HIGH-GRADE TIN ZONES AT ACHMMACH CONFIRMED. 19 June 2013 ASX RELEASE ASX CODE: KAS HIGHLIGHTS OUR PRIME COMMODITY IS TIN
|
|
- Brendan Howard
- 5 years ago
- Views:
Transcription
1 HIGH-GRADE TIN ZONES 19 June 2013 ASX CODE: KAS OUR PRIME COMMODITY IS TIN LME TIN PRICE (17/06/13) US$20,295 / T (CASH BUYER) ABOUT KASBAH KASBAH IS AN AUSTRALIAN LISTED MINERAL EXPLORATION AND DEVELOPMENT COMPANY. THE COMPANY IS ADVANCING THE ACHMMACH TIN PROJECT IN THE KINGDOM OF MOROCCO TOWARDS PRODUCTION. PROJECTS ACHMMACH TIN PROJECT BOU EL JAJ TIN PROJECT HIGHLIGHTS AT ACHMMACH CONFIRMED The results of in-fill drilling on sections 2430mE and 2470mE have successfully confirmed position, grade and geometry of the key high-grade mineralisation targeted for early underground extraction at Achmmach. Drilling is demonstrating potential for additional tonnage to be added to the Measured category in the next Resource update. Best drilling widths from section 2430mE include: 1.08% Sn from 304m (including 3.13% Sn from 321m) (AD229) 1.26% Sn from 314m (including 6.47% Sn from 334m) (AD235) 1.46% Sn from 412m (AD225) CAPITAL STRUCTURE Best drilling widths from section 2470mE include: SHARES ON ISSUE: 396M UNLISTED OPTIONS: 21.95M 31/03/13: $13.2M MAJOR SHAREHOLDERS WORLD BANK (IFC) 15.8% AFRICAN LION GROUP 15.1% TRANSAMINE 3.3% TRAXYS 3.3% MGMT & DIRECTORS 3.1% THAISARCO 2.0% CONTACT US 1.13% Sn from 274m (including 1.69% Sn from 280m) 0.79% Sn from 300.4m (including 1.23% Sn from 307m) 1.38% Sn from 313m (including 2.63% Sn from 316m) 1.38% Sn from 316m (including 2.96% Sn from 316m) (AD230) (AD237) (AD241) (AD230) : : info@kasbahresources.com : Approximately 800 assays are now pending. Resource update expected in Quarter 3, 2013.
2 OVERVIEW Kasbah Resources Limited ( Kasbah, ASX:KAS) is pleased to report the continuation of high-grade tin mineralisation from its 20m spaced in-fill drilling program of the Gap Zone at the Achmmach Tin Project in Morocco. Sections 2430mE and 2470mE (refer Figures 1, 2 and 3) have successfully: increased resolution in a key area of the ore body targeted for early stage underground development; demonstrated the general continuity of the high-grade mineralised core defined in the March 2013 Resource model; and returned consistent moderate to high grade results from secondary targets at intermediate and deeper levels. Meknes Trend Figure 1: Achmmach Drill Plan (Meknes Trend) DRILLING OBJECTIVE The Meknes Trend within the Achmmach hill has an interpreted strike length of approximately 2km and was modelled in the March 2013 Mineral Resource Estimate (refer Table 1 ) which was released to the ASX on 5 March This resource model was based predominantly upon 40m spaced drill sections (but included some 20m spaced drill holes) drilled up to January
3 Table 1 Achmmach Tin Project Mineral Resource Estimate (5 March 2013) undiluted 0.5% Sn cut off grade Category M Tonnes Sn % Contained Tin (k tonnes) Measured Indicated Inferred Total The objectives of the resource development drilling program post the release of the 5 March 2013 Mineral Resource at Achmmach has been to: extend the 20m spaced in-fill drill sections (between 2270mE and 2670mE); complete 40m spaced in-fill and extensional drilling across the Eastern Zone (on sections 3330mE to 3410mE); and complete close spaced drilling of the Eastern Zone Shallow ( EZS ) mineralisation centred on section 3050mE. If successful, this drilling may increase the Measured and Indicated component of the next mineral resource estimate. 1 Once all outstanding assays have been received a new resource estimate will commence. This estimate will incorporate all drilling completed across the shallow and deeper targets within the Meknes Trend at Achmmach and Kasbah expects an updated mineral resource estimate in Quarter 3, The updated estimate will be used in the Definitive Feasibility Study ( DFS ), due Quarter 4, KEY POINTS 2430mE & 2470mE Sections 2430mE and 2470mE are the second and third completed 20m spaced infill sections in the Gap Zone of the Meknes Trend (refer Figure 1). Approximately 240m of strike length (from 2390mE to 2630mE) has been now been infilled to 20m drill spacing. This area of the Gap Zone represents the prime target for initial ore extraction and as such the 20m spaced infill program aims to provide higher resolution and increased confidence in determining the location of the high-grade tourmaline-tin zones. 1 Kasbah notes that until the results of the drilling program are returned, the Mineral Resource classification upgrade cannot be guaranteed. 3
4 Diamond drilling on those sections is validating Indicated Resources and, where possible, targets the upgrade of Indicated Resources to Measured category. Sections 2430mE and 2470mE fall in the western portion of the Gap Zone where the 2013 Resource block model interpreted 4 sub-vertical feeders and more than ten branching tourmaline-tin envelopes of various sizes. The primary drilling target on both sections is TZ2270_860 which carries moderate to high grade tin results across 15 to 20m in the footwall and within a felsic intrusive for more than 120m dip length (e.g. 1.21% Sn from 296m in AD130 on section 2410mE; 3.17% Sn from 319m in AD100 on section 2450mE and 1.21% Sn from 287.2m in AD141 on section 2490mE). Section 2430mE was tested with 7 drill holes totalling 3,185.2m. Section 2470mE also included seven holes for a total of 3,399.1m. Drill holes AD221, AD225, AD229 and AD230 were already integrated in the March 2013 mineral resource estimate while new drill holes will be included in the Quarter 3, 2013 resource update. SUMMARY 2430mE and 2470mE results Drilling on 2430mE and 2470mE has successfully