mathematics & Statistics Caledonian college of Engineering Muscat,

More information

Availability. M(t) = 1 - e -mt

Availability. M(t) = 1 - e -mt Availability Availability - A(t) the probability that the system is operating correctly and is available to perform its functions at the instant of time t More general concept than reliability: failure

More information

Analysis of a Machine Repair System with Warm Spares and N-Policy Vacations

Analysis of a Machine Repair System with Warm Spares and N-Policy Vacations The 7th International Symposium on Operations Research and Its Applications (ISORA 08) ijiang, China, October 31 Novemver 3, 2008 Copyright 2008 ORSC & APORC, pp. 190 198 Analysis of a Machine Repair System

More information

ANALYSIS FOR A PARALLEL REPAIRABLE SYSTEM WITH DIFFERENT FAILURE MODES

ANALYSIS FOR A PARALLEL REPAIRABLE SYSTEM WITH DIFFERENT FAILURE MODES Journal of Reliability and Statistical Studies; ISSN (Print): 0974-8024, (Online):2229-5666, Vol. 5, Issue 1 (2012): 95-106 ANALYSIS FOR A PARALLEL REPAIRABLE SYSTEM WITH DIFFERENT FAILURE MODES M. A.

More information

Probabilistic Analysis of a Computer System with Inspection and Priority for Repair Activities of H/W over Replacement of S/W

Probabilistic Analysis of a Computer System with Inspection and Priority for Repair Activities of H/W over Replacement of S/W International Journal of Comuter Alications (975 8887) Volume 44 o. Aril Probabilistic Analysis of a Comuter ystem with Insection and Priority for Reair Activities of /W over Relacement of /W Jyoti Anand

More information

Review Paper Machine Repair Problem with Spares and N-Policy Vacation

Review Paper Machine Repair Problem with Spares and N-Policy Vacation Research Journal of Recent Sciences ISSN 2277-2502 Res.J.Recent Sci. Review Paper Machine Repair Problem with Spares and N-Policy Vacation Abstract Sharma D.C. School of Mathematics Statistics and Computational

More information

STOCHASTIC REPAIR AND REPLACEMENT OF A STANDBY SYSTEM

STOCHASTIC REPAIR AND REPLACEMENT OF A STANDBY SYSTEM Journal of Mathematics and Statistics 0 (3): 384-389, 04 ISSN: 549-3644 04 doi:0.3844/jmssp.04.384.389 Published Online 0 (3) 04 (http://www.thescipub.com/jmss.toc) STOCHASTIC REPAIR AND REPLACEMENT OF

More information

Linmin Hu, Jiandong Li and Wenming Fang. Received November 2007; accepted January 2008

Linmin Hu, Jiandong Li and Wenming Fang. Received November 2007; accepted January 2008 ICIC Express Letters ICIC International c 28 ISSN 1881-83X Volume 2, Number 1, March 28 pp. 53 58 RELIABILITY ANALYSIS OF AN N-COMPONENT SERIES SYSTEM WITH M FAILURE MODES AND VACATION Linmin Hu, Jiandong

More information

Stochastic outlook of two non-identical unit parallel system with priority in repair

Stochastic outlook of two non-identical unit parallel system with priority in repair STATISTICS RESEARCH ARTICLE Stochastic outlook of two non-identical unit parallel system with priority in repair Pramendra Singh Pundir 1, Rohit Patawa 1 and Puneet Kumar Gupta 1 * Received: 24 August

More information

Multi-State Availability Modeling in Practice

Multi-State Availability Modeling in Practice Multi-State Availability Modeling in Practice Kishor S. Trivedi, Dong Seong Kim, Xiaoyan Yin Depart ment of Electrical and Computer Engineering, Duke University, Durham, NC 27708 USA kst@ee.duke.edu, {dk76,

More information

RELIABILITY AND AVAILABILITY ANALYSIS OF TWO DISSIMILAR UNITS BY USING LAPLACE TRANSFORMS Khaled Moh.El-said 1, Amany S. Mohamed 2, Nareman.

