1 AUGUSTA GOLD-ANTIMONY MINE Authors: Melanie McCarthy Andrew Fowler Shane Marshall Narrow Vein Mining Conference 2008 Contact: Melanie McCarthy AGD Operations Pty Ltd PO Box 662 Heathcote Vic 3523 Ph Fax

2 AUGUSTA GOLD-ANTIMONY MINE Narrow Vein Mining Conference 2008 Authors: Melanie McCarthy Mining Manager AGD Operations Pty Ltd PO Box 662 Heathcote Vic 3523 Andrew Fowler Head Geologist AGD Operations Pty Ltd PO Box 662 Heathcote Vic 3523 Shane Marshall Senior Mining Engineer AGD Operations Pty Ltd PO Box 662 Heathcote Vic

3 AUGUSTA GOLD-ANTIMONY MINE Narrow Vein Mining Conference 2008 List of Headings Abstract Introduction Location and history Geology and mineralisation Resource estimation* Mine development Dilution and grade control Ore drive development Stoping Dewatering Ventilation Geotechnical challenges Process plant Technical support Personnel recruitment and retention Conclusion Acknowledgements References 3

4 Abstract The Augusta underground mine at Costerfield in Central Victoria has been in operation since mid 2006, however AGD Operations Pty Ltd have explored and undertaken open pit operations in the area for over 20 years. The high grade, narrow gold-antimony orebody is being mined using both mechanised and hand held methods, to produce up to 70,000 tonnes per annum at ten grams per tonne gold and six per cent stibnite. AGD Operations Pty Ltd processes the ore on site using gravity and flotation to produce two products, a concentrate which is sold to Chinese smelters and a gravity concentrate which is refined off-site. The circuit achieves up to thirty percent recovery of gold from gravity methods. There are many challenges in the underground mine including an orebody with an average width of 300 mm, very poor rock mass conditions in the host rock and variable dips in the ore along strike, between 45 and 90 degrees. The upper levels of the mine have been developed ready for stoping however their depths range from 20 to 70 metres below surface in both oxide and transitional material. A major fault structure consisting of mud has been encountered underground and is associated with the orebody causing very poor ground conditions, water inflow and requiring additional reinforcement. The northern limit of the mine is defined by the proximity of historical workings in the South Costerfield Mine, which is being continuously dewatered. Introduction Various gold-antimony deposits have been mined in the Costerfield gold-antimony field, in Central Victoria, since its discovery in the 1860 s. Production has however been sporadic, being highly dependent on metal prices and extractive technology developments (Hazeldene, 2007). The AGD group has been actively exploring the area since the 1980 s. During the mid 1990 s AGD mined the upper levels of the Brunswick Deposit for oxide gold by open cut, then in 2001, began delineating the Augusta Deposit under cover at the southern end of the field (Hazeldene, 2007). Mining began in Location and History The Costerfield Project is centred on the Costerfield township in Central Victoria, located about ten kilometres northeast of Heathcote and 50 kilometres east of the City of 4

5 Bendigo. Heathcote is serviced from either Bendigo or Melbourne via the McIvor/Northern Highway. Small antimony deposits were first discovered and worked in 1853 in the Costerfield area. It was not until 1860 that prospectors Coster, Field and Youle discovered the main Costerfield Deposit comprising antimony sulphide (stibnite) with visible gold. The Costerfield Mine and its associated deposits, Minerva and Bombay produced ounces of gold and tonnes of 40 per cent stibnite concentrate between 1860 and 1883 (Bannear, 1993). Between 1904 and 1925, mines in the Costerfield area produced tonnes of ore for ounces of gold and tonnes of 49.8 percent stibnite concentrate. Development of the Costerfield mine reached 309 metre depth. Following a lull in production, the Costerfield Mine started producing again between 1934 and tonnes of Stibnite concentrate was produced during this period under the management of Gold Exploration and Finance Company of Australia (WMC) (Hazeldene, 2007). A series of different operators explored and mined the area from 1939 to 1981 including the South Costerfield Antimony and Gold Company, Victorian Antimony Mines Ltd., Mid East Minerals, Metals Investment Holdings, and Forsayth Mineral Exploration and Costerfield Mining Pty Ltd. During this time production was comparatively limited (Hazeldene, 2007). In 1981 the Victorian Mines Department explored the area and discovered mineralisation under shallow alluvial cover that was later defined as part of the Augusta Deposit. Following discovery, and up until 2005, Federation Resources and Australian Gold Development (AGD) delineated an ore reserve with Probable status of tonnes at 10.9 grams per tonne gold and 5.7 percent stibnite. Open cut mining down to ten metres below surface began in early 2006 and underground development began in mid 2006 (Hazeldene, 2007). Geology and Mineralisation The Costerfield Project is located in the Melbourne Zone of the Lachlan Fold Belt and is divided structurally from the Bendigo Zone to the west by the crustal-scale discontinuity, 5

6 the Mount William Fault (Vandenberg et al., 2000). Mineralization in the west of the Melbourne Zone is characterized by an association between gold and antimony (Vandeberg et al., 2000). The Augusta Deposit comprises six mineralized veins that predominantly dip to the west, south-west at approximately 60 degrees and strike north, north-west. They are composed of massive stibnite with quartz, which occurs either intermingled with the stibnite, as a stibnite/quartz breccia, or along the margins of the stibnite as laminated quartz. Gold is commonly microscopic (< 20 microns) and is generally included within stibnite grains. Free gold has been observed in the weathered zone and also in some recent drill holes, below 100 m depth. (Figure 1). The mineralization is interpreted as occurring in two episodes: first was a gold-in-arsenopyrite phase, which was then followed by a stibnite-rich fluid that re-mobilised the gold and included it within the stibnite (McArthur, 2005). Geometrically, the veins are arranged in an en-echelon pattern, and are generally subparallel. The largest of the veins, E lode, is continuously mineralized along a strike length of approximately 400 metres, and is on average 298 mm with a grade of 52.4 grams per tonne gold and 29.2 percent stibnite (Figure 2,3). Two veins are currently being mined: E lode and W lode. Both contain ore shoots that plunge to the north at approximately 35 degrees (Figures 4,5). Maximum lode width and grade observed in an ore shoot was 1750 mm of massive stibnite grading 28.6 grams per tonne and 33.6 percent stibnite. The ore shoots are spatially correlated where the lodes intersect major cross-cutting, un-mineralised structures that trend northeastsouthwest. These major crosscutting structures are highly sheared, containing up to a metre of pug material and generally disrupting the hanging wall and/or foot wall across several metres width. The cross-cutting structures do not significantly displace the lode structures in a strike slip sense (dip slip displacement unknown). The maximum strikeslip displacement observed is approximately six metres, however the mineralisation is consistently observed to continue through and around this displacement, suggesting that the mineralization post-dates the main phase of movement on these north-west striking faults. Grade and lode width appears to be distributed in an en-echelon arrangement. The ore shoot in W lode, which is to the west and in the hanging wall of E lode, is offset to 6

7 the south, and continues significantly further down plunge than the ore shoot in E lode. Furthermore, on a level, W lode starts to become ore grade at the approximate northing where E lode becomes sub-economic. The mineralization is hosted by the ubiquitous and largely featureless, Silurian Costerfield Siltstone. Regionally, the siltstone is interpreted to form the core of an Antiformal Dome, with the gold-antimony deposits occurring along the axis of the dome (Edwards et al., 1998). In the Augusta Mine, the hinge of the major antiform has not been observed. The bedding predominantly dips to the west-south-west, in a similar orientation to the lodes, suggesting the Augusta Deposit was precipitated on the western limb of the north, north-west striking antiform. There are exceptions where bedding is observed to be rotated in the vicinity of faults. Mapping in the ore drives shows a gentle warping of bedding near the lode structures with fold hinges plunging down the dip direction of the bedding, approximately west, south-west. This suggests minor north-south compression, possibly related to the mineralizing event. Resource Estimation* An updated Mineral Resource estimate for the Augusta Mine has been prepared. The data set is as of 30 June 2008 and includes all recent diamond drilling and face sample information and is reported depleted of development and stoping. The summary Mineral Resource Table 1 is as follows and excludes the estimate for N Lode that was completed in There has been no new data added to N Lode that can yet be incorporated into a Mineral Resource estimate. Diamond drill data has been loaded from the site databases and validated for downhole surveys and assay information. Face samples have been spatially located to represent 3D channel samples in their correct location. All mineralised intercepts have been coded by lode and composited to the full thickness of the lode in each location. True widths have been calculated for the diamond drill intercepts. For the face sample information the true width is as measured at the face by the geological team. The Mineral Resource estimate has been constructed using a 2D estimation methodology. All data has been transformed to a common 2D plan. Metal accumulations (true width * Au ppm and true width * Sb %) are calculated for each face sample or diamond drill 7

8 intercept. Block models for the face sampled or developed areas of the mine are 2.5 metre strike by five metres high. In the diamond drill areas the dimensions are 20 metres strike by ten metres high. Two separate models were estimated for each data set then combined together for reporting and mine planning purposes. The true thickness and metal accumulations have been estimated by ordinary kriging. Variogram and search ellipses were determined using the face sample information and scaled appropriately for use in the diamond drill areas. Gold and antimony grades are back calculated by dividing the accumulation by the estimated true thickness. For each of E lode and W lode a series of structural domains were modelled that define areas where the true dip and strike are similar. For each of these domains (seven E lode domains and four W lode domains) a strike and dip correction factor is calculated that can be utilised to calculate the corrected lode volume for each block. Volumes, tonnes and grades diluted to a minimum width of 1.2 metres have been calculated for each block. Density has been estimated based upon an historical regression calculation with Sb % that has been consistently applied at Augusta mine. The Mineral Resource has been classified based upon the quality of the estimates (slope of regression of the estimate), the drilling density and more importantly demonstration of continuity of the lodes. Areas that have been accessed by development top and bottom have been classified as Measured Resource. The Mineral Resource has been reported above a cutoff of 4.6 grams per tonne gold equivalent (AuEq) (Aueq = Au + Sb *1.9) and at a minimum mining width of 1.2 metres. The Mineral Resource is depleted for mining based upon surveys of underground workings completed 30 June 2008 and estimates of the material yet to be recovered from stoping areas. In addition to the resource quoted above, there are some additional tonnes in the N lode and C lode, however, currently there are no plans to mine these lodes. *The information in this report as it relates to Resource Estimations was compiled by Mr. Dean Fredericksen, MAusIMM, who is a consultant geologist to AGD operations, with sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent 8

9 Person as defined in the 2004 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.. Mr. Fredericksen consents to the inclusion of this information in the form and context in which it appears in this report. Mine development The Augusta mine is accessed via a boxcut which is formed from the original open pit developed in A concrete pillar was installed in the base of the open pit prior to underground development commencing. AGD Operations Pty Ltd worked with mining contractors to operate a road header for the initial 50 metres of decline and one level to E lode. The initial mining of E lode for the 400 metre strike length was an exploration exercise to prove up continuity of the lode along strike, since initial exploration drill spacing was 40 metres. W lode is 200 metres in strike length and was not considered to be a significant contribution to production, but has since proven more consistent in lode width and contains higher grades than E lode. The initial mining in the upper levels (one and two level) was by air leg boring and bolting with some air scraper work, constructing a 2.4 metre wide by 2.8 metre high drive, and bogging with Toro 151 loaders. Water flowing from the orebody and the created mud was a significant hazard especially in E lode two level, where after 200 metres of advance the floor level had washed away up to 500 mm deep requiring road base to be continually brought in. During this time the four metre wide by four metre high, one in seven spiral decline progressed with a single-boom Atlas 126 jumbo, and cable bolting was required to be both drilled and installed out of a tele handler basket. Bogging was performed by a Elphinstone R1700G loader. In July 2007 a twin boom Atlas Copco M2D was commissioned for the decline, as well as a single boom Atlas Copco H104 for the ore development. This enabled cable bolt drilling to be performed with the jumbo and increased rates in decline and cross cut development. At the same time the decline was re-designed to include long straights and a 1:6.5 gradient. A Wagner MT 426 Truck is used to cart ore and waste to surface. Difficult ground conditions were experienced at the entrance to four level E lode. The entrance to 4 level E lode was at the intersection of a large fault and the rock mass 9

10 conditions were so poor that drill and blast methods were not used. An excavator was taken underground and cut the profile of both north and south E lode drives for some ten metres until the ground conditions improved. An excavator with a cutter head installed was also trialed, and was able to cut the host rock easily. The intersection required shotcrete, which was applied using dry application methods, as well as concrete re-enforcement of the pillars, to ensure that it remained stable for the life of the level. The decline is designed to be developed to ten level (120 metres below surface) and further exploration drilling in 2008 has extended the life of mine to 18 level (190 metres below surface) with W lode open at depth. Dilution and grade control The mine classifies ore as stope, high and low grade and stockpiles them separately. Grade is controlled by the shift supervisor in close consultation with the mine geologist and shift samplers. For the ore drives, samplers visit each face on a daily basis and advise the shift supervisor of the predicted grade based on measurements of the lode width, quartz content and the width of the drive. Refer to Figure 6. For stoping, the grade and width of the lode in the stope panel is estimated by the mine geologist when it is designed. The estimation is based on the face samples in the drives above and below the stope panel. As the stope is mined, the samplers, mine geologist and production engineer monitor the stope width and dilute the lode grade accordingly. Ore drive development In late 2007 to reduce dilution, part-facing was trialed in ore development. This involved positioning the ore on one side of the drive, and using the ore contact as the hanging wall. The waste was bored out and fired, and the waste cut width dimension being such that the 1.4 metre wide Toro buckets could bog the majority of the waste from the face. Refer Figure 7. The ore was then stripped in. Experimentation with boring on the hangingwall contact or in the ore was trialed, as the former resulted in large lumps of stibnite greater than the process plant grizzly aperture of 250 mm, and would require secondary breakage with a rock breaker. The increase in grade delivered to the mill was significant, however full face mining has since resumed due to a number of issues. The number of faces on line to enable efficient part facing is at least ten, to enable flexibility with the mid shift and end of shift firings being undertaken. The ore stripping cut took less than an hour to 10

11 bore and charge, but the face would remain idle until firing time. The drives would generally result in widths greater than the 2.4 metre design, to enable the loader bucket to fit in beside the ore. This required more waste movement. The positioning of the ore as the hanging wall also posed problems for the production drill rig, as it required at least 250 mm additional room to drill on the correct angle for stoping. After the part facing trial, the ore drive width dimension was reduced to 2.2 metres and part facing is now implemented only when the ore width in the face would result in low grade being delivered to the mill. W lode development is a challenge as its average dip is 50 degrees. Sublevels are developed so that at least a 1:1 pillar is the result along the dip of the ore. Shanty back profiles are mined. There is significant survey control required when developing W lode to ensure the drives do not interact. All ore drives are normally developed under geological control but in W lode a laser is used to control both the development line and grade. The level drives are advanced at least 20 metres in front of sub levels as an additional control to ensure the drives do not interact. Stoping Geotechnical consultants in both the feasibility stage and initial development stage were skeptical whether short bench stoping over any length of hanging wall expanse would be possible. The mine was scheduled to assume that short bench stopes were possible and a level spacing of ten metres floor to floor on E lode was planned. Trial stoping commenced on E lode in January 2008, in an area that ranged from 67 to 65 degrees dip. The production drill rig being used is a Boart Longyear Stopemate which has a shorter feed cylinder installed so that in the narrow drives it can achieve 360 degrees movement. E lode on three level south was stoped in the initial six months of 2008, with the trial parameters changing as stope performance was assessed. Initially drill patterns were dice five, with holes in the footwall, hanging wall and in the ore. Fifty percent strength ANFO was used for all firings including the initial slot. For the first stope in three Level E lode, the initial slot dimensions were 1.2 metre square, and this and subsequent firings were encouraging as they resulted in a stope width matching design of 1.2 metres. However, once the stope was open for approximately eight metres along strike, parallel beds of mudstone within the hanging wall would slide off under 11

12 gravity, and cause in some cases stope widths of in excess of 3 metres. Minimal overbreak occurred on the footwall. The loaders operators were able to bog these large slabs and stockpile them separate to the ore in some cases. Extensive cable bolting of the hanging wall was trialed, at less than favourable orientations achievable from the drill and extraction drives. W strapping and cable bolt tensioning was completed and stopes fired with this extra support installed. However, in most cases the hanging wall continued to fail under gravity around the cables. Geotechnical consultants indicated that the transitional and weathered nature of the rockmass was partly the cause of cable bolts being unable to hold the hangingwall. Stoping in W lode where the rock mass is generally blockier than E lode has had success in achieving better than the predicted stope widths of 1.2 metres wide. Current drill and blast methods are successfully achieving 700 mm average stope width over 15 metres open along strike. Refer to Figure 8. Hole spacing is 400 mm with one hole rings drilled 100 mm into the footwall. Generally holes must be lined with poly as they squash after 24 to 48 hours of being drilled. In each firing the next hole behind is damaged and is providing a shadowing effect, so essentially a burden of 800 mm is being fired each firing. Hole diameter is 57mm charged with a fifty percent strength ANFO product. Ore is bogged and backfilled immediately with waste. A void must be created on the free face to allow successful firing of the narrow 700 mm wide stope. Further work with different backfill materials including cemented fill, is currently ongoing in an attempt to increase recovery and reduce dilution. Dewatering The South Costerfield mine included workings on the modern E lode and is dewatered to 65 metres below surface, the mine workings being approximately 60 metres from the northernmost extent of the Augusta Mine workings. An evaporation dam with 40ML capacity holds any excess mine water, surface storm water and South Costerfield shaft water and is set up with sprays to increase evaporation. The mine has recently reached below the depth of the South Costerfield shaft pump and has experienced between five to eight litres per second inflow from both the decline and ore headings, as water is transferred along the lodes and through fault zones. The host mudstone does not transmit 12

13 water. The current mine plan is to push the decline to ten level and cross cut to the lode structures in an attempt to dewater the lodes prior to extensive mining of the lower levels. Ventilation Primary ventilation is provided by a 110kW axial fan installed underground at one level. An overpass arrangement was designed and constructed so that air lock ventilation doors would not be required, as access to the magazine requires personnel to travel past the primary fan chamber and return airway infrastructure. Primary ventilation upcast shafts are approximately three metres in diameter and also act as the second means of egress. The primary fan has been installed with the capability of reversing it in the event it is required to be downcast. Secondary ventilation is currently being supplied by 75kW axial fans and a 110kW centrifugal fan located on surface, which was the dust extraction fan when the road header was in operation. Ventilation testing is performed by the geology samplers along with remote re-entry time monitoring and Nox personal Draeger tube testing of loader operators. Results are communicated to operators personally and published on notice boards. Geotechnical challenges Augusta mine previously used contract geotechnical expertise for monthly inspections and ground support design and has recently employed a part-time geotechnical engineer. Mesh is installed to grade-line in all areas, and in poor ground faces are required to be meshed before boring and charging can occur. Bedding is generally parallel with the lode and cross cutting structures cause hanging wall failure in stopes. These structures are identified during initial mapping and have a quartz/calcite infill, making blocks slip under gravity when exposed. The lodes are associated with a major mud shear /fault zone which dips north west. The faults contain puggy shear zones and polished fault surfaces. Regions where the mud fault are intersected are also hazardous due to the mud crumbling after it has dried out back from the advancing face, which usually requires rehabilitation. It is anticipated that mining and stoping W lode at depth will be problematic and a current study is whether or not dry fibrecrete can be utilized for safe and efficient narrow vein mining. 13

14 Process Plant Process plant design head grade is six percent Stibnite and fifteen grams per tonne gold and a throughput tonne per annum (15 tonne per hour). The grizzly aperture is 250 mm. The grinding circuit consists of two ball mills and achieves p80 of 106 micron. Gravity circuit recovery is up to thirty per cent of the total feed gold, and incorporates spirals on the cyclone underflows from both milling circuits. The spiral concentrate reports to a Knelson concentrator which is tabled. The flotation section incorporates two stages of cleaning to produce a concentrate assaying 52 percent Stibnite and 60 grams per tonne gold. Flotation concentrate is filtered and bulka bagged then shipped to customers in China. Penalties occur for any concentrates below 52 percent Stibnite. 75 percent of the concentrate produced is sold under contract and the operation is currently reviewing options for the remainder to be sold to a different customer. Technical support The mine technical staff consist of head geologist, mine geologist and two samplers who work dayshift only, senior mining engineer and recently a mine production engineer and two mine surveyors working an eight and six roster. Personnel recruitment and retention AGD Operations Pty Ltd has a labour and equipment hire contract with a mining contractor, and the contract specifies that personnel are to be sourced from the local area. The towns of Seymour, Heathcote and other smaller communities are targeted for potential recruitment of heavy mobile equipment operators who are usually well suited to underground mining. A personnel bus is run from Bendigo for the shift workers who work seven on seven off, 12 hour continuous day and night shifts. All supervision, training and personnel development is provided by AGD Operations and employee turnover is very low. The underground mining crews are between eight and ten people who are required to be multi-skilled. This provides an opportunity to learn hand held mining methods, loader and truck operations, development and production charging, production drilling and jumbo operations in a relatively short time compared to larger mines. Conclusion Augusta mine is successful in mining a difficult orebody in transitional material. 14

15 The W lode stoping is proving better than ore reserve assumptions of a 1.2 metre stope width and a significant reduction in dilution has been achieved. Further work is planned to quantify dilution being bogged against fill and trialling different filling methods to reduce dilution. Mechanisation of the underground mine has a further step to go, to remove the operator from hand held bolting if at all possible. Geotechnically the orebody is challenging and may involve an improved method of ground support at depth. The W lode orebody is the widest and richest lode and is currently open along strike and at depth. Acknowledgements The authors wish to acknowledge AGD Operations Pty Ltd and its parent Cambrian Mining plc for enabling this paper to be published. 15

16 References Bannear, D., North Central Goldfields Project, Historic Mining Sites in the Heathcote (Waranga South) Mining Division, Part two: Site Gazetteer, Department of Conservation and Natural Resources, North West Area. Edwards, J., Wohlt, K.E., Slater, K.R. Olshina, A. Hutchison, D.F Heathcote, and parts of Woodend & Echuca. 1:100,000 Map Area Geological Report, Geological Survey Report No Hazeldene, R.K., MIN 4644, EL 3310, & 4848, Costerfield Project. Annual Technical Report for the Period 1 July 2006 to 30 June AGD Operations Pty. Ltd. Report. McArthur, G., AGD Operations Pty. Ltd. Augusta Project, Costerfield Sb/Au Mineragraphy. Vandenberg, A.H.M., Willman, C.E., Maher, S., Simons, B.A., Cayley, R.A., Taylor, D.H., Morand, V.J., Moore, D.H. & Radojkovic, A., The Tasman Fold Belt System in Victoria. Geol. Surv. Vict. Special Publication. 16

17 AUGUSTA GOLD-ANTIMONY MINE Narrow Vein Mining Conference 2008 Table 1 Summary of E and W lode mineral resources* Augusta Grade Contained Metal Category Tonnes Au ppm Sb% Au Eq Undiluted True Thick (m) Au (Oz's) Sb (Tonne) Measured 66, ,000 7,000 Indicated 180, ,000 10,700 Inferred 85, ,000 2,100 Total 331, ,000 19,800 17

18 AUGUSTA GOLD-ANTIMONY MINE Narrow Vein Mining Conference 2008 List of Figure and Table captions Figure 1. Elode, MH m down hole, Sample: P Assay results: 113 g/t Au, 30.6 % Sb. Qz Photo: 7465, Digital image, Objective: 20X, Light: Reflected, Nicols: Uncrossed Figure 2. Elode, 2 Level, north drive: 4567mN in Costerfield Mine Grid. Looking north. Figure 3. Schematic cross section through the Augusta Deposit on 4400mN in Costerfield Mine Grid. Looking north Figure 4. Long section of the E Lode block model estimated by D. Fredericksen in July Only blocks above 4.6 g/t Au equivalent are displayed. In Costerfield Mine Grid Figure 5. Long section of the W Lode block model estimated by D. Fredericksen in July Only blocks above 4.6 g/t Au equivalent are displayed. In Costerfield Mine Grid Table 1 Summary of E and W lode mineral resources* Figure 6: Example of a grade control chart currently being used underground for a shanty-back ore drive profile Figure 7: Part face example from W Lode showing fired mullock and ore intact, 1 level at 4361mN, looking south. Figure 8: Example of a stope taken looking down from 0.6m W4 sub level at 4335mN. Stope was 3.5m high from backs to floor and open 15 metres along strike 18

19 Figure 1. Elode, MH m down hole, Sample: P Assay results: 113 g/t Au, 30.6 % Sb. Photo: 7465, Digital image, Objective: 20X, Light: Reflected, Nicols: Uncrossed Figure 2. Elode, 2 Level, north drive: 4567mN in Costerfield Mine Grid. Looking north. 19

20 Figure 3. Schematic cross section through the Augusta Deposit on 4400mN in Costerfield Mine Grid. Looking north 20

21 Figure 4. Long section of the E Lode block model estimated by D. Fredericksen in July Only blocks above 4.6 g/t Au equivalent are displayed. In Costerfield Mine Grid 21

22 Figure 5. Long section of the W Lode block model estimated by D. Fredericksen in July Only blocks above 4.6 g/t Au equivalent are displayed. In Costerfield Mine Grid Figure 6: Example of a grade control chart currently being used underground for a shanty-back ore drive profile 22

23 Figure 7: Part face example from W Lode, 1 level at 4361mN in Costerfield Mine Grid, looking south. 23

24 Figure 8: Example of a stope taken looking down from W4 sub level at 4335mN. Stope was 3.5m high from backs to floor. 24

25 Sb Au Qz 330µm Figure 1. Elode, MH m down hole, Sample: P Assay results: 113 g/t Au, 30.6 % Sb. Photo: 7465, Digital image, Objective: 20X, Light: Reflected, Nicols: Uncrossed Barren Siltstone Massive Stibnite 75.6 g/t Au, 34.2 % Sb Barren Siltstone 0.6m Figure 2. Elode, 2 Level, north drive: 4567mN in Costerfield Mine Grid. Looking north.

26 Figure 3. Long section of the E Lode block model estimated by D. Fredericksen in July Only blocks above 4.6 g/t Au equivalent are displayed. In Costerfield Mine Grid Figure 4. Long section of the W Lode block model estimated by D. Fredericksen in July Only blocks above 4.6 g/t Au equivalent are displayed. In Costerfield Mine Grid

27 Figure 5: Example of a grade control chart currently being used underground for a shanty-back ore drive profile lode 3.3m mullock 2.6m Figure 6: Part face example from W Lode showing fired mullock and ore intact, 1 level at 4361mN, looking south.

28 ~ 600mm stope width ~ 400mm lode width Figure 7: Example of a stope taken looking down from W4 sub level at 4335mN. Stope was 3.5m high from backs to floor and open 15 metres along strike

Practical long-term planning in narrow vein mines a case study

Practical long-term planning in narrow vein mines a case study Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 https://papers.acg.uwa.edu.au/p/1511_31_khani/ Practical long-term planning in narrow

More information

For personal use only

For personal use only UPDATE ON COCK-EYED BOB UNDERGROUND MINING INCREASING CONFIDENCE IN THE POTENTIAL FOR THREE LONG-LIFE UNDERGROUND MINES Integra Mining Limited (ASX:IGR, Integra) is pleased to report that the trial mining

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 21 st September 2015 Operational Update from the Old Pirate Gold Mine and the Coyote Processing Plant ABM Resources NL ( ABM or the Company ) is pleased to announce

More information

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA ASX Release 4 th November 2009 SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce commencement of site works at the A1 Gold Mine in eastern

More information

NEW DISCOVERIES AT THE RED OCTOBER MINE

NEW DISCOVERIES AT THE RED OCTOBER MINE 23 July 2013 ASX & MEDIA RELEASE NEW DISCOVERIES AT THE RED OCTOBER MINE The Directors of Saracen Mineral Holdings Limited (the Company ) are pleased to provide an update on the Red October underground

More information

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017. MANDALAY RESOURCES CORPORATION ANNOUNCES 2018 MINERAL RESOURCES AND RESERVES UPDATE FOR ITS COSTERFIELD OPERATION, INCLUDING MAIDEN RESOURCES AND RESERVES ESTIMATE FOR THE YOULE LODE TORONTO, ON, January

More information

For personal use only

For personal use only ASX/ MEDIA RELEASE 28/03/ 2012 Exciting developments for GBM Gold at its Wedderburn Resource Project Highlights of this announcement: Details Exciting results from recent Diamond drill programme at Gowks

More information

Trial Mining & Processing Update at the Old Pirate High-Grade Gold Project

Trial Mining & Processing Update at the Old Pirate High-Grade Gold Project ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 1st August, 2013 Trial Mining & Processing Update at the Old Pirate High-Grade Gold Project ABM Resources NL ( ABM or The Company ) presents an update on the Trial

More information

For personal use only

For personal use only ASX ANNOUNCEMENT / MEDIA RELEASE 16 th August, 2013 ASX:ABU Trial Mining Continues and Commissioning of the Old Pirate Processing Plant is Underway ABM Resources NL ( ABM or The Company ) presents an update

More information

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS National Stock Exchange of Australia Company Announcements Level 2, 117 Scott Street Newcastle NSW 2300 25 th January 2013 STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS 100m

More information

Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode

Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode Summary The main shaft at the Prestwood mine has been fully rehabilitated to 4

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. 30 April 2008 60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. Perilya Limited (ASX: PEM) is pleased to announce a 60% increase in the mineral resource estimate for the

More information

ASX/Media Announcement

ASX/Media Announcement ASX/Media Announcement 25 March 2013 MAIDEN HIGH-GRADE JUDY LODE RESOURCE INDICATES POTENTIAL TO INCREASE ANDY WELL MINE LIFE 106,000 ounce high-grade resource (Indicated & Inferred) Judy South (137,000t

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

ROSE OF DENMARK MINE RE-DEVELOPMENT COMMENCES

ROSE OF DENMARK MINE RE-DEVELOPMENT COMMENCES Friday, 1 October 2010 ROSE OF DENMARK MINE RE-DEVELOPMENT COMMENCES Redevelopment of Key Regional target Rose of Denmark Mine Rose of Denmark is a High Grade shallow depth opportunity Multiple samples

More information

The Manager Companies ASX Limited 20 Bridge Street

The Manager Companies ASX Limited 20 Bridge Street ABN 79 106 879 690 10 July 2012 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, 1.54 Moz Gold Equivalent Maiden Gold/Copper Resource at Wonogiri The Directors

More information

For personal use only

For personal use only 2 May 2013 No. of Pages: 7 ASX CODE: ORS Market Cap.: $12.2 m ($0.115 p/s) Shares on issue: 106,048,002 Cash: $2.4 m (31 March 2013) BOARD & MANAGEMENT Ian Gandel, Chairman Anthony Gray, Managing Director

More information

Co-O MINE MINERAL RESOURCE UPDATE

Co-O MINE MINERAL RESOURCE UPDATE MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS Heron Resources Limited ABN: 30 068 263 098 Level1, 37 Ord Street, West Perth WA 6005 Phone: +61 (0) 8 9215 4444 Website: www.heronresources.com.au Email: info@heronresouces.com.au ASX: HRR ASX Release

More information

New High Grade Lode Discovered at Wagtail South

New High Grade Lode Discovered at Wagtail South 23 April 2013 ASX Announcement New High Grade Lode Discovered at Wagtail South Bulletin Resources Limited (ASX: BNR) is pleased to announce the receipt of further assay results from the 5,000 metre reverse

More information

FIRST RESULTS FROM RC DRILLING AT KONONGO

FIRST RESULTS FROM RC DRILLING AT KONONGO ASX Release Monday 29 March 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 FIRST RESULTS FROM RC DRILLING AT KONONGO Signature

More information

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation

MAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation MAD345 - Mining II INTRODUCTION 10 October 2018 Course content MAD345 THEORY Date October, 10 October, 17 October, 24 October, 31 November, 7 November, 14 November, 21 Topic Introduction Prospecting, exploration

More information

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project

ASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project Bulletin Resources is the 100% owner of the Lamboo and Golden Crown Gold Projects located near Halls Creek in the East Kimberley region of Western Australia. The projects have a combined open pit and underground

More information

ASX ANNOUNCEMENT 21 MARCH 2011

ASX ANNOUNCEMENT 21 MARCH 2011 ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights

More information

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE ASX ANNOUNCEMENT 21 APRIL 2017 TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE RC Blade drilling commences at Tandarra Gold Project Up to 3,800 metres planned in 67

More information

For personal use only

For personal use only 18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand

More information

EXPLORATION SUCCESS AT COYOTE GOLD MINE

EXPLORATION SUCCESS AT COYOTE GOLD MINE 19 November 2012 Jon Latto COMPANY SECRETARY Jane Bown EXECUTIVE ASSISTANT EXPLORATION SUCCESS AT COYOTE GOLD MINE COYOTE GOLD MINE HIGHLIGHTS Ongoing exploration drilling continues to return high grade

More information

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME ASX ANNOUNCEMENT 28 March 2013 FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME Focus Minerals Ltd. (ASX: FML) is pleased to announce the first round of results

More information

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width

More information

Portia Gold Mine Update

Portia Gold Mine Update 1 Portia Gold Mine Update South Australian Resources & Energy Investment Conference 20 April 2016 Dr Chris Giles Managing Director Havilah Resources LimitedDr Chris Giles, MD 20 April 2016 Dr Chris Giles

More information

Tel: (+61-8) Mob: (+61) (0)

Tel: (+61-8) Mob: (+61) (0) 30 November 2010 HIGH GRADE INTERCEPT EXTENDS FOSSEY EAST DISCOVERY 15 metres at 7.4 % zinc, 4 % lead, 0.5% copper, 76 g/t silver and 2.8 g/t gold Fossey East now defined over 100 metres strike extent

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 16 th January 2012 BLACKHAM CONFIRMS MATILDA RESOURCES Blackham completes review of existing Matilda Project Resources 601,000oz inferred resources contained within 6 deposits Includes

More information

MINERAL RESOURCE AND ORE RESERVE UPDATE PAMPALO GOLD MINE

MINERAL RESOURCE AND ORE RESERVE UPDATE PAMPALO GOLD MINE REPORT Pampalo Pekka Lovén, Markku Meriläinen 15.February. 2012 1 (14) MINERAL RESOURCE AND ORE RESERVE UPDATE PAMPALO GOLD MINE 31.12.2011 FOR ENDOMINES OY Outotec Oyj Riihitontuntie 7 C, PO Box 86 FI-02201

More information

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred

More information

Bass Metals records further positive drill results & progress at 3 prospects.

Bass Metals records further positive drill results & progress at 3 prospects. 16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret

More information

Quaternary clays alluvial sands of the Shepparton Formation overlie the basement rocks.

Quaternary clays alluvial sands of the Shepparton Formation overlie the basement rocks. NAGAMBIE GOLDFIELD Regional Geological Setting The Nagambie Project is located within the Melbourne Structural Zone of Victoria. The lithologies range in age from the Upper Silurian Broadford Formation

More information

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT ASX ANNOUNCEMENT 17 OCTOBER 2017 DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT Reconnaissance Air Core drilling to commence at Macorna Bore and Sebastian Projects Diamond drilling planned

More information

For personal use only

For personal use only 29 July 2011 The Manager Company Announcements Office Australian Securities Exchange Exchange Centre 20 Bridge Street SYDNEY NSW 2000 Dear Sir Quarterly Activities Report for the period ended 30 June 2011

More information

Chalice, Higginsville Drilling

Chalice, Higginsville Drilling Chalice, Higginsville Drilling 31 May 2006 Eastern Goldfields Higginsville Chalice First results from Chalice Gold Mines Limited s (Chalice Gold Mines or Company) drilling program have been received. Chalice

More information

For personal use only

For personal use only ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non

More information

High Grade Gold Intersections at Harry Smith Prospect

High Grade Gold Intersections at Harry Smith Prospect ABN: 82 138 358 728 ASX: TMZ Level 1, 80 Chandos Street, St Leonards, NSW 2065 PO Box 956, Crows Nest, NSW 1585 Tel: +61 2 9906 6225 Fax: +61 2 9906 5233 Web: www.thomsonresources.com.au ASX Release 16

More information

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY

News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY June 29, 2007 ASX & TSX: WSA News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY The Board of Western Areas is pleased to announce that the

More information

BUNDARRA RESOURCE UPDATE

BUNDARRA RESOURCE UPDATE t Friday 15 April 2011 Company Announcement ASX ANNOUNCEMENT ASX CODE: TMX, TMXOA CAPITAL STRUCTURE TMX - Shares on Issue 217.98m TMXOA - Options on Issue 18.24m - Unlisted Options 56.81m DIRECTORS & KEY

More information

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 20 September 2010 EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT Boddington South Gold

More information

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

More information

ASX Announcements & Media Release

ASX Announcements & Media Release ASX Announcements & Media Release October 15, 2010 Fast Facts ASX Code: RNS Shares on issue: 62.2 million Cash at bank: $5 million (Sept 2010) Board & Management Rick Hart, Chairman Justin Tremain, Managing

More information

Malachite Resources Limited ABN

Malachite Resources Limited ABN Malachite Resources Limited ABN 86 075 63 268 ASX Announcement ASX Code: MAR 27 October 20 NEW DRILLING RESULTS AT LORENA SUPPORT COMMENCEMENT OF MINING FEASIBILITY STUDY Malachite Resources Limited (

More information

For personal use only

For personal use only ASX Release 18 February 2011 BALLARAT GOLD PROJECT Sulieman-Britannia lode extended to 85 metres with very high gold grades Castlemaine Goldfields Limited (ASX:CGT) announces exploration drill results

More information

For personal use only

For personal use only MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:

More information

MARCH 2010 QUARTERLY REPORT

MARCH 2010 QUARTERLY REPORT MARCH 2010 QUARTERLY REPORT ASX Release HIGHLIGHTS Friday 30 April 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill

More information

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce

More information

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE ASX ANNOUNCEMENT 2 MARCH 2018 FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE Mineralisation Report for Four Eagles Gold Project accepted by DEDJTR RC and Diamond drilling to recommence

More information

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS Magmatic Resources Ltd Level 1, 11 Lucknow Place West Perth WA 6005 Phone: +61 8 6102 2709 www.magmaticresources.com ASX / MEDIA ANNOUNCEMENT 21 August 2017 RC DRILLING TO RESUME THIS WEEK AT CARLISLE

More information

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM ASX RELEASE 4 April 2007 REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM The Directors of Hemisphere Resources Limited ( Hemisphere or the Company ) are pleased to announce that a review has been conducted

More information

ASX Release 3 July Update on Trial Mining at the Morning Star Gold Mine

ASX Release 3 July Update on Trial Mining at the Morning Star Gold Mine 3 July 2018 Update on Trial Mining at the Morning Star Gold Mine AuStar Gold Limited (ASX: AUL) ( AuStar or the Company ) provides the following update on progress at its first stage of trial mining at

More information

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION Ramelius Resources Limited ACN 001 717 540 140 Greenhill Road, Unley SA 5061 GPO Box 1373, Adelaide SA 5001 DX 52003, Unley Telephone (08) 8373 6473 / (08) 8373 5588 Facsimile (08) 8373 5917 ASX RELEASE

More information

For personal use only

For personal use only CLASSIC CONTINUES HUNT FOR HIGH GRADE GOLD WITH COMMENCEMENT OF RC DRILLING PROGRAM Highlights: ~3000m of RC drilling underway at Kat Gap, Lady Lila, Lady Magdalene and Van Uden West Assay results expected

More information

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

MARKET UPDATE ON URANIUM AND GOLD PROJECTS ASX Announcement 1 March 2011 MARKET UPDATE ON URANIUM AND GOLD PROJECTS HIGHLIGHTS 5,000 metre drilling programme to commence at Rio Puerco uranium project within the next two weeks. Drilling to commence

More information

LATEST RESULTS FROM RC DRILLING

LATEST RESULTS FROM RC DRILLING ASX Release Tuesday 6 July 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 LATEST RESULTS FROM RC DRILLING Signature Metals Limited

More information

Queensland Mining Corporation Limited

Queensland Mining Corporation Limited Queensland Mining Corporation Limited ABN 61 109 962 469 ASX Release 29 th July 2011 Drilling Commenced at Duck Creek Copper-Gold Project, Cloncurry, North-west Queensland Highlights RC drilling has commenced

More information

MANGANESE DISCOVERY AT KONONGO PROJECT

MANGANESE DISCOVERY AT KONONGO PROJECT ASX Release Wednesday 8 September 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill Oliver (Managing Director) E-mail:

More information

FIVE RIGS DRILLING AT KARLAWINDA

FIVE RIGS DRILLING AT KARLAWINDA FIVE RIGS DRILLING AT KARLAWINDA Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed ASX ANNOUNCMENT 2 September 2016 Australian

More information

Ausgold awarded EIS grant for Jinkas deep drilling

Ausgold awarded EIS grant for Jinkas deep drilling ASX Release 21 June 2018 Ausgold awarded EIS grant for Jinkas deep drilling Highlights: EIS grant will support drilling at the Katanning Gold Project to a value of $150,000 Grant will partly fund four

More information

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project ASX ANNOUNCEMENT 22 August 2013 General Mining Corporation ABN: 95 125 721 075 Hits of up to 123gpt show Chesterfield emerging as a high grade gold project Prospects are ideally located close to existing

More information

76,000 Ounce Gold Resource at Akoko North

76,000 Ounce Gold Resource at Akoko North 31 st March 2009 76,000 Ounce Gold Resource at Akoko North 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Scoping study (assuming toll milling) estimates $A24M

More information

Hampton Hill Mining NL

Hampton Hill Mining NL Hampton Hill Mining NL Second Floor, 9 Havelock Street West Perth WA 6005 Mailing Address: PO Box 689 West Perth WA 6872 ABN 60 606 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email:

More information

For personal use only

For personal use only ACN 097 088 689 ASX Announcement 1 EXPLORATION SUCCESS CONTINUES AT RAVENSWOOD RC drilling targeting shallow portions of Welcome breccia returns a number of significant new results including: 7m @ 7.84g/t

More information

102 metres strike length averaging 32.62g/t Gold extends overall surface vein sampling to date to 726 metres strike length averaging 24.

102 metres strike length averaging 32.62g/t Gold extends overall surface vein sampling to date to 726 metres strike length averaging 24. ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 8 th February 2012 Old Pirate Phase 4 Longitudinal Trenching Results for veins on the Western Limb Lodes 102 metres strike length averaging 32.62g/t Gold extends

More information

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER ASX / MEDIA RELEASE 6 MAY 2011 4-MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER Highlights: Silver-lead-zinc discovery at 4-Mile; mineralisation intersected in all

More information

Elverdton Copper-Gold Project Ravensthorpe, Western Australia

Elverdton Copper-Gold Project Ravensthorpe, Western Australia FOR SALE or JV Elverdton Copper-Gold Project Ravensthorpe, Western Australia Summary: The Elverdton Copper-Gold Project is located approximately 11 kilometres south-east of Ravensthorpe town, which is

More information

For personal use only

For personal use only BOARD OF DIRECTORS Mr Oscar Aamodt Non-Executive Chairman Ms Sofia Bianchi Non-Executive Director Mr Lindsay Dudfield Non-Executive Director Mr Anthony Ho Non-Executive Director ISSUED CAPITAL SHARES 156,852,955

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 29 July 2011 KATANNING UPDATE GOLD DISCOVERED AT JACKSON First-pass drilling at Jackson confirms presence of primary gold mineralisation Potential for third ore body at the Katanning Gold

More information

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary ASX announcement 27 November 2017 Andromeda Metals Limited ABN: 75 061 503 375 Mylo-Frontier Pilbara Gold Project acquisition Corporate details: Summary ASX Code: ADN Cash: $0.546 million (at 30 June 2017)

More information

result of granted over the

result of granted over the Registered Office and Postal Address Crater Gold Mining Limited ABN 75 067 519 779 Level 4, 15-17 Young St Sydney, NSW, 2000 Australia Ph (02) 9241 4224 Fax (02) 9252 2335 23 July 2013 Australian Securities

More information

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE High-grade, visible-gold mineralization intersected 120 metres ( m ) down-plunge of Swan Zone Inferred Mineral Resource and 210

More information

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA 28 NOVEMBER 2018 ASX/MEDIA RELEASE NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA Drilling underway targeting high-grade underground extensions of Zoroastrian

More information

ASX ANNOUNCEMENT FURTHER EXPLORATION SUCCESS AT NULLAGINE

ASX ANNOUNCEMENT FURTHER EXPLORATION SUCCESS AT NULLAGINE WEDGETAIL MINING LTD ABN 85 3 257 556 Ground Floor, 24 Outram St West Perth WA 65 ASX ANNOUNCEMENT Postal: PO Box 117, West Perth WA 6872 Phone: +61 8 9488 88 Fax: +61 8 9481 288 Website: www.wedgetail.net.au

More information

RC Drilling Confirms Zeus Gold Prospect

RC Drilling Confirms Zeus Gold Prospect MEDIA RELEASE 30 September 2008 RC Drilling Confirms Zeus Gold Prospect (Gondwana) is pleased to report that it has identified shallow gold potential at Zeus from its recent program of RC drilling combined

More information

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT September 18 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT Two tier one Australian banks mandated to arrange

More information

For personal use only

For personal use only ASX Release 2 February 2012 ENCOURAGING DIAMOND DRILLING RESULTS CONTINUE AT THE FEKOLA PROJECT Papillon Resources Limited ( Papillon or the Company ) is pleased to release the assay results from two additional

More information

Evaluation of Mineral Resource risk at a high grade underground gold mine

Evaluation of Mineral Resource risk at a high grade underground gold mine Evaluation of Mineral Resource risk at a high grade underground gold mine Presented by: Aaron Meakin Manager Corporate Services CSA Global 21 August 2015 Project Background Beaconsfield Gold Mine, Tasmania

More information

For personal use only

For personal use only Orion Gold NL ASX Release Orion Gold NL is an Australian gold exploration company focused on delivering value to shareholders through the successful exploration of the Company s highly prospective tenement

More information

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

704,000 OUNCE MIYABI GOLD PROJECT UPDATE 704,000 OUNCE MIYABI GOLD PROJECT UPDATE ASX/ RELEASE 21 April 2016 ASX code RVY Board of Directors: Geoff Gilmour Managing Director Greg Cunnold Technical Director Graeme Clatworthy Non-Executive Director

More information

Encouraging drill results from Paroo Range

Encouraging drill results from Paroo Range 17 July 2012 The Manager ASX Company Announcements Office PO Box H224, Australia Square SYDNEY NSW 2001 Encouraging drill results from Paroo Range Highlights Significant uranium mineralisation at the 100%

More information

Mimosa MSZ 6E metal ratio (%) Harare Hartley Complex. Bulawayo ZAMBIA ZIMBABWE BOTSWANA SOUTH AFRICA Pt Pd Rh Ru Ir Au

Mimosa MSZ 6E metal ratio (%) Harare Hartley Complex. Bulawayo ZAMBIA ZIMBABWE BOTSWANA SOUTH AFRICA Pt Pd Rh Ru Ir Au FACT SHEET MIMOSA N ZAMBIA Musengezi Complex ZIMBABWE Harare Hartley Complex Great Dyke Bulawayo Mimosa BOTSWANA Selukwe Complex Wedza Complex SOUTH AFRICA Mimosa is jointly held by Implats and Sibanye.

More information

High Grade Gold Drill Results Extend Buccaneer

High Grade Gold Drill Results Extend Buccaneer ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 14 June, 2012 High Grade Gold Drill Results Extend 31 metres averaging 3.68g/t gold including 14 metres averaging 7.56g/t gold ABM Resources NL ( ABM or The Company

More information

Paddington Life of Mine Plan. 1 July 2009

Paddington Life of Mine Plan. 1 July 2009 Paddington Life of Mine Plan 1 July 2009 1 Life of mine concept The Life of Mine Plan (LoM) sets out a ten-year mining program that will underpin planning decisions and provide guidance for Paddington

More information

Drilling Program Commences on Iron Oxide Copper Gold Targets

Drilling Program Commences on Iron Oxide Copper Gold Targets 3 June 2008 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 ABN 42 082 593 235 Electronic delivery No of pages: 6 Drilling

More information

Additional significant gold and copper intercepts obtained in Sweden

Additional significant gold and copper intercepts obtained in Sweden 18 November 2009 Additional significant gold and copper intercepts obtained in Sweden Drake Resources (ASX: DRK, Drake ) is pleased to announce that additional significant assays for the drilling programme

More information

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE 27 th October 2008 EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE Atlas Iron Limited (ASX Code: AGO) is pleased to announce a number of high grade results from the first drilling programme completed at

More information

Prospect Resources Signs Mining Agreement over Bucks Reef Gold Mine.

Prospect Resources Signs Mining Agreement over Bucks Reef Gold Mine. Prospect Resources Signs Mining Agreement over Bucks Reef Gold Mine. HIGHLIGHTS Prospect Resources has secured the mining rights to the Bucks Reef Gold Mine, which lies some 600m west of its Prestwood

More information

For personal use only

For personal use only About Convergent ASX Code: CVG CVG owns 100% of the Bounty Goldfield in Western Australia with 872,000 ounces of gold Our Aim CVG s key objective is to define high grade gold and to recommence gold production

More information

Option agreement with Randgold set to commercialise Massigui Gold Project

Option agreement with Randgold set to commercialise Massigui Gold Project ASX Announcement 4 November 2016 Option agreement with Randgold set to commercialise Massigui Gold Project Option agreement with the Morila mine-operator provides potential low risk and low cost processing

More information

For personal use only

For personal use only 15 October 2010 ASX/Media Release 17 July 2012 Paste Fill Approval and New Drilling Program at Dargues Reef Initial focus on high priority near-mine gold targets Approval received for use of paste-fill

More information

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling Resource Diamond Drilling Commences at Productora Strong results continue from Productora central area drilling Resource diamond drilling commences at Productora 5 drill rigs to be operating shortly Productora

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 31 August 2012 DRILLING SUCCESS CONTINUES AT GUCHAB Near surface copper mineralisation in drill core from GCDD0002 HIGHLIGHTS The pilot programme of diamond drilling at Guchab continues

More information