confirmed the position and overall metal content of the high-grade mineralisation predicted by the March 2013 resource model in TZ2270_860 while refining the geometry of it. As highlighted in the ASX announcement on section 2510mE (released 13/2/13) westward from 2510mE the up dip portions of the tourmaline envelope TZ2270_860 appear to split into two branches. On section 2430mE (refer Figure 2 the main mineralisation seems to be diverted along the bottom branch which is believed to be associated with the southern limb of a decametric fold linking FEEDER_01 and FEEDER_03. On section 2470mE (refer Figure 3) hole AD230 returned unexpectedly wider high-grade intervals from both branches but mineralisation also appeared to be delimited up dip by Feeder_03. These results support the westward continuity of the high-grade ellipsoid inside TZ2270_860 defined on section 2510mE and establish an averaged dip length of about 90m and thicknesses around 15 to 20m. Moderate to high-grade mineralisation with shorter range continuity was cross cut as predicted in the hanging wall of the intrusive (in several envelopes constituting the previously named Fez Zone). Thinner but relatively consistent mineralisation was encountered as well in the deeper levels ( RL) in TZ2290_860. All drill widths reported here are true widths. 4
5 Figure 2: Cross Section 2430mE Figure 3: Cross Section 2470mE 5
6 Best drilling results from section 2430mE include: AD221: 0.57% Sn from 288m; 1.04% Sn from 346m; and 0.92% Sn from 360m. AD225: 0.69% Sn from 296m; 0.93% Sn from 325m (including 2.09% Sn from 325m); 1.46% Sn from 412m; and 0.98% Sn from 432m. AD229: 1.08% Sn from 304m (including 3.13% Sn from 321m). AD235: 1.17% Sn from 210m; 0.67% Sn from 234m; 1.54% Sn from 302m; and 1.26% Sn from 314m (including 6.47% Sn from 334m). AD238: 0.53% Sn from 332m; and 1.75% Sn from 394m (including 4.30% Sn from 394m). AD242: 1.20% Sn from 332m; and 0.82% Sn from 388m. AD243: 1.66% Sn from 178m; 0.56% Sn from 239.8m; 0.65% Sn from 264m; and 1.11% Sn from 335m. 6
7 Best results from on section 2470mE include: AD230: 1.56% Sn from 267m; 1.13% Sn from 274m (including 1.69% Sn from 280m); 1.38% Sn from 316m (including 2.96% Sn from 316m); and 0.55% Sn from 343m. AD234: 0.69% Sn from 386m; 1.94% Sn from 427m; and 0.57% Sn from 481m. AD237: 0.79% Sn from 300.4m (including 1.23% Sn from 307m); 1.12% Sn from 413m; and 0.60% Sn from 425m. AD239: 4.58% Sn from 378m. AD241: 1.12% Sn from 194m; 1.17% Sn from 223m; 0.78% Sn from 243m; 0.88% Sn from 282m; 0.89% Sn from 294m; 3.62% Sn from 304m; 1.38% Sn from 313m (including 2.63% Sn from 316m); and 0.96% Sn from 476m. AD246: 1.84% Sn from 152m; and 0.86% Sn from 312m (including 2.11% Sn from 319m). AD256: 0.55% Sn from 320m. 7
8 Refer to Appendix A for significant assays, Appendix B for drill hole collar summary, Appendix C for Assays and 2012 JORC QA/QC summary. LOOKING FORWARD All the three major drill programs across the Meknes Trend at Achmmach have now been completed. These programs included: 1. The 20m spaced infill of the Gap Zone across 240m of strike length (from 2390mE to 2630mE); 2. The 40m spaced coverage of the Eastern Zone extending the resource (out to 3410mE); and 3. The 40x20m infill of the Eastern Zone Shallow ( EZS ) mineralisation. Approximately 800 drill assays are currently pending from the laboratory. The next Achmmach resource update is on track to be reported in Quarter 3, Wayne Bramwell Managing Director For further information please visit: Or info@kasbahresources.com ABOUT KASBAH Kasbah currently has two 100% owned tin projects located in the Kingdom of Morocco. A definitive feasibility study ( DFS ) into the development of a 1Mtpa underground mine, concentrator and associated infrastructure at Achmmach is due for completion in Q4, 2013 with Kasbah targeting first tin production in Toyota Tsusho Corporation ( TTC ) of Japan is Kasbah s strategic development partner in the Achmmach Tin Project. TTC has a right to acquire a 20% interest in the Achmmach Tin Project, having earned a nominal interest of 18.8% to date by paying $16 million in cash to Kasbah in TTC is required to make a final payment to Kasbah within 90 days of completion of the DFS to earn its 20% interest. Kasbah retains a 100% interest in the Bou El Jaj Tin Project, 10km from its Achmmach Tin Project. 8
9 COMPETENT PERSONS STATEMENT The information in this report that relates to Exploration Results is based on and fairly represents information and supporting documentation prepared by Mr Pierre Chaponniere, a Competent Person who is a Member of the Australasian Institute of Geoscientists (AIG). Mr Chaponniere is a full-time employee of Kasbah Resources Limited and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Chaponniere consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. FORWARD LOOKING STATEMENTS This announcement may contain forward-looking statements which involve a number of risks and uncertainties. These forward looking statements are expressed in good faith and believed to have a reasonable basis. These statements reflect current expectations, intentions or strategies regarding the future and assumptions based on currently available information. Should one or more of the risks or uncertainties materialise, or should underlying assumptions prove incorrect, actual results may vary from the expectations, intentions and strategies described in this announcement. No obligation is assumed to update forward looking statements if these beliefs, opinions and estimates should change or to reflect other future developments. 9