RELIABILITY AND AVAILABILITY ANALYSIS OF TWO DISSIMILAR UNITS BY USING LAPLACE TRANSFORMS Khaled Moh.El-said 1, Amany S. Mohamed 2, Nareman. Vol.4, No.4, pp.1-10, August 016 RELIABILITY AND AVAILABILITY ANALYSIS OF TWO DISSIMILAR UNITS BY USING LAPLACE TRANSFORMS Khaled Moh.El-said 1, Aany S. Mohaed, Narean.Mostafa 1 Departent of Math, Faculty

More information

A Comparative Study of Profit Analysis of Two Reliability Models on a 2-unit PLC System

A Comparative Study of Profit Analysis of Two Reliability Models on a 2-unit PLC System International Journal of Scientific & Engineering Research, Volume 4, Issue 4, Aril-2013 400 A Comarative Study of Profit Analysis of Two Reliability Models on a 2-unit PLC System Dr. Bhuender Parashar,

More information

Reliability analysis of a warm standby repairable system with two cases of imperfect switching mechanism

Reliability analysis of a warm standby repairable system with two cases of imperfect switching mechanism Scientia Iranica E (017) (), 808{8 Sharif University of Technology Scientia Iranica Transactions E: Industrial Engineering www.scientiairanica.com Reliability analysis of a warm standby repairable system

More information

A Heterogeneous Two-Server Queueing System with Balking and Server Breakdowns

A Heterogeneous Two-Server Queueing System with Balking and Server Breakdowns The Eighth International Symposium on Operations Research and Its Applications (ISORA 09) Zhangjiajie, China, September 20 22, 2009 Copyright 2009 ORSC & APORC, pp. 230 244 A Heterogeneous Two-Server Queueing

More information

Fault Tolerance. Dealing with Faults

Fault Tolerance. Dealing with Faults Fault Tolerance Real-time computing systems must be fault-tolerant: they must be able to continue operating despite the failure of a limited subset of their hardware or software. They must also allow graceful

More information

QUEUING MODELS AND MARKOV PROCESSES

QUEUING MODELS AND MARKOV PROCESSES QUEUING MODELS AND MARKOV ROCESSES Queues form when customer demand for a service cannot be met immediately. They occur because of fluctuations in demand levels so that models of queuing are intrinsically

More information

Markov Reliability and Availability Analysis. Markov Processes

Markov Reliability and Availability Analysis. Markov Processes Markov Reliability and Availability Analysis Firma convenzione Politecnico Part II: Continuous di Milano e Time Veneranda Discrete Fabbrica State del Duomo di Milano Markov Processes Aula Magna Rettorato

More information

Markov Model. Model representing the different resident states of a system, and the transitions between the different states

Markov Model. Model representing the different resident states of a system, and the transitions between the different states Markov Model Model representing the different resident states of a system, and the transitions between the different states (applicable to repairable, as well as non-repairable systems) System behavior

More information

Cost Analysis of a vacation machine repair model

Cost Analysis of a vacation machine repair model Available online at www.sciencedirect.com Procedia - Social and Behavioral Sciences 25 (2011) 246 256 International Conference on Asia Pacific Business Innovation & Technology Management Cost Analysis

More information

International Journal on Mechanical Engineering and Robotics (IJMER)

International Journal on Mechanical Engineering and Robotics (IJMER) Cost- Benefit Analysis of Two Similar Cold Standby Satellite System subject to Failure due to leak in the Russian cryogenic engine and Failure caused by an anomaly on the Fuel Booster Turbo Pump (FBTP)

More information

STOCHASTIC ANALYSIS OF A TWO UNIT SYSTEM WITH VACATION FOR THE REPAIR FACILITY AFTER m REPAIRS

STOCHASTIC ANALYSIS OF A TWO UNIT SYSTEM WITH VACATION FOR THE REPAIR FACILITY AFTER m REPAIRS 139 ORiON, Vol. 16, No. 2, pp139148 ISSN 0259191X STOCHASTIC ANALYSIS OF A TWO UNIT SYSTEM WITH VACATION FOR THE REPAIR FACILITY AFTER m REPAIRS V.S.S. YADAVALLI & M. BOTHA University of South Africa Department

More information

Reliability of an (M, M) Machining System with Spares

Reliability of an (M, M) Machining System with Spares Reliability of an (M, M) Machining System with Spares Rashmita Sharma Department of Mathematics D.A.V. (P.G.) College, Dehradun-248001 (India). Abstract This paper studies the reliability characteristics

More information

RELIABILITY OF REPAIRABLE k out of n: F SYSTEM HAVING DISCRETE REPAIR AND FAILURE TIMES DISTRIBUTIONS

RELIABILITY OF REPAIRABLE k out of n: F SYSTEM HAVING DISCRETE REPAIR AND FAILURE TIMES DISTRIBUTIONS www.arpapre.com/volume/vol29iue1/ijrras_29_1_01.pdf RELIABILITY OF REPAIRABLE k out of n: F SYSTEM HAVING DISCRETE REPAIR AND FAILURE TIMES DISTRIBUTIONS Sevcan Demir Atalay 1,* & Özge Elmataş Gültekin

More information

Chapter 9 Part II Maintainability

Chapter 9 Part II Maintainability Chapter 9 Part II Maintainability 9.4 System Repair Time 9.5 Reliability Under Preventive Maintenance 9.6 State-Dependent Systems with Repair C. Ebeling, Intro to Reliability & Maintainability Chapter

More information

57:022 Principles of Design II Final Exam Solutions - Spring 1997

57:022 Principles of Design II Final Exam Solutions - Spring 1997 57:022 Principles of Design II Final Exam Solutions - Spring 1997 Part: I II III IV V VI Total Possible Pts: 52 10 12 16 13 12 115 PART ONE Indicate "+" if True and "o" if False: + a. If a component's

More information

A Markov model for estimating the remaining life of electrical insulation in distribution transformer

A Markov model for estimating the remaining life of electrical insulation in distribution transformer AMERICAN JOURNAL OF SCIENTIFIC AND INDUSTRIAL RESEARCH 2010, Science Huβ, http://www.scihub.org/ajsir ISSN: 2153-649X doi:10.5251/ajsir.2010.1.3.539.548 A Markov model for estimating the remaining life

More information

A Heterogeneous two-server queueing system with reneging and no waiting line

A Heterogeneous two-server queueing system with reneging and no waiting line ProbStat Forum, Volume 11, April 2018, Pages 67 76 ISSN 0974-3235 ProbStat Forum is an e-journal. For details please visit www.probstat.org.in A Heterogeneous two-server queueing system with reneging and

More information

Reliability evaluation of a repairable system under fuzziness

Reliability evaluation of a repairable system under fuzziness ISSN 1 746-7233, England, UK World Journal of Modelling and Simulation Vol. 12 (2016) No. 1, pp. 48-58 Reliability evaluation of a repairable system under fuzziness Kalika Patrai 1, Indu Uprety 2 1 Department

More information

IEOR 4106: Introduction to Operations Research: Stochastic Models Spring 2011, Professor Whitt Class Lecture Notes: Tuesday, March 1.

IEOR 4106: Introduction to Operations Research: Stochastic Models Spring 2011, Professor Whitt Class Lecture Notes: Tuesday, March 1. IEOR 46: Introduction to Operations Research: Stochastic Models Spring, Professor Whitt Class Lecture Notes: Tuesday, March. Continuous-Time Markov Chains, Ross Chapter 6 Problems for Discussion and Solutions.

More information

STEADY-STATE BEHAVIOR OF AN M/M/1 QUEUE IN RANDOM ENVIRONMENT SUBJECT TO SYSTEM FAILURES AND REPAIRS. S. Sophia 1, B. Praba 2

STEADY-STATE BEHAVIOR OF AN M/M/1 QUEUE IN RANDOM ENVIRONMENT SUBJECT TO SYSTEM FAILURES AND REPAIRS. S. Sophia 1, B. Praba 2 International Journal of Pure and Applied Mathematics Volume 101 No. 2 2015, 267-279 ISSN: 1311-8080 (printed version); ISSN: 1314-3395 (on-line version) url: http://www.ijpam.eu doi: http://dx.doi.org/10.12732/ijpam.v101i2.11

More information

Chapter 5. System Reliability and Reliability Prediction.

Chapter 5. System Reliability and Reliability Prediction. Chapter 5. System Reliability and Reliability Prediction. Problems & Solutions. Problem 1. Estimate the individual part failure rate given a base failure rate of 0.0333 failure/hour, a quality factor of

More information

Availability Analysis of Refining System of a Sugar Plant Using Markov Process

Availability Analysis of Refining System of a Sugar Plant Using Markov Process Availability Analysis of Refining System of a Sugar Plant Using Markov Process Er. Aman 1, Dr. V.K. Mahna 2, Dr. Rajiv Khanduja 3 1 Research Scholar, Dept. of Mechanical Engineering, M.R.I.U., Faridabad,Haryana,

More information

An M/M/1 Queue in Random Environment with Disasters

An M/M/1 Queue in Random Environment with Disasters An M/M/1 Queue in Random Environment with Disasters Noam Paz 1 and Uri Yechiali 1,2 1 Department of Statistics and Operations Research School of Mathematical Sciences Tel Aviv University, Tel Aviv 69978,

More information

Mahdi karbasian* & Zoubi Ibrahim

Mahdi karbasian* & Zoubi Ibrahim International Journal of Industrial Engineering & Production Research (010) pp. 105-110 September 010, Volume 1, Number International Journal of Industrial Engineering & Production Research ISSN: 008-4889

More information

Software Reliability & Testing

Software Reliability & Testing Repairable systems Repairable system A reparable system is obtained by glueing individual non-repairable systems each around a single failure To describe this gluing process we need to review the concept

More information

Dynamic Programming Model Integer Programming Model

Dynamic Programming Model Integer Programming Model Dynamic Programming Model Integer Programming Model D. L. Bricker Dept of Mechanical & Industrial Engineering The University of Iowa Optimal Redundancy 4/1/2002 page 1 of 26 One of the systems of a communication

More information

A FAST MATRIX-ANALYTIC APPROXIMATION FOR THE TWO CLASS GI/G/1 NON-PREEMPTIVE PRIORITY QUEUE

A FAST MATRIX-ANALYTIC APPROXIMATION FOR THE TWO CLASS GI/G/1 NON-PREEMPTIVE PRIORITY QUEUE A FAST MATRIX-ANAYTIC APPROXIMATION FOR TE TWO CASS GI/G/ NON-PREEMPTIVE PRIORITY QUEUE Gábor orváth Department of Telecommunication Budapest University of Technology and Economics. Budapest Pf. 9., ungary

More information

M/M/1 TWO-PHASE GATED QUEUEING SYSTEM WITH UNRELIABLE SERVER AND STATE DEPENDENT ARRIVALS

M/M/1 TWO-PHASE GATED QUEUEING SYSTEM WITH UNRELIABLE SERVER AND STATE DEPENDENT ARRIVALS Int. J. Chem. Sci.: 14(3), 2016, 1742-1754 ISSN 0972-768X www.sadgurupublications.com M/M/1 TWO-PHASE GATED QUEUEING SYSTEM WITH UNRELIABLE SERVER AND STATE DEPENDENT ARRIVALS S. HANUMANTHA RAO a*, V.

More information

International Journal of Pure and Applied Mathematics Volume 28 No ,

International Journal of Pure and Applied Mathematics Volume 28 No , International Journal of Pure and Applied Mathematics Volume 28 No. 1 2006, 101-115 OPTIMAL PERFORMANCE ANALYSIS OF AN M/M/1/N QUEUE SYSTEM WITH BALKING, RENEGING AND SERVER VACATION Dequan Yue 1, Yan

More information

Performance Analysis of an M/M/c/N Queueing System with Balking, Reneging and Synchronous Vacations of Partial Servers

Performance Analysis of an M/M/c/N Queueing System with Balking, Reneging and Synchronous Vacations of Partial Servers The Sixth International Symposium on Operations Research and Its Applications (ISORA 06) Xinjiang, China, August 8 12, 2006 Copyright 2006 ORSC & APORC pp. 128 143 Performance Analysis of an M/M/c/ Queueing

More information

EE 445 / 850: Final Examination

EE 445 / 850: Final Examination EE 445 / 850: Final Examination Date and Time: 3 Dec 0, PM Room: HLTH B6 Exam Duration: 3 hours One formula sheet permitted. - Covers chapters - 5 problems each carrying 0 marks - Must show all calculations

More information

Chapter 3: Markov Processes First hitting times

Chapter 3: Markov Processes First hitting times Chapter 3: Markov Processes First hitting times L. Breuer University of Kent, UK November 3, 2010 Example: M/M/c/c queue Arrivals: Poisson process with rate λ > 0 Example: M/M/c/c queue Arrivals: Poisson

More information

Reliability Analysis of a Seven Unit Desalination Plant with Shutdown during Winter Season and Repair/Maintenance on FCFS Basis

Reliability Analysis of a Seven Unit Desalination Plant with Shutdown during Winter Season and Repair/Maintenance on FCFS Basis International Journal of Perforability Engineering Vol. 9, No. 5, Septeber 2013, pp. 523-528. RAMS Consultants Printed in India Reliability Analysis of a Seven Unit Desalination Plant with Shutdown during

More information

REVISTA INVESTIGACION OPERACIONAL VOL. 37, NO. 3, , 2016

REVISTA INVESTIGACION OPERACIONAL VOL. 37, NO. 3, , 2016 EVISTA IVESTIGACIO OPEACIOAL VOL. 37 O. 3 47-57 6 PEFOMACE AALYSIS OF A EUAT SYSTEM WITH WEIBULL FAILUE A EPAI LAWS Ashish Kumar Monika S. Barak and Kuntal evi epartment of Mathematics Manipal University

More information

Unique Journal of Engineering and Advanced Sciences Available online: Research Article

Unique Journal of Engineering and Advanced Sciences Available online:   Research Article ISSN 2348-375X Unique Journal of Engineering and Advanced Sciences Available online: www.ujconline.net Research Article COST- BENEFIT ANALYSIS OF TWO DISSIMILAR WARM STANDBY SPACE SHUTTLE SYSTEM SUBJECT

More information

4.7 Finite Population Source Model

4.7 Finite Population Source Model Characteristics 1. Arrival Process R independent Source All sources are identical Interarrival time is exponential with rate for each source No arrivals if all sources are in the system. OR372-Dr.Khalid

More information

Quantitative evaluation of Dependability

Quantitative evaluation of Dependability Quantitative evaluation of Dependability 1 Quantitative evaluation of Dependability Faults are the cause of errors and failures. Does the arrival time of faults fit a probability distribution? If so, what

More information

Markov Processes Cont d. Kolmogorov Differential Equations

Markov Processes Cont d. Kolmogorov Differential Equations Markov Processes Cont d Kolmogorov Differential Equations The Kolmogorov Differential Equations characterize the transition functions {P ij (t)} of a Markov process. The time-dependent behavior of the

More information

Monte Carlo Simulation for Reliability Analysis of Emergency and Standby Power Systems

Monte Carlo Simulation for Reliability Analysis of Emergency and Standby Power Systems Monte Carlo Simulation for Reliability Analysis of Emergency and Standby Power Systems Chanan Singh, Fellow, IEEE Joydeep Mitra, Student Member, IEEE Department of Electrical Engineering Texas A & M University

More information

Structured Markov Chains

Structured Markov Chains Structured Markov Chains Ivo Adan and Johan van Leeuwaarden Where innovation starts Book on Analysis of structured Markov processes (arxiv:1709.09060) I Basic methods Basic Markov processes Advanced Markov

More information

Geom/G 1,G 2 /1/1 REPAIRABLE ERLANG LOSS SYSTEM WITH CATASTROPHE AND SECOND OPTIONAL SERVICE

Geom/G 1,G 2 /1/1 REPAIRABLE ERLANG LOSS SYSTEM WITH CATASTROPHE AND SECOND OPTIONAL SERVICE J Syst Sci Complex (2011) 24: 554 564 Geom/G 1,G 2 /1/1 REPAIRABLE ERLANG LOSS SYSTEM WITH CATASTROPHE AND SECOND OPTIONAL SERVICE Yinghui TANG Miaomiao YU Cailiang LI DOI: 10.1007/s11424-011-8339-2 Received:

More information

2 Theory. 2.1 State Space Representation S 2 S 1 S 3

2 Theory. 2.1 State Space Representation S 2 S 1 S 3 In the following sections we develop the theory, illustrate the technique by applying it to a sample system, and validate the results using the method of enumeration. Notations: A-state functional (acceptable)

More information

57:022 Principles of Design II Midterm Exam #2 Solutions

57:022 Principles of Design II Midterm Exam #2 Solutions 57:022 Principles of Design II Midterm Exam #2 Solutions Part: I II III IV V Total Possible Pts: 20 15 12 16 12 75 PART ONE Indicate "+" if True and "O" if False: _+_a. If a component's lifetime has exponential

More information

MATH 446/546 Test 2 Fall 2014

MATH 446/546 Test 2 Fall 2014 MATH 446/546 Test 2 Fall 204 Note the problems are separated into two sections a set for all students and an additional set for those taking the course at the 546 level. Please read and follow all of these

More information

Reliability and Availability Simulation. Krige Visser, Professor, University of Pretoria, South Africa

Reliability and Availability Simulation. Krige Visser, Professor, University of Pretoria, South Africa Reliability and Availability Simulation Krige Visser, Professor, University of Pretoria, South Africa Content BACKGROUND DEFINITIONS SINGLE COMPONENTS MULTI-COMPONENT SYSTEMS AVAILABILITY SIMULATION CONCLUSION

More information

A Vacation Queue with Additional Optional Service in Batches

A Vacation Queue with Additional Optional Service in Batches Applied Mathematical Sciences, Vol. 3, 2009, no. 24, 1203-1208 A Vacation Queue with Additional Optional Service in Batches S. Pazhani Bala Murugan Department of Mathematics, Annamalai University Annamalainagar-608

More information

Optimal Time and Random Inspection Policies for Computer Systems

Optimal Time and Random Inspection Policies for Computer Systems Appl. Math. Inf. Sci. 8, No. 1L, 413-417 214) 413 Applied Mathematics & Information Sciences An International Journal http://dx.doi.org/1.12785/amis/81l51 Optimal Time and Random Inspection Policies for

More information

Transient Solution of a Multi-Server Queue. with Catastrophes and Impatient Customers. when System is Down

Transient Solution of a Multi-Server Queue. with Catastrophes and Impatient Customers. when System is Down Applied Mathematical Sciences, Vol. 8, 2014, no. 92, 4585-4592 HIKARI Ltd, www.m-hikari.com http://dx.doi.org/10.12988/ams.2014.45388 Transient Solution of a Multi-Server Queue with Catastrophes and Impatient

More information

Transient behaviour in highly dependable Markovian systems: new regimes, many paths.

Transient behaviour in highly dependable Markovian systems: new regimes, many paths. Transient behaviour in highly dependable Markovian systems: new regimes, many paths. Daniël Reijsbergen Pieter-Tjerk de Boer Werner Scheinhardt University of Twente RESIM, June 22nd, 2010 Outline Problem

More information

Performance analysis of a juice packaging plant using BFT

Performance analysis of a juice packaging plant using BFT Malaya Journal of Matematik, Vol. S, No., -, 08 https://doi.org/0./mjm0s0/08 Performance analysis of a juice packaging plant using BFT Nitin Kumar Sharm *, Sachin Kumar and Neelam Sharm Abstract In this

More information

Cost Analysis of Two-Phase M/M/1 Queueing system in the Transient state with N-Policy and Server Breakdowns

Cost Analysis of Two-Phase M/M/1 Queueing system in the Transient state with N-Policy and Server Breakdowns IN (e): 2250 3005 Volume, 07 Issue, 9 eptember 2017 International Journal of Computational Engineering Research (IJCER) Cost Analysis of Two-Phase M/M/1 Queueing system in the Transient state with N-Policy

More information

Cost Analtsis for a Nuclear Power Plant with Standby Redundant Reactor Vessel

Cost Analtsis for a Nuclear Power Plant with Standby Redundant Reactor Vessel Research Journal of Mathematics and Statistics 2(3): 91-96, 2010 ISSN: 2040-7505 Maxwell Scientific Organization, 2010 Submitted Date: March 09, 2010 Accepted Date: April 30, 2010 Published Date: September

More information

Availability Optimization for Coal Handling System using Genetic Algorithm

Availability Optimization for Coal Handling System using Genetic Algorithm International Journal of Performability Engineering Vol. 9, o. 1, January 21, pp. 19-1. RAMS Consultants Printed in India Availability Optimization for Coal Handling System using Genetic Algorithm SAJAY

More information

Modeling Common Cause Failures in Diverse Components with Fault Tree Applications

Modeling Common Cause Failures in Diverse Components with Fault Tree Applications Modeling Common Cause Failures in Diverse s with Fault Tree Applications Joseph R. Belland, Isograph Inc. Key Words: Common Cause Failures, Fault Trees, Beta Factor SUMMARY & CONCLUSIONS A common cause

More information

Inventory Ordering Control for a Retrial Service Facility System Semi- MDP

Inventory Ordering Control for a Retrial Service Facility System Semi- MDP International Journal of Engineering Science Invention (IJESI) ISS (Online): 239 6734, ISS (Print): 239 6726 Volume 7 Issue 6 Ver I June 208 PP 4-20 Inventory Ordering Control for a Retrial Service Facility

More information

Analysis of an M/M/1/N Queue with Balking, Reneging and Server Vacations

Analysis of an M/M/1/N Queue with Balking, Reneging and Server Vacations Analysis of an M/M/1/N Queue with Balking, Reneging and Server Vacations Yan Zhang 1 Dequan Yue 1 Wuyi Yue 2 1 College of Science, Yanshan University, Qinhuangdao 066004 PRChina 2 Department of Information

More information

Asymptotic Confidence Limits for a Repairable System with Standbys Subject to Switching Failures

Asymptotic Confidence Limits for a Repairable System with Standbys Subject to Switching Failures American Journal of Applied Sciences 4 (11): 84-847, 007 ISSN 1546-99 007 Science Publications Asymptotic Confidence Limits for a Repairable System with Stbys Subject to Switching Failures 1 Jau-Chuan

More information

The Behavior of a Multichannel Queueing System under Three Queue Disciplines

The Behavior of a Multichannel Queueing System under Three Queue Disciplines The Behavior of a Multichannel Queueing System under Three Queue Disciplines John K Karlof John Jenkins November 11, 2002 Abstract In this paper we investigate a multichannel channel queueing system where

More information

International Journal on Mechanical Engineering and Robotics (IJMER)

International Journal on Mechanical Engineering and Robotics (IJMER) Cost-Benefit Analysis of Two Similar Warm Standby system subject to India losing component and failure caused by an anomaly on the Fuel Booster Turbo Pump (FBTP) of the third stage Ashok Kumar Saini Assoc.

More information

Chapter 4 Availability Analysis by Simulation and Markov Chain

Chapter 4 Availability Analysis by Simulation and Markov Chain Chapter 4 Availability Analysis by Simulation and Markov Chain Chapter 4 Availability Analysis by Simulation and Markov Chain 4.1 Introduction: For a perfect design, an engineering systems, component and

More information

Random Walk on a Graph

Random Walk on a Graph IOR 67: Stochastic Models I Second Midterm xam, hapters 3 & 4, November 2, 200 SOLUTIONS Justify your answers; show your work.. Random Walk on a raph (25 points) Random Walk on a raph 2 5 F B 3 3 2 Figure

More information

The Transition Probability Function P ij (t)

The Transition Probability Function P ij (t) The Transition Probability Function P ij (t) Consider a continuous time Markov chain {X(t), t 0}. We are interested in the probability that in t time units the process will be in state j, given that it