1 Determination of the transition point from open pit to underground mining Strategic Mine planning and Optimisation for Combination Mining Method J Chung, M Asad, E Topal, AK Ghosh Department of Mining Engineering and Metallurgical Engineering Western Australian School of Mines, Curtin University Western Australia The Ninth AusIMM Open Pit Operators Conference Kalgoorlie, Western Australia

2 Presentation Outline 1. Introduction 2. Problem Definition & Objectives 3. Underground Mining System 4. Modelling the Transition Problem 5. Case Study 6. Conclusions & Recommendations 7. References Ninth Open Pit Operators Conference 2016 Page 2

3 Introduction Haulage cost and stripping ratio in OP mining will increase when the pit goes deeper. As the stripping cost goes over UG mining cost and OP mining becomes uneconomical, UG mining emerges as a viable option. Transition from OP to UG required. Ninth Open Pit Operators Conference 2016 Page 3

4 Introduction: Combination Mining In combination mining, all involved mining strategies need to be considered simultaneously in the mine planning and optimisation process to ensure global optimality achieved. 4

5 Introduction Transition Problem is the determination of the optimal transition point with the aim of maximisation of project s value and resource utilisation. Transition Point is where the decision has to be made whether expand the pit or make the transition from OP to UG. Page 5

6 Problem Definition & Objectives Conservative/Simplest approach: The transition is considered near or after the exhaustion (secondary) of the available reserves inside the ultimate pit (Finch 2012). Disadvantages: 1. UG mining could have been the optimal strategy for some of the OP reserves, but were planned for OP mining 2. Evaluates OP and UG mining options separately 3. Ignores the variation in mining layout from one UG mining method to the other. 4. Defines the crown pillar (CP) is an arbitrary location. Ninth Open Pit Operators Conference 2016 Page 6

7 Problem Definition & Objectives Objectives of this study are: Present an implementation of an integer programming (IP) based mathematical model Evaluates possible variations in transition point from OP to UG mining for sublevel stoping and block caving methods. Demonstrates the impact of OP to UG mining strategies and different UG mining methods on the overall value of the project. Ninth Open Pit Operators Conference 2016 Page 7

8 UG Mining System Block Caving Mining Method High production rate and low mining cost Highly depend on cave-ability of the ore and host rock Dilution Costly if caving cannot be maintained Stoping Mining Method Minimum dilution if hanging wall is strong Stopes can be filled with waste rock, paste fill to recover pillar Early production is possible Safe working environment Ninth Open Pit Operators Conference 2016 Page 8

9 Mathematical Modelling for Transition Problem IP model for OP & UG stoping combined method: Objective function: Maximises the undiscounted profit from both OP mining and UG mining. Constraints: (i) OP slope or block precedence constraint (ii) UG mine design constraints (iii) Reserve restriction constraints (iv) CP design constraint that ensures the placement of CP is underneath the pit (v) The provision of required number of level needed for CP is in accordance to the geotechnical requirement. Ninth Open Pit Operators Conference 2016 Page 9

10 Mathematical Modelling for Transition Problem IP model for OP & UG block caving combined method: Objective function: Maximises the undiscounted profit from both OP mining and UG mining. Constraints: (i) OP slope or block precedence constraint (ii) UG mine design constraints (iii) Reserve restriction constraints (iv) CP design constraint that ensures the placement of CP is underneath the pit (v) The provision of required number of level needed for CP is in accordance to the geotechnical requirement. Ninth Open Pit Operators Conference 2016 Page 10

11 Mathematical Modelling for Transition Problem Issues: Size Big data handling Computer/Hardware capability What if they are solved: Accuracy Precision Effectiveness and efficiency Adapting to Change Ninth Open Pit Operators Conference 2016 Page 11

12 Case Study Case study profile and parameters Three-dimension (3-D) hypothetical gold deposit. 41,472 blocks with block size of 25m 25m 25m. Design stope size blocks. Two levels need to be retained as crown pillar. IP problem written by Microsoft Visual Basic (VB.net) and solved by using CPLEX solver. Ninth Open Pit Operators Conference 2016 Page 12

13 Result Discussions Scenarios IP model results ($billion) Scenario 1: OP UG stoping method Scenario 2: OP UG block caving method Scenario 3: OP mining method only Scenario 4: UG stoping method only Scenario 5: UG block caving method only Ninth Open Pit Operators Conference 2016 Page 13

14 Case Study OP-UG stoping and OP-UG block caving methods have the highest values. CP for scenario 1 is at Level and scenarios 2 is Level OP-UG block caving generates a higher value -- low mining cost, high production rate and economy of scale. Proved that if the deposit can be mined through a combination mining method, optimality can be achieved through strategic mine planning. Ninth Open Pit Operators Conference 2016 Page 14

15 Case Study If OP mining is selected for the shallow deposit without considering the potential transition to UG mining, the ultimate pit will extend deeper than the final pit generated. The IP model includes opportunity cost of all available mining strategies. Avoid the delays in production during the transition plan the development in the early stage. Maximised resource and reserve utilisation. Ninth Open Pit Operators Conference 2016 Page 15

16 Conclusions & Recommendations OP, UG and CP concurrently during the strategic mine planning strategy is important global optimisation. UG mining method selection plays an important role in combination method as it will affect the mining layout and project s value directly. IP models are presented to optimise the mine planning of combination mining method Ninth Open Pit Operators Conference 2016 Page 16

17 Conclusions & Recommendations Technical limitations: Production rate, Equipment requirements Variation of labour skills Limitations: Timing of transition: Production scheduling Problem size reduction strategy: Nature of IP model Ninth Open Pit Operators Conference 2016 Page 17

18 References 1. Alford, C, Optimization in underground mine design, in Proceedings of 25th International APCOM Symposium 1995, pp (Australasian Institute of Mining and Metallurgy,Melbourne: Brisbane, Australia). 2. Asad, M and Topal, E, Production scheduling of open pit mining operations through cutoff grade optimization. South African Institute of Mining and Metallurgy, 111(11): Bakhtavar, E and Shahriar, K, Optimal ultimate pit depth considering an underground alternative, in Proceedings of Fourth AACHEN International Mining Symposium-High Performance Mine Production 2007, pp (AIMS: Germany). 4. Bakhtavar, E, Shahriar, K and Mirhassani, A, Optimization of the transition from open-pit to underground operation in combined mining using (0-1) integer programming. J. South. Afr. Inst. Min. and Metall., 112(12): Brazil, M, Thomas, D A, Weng, J F, Rubinstein, J H and Lee, D H, Cost optimisation for underground mining networks. Optimization and engineering, 6(2): Camus, J P, Open pit optimization considering an underground alternative, in Proceedings of 23th International APCOM Symposium 1992, pp (SME: Tucson). 7. Chung, J, Topal, E and Erten, O, Transition from open-pit to underground - using integer programming considering grade uncertainty, in The 17th annual conference of the International Association for Mathematical Geosciences 5-13 September , (Schaeben, H, Delgado, R T, Boogart, K G and Boogart, R), pp (IAMG: Freiberg, Germany). 8. Chung, J, Topal, E and Ghosh, A G, in press. Where to make the transition from open-pit to underground? - using integer programming. South African Institute of Mining and Metallurgy. 9. Dagdelen, K and Traore, I, Open pit transition depth determination through global analysis of open pit and underground mine scheduling, in Orebody Modelling and Strategic Mine Planning November , (Dimitrakopoulus, R), pp (The Australasian Institute of Mining and Metallurgy: Perth, Australia). 10. Dimitrakopoulos, R, Martinez, L and Ramazan, S, A maximum upside/minimum downside approach to the traditional optimization of open pit mine design. Journal of Mining Science, 43(1): IBM CPLEX Optimization Solver, Version IBM CPLEX ILOG Corp. 12. Johnson, T B, Optimum open pit mine production scheduling. Berkeley: DTIC Document. 13. Lerchs, H and Grossman, F I, Optimum design of open-pit mines, in Operations research 1964, pp. 14. Opoku, S and Musingwini, C, Stochastic modelling of the open pit to underground transition interface for gold mines. Int. J. Min. Reclam. and Environ., 27(6): Soderberg, A and Rausch, D O, Pit planning and layout, pp (The American Institute of Mining, Metallurgical, and Petroleum Engineers, Inc: New York). 16. Topal, E and Ramazan, S, Strategic mine planning model using network flow model and real case application. International Journal of Mining, Reclamation and Environment, 26(1): Ninth Open Pit Operators Conference 2016 Page 18

19 Ninth Open Pit Operators Conference 2016 Page 19

20 Introduction Mine Planning & Optimisation Exploration stage Block model generation Determination appropriate mining method Search mineralization zone Geological block model Economic block model Shallow deposit Deep deposit Near surface orebody extend vertically to a considerable depth Open pit mining method Underground mining method Combination mining method Transition problem Transition point Ninth Open Pit Operators Conference 2016 Page 20

OPTIMIZATION OF PRODUCTION PLANNING IN UNDERGROUND MINING

OPTIMIZATION OF PRODUCTION PLANNING IN UNDERGROUND MINING OPTIMIZATION OF PRODUCTION PLANNING IN UNDERGROUND MINING A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF BACHELOR OF TECHNOLOGY IN MINING ENGINEERING BY JITESH GANGAWAT

More information

For personal use only

For personal use only ACN 092 471 513 28 November 2016 ASX Release PENNY S FIND GOLD MINE UPGRADED POTENTIAL FOR MINE LIFE EXTENSION Empire Resources Limited ( Empire, ASX code: ERL) is pleased to give an update on the progress

More information

Using Integer Programming for Strategic Underground and Open Pit-to-Underground Scheduling

Using Integer Programming for Strategic Underground and Open Pit-to-Underground Scheduling Using Integer Programming for Strategic Underground and Open Pit-to-Underground Scheduling Barry King Advisor: Alexandra Newman Operations Research with Engineering PhD Program August 5-6, 2016 Cutoff

More information

Oposura Scoping Study Nearing Completion

Oposura Scoping Study Nearing Completion 20 AUGUST 2018 KEY POINTS: Oposura Scoping Study Nearing Completion Mining study with open pit optimisations and underground mine designs completed High grade massive sulphide mineralisation occurs near

More information

Australia s Response To The Chile Technological Roadmap In Mining : The University of Queensland Experience

Australia s Response To The Chile Technological Roadmap In Mining : The University of Queensland Experience Australia s Response To The Chile Technological Roadmap In Mining : The University of Queensland Experience CHALLENGE 1: Underground mining: Development of large-scale deep mining Professor and Chair In

More information

Practical long-term planning in narrow vein mines a case study

Practical long-term planning in narrow vein mines a case study Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 https://papers.acg.uwa.edu.au/p/1511_31_khani/ Practical long-term planning in narrow

More information

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation MAD345 - Mining II INTRODUCTION 10 October 2018 Course content MAD345 THEORY Date October, 10 October, 17 October, 24 October, 31 November, 7 November, 14 November, 21 Topic Introduction Prospecting, exploration

More information

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com

More information

Mining method optimisation of Bayi gold mine based on the value engineering principle

Mining method optimisation of Bayi gold mine based on the value engineering principle Underground Mining Technology 2017 M Hudyma & Y Potvin (eds) 2017 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-7-0 https://papers.acg.uwa.edu.au/p/1710_41_cai/ Mining method optimisation

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

University of Saskatchewan

University of Saskatchewan University of Saskatchewan Geological Engineering GEOE 498.3 Introduction to Mineral Engineering Lecture 2 Underground Mining Methods Bulk vs. Selective Reasons for Selection (Geotechnical, Geometry, Value,

More information

New High Grade Lode Discovered at Wagtail South

New High Grade Lode Discovered at Wagtail South 23 April 2013 ASX Announcement New High Grade Lode Discovered at Wagtail South Bulletin Resources Limited (ASX: BNR) is pleased to announce the receipt of further assay results from the 5,000 metre reverse

More information

FUTORES II Augmenting Prospectivity Analysis with Mining Criteria: A Test for Viability

FUTORES II Augmenting Prospectivity Analysis with Mining Criteria: A Test for Viability FUTORES II - 2017 Augmenting Prospectivity Analysis with Mining Criteria: A Test for Viability T. Murphy, A. Pratt, M. Hinman, J. Donohue, M. Pirlo, & R. Valenta Townsville, Queensland 5 th June, 2017

More information

INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME 7, ISSUE 3, MARCH 2018 ISSN

INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME 7, ISSUE 3, MARCH 2018 ISSN Open Pit Optimization Processes Of Okobo Coal Mine - Strategies For Improving The Economics Of Mining Projects With Special Utilization Of Minex Optimizer Programme Nwafor, C. Gideon, Nwafor, O. Michelle

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 21 st September 2015 Operational Update from the Old Pirate Gold Mine and the Coyote Processing Plant ABM Resources NL ( ABM or the Company ) is pleased to announce

More information

Introduction to Geology and Geometallurgy

Introduction to Geology and Geometallurgy Introduction to Geology and Geometallurgy Improving Resource Knowledge to Optimise Minerals Processing: Part 1 Mark Noppe mnoppe@srk.com.au 24 May 2018 1 Why Geology? Improving resource knowledge Rocks

More information

MINERAL RESOURCE AND ORE RESERVE UPDATE PAMPALO GOLD MINE

MINERAL RESOURCE AND ORE RESERVE UPDATE PAMPALO GOLD MINE REPORT Pampalo Pekka Lovén, Markku Meriläinen 15.February. 2012 1 (14) MINERAL RESOURCE AND ORE RESERVE UPDATE PAMPALO GOLD MINE 31.12.2011 FOR ENDOMINES OY Outotec Oyj Riihitontuntie 7 C, PO Box 86 FI-02201

More information

Analyzing the effect of ore grade uncertainty in open pit mine planning; a case study of the Rezvan iron mine, Iran

Analyzing the effect of ore grade uncertainty in open pit mine planning; a case study of the Rezvan iron mine, Iran Analyzing the effect of ore grade uncertainty in open pit mine planning; a case study of the Rezvan iron mine, Iran Mohammad Mehdi Tahernejad a, *, Reza Khalokakaie a, Mohammad Ataei a a Faculty of Mining,

More information

Diversification into the exciting South Africa Platinum Industry

Diversification into the exciting South Africa Platinum Industry MORNING STAR HOLDINGS (AUSTRALIA) LTD ASX/Media Release 18 November 2009 Key Points Diversification into the exciting South Africa Platinum Industry The company is completing the acquisition of three platinum

More information

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA ASX Release 4 th November 2009 SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce commencement of site works at the A1 Gold Mine in eastern

More information

1. Rock Mechanics and mining engineering

1. Rock Mechanics and mining engineering 1. Rock Mechanics and mining engineering 1.1 General concepts Rock mechanics is the theoretical and applied science of the mechanical behavior of rock and rock masses; it is that branch of mechanics concerned

More information

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso ASX/Media Announcement 10 July 2012 More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso New reverse circulation (RC) hole intersections include: o 12m at 20.5 g/t gold from 73m,

More information

The Evolution of Block Caving Technology Tony Weston MAusIMM(CP) MassMin 2016

The Evolution of Block Caving Technology Tony Weston MAusIMM(CP) MassMin 2016 The Evolution of Block Caving Technology Tony Weston MAusIMM(CP) MassMin 2016 : Turton, 1952, with permission from SME 1 Caving Methods Top slicing Sublevel caving Block caving Open stoping with mass blasting

More information

An improved formulation of the underground mine scheduling optimization problem when considering selective mining

An improved formulation of the underground mine scheduling optimization problem when considering selective mining An improved formulation of the underground mine scheduling optimization problem when considering selective mining A. Bley 1 and S.E. Terblanche 2 1 TU Berlin, Institute of Mathematics bley@math.tu-berlin.de

More information

Haulage Drift Stability Analysis- A Sensitivity Approach

Haulage Drift Stability Analysis- A Sensitivity Approach Haulage Drift Stability Analysis- A Sensitivity Approach W. Abdellah University of Assiut, Assiut, Egypt ABSTRACT Haulage drifts are the primary access to the mining blocks of an ore body in a multi-level

More information

AMUR MINERALS CORPORATION (AIM: AMC) April 2018 Mining Potential Update

AMUR MINERALS CORPORATION (AIM: AMC) April 2018 Mining Potential Update 16 April 2018 AMUR MINERALS CORPORATION (AIM: AMC) April 2018 Mining Potential Update Amur Minerals rporation ( AMC or the mpany ), a nickel-copper sulphide mineral exploration and resource development

More information

Case study: How Leapfrog Geo helped improve geological understanding at Edna May Gold Mine, Western Australia

Case study: How Leapfrog Geo helped improve geological understanding at Edna May Gold Mine, Western Australia LEAPFROG GEO Case study: How Leapfrog Geo helped improve geological understanding at Edna May Gold Mine, Western Australia EDNA MAY GOLD MINE, WESTONIA, WESTERN AUSTRALIA THE PROJECT Edna May Gold Mine

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

Optimisation of Cut-Off Grade at Mount Isa Mines Limited s Enterprise Mine

Optimisation of Cut-Off Grade at Mount Isa Mines Limited s Enterprise Mine Optimisation of Cut-Off Grade at Mount Isa Mines Limited s Enterprise Mine J Poniewierski 1, G MacSporran 2 and I Sheppard 3 ABSTRACT The practical application of Lane s theory on optimum cut-off grade

More information

Dilution and ore loss A short practical guide

Dilution and ore loss A short practical guide Dilution and ore loss A short practical guide Following are a few helpful pointers when dealing with dilution and ore loss. Please refer to the suggested reading list that is at the bottom of this paper

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 16 th January 2012 BLACKHAM CONFIRMS MATILDA RESOURCES Blackham completes review of existing Matilda Project Resources 601,000oz inferred resources contained within 6 deposits Includes

More information

Accurate costing in mixed integer utilisation mining models

Accurate costing in mixed integer utilisation mining models 18th World IMACS / MODSIM Congress, Cairns, Australia 13-17 July 2009 http://mssanz.org.au/modsim09 Accurate costing in mixed integer utilisation mining models C. Burt 1 and Y. Chan 1 1 ARC Centre of Excellence

More information

Evolution of seismicity at Kiruna Mine

Evolution of seismicity at Kiruna Mine Deep Mining 2017: Eighth International Conference on Deep and High Stress Mining J Wesseloo (ed.) 2017 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-6-3 Evolution of seismicity at Kiruna

More information

For personal use only

For personal use only 23 September 2013 Exploration Target for Sambas Project set at 58,500 to 87,750 Tonnes of Tin 1 Following a review of available geological and government data, Stratos Resources Ltd (ASX: SAT) is pleased

More information

IMPROVING THE MINING EFFICIENCIES BY MEANS OF A NEW SUPPORT DESIGN AT UNISEL MINE. AMMSA Annual General Meeting 1 December 2017

IMPROVING THE MINING EFFICIENCIES BY MEANS OF A NEW SUPPORT DESIGN AT UNISEL MINE. AMMSA Annual General Meeting 1 December 2017 IMPROVING THE MINING EFFICIENCIES BY MEANS OF A NEW SUPPORT DESIGN AT UNISEL MINE AMMSA Annual General Meeting 1 December 2017 2 OVERVIEW Introduction to Unisel Problem statement Objectives Investigation

More information

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY

Further Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY EXECUTIVE SUMMARY This report presents the results of a program of further research into the use of a combined approach of numerical and centrifuge modeling in assessing the stability of deep open pit

More information

Ulysses Gold Project, WA

Ulysses Gold Project, WA Ulysses Gold Project, WA Growing and developing a new high-grade Australian gold project in a Tier-1 location December 2018 Investor Luncheon Series Melbourne, Monday 10 th Sydney, Wednesday 12 th Disclaimer

More information

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY June 29, 2007 ASX & TSX: WSA News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY The Board of Western Areas is pleased to announce that the

More information

For personal use only

For personal use only UPDATE ON COCK-EYED BOB UNDERGROUND MINING INCREASING CONFIDENCE IN THE POTENTIAL FOR THREE LONG-LIFE UNDERGROUND MINES Integra Mining Limited (ASX:IGR, Integra) is pleased to report that the trial mining

More information

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes ASX ANNOUNCEMENT/MEDIA RELEASE 7 January 2019 Drill testing of gold zones at Albury Heath intersect impressive quartz lodes Focused drill testing of bonanza grade gold at Albury Heath completed Seven holes

More information

NEW DISCOVERIES AT THE RED OCTOBER MINE

NEW DISCOVERIES AT THE RED OCTOBER MINE 23 July 2013 ASX & MEDIA RELEASE NEW DISCOVERIES AT THE RED OCTOBER MINE The Directors of Saracen Mineral Holdings Limited (the Company ) are pleased to provide an update on the Red October underground

More information

Dugald River trial stoping, overall hanging wall behaviour

Dugald River trial stoping, overall hanging wall behaviour Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 https://papers.acg.uwa.edu.au/p/1511_08_hassell/ Dugald River trial stoping, overall

More information

Dennis L Buchanan Imperial College London, UK

Dennis L Buchanan Imperial College London, UK METALS AND ENERGY FINANCE Advanced Textbook on the Evaluation of Mineral and Energy Projects Dennis L Buchanan Imperial College London, UK Contents Acknowledgements List of Abbreviations xi xv Chapter

More information

Aureus Mining New Liberty Project Geology

Aureus Mining New Liberty Project Geology Aureus Mining New Liberty Project Geology February 2014 Contents Location and Regional context Deposit geology Resources and Reserves Grade Control Underground potential Near-mine exploration potential

More information

Gold Grades and Gold Costs Exploding the High-Grade Myth

Gold Grades and Gold Costs Exploding the High-Grade Myth Allan Trench 12 Matthew Kanakis 23 & John Sykes 12 1. Department of Mineral & Energy Economics, Curtin University 2. Centre for Exploration Targeting, Curtin University & University of Western Australia

More information

AGM Presentation 12 November 2013

AGM Presentation 12 November 2013 AGM Presentation 12 November 2013 Disclaimer Exploration Results and Mineral Resources The information in this report that relates to Exploration Results, Exploration Targets, Mineral Resources or Ore

More information

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project Bulletin Resources is the 100% owner of the Lamboo and Golden Crown Gold Projects located near Halls Creek in the East Kimberley region of Western Australia. The projects have a combined open pit and underground

More information

Some practical aspects of the use of lognormal models for confidence limits and block distributions in South African gold mines

Some practical aspects of the use of lognormal models for confidence limits and block distributions in South African gold mines Some practical aspects of the use of lognormal models for confidence limits and block distributions in South African gold mines by D.G. Krige* Synopsis For the purpose of determining confidence limits

More information

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT September 18 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT Two tier one Australian banks mandated to arrange

More information

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA 28 NOVEMBER 2018 ASX/MEDIA RELEASE NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA Drilling underway targeting high-grade underground extensions of Zoroastrian

More information

76,000 Ounce Gold Resource at Akoko North

76,000 Ounce Gold Resource at Akoko North 31 st March 2009 76,000 Ounce Gold Resource at Akoko North 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Scoping study (assuming toll milling) estimates $A24M

More information

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program LAKEWOOD, Colo., November 9, 2016 (PR NEWSWIRE) Pershing Gold Corporation (NASDAQ:PGLC)

More information

Strengths and weaknesses of using elastic numerical modelling in mine design at the Callie underground mine

Strengths and weaknesses of using elastic numerical modelling in mine design at the Callie underground mine Deep Mining 2017: Eighth International Conference on Deep and High Stress Mining J Wesseloo (ed.) 2017 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-6-3 https://papers.acg.uwa.edu.au/p/1704_59_arbi/

More information

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project

Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project 5 th July 2017 Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project Intensive site based exploration has commenced at Dobsina Co-Ni Project. Activities include:

More information

Excavation method in Goushfill mine

Excavation method in Goushfill mine International Journal of Engineering and Technology, 2 (3) (2013) 225-229 Science Publishing Corporation www.sciencepubco.com/index.php/ijet Excavation method in Goushfill mine Masoud Cheraghi Seifabad*,

More information

MineScape Geological modelling, mine planning and design

MineScape Geological modelling, mine planning and design INTELLIGENT MINING SOLUTIONS MineScape Geological modelling, mine planning and design Specifically developed to meet the mining industry s rigorous demands, MineScape is used at more than 200 of the world

More information

Brookfield Place Tel: (416) Bay Street, Suite 3630 Fax: (416) FOR IMMEDIATE RELEASE February 7, 2012

Brookfield Place Tel: (416) Bay Street, Suite 3630 Fax: (416) FOR IMMEDIATE RELEASE February 7, 2012 FOR IMMEDIATE RELEASE Brookfield Place Tel: (416) 367-5500 181 Bay Street, Suite 3630 Fax: (416) 367-5505 Toronto, Ontario M5J 2T3 E: info@romarco.com NEWS RELEASE FOR IMMEDIATE RELEASE February 7, 2012

More information

Advances in Seismic Reflection as an Exploration Tool in Hard-Rock Mining

Advances in Seismic Reflection as an Exploration Tool in Hard-Rock Mining Advances in Seismic Reflection as an Exploration Tool in Hard-Rock Mining Greg Turner 28 February 2018, Brisbane, Qld, Australia The last 10 years Status 2007 Applied research and surveys led by Curtin

More information

ABSTRACT INTRODUCTION

ABSTRACT INTRODUCTION SGS MINERALS SERVICES TECHNICAL BULLETIN 2010-1 JANUARY 2010 VISION FOR A RISK ADVERSE INTEGRATED GEOMETALLURGY FRAMEWORK GUILLERMO TURNER-SAAD, GLOBAL VICE PRESIDENT METALLURGY AND MINERALOGY, SGS MINERAL

More information

MASSIVE AND SEMI MASSIVE SULPHIDES CONTINUE TO BE INTERSECTED AT ROCKLANDS SOUTH - SIGNIFICANT ZONE OF COPPER MINERALISATION BEING DEFINED

MASSIVE AND SEMI MASSIVE SULPHIDES CONTINUE TO BE INTERSECTED AT ROCKLANDS SOUTH - SIGNIFICANT ZONE OF COPPER MINERALISATION BEING DEFINED ACN. 000 317 251 MARKET RELEASE 2 nd July 2013 ROCKLANDS COPPER PROJECT (CDU 100%) MASSIVE AND SEMI MASSIVE SULPHIDES CONTINUE TO BE INTERSECTED AT ROCKLANDS SOUTH - SIGNIFICANT ZONE OF COPPER MINERALISATION

More information

2016 Semester Terms and Dates Summary

2016 Semester Terms and Dates Summary 2016 Semester Terms and Dates Summary Session Code Session Description Formal Semester Start Date Last Date to Enrol Census Date W Date End of Semester Assessments Due Results Published 1605 Semester 1

More information

AGM Presentation 6 November 2012

AGM Presentation 6 November 2012 AGM Presentation 6 November 2012 November 2012 Disclaimer Exploration Results and Mineral Resources The information in this report that relates to Exploration Results, Exploration Targets, Mineral Resources

More information

ROX DEFINES STRONG IP ANOMALIES AT PHA LUANG

ROX DEFINES STRONG IP ANOMALIES AT PHA LUANG ASX/MEDIA RELEASE ROX DEFINES STRONG IP ANOMALIES AT PHA LUANG Rox Resources (ASX: RXL, Rox ) has completed Induced Polarisation ( IP ) surveys at its Pha Luang zinc project in Laos. The survey was conducted

More information

Institutional Control Registry - Report

Institutional Control Registry - Report Institutional Control Registry - Report IC REGISTRY ICR # ICR - 01 Date of Acceptance May 11, 2009 Contact Lake Mine Cameco Corporation Cameco Corporation La Ronge 73-P-07 UTM-North 6141199 UTM-East 507983

More information

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT ABN 17 124 444 122 9 November 2009 SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT HIGHLIGHTS Non-JORC code compliant gold resource of 553,000t @ 2.5g/t gold identified as being hosted

More information

MOUNT OXIDE MINERAL RESOURCE INCREASE AND DEVELOPMENT STUDY UPDATE

MOUNT OXIDE MINERAL RESOURCE INCREASE AND DEVELOPMENT STUDY UPDATE 28 April 2011 MOUNT OXIDE MINERAL RESOURCE INCREASE AND DEVELOPMENT STUDY UPDATE Perilya Limited (ASX: PEM) is pleased to announce a new mineral resource estimate for the Mt Oxide Copper Project and provide

More information

Application of the GeoSequencing Module to ensure optimised underground mine schedules with reduced geotechnical risk

Application of the GeoSequencing Module to ensure optimised underground mine schedules with reduced geotechnical risk Underground Mining Technology 2017 M Hudyma & Y Potvin (eds) 2017 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-7-0 Application of the GeoSequencing Module to ensure optimised underground

More information

Evaluation of Mineral Resource risk at a high grade underground gold mine

Evaluation of Mineral Resource risk at a high grade underground gold mine Evaluation of Mineral Resource risk at a high grade underground gold mine Presented by: Aaron Meakin Manager Corporate Services CSA Global 21 August 2015 Project Background Beaconsfield Gold Mine, Tasmania

More information

Geotechnical Models and Data Confidence in Mining Geotechnical Design

Geotechnical Models and Data Confidence in Mining Geotechnical Design Page 1 Geotechnical Models and Data Confidence in Mining Geotechnical Design Michael Dunn This paper was first published in Proceedings, AusRock 2014: Third Australasian Ground Control in Mining Conference,

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 8 June 2016 Aeromagnetic Interpretation Identifies Pinnacles Targets ASX: NXM Capital Structure Shares on Issue 70.4 million Unlisted Options 3.5 million Corporate Directory Mr Paul Boyatzis

More information

Regression revisited (again)

Regression revisited (again) by I. Clark* Synopsis One of the seminal pioneering papers in reserve evaluation was published by Danie Krige in 1951. In that paper he introduced the concept of regression techniques in providing better

More information

Northern Mining Limited 2012 Annual General Meeting Presentation

Northern Mining Limited 2012 Annual General Meeting Presentation NORTHERN MINING LIMITED Northern Mining Limited 2012 Annual General Meeting Presentation www.northernmining.com.au 23 November 2012 NORTHERN MINING LIMITED DISCLAIMER This presentation has been prepared

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects Presenter: Mike Allen Manager, Surface Mining April 29, 2015 Outline Terms / Definitions Factors affecting coal

More information

ASX ANNOUNCEMENT 21 MARCH 2011

ASX ANNOUNCEMENT 21 MARCH 2011 ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights

More information

Drilling Commences at Telfer West Gold Project

Drilling Commences at Telfer West Gold Project Level 7, 600 Murray Street West Perth WA 6005 PO Box 273 West Perth WA 6872 P 08 9486 9455 F 08 6210 1578 www.enrl.com.au 17 November 2016 ASX : ENR Company Announcements Office Australian Securities Exchange

More information

This is the author s version of a work that was submitted/accepted for publication in the following source:

This is the author s version of a work that was submitted/accepted for publication in the following source: This is the author s version of a work that was submitted/accepted for publication in the following source: Kozan, Erhan & Liu, Shi Qiang (2016) A new open-pit multi-stage mine production timetabling model

More information

Rock mechanics related to mining: challenges and opportunities

Rock mechanics related to mining: challenges and opportunities Rock mechanics related to mining: challenges and opportunities Zong-Xian Zhang April 26, 2018 Zhang ZX, University of Oulu 1 Two missions of rock mechanics in mining engineering Destroy rock efficiently

More information

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts October 2017 Investor Presentation Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts 2 Disclaimer Forward-Looking Statements Some statements in this report regarding

More information

Manuscript of paper for APCOM 2003.

Manuscript of paper for APCOM 2003. 1 Manuscript of paper for APCOM 2003. AN ANALYSIS OF THE PRACTICAL AND ECONOMIC IMPLICATIONS OF SYSTEMATIC UNDERGROUND DRILLING IN DEEP SOUTH AFRICAN GOLD MINES W. ASSIBEY-BONSU Consultant: Geostatistics

More information

Mining. Analysis of options of production and access ways in underground mines. Mineração. Abstract. 1. Introduction. Leandro de Vilhena Costa

Mining. Analysis of options of production and access ways in underground mines. Mineração. Abstract. 1. Introduction. Leandro de Vilhena Costa http://dx.doi.org/10.1590/0370-44672015700030 Leandro de Vilhena Costa Mestre em Engenharia Mineral Universidade Federal de Ouro Preto UFOP Escola de Minas Departamento de Engenharia de Minas Ouro Preto

More information

WHAT IS MINERAL EXPLORATION?

WHAT IS MINERAL EXPLORATION? INDABA PRESENTATION CAPE TOWN FEBRUARY 2017 AIM:SAV WHAT IS MINERAL EXPLORATION? AIM:SAV What is mineral exploration? 2 Exploration is the term used to describe a wide range of activities aimed at searching

More information

For personal use only

For personal use only ACN 092 471 513 6 February 2012 ASX Release New drill assays up to 4% Cu confirm high grade copper continues at depth at Empire s Yuinmery project in WA 3m @ 4.0% Cu within 6m @ 3.0% Cu in drill hole YRC11-41D

More information

Deep Mining Queensland (1)

Deep Mining Queensland (1) Deep Mining Queensland (1) New Initiatives in Exploration (18 th February, 2015) Dr Travis Murphy (M. Scott, D. Wood, & T. Webster) 1 UQ - Sustainable Minerals Institute 2 WH Bryan Mining and Geology Research

More information

CERRO PRIETO PROJECT MINERAL CONCESSIONS LOCATION AND ACCESS

CERRO PRIETO PROJECT MINERAL CONCESSIONS LOCATION AND ACCESS Cerro Prieto CERRO PRIETO PROJECT MINERAL CONCESSIONS The Cerro Prieto Project is comprised of three mining exploitation concessions encompassing 2,723 hectares in northern Sonora, Mexico. Oroco holds

More information

A rules-based production scheduling approach allowing multiple scenarios to be generated to test the impact of advance rate variability

A rules-based production scheduling approach allowing multiple scenarios to be generated to test the impact of advance rate variability LANE, G.R., KRAFFT, G., CAMBITSIS, A., DAYA, K., and VAN DER WESTHUIZEN, A. A rules-based production scheduling approach allowing multiple scenarios to be generated to test the impact of advance rate variability.

More information

Disclaimer. Forward-Looking Statements. Competent Person s Statement

Disclaimer. Forward-Looking Statements. Competent Person s Statement Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director Resources Rising Stars, May 29-30 2018 Disclaimer Forward-Looking Statements Some statements

More information

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) Vendetta Increases Pegmont Lead-Zinc Mineral Resource to 5.8 Million Tonnes and 8.3 Million Tonnes of. Open Pit Constrained Mineral Resource now

More information

ASX/Media Announcement

ASX/Media Announcement ASX/Media Announcement 25 March 2013 MAIDEN HIGH-GRADE JUDY LODE RESOURCE INDICATES POTENTIAL TO INCREASE ANDY WELL MINE LIFE 106,000 ounce high-grade resource (Indicated & Inferred) Judy South (137,000t

More information

For personal use only

For personal use only ASX Announcement 16 November 2015 ASX Code: MRP Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9068 1300 F +61 (0) 8 9068 1310 E info@mrpresources.com.au ABN 98 139 357

More information

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA HIGHLIGHTS New claims staked covering ~9km 2 to secure a 100% interest in the McCleery Copper-Cobalt Project in the Yukon Territory, Canada ABN

More information

ITASCA Consulting Canada Inc.

ITASCA Consulting Canada Inc. Forward Thinking Engineering World leaders in geomechanics, hydrogeology and microseismicity. Solving problems for clients in the mining industry. Itasca offers advanced, first-hand knowledge of mining

More information

PROCEDURE FOR MARBLE CLASSIFICATION FROM BOREHOLES WITH PARTICULAR REFERENCES TO THE SIVEC MINE Mice Trkaleski1, Blazo Boev2, Ilias Rigoupolous 1 1 AD Mermeren Kombin pat, Krusevski pat bb, 7500 Prilep,

More information

Sipa Resources Limited

Sipa Resources Limited 30 October 2012 Sipa Resources Limited ABN 26 009 448 980 September Quarter 2012 Quarterly ASX Report HIGHLIGHTS The September Quarter, and through October, has seen a very high level of drilling and geophysical

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 8 October 2012 FRESH REVIEW OF HIGH GRADE GOLD LODES ON BATANGAS PROJECT SOUTH OF MANILA A new review of available data on high grade epithermal gold lodes including beneath an historic

More information

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated November 30, 2012 TECHNICAL REPORT TO BE RELEASED THAT PRESENTS FIRST MINERAL RESOURCE ESTIMATE TO NI 43-101 STANDARDS FOR CAHUILLA PROJECT IN IMPERIAL COUNTY, CALIFORNIA BY TERAS RESOURCES. POSITIVE GOLD-SILVER

More information

Geotechnical approach to stope and pillar optimisation at Granny Smith Mine

Geotechnical approach to stope and pillar optimisation at Granny Smith Mine Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 Geotechnical approach to stope and pillar optimisation at Granny Smith Mine L Machuca

More information

Modelling Ore Bodies of High-Nugget Gold Using Conditional Probability

Modelling Ore Bodies of High-Nugget Gold Using Conditional Probability Modelling Ore Bodies of High-Nugget Gold Using Conditional Probability Evelyn June Hill, Nicholas H. S. Oliver, James Cleverley and Michael Nugus 1 Introduction In vein-hosted gold deposits, gold distribution

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 26 April 2016 QUARTERLY ACTIVITY REPORT FOR THE PERIOD ENDING 31 March 2016 ASX: NXM Capital Structure Shares on Issue 70.4 million First Earn-in milestone completed in the Pinnacles JV

More information