10 APPENDIX A SIGNIFICANT INTERSECTIONS A Hole ID Section ID Collar UTM 30N WGS84 E Collar UTM 30N WGS84 N From (m) To (m) Down-hole interval (m) Tin Grade B Sn % AD mE AD mE incl AD mE incl AD mE incl incl AD mE AD mE incl AD mE incl AD mE incl AD mE AD mE
11 Hole ID Section ID Collar UTM 30N WGS84 E Collar UTM 30N WGS84 N From (m) To (m) Down-hole interval (m) Tin Grade B Sn % incl AD mE AD mE AD mE incl AD mE A Significant intersection criteria >100m below natural surface selection criteria: 0.5% Sn and 5m down-hole and 3m down-hole < 0.5% Sn included; or 0.5% Sn and 2.5 %Tin-metres metal accumulation down-hole and 3m down-hole consecutive < 0.5% Sn included. <100m below natural surface selection criteria: 0.3% Sn and 3m down-hole and 3m down-hole < 0.3% Sn included; or 0.3% Sn and 1.5 %Tin-metres metal accumulation down-hole and 3m down-hole consecutive < 0.3% Sn included. B grades adjusted for recovery. 11
12 APPENDIX B - DRILL-HOLE COLLAR DETAILS Hole ID Collar UTM 30N WGS84 N Collar UTM 30N WGS84 E RL (m) Azimuth TRUE Dip Depth AD AD AD AD AD AD AD AD AD AD AD AD AD AD APPENDIX C - ASSAY DATA Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD
13 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD
14 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD AD
15 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn%
16 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD AD
17 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD
18 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD AD AD
19 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD
20 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD AD
21 Drill Hole From (m) To (m) Sample Width Tin Grade B Sn% AD B grades adjusted for recovery 21
22 JORC TABLE 1 Section 1: Sampling Techniques & Data Criteria Explanation Commentary Sampling techniques Drilling techniques Drill sample recovery Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as limiting the broad meaning of sampling. Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used. Aspects of the determination of mineralisation that are Material to the Public Report. In cases where industry standard work has been done this would be relatively simple (e.g. reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay ). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information. Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc.). Method of recording and assessing core and chip sample recoveries and results assessed. Measures taken to maximise sample recovery and ensure representative nature of the samples. The Achmmach Tin Project was entirely sampled using Diamond Drilling (DD). Sample diameters vary from PQ, HQ and NQ depending on the depth. A total of 293 DD holes were drilled for 105,193m achieving a section spacing of 60m, 40m and 20m depending on the area of the deposit. Sample representivity was ensured by: - locating collar using Differential GPS or Total Station with sub meter vertical and horizontal accuracy; - using Diamond Drilling to obtain high quality core samples that were exhaustively logged for lithology, alteration, mineralization, density, weathering and structural attributes; and - sampling half core on nominal 1m intervals using industry best practice protocols and QAQC procedures Each sample is analysed with a handheld Niton XRF analyser and anomalous samples are submitted to ALS laboratory for more precise analysis. Diamond core PQ, HQ or NQ size were sampled on a nominal 1m interval, cut by Kasbah into half core with automatic core saw, dried, crushed to 80% passing 200 microns to produce a 250g sample and dispatched to ALS laboratory. Sample was subsequently pulverised to 85% passing 75 microns to produce a 25g charge. Tin was assayed using fused bead preparations with XRF determination. Diamond Drilling with core diameter varying from PQ, HQ and NQ. To maximize recovery in weathered ground, triple tube was used, mostly in HQ3 and NQ3. Hole depths range from 13m to 630m. Orientation of core has been performed using the Eazymark and the ACT tool methods. DD recoveries were measured and captured in the database from AD149. Prior to AD149 recovery by run (part of the geotechnical logging) was used to assess sample recovery. Triple tube was used to maximize core recovery in weathered or broken ground. Drillers reduced core runs to sub meter intervals in difficult ground conditions. Logging depths were checked against core blocks and rod counts were routinely carried out by drillers and upon the geologist request. 22
23 Criteria Explanation Commentary Logging Sub-sampling techniques and sample preparation Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material. Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.) photography. The total length and percentage of the relevant intersections logged. If core, whether cut or sawn and whether quarter, half or all core taken. If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or dry. For all sample types, the nature, quality and appropriateness of the sample preparation technique. Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples. Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling. Released intercepts and assay values are adjusted for recovery with the formula: - Lab assay value x sample recovery = Corrected assay value; and - As core samples are conservative and in situ samples, it is expected that sample bias due to preferential loss / gain of fine / coarse material is negligible. Geological and geotechnical logging was carried on all core produced. Lithology, alteration, mineralization, weathering and structures were all recorded. Geotechnical logging was also completed according to industry best practice. Logging was entered directly into a self-validated template and resulting tables were uploaded into a GBIS database post validation. Logging of diamond core recorded both qualitative and quantitative parameters. Lithology, alteration, weathering, mineralization, structural and geotechnical logs collect both quantitative and qualitative fields. Diamond core was stored in clearly labelled core trays and photographed after mark up, before sampling with both Dry and Wet photos recorded. All drill holes were logged from start to end of hole. Core was cut in half onsite by Kasbah initially using manual core saw and later automatic core saw. Samples were collected from the same side of the core. Only core samples. The sample preparation of diamond core is considered adequate as per industry best practice involving onsite core samples collection, weighting and drying. Prior to AD100, half core samples were sent to ALS laboratory for crushing and pulverizing. From drill hole AD100, crushing and splitting of half core samples was achieved onsite. 80% of sampled crushed material passing 200 microns and splitting using a rotary splitter to obtain a 250g sample. Samples were subsequently dispatched to ALS laboratories for pulverizing to 85% passing 75 microns. QC procedures involve the use of Certified Reference Material as assay standards along with blanks, field duplicates, coarse reject duplicates and pulp duplicates. The insertion rate of these averaged 1:7. In addition, 3% of pulp duplicates have been analysed externally by an independent laboratory or umpire laboratory. A selection of 114 samples HQ and NQ diameter were chosen for second half core sampling. Statistical analysis of these field duplicates shows a very high level of repeatability and a lack of bias between original and duplicate sample data. 23
24 Criteria Explanation Commentary Quality of assay data and laboratory tests Verification of sampling and assaying Whether sample sizes are appropriate to the grain size of the material being sampled. The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc. Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established. The verification of significant intersections by either independent or alternative company personnel. The use of twinned holes. Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. Discuss any adjustment to assay data. The sample sizes are on average 1m intervals and vary from PQ, HQ or NQ diameter. This size is considered appropriate to the grain size of the material being sampled to correctly represent the tin mineralization at Achmmach. Kasbah tin assays were determined using fused bead X-Ray Fluorescence (XRF) which is the current industry standard for tin. This assay technique is considered total as it extracts and measures the entire element contained within the sample. No geophysical tools were used to determine any element concentrations used in the resource estimate. A Thermo Scientific Niton handheld XRF XL3t analyser was used as a complementary help to identify core intervals to be assayed. Internal laboratory QAQC involved the use of various Certified Reference Materials as assay standards along with pulp duplicate. For the entire drilling program, Kasbah regularly inserted Certified Reference Material independently having a range of values from 0.2 to 1.05%Sn at a rate of 1:20. Once sample preparation was achieved onsite (from AD100), Kasbah regularly inserted: - coarse reject duplicates at a rate of 1:25; and - blanks at a rate of 1:50. In addition, 3% of pulp duplicates have been analysed externally by an independent laboratory or umpire laboratory. Duplicate and standard statistical analysis demonstrates the data to be reliable and unbiased. All significant intercepts are reviewed and confirmed by at least three senior personnel before release to the market. No twinned holes have been drilled at Achmmach to date. Data is collected by qualified geologists and entered into spread sheets with pre-determined lookup fields. The spread sheets are locked and have validation rules attached in order to limit potential data entry errors. After entry and validation, data is being imported via a GBIS frontend onto a SQL server database. The import process also includes a validation step. Data is stored on a server located in a locked room on site and replicated to the Perth Office. Backups are also regularly made. Regular data validation reviews are being conducted by Kasbah supervisors and audited prior to Resource Estimation. No adjustments or calibration are made to the raw assay data. Data is imported directly onto the database in raw original format. 24
25 Criteria Explanation Commentary Location of data points Data spacing and distribution Orientation of data in relation to geological structure Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. Specification of the grid system used. Quality and adequacy of topographic control. Data spacing for reporting of Exploration Results. Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied. Whether sample compositing has been applied. Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type. If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material. Drill hole collars were set out using hand-held GPS or by offset from nearby previously drilled holes. The final drill hole collar coordinates were established by a licensed contract surveyor, using either a Trimble Differential GPS or a total station TopCon when tree cover was too thick. Sub-meter accuracy horizontally and vertically is expected from the surveying equipment used. Quality Control collar location checks were routinely inserted at each survey campaign in order to monitor accuracy and consistency of the equipment at a rate of 1:10. Down hole surveys were conducted using Single shot Reflex and multi-shot Reflex cameras depending on the drilling contractor. Down hole survey shots were taken every 50m prior to AD097 and at 25m intervals ever since. Coordinate system is UTM 30N and datum is WGS84. A Local grid was introduced locally over the Achmmach Tin Project with the Easting axis parallel to the overall tin mineralization. The Local grid is rotated 20deg anticlockwise from the UTM system. The Digital Elevation Model of the Achmmach Tin Project used in Resource Estimation was derived from a stereo image pair of a GeoEye-1 acquisition from December m vertical accuracy is expected from the dataset. Drill spacing is variable. Drill sections are 60m, 40m or 20m spaced (Easting) depending on the area of the deposit. Multiple holes are drilled from the same drill pad in a fan configuration leading to various pierce point spacing. It is the opinion of the Competent Person that mineralized envelopes have sufficiently demonstrated geological and grade continuity to support the definition of Mineral Resource and Ore Reserve as defined in the 2012 JORC Code. For mineral resource estimation purpose, grades have been estimated on 1m composited assay data. Sample compositing was not applied to interval calculations reported to the market. Reported intercepts were calculated as per industry best practice. Early drilling from the south flank of the Achmmach hill would have intercepted the mineralized structures at an acute angle. But in general, the orientation of the drill program has been designed to intersect tourmaline structures perpendicularly or nearly perpendicular. No orientation sampling bias has been identified in the data at this stage. 25
26 Criteria Explanation Commentary Sample security Audits or reviews The measures taken to ensure sample security. The results of any audits or reviews of sampling techniques and data. Chain of custody is managed by Kasbah from the site up to Meknes. From there a local transport company, SDTM, is responsible to deliver the samples to DSV in Casablanca. From Casablanca, DSV is responsible to clear and air freight samples to ALS laboratory. Sample bags and drums are sealed with security tags for transport. Sample data review was carried out by: - Carras as part of the 2008 Resource Estimate; - QG as part of the 2010 Resource Estimate; - MiningOne as part of the 2012 Resource Estimate; and - QG as part of the 2013 Resource Estimate. At each step, the database was considered to be sufficient quality and reliability to carry out resource estimation. JORC TABLE 2 Section 2: Reporting of Exploration Results Criteria Explanation Commentary Mineral tenement and land tenure status Exploration done by other parties Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. The security of the tenure held at the time of reporting along with any known impediments to obtaining a license to operate in the area. Acknowledgment and appraisal of exploration by other parties. Mining permits - PE2912 and PE are both 100% owned by Kasbah s Moroccan subsidiary Kasbah Gold Sarlau. Toyota Tsusho Corporation has a right to acquire 20% interest in these permits through a Joint Venture. Signed agreements with the Moroccan Administration. The permits are in good standing and there are no known impediments. ONHYM completed 14,128m of diamond drilling prior to Kasbah commencing operations. Geology Deposit type, geological setting and style of mineralisation. Primary tin deposit, cassiterite dominant. Drill hole Information Data aggregation methods A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes: easting and northing of the drill hole collar elevation or RL (Reduced Level elevation above sea level in metres) of the drill hole collar dip and azimuth of the hole down hole length and interception depth hole length. If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case. In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually Material and should be stated. As per tables in Appendices A and B in body of text. N/A As per Tables in Appendices A and C in body of text. 26
27 Criteria Explanation Commentary Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail. Relationship between mineralization widths and intercept lengths The assumptions used for any reporting of metal equivalent values should be clearly stated. These relationships are particularly important in the reporting of Exploration Results. If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported. If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (e.g. down hole length, true width not known ). N/A Drill widths are true widths. Refer images. Drill widths are true widths. Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported. These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. Refer to Figures 1, 2, and 3 in body of text. Balanced reporting Other Substantive exploration data Further work Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results. Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances. The nature and scale of planned further work (e.g. tests for lateral extensions or depth extensions or large-scale stepout drilling). Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive. Refer to Appendix C in body of text. N/A Resource Update scheduled for Quarter 3, Refer images. 27
For personal use only
18 April 2013 ASX CODE: KAS OUR PRIME COMMODITY IS TIN HIGHLIGHTS Drilling Confirms Continuity & Grade at Achmmach Drilling on sections 3130mE, 3170mE and 3290mE has successfully confirmed position, continuity
More informationMEDIA / ASX RELEASE JORC TABLE 1 ANNEXURE - REVISED. Tuesday 22 April 2014
MEDIA / ASX RELEASE Tuesday 22 April 2014 JORC TABLE 1 ANNEXURE - REVISED Regal Resources Limited ( Regal or the Company ) (ASX:RER) releases a revised JORC Table 1 Annexure which relates to the announcement
More informationJORC Code, 2012 Edition Table 1
JORC Code, 2012 Edition Table 1 Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.) Sampling techniques Drilling techniques Drill sample recovery Logging
More informationFor personal use only
Tanga Resources Limited Ground Floor 63 Hay Street Subiaco WA 6008 t: +61 (8) 9 381 5686 ASX Code : TRL ASX Announcement 03 March 2016 Singida Project Update Winston Prospect Results of Detailed Ground
More informationNarembeen Drilling Result. Assay results have been received from the diamond drilling program at Narembeen.
Date: 31 July 2014 Narembeen Drilling Result Highlights Assay results have been received from the diamond drilling program at Narembeen. Assay Results International Resources Ltd () is pleased to announce
More informationFor personal use only
ACN 092 471 513 27 December 2017 ASX Release HIGH GRADE OPEN-PIT GOLD CONFIRMED AT EMPIRE S PENNY S FIND GOLD MINE Further in-pit high grade gold has been confirmed by gold miner, Empire Resources Ltd
More informationFor personal use only
ASX ANNOUNCEMENT 31 July 2018 For personal use only ASX: ASN, ASNOB Anson Application to Drill for Lithium Brine Approved Highlights: Notice of Intent (NOI) to drill Long Canyon A1 site approved by BLM
More informationWestern Queen Gold Project Drilling Results
Exploration Office Level 3, 100 Pirie Street ADELAIDE SA 5000 ABN: 96 110 336 733 Tel: +61 8 8232 8320 Fax: +61 8 8232 8811 www.monaxmining.com.au 4 January 2018 Western Queen Gold Project Drilling Results
More informationFor personal use only
ASX ANNOUNCEMENT Date: 6 January 2015 Exploration Programme Update Highlights Initial geochemical soil sampling programmes completed Elevated copper and nickel anomalies defined on interpreted geological
More informationFor personal use only
2 March 2016 Company Announcements Office Australian Securities Exchange 10 th Floor, 20 Bond Street SYDNEY NSW 2000 DRILLING EXPANDS AREA OF KNOWN HEAVY MINERAL SAND CONCENTRATION MANNAR ISLAND, REPUBLIC
More informationAnson Successfully Samples Clastic Zone 31 Brine
30 January 2018 ASX ANNOUNCEMENT ASX: ASN, ASNOB Anson Successfully Samples Clastic Zone 31 Brine Highlights: Brine successfully extracted from Clastic Zone 31 during Gold Bar Unit 2 drilling Samples collected
More informationHIGH-GRADE LITHIUM CONFIRMED IN MINCOR S WIDGIEMOOLTHA PEGMATITES
22 February 2017 HIGH-GRADE LITHIUM CONFIRMED IN MINCOR S WIDGIEMOOLTHA PEGMATITES Initial results support interpretation of 4.5km long LCT corridor at Widgiemooltha Presence of lithium-rich pegmatites
More informationBRYAH BASIN DRILLING JORC UPDATE
ASX Announcement 16 August 2016 BRYAH BASIN DRILLING JORC UPDATE Further to the ASX announcement of 11 August 2016, RNI NL (ASX: RNI) provides the following JORC Code table on the diamond hole drilled
More informationEXPLORATION UPDATE CHANNEL SAMPLING AT HORN ISLAND CONFIRMS PREVIOUS HIGH GRADE RESULTS
EXPLORATION UPDATE CHANNEL SAMPLING AT HORN ISLAND CONFIRMS PREVIOUS HIGH GRADE RESULTS 18 June 2015 1 CHANNEL SAMPLING AT HORN ISLAND CONFIRMS PREVIOUS HIGH GRADE RESULTS Rock channel sampling and rock
More informationFor personal use only
ACN 092 471 513 6 November 2017 ASX Release HIGH GRADE GOLD DEFINED IN TARGETED UNDERGROUND EXTENSION OF NEW PENNY S FIND OPEN PIT MINE High grade gold mineralisation confirmed by assays has been outlined
More informationFor personal use only
12 July 2018 ASX ANNOUNCEMENT ASX: ASN, ASNOB Anson Produces First LCE Product Highlights: First lithium carbonate product extracted from Cane Creek 32-1 brine LCE produced by precipitation process Test
More informationHigh grade cobalt confirms Polinga Project as a significant new discovery
ABN 64 123 993 233 ASX Announcement 22 February ABN 64 123 2017 993 233 High grade cobalt confirms Polinga Project as a significant new discovery Highlights First drill holes assayed at Polinga Project
More informationFor personal use only
8 June 2017 Company Announcements Office ASX Limited Exchange Centre Level 4, 20 Bridge Street SYDNEY NSW 2000 HIGH GRADE GOLD ASSAYS, PANAMA HAT EL8024 Carbine Tungsten Limited (ASX: CNQ, Carbine or the
More informationFor personal use only
12 November 2014 ASX CODE: KAS OUR PRIME COMMODITY IS TIN LME TIN PRICE (10/11/14) US$20,000/t (CASH BUYER) ABOUT KASBAH KASBAH IS AN AUSTRALIAN LISTED MINERAL EXPLORATION AND DEVELOPMENT COMPANY. THE
More informationASX Release. Exploration Commences at High Grade Cobalt Projects
ASX Release Exploration Commences at High Grade Cobalt Projects Commenting on the completion of the stakeholder engagement activities and commencement of exploration, Managing Director, Mr David Riekie
More informationFor personal use only
Exploration Office Level 3, 100 Pirie Street ADELAIDE SA 5000 ABN: 96 110 336 733 Tel: +61 8 8232 8320 Fax: +61 8 8232 8811 www.monaxmining.com.au 11 January 2017 Further Significant Sampling Results at
More informationHigh Grade Lithium Samples from Solonopole
ASX/Media Release 2 October 2017 High Grade Lithium Samples from Solonopole Results returned from first pass mapping, rock chip, soil and grab sampling of the Solonopole Lithium Project, Brazil 10 small
More informationFor personal use only
ASX RELEASE 18 December 2014 ASX Code: CAE High Gold Results from Recent Stream Sediment Sampling Program Stream sediment sampling identified 3 catchments of highly anomalous gold results including a new
More informationExtensions confirmed at Wingina and Amanda
ASX Announcement 08 March 2019 Extensions confirmed at Wingina and Amanda Extensions beyond existing resource model defined at both Wingina and Amanda Potential to expand resources with further drilling
More informationFor personal use only
Miyabi Gold Project Update Rift Valley Resources Limited ( Rift Valley or Company ) (ASX: RVY) is pleased to announce first assay results from current drilling at its 100% owned Miyabi Gold Project in
More informationSANTA FE MINERALS LIMITED TO ACQUIRE STRATEGIC LANDHOLDING AT CHALLA SOUTH PROJECT
39 Clifton St Nedlands WA 6009 Tel: +61 8 9389 6032 ABN: 59 151 155 734 www.santafeminerals.com.au 1 March 2018 Company Announcements Office ASX Limited SANTA FE MINERALS LIMITED TO ACQUIRE STRATEGIC LANDHOLDING
More informationAnson Stakes Additional Claims at its Paradox Brine Project
30 November 2017 ASX ANNOUNCEMENT ASX: ASN, ASNOB Highlights: Anson Stakes Additional Claims at its Paradox Brine Project 217 claims staked for an additional 1,756 hectares New claims only 120m south of
More informationDeveloping the +1.0Moz Pilbara Gold Project. Diamond Drilling confirms Thick High Grade Gold Zones. Highlights
Developing the +1.0Moz Pilbara Gold Project ASX Announcement 22 August 2017 ASX Code DEG FRA Code WKN 633879 ABN 65 094 206 292 Diamond Drilling confirms Thick High Grade Gold Zones Highlights DIRECTORS
More informationFor personal use only
ASX Release 6 October 2017 ASX code: MAU Level 1 44A Kings Park Road PO Box1388 West Perth WA 6872 Telephone 08 9226 1777 www.magres.com.au ABN34 121 370 232 COARSE NUGGET PATCH LATERITE EXTENDED BY 600%
More informationJORC Code, 2012 Edition Table 1 report
JORC Code, 2012 Edition Table 1 report Section 1 Sampling Techniques and Data Criteria JORC Code explanation Commentary Sampling Drilling Drill sample recovery Logging Nature and quality of sampling (eg
More informationDRILLING INTERSECTS 200M WIDE ZONE OF NEW MINERALISATION
ASX Release: 1 February 2019 DRILLING INTERSECTS 200M WIDE ZONE OF NEW MINERALISATION Caravel Minerals Limited (ASX:CVV, Caravel or Company ) is pleased to announce that the first four holes of the current
More informationFor personal use only
ASX ANNOUNCEMENT 20th November 207 WWW.NTMGOLD.COM.AU ASX: NTM ABN: 24 9 494 772 NTM INCREASES LEONORA TENURE WITH ACQUISITION OF EXPLORATION LICENCES Recent gold nugget discoveries support regional approach
More informationFor personal use only
ASX RELEASE Suite 2501 Level 25 St Martins Tower 31 Market Street Sydney NSW 2000 Australia (PO Box Q638 QVB Market Street NSW 1230 Australia) Tel: +61 (02) 9283 3880 3 November 2016 Significant free gold
More informationJORC Code, 2012 Edition Table 1 report
JORC Code, 2012 Edition Table 1 report Section 1 Sampling Techniques and Data Criteria JORC Code explanation Commentary Sampling Drilling Drill sample recovery Logging Nature and quality of sampling (eg
More informationSALTA LITHIUM PROJECT - EXPLORATION UPDATE
ASX RELEASE 19 September 2017 ASX:PNN SALTA LITHIUM PROJECT - EXPLORATION UPDATE The Directors of PepinNini Minerals Ltd(PNN, the Company) report that geophysical surveys have been completed at the Rincon
More informationFor personal use only
ASX RELEASE 25 August 2017 ASX Code: CAE FURTHER EXTENSIONS OF GOLD MINERALISATION AT PICCADILLY New results confirm gold grades extending further to the west. Identification of further significant widths
More informationKAS KASBAH INTERSECTS HIGH GRADE TIN AT ACHMMACH. 18 August % Sn from 39.5m (WZGTD002) HIGHLIGHTS ASX RELEASE ASX CODE: KAS
18 August 2014 ASX CODE: KAS OUR PRIME COMMODITY IS TIN LME TIN PRICE (15/08/14) US$22,375 / T (CASH BUYER) ABOUT KASBAH KASBAH IS AN AUSTRALIAN LISTED MINERAL EXPLORATION AND DEVELOPMENT COMPANY. THE
More informationLARGE 21OZ GOLD NUGGET RECOVERED FROM MERTONDALE
ASX Release 2 November 2017 ASX code: MAU Level 1 44A Kings Park Road PO Box1388 West PerthWA 6872 Telephone 08 9226 1777 www.magres.com.au LARGE 21OZ GOLD NUGGET RECOVERED FROM MERTONDALE ABN 34 121 370
More informationHARVEST MINERALS ACQUIRES SERGI POTASH PROJECT
HARVEST MINERALS Developing Fertiliser Projects ASX release 20 April 2015 ASX: HMI SERGIPE POTASH PROJECT UPATE HARVEST MINERALS ACQUIRES SERGI POTASH PROJECT Harvest Minerals Limited ASX:HMI ( Harvest
More informationMt Jumbo East Maiden RC Drill programme Delivers 4g/t Gold from 8m in Hole MMJRC04
ASX Release 28 September 2018 ASX code: MAU Level 1 44A Kings Park Road PO Box1388 West Perth WA 6872 Telephone 08 9226 1777 www.magres.com.au ABN 34 121 370 232 Mt Jumbo East Maiden RC Drill programme
More informationFor personal use only
Multiple Manganese Drilling Targets Identified by DDIP Survey at Woodie Woodie West Dipole-Dipole Induced Polarisation (DDIP) ground based geophysical program completed. High priority chargeability drill
More informationADDITIONAL SHALLOW GOLD ZONES INTERSECTED IN DRILLING AT THE MASSIGUI PROJECT, MALI
Suite 9, 5 Centro Ave, Subiaco WA 6008 P.O. Box 457, West Perth, WA 6872, Australia Ph+61 8 9286 3045 Fax: +61 8 9226 2027 info@birimiangold.com ABN 11 113 931 105 23 December 2013 The Company Announcements
More informationFor personal use only
ION MINERALS INCREASES ASHBURTON PRESCENCE WITH OPTION OVER PROSPECTIVE COBALT GROUND Greenpower Energy Limited (ASX:GPP) is pleased to announce that its subsidiary, Ion Minerals Pty Ltd has signed an
More informationApollo Hill Produces More Robust Extensional Drilling Results
31 May 2018 Apollo Hill Produces More Robust Extensional Drilling Results Highlights: Apollo Hill drilling returns significant near-surface extensional intersections including: AHRC0029, 22m @ 1.01g/t
More informationSaturn Accelerates RC Resource Drilling with Two Drill Rigs at the Apollo Hill Gold Project
ASX Announcement 20 July 2018 Saturn Accelerates RC Resource Drilling with Two Drill Rigs at the Apollo Hill Gold Project A second phase of RC resource drilling is underway at Apollo Hill near Leonora,
More informationUp to 75m wide quartz vein/stringer zone identified at Kamalingela, Moba Gold Project, DRC
ASX ANNOUNCEMENT Up to 75m wide quartz vein/stringer zone identified at Kamalingela, Moba Gold Project, DRC Prospect Resources Limited (ASX: PSC) (Prospect, the Company) recently announced the acquisition
More informationMore High Grade Assay Results Received from RC Drilling Arcadia High Grade Lithium Project
More High Grade Assay Results Received from RC Drilling Arcadia High Grade Lithium Project Prospect Resources Ltd (ASX: PSC) (Prospect, the Company) is pleased to report assay results from RC drill holes
More informationMarindi expands its strategic gold portfolio at Forrestania with acquisition of high-grade gold tenement
15 th October 2018 Marindi expands its strategic gold portfolio at Forrestania with acquisition of high-grade gold tenement Plus, key tenement granted along strike from outstanding results announced recently
More informationFor personal use only
ACQUISITION OF THE PROSPECTIVE MANDACARU PHOSPHATE PROJECT. Harvest Minerals Limited AIM:HMI ASX:HMI ( Harvest or the Company ) is pleased to announce it has been awarded two exploration licences covering
More informationLarge-scale coincident copper and gold anomalism at Blue Hills
ASX Announcement (ASX:AXE) 26 June 2018 Large-scale coincident copper and gold anomalism at Blue Hills Highlights Discovery of large gold anomaly at Blue Hills with gold grades up to 0.42 g/t. Gold anomaly
More informationOption on Good Days Lithium Project Exercised
ASX ANNOUNCEMENT Option on Good Days Lithium Project Exercised Prospect Resources Limited (ASX:PSC) ( Prospect or the Company ), is pleased to announce that it has exercised its option to acquire the Good
More informationAnson Assays 91% Higher Lithium Grades at Skyline Well. Well Clastic Zone Li Br B I Mg
11 March 2019 ASX ANNOUNCEMENT ASX: ASN Anson Assays 91% Higher Lithium Grades at Skyline Well Highlights: Intercepted supersaturated brine in Clastic Zone 31 at Skyline Unit 1 well o 193.5 ppm Li (91%
More informationExcellent High Grade Gold Results - Cobar Gold Project, NSW
ASX Announcement 17 November 2016 Excellent High Grade Gold Results - Cobar Gold Project, NSW - Diamond drilling targeting high-grade gold at the Good Friday and Boundary Prospects has returned excellent
More informationGOOD GRADES AND NEW COPPER ZONE AT DASHER
ASX Release: 14 January 2019 GOOD GRADES AND NEW COPPER ZONE AT DASHER HIGHLIGHTS Two thick copper zones intersected at Dasher: o 56m @ 0.53% Cu from 18m, including 20m @ 0.66% Cu from 18m, and 16m @ 0.64%
More informationExploration Success Continues at Consuelo Third Drill Hole Intersects Coal Sequence
March 5, 2018 Exploration Success Continues at Consuelo Third Drill Hole Intersects Coal Sequence Perth, Western Australia March 5, 2018 Lustrum Minerals Limited (ASX: LRM) (Lustrum) (Company) is pleased
More informationVery High Grade Assay Results from RC Drilling Extends Arcadia High Grade Lithium Project
Very High Grade Assay Results from RC Drilling Extends Arcadia High Grade Lithium Project Prospect Resources Ltd (ASX: PSC) ( Prospect and the Company ) is pleased to report assay results from the first
More informationFor personal use only
22 December 2016 Tyranna reports further consistent gold grades, strengthening Greenewood Prospect with Phase II drill program completed Highlights Consistent gold results strengthens geological model
More informationFor personal use only
30 September 2015 Pervasive Gold Mineralisation at Chanape s Oro Doble HIGHLIGHTS Broad gold mineralisation identified in Oro Doble Breccia Down hole interval of 218m from 13m at 0.34g/t gold includes:
More informationStrong Drill Results Continue - Apollo Hill Gold
13 September 2018 Strong Drill Results Continue - Apollo Hill Gold Highlights: Apollo Hill resource drilling returns additional thick, shallow, extensional intersections including: 23m @ 1.76 g/t Au from
More informationDe Grey Mining Ltd. High Grade Zinc mineralisation defined at Tabba Tabba Highlights. Turner River Unlocking Shareholder Value
De Grey Mining Ltd ASX Announcement 12 September 2016 ASX Code DEG ABN 65 094 206 292 COMPANY DIRECTORS Simon Lill Executive Chairman Davide Bosio Non-executive Director Steve Morris Non-executive Director
More informationDrilling Defines Higher Grade Gold Lode at Apollo Hill
6 August 2018 Drilling Defines Higher Grade Gold Lode at Apollo Hill Highlights: Significant shallow RC intersections include: 11m @ 4.06g/t Au from 132m within 18m @ 2.58g/t Au from 126m AHRC0038; 10m
More informationFor personal use only
ASX/Media Release (ASX: MZN) 16 November 2017 Marindi Metals Ltd ABN 84 118 522 124 Level 3, 35 Havelock Street West Perth WA 6005 Australia Contact: Joe Treacy Managing Director Phone: 08 9322 2338 Email
More informationFor personal use only
ASX Announcement 25/11/2014 Drill data reveals high grade intercepts below Lomero-Poyatos mine Previous drill intercepts on the periphery of the mine workings include: 19.3m* @ 5.86 g/t Au, 2.44% Cu; 16.6m
More information1.3KM x 1.0KM SOIL ANOMALY DEFINED AT GASCOYNE LITHIUM PROJECT
12 April 2017 Market Announcements Platform ASX Limited Exchange Centre, 20 Bridge Street Sydney NSW 2000 ASX Code: SEG 1.3KM x 1.0KM SOIL ANOMALY DEFINED AT GASCOYNE LITHIUM PROJECT Segue Resources Limited
More informationFor personal use only
6 July 2018 ASX Announcement DRILLING INTERSECTS WIDESPREAD GOLD MINERALISATION AT SLATE DAM GOLD PROJECT Repetitions of gold mineralised trend to the east confirmed by drilling HIGHLIGHTS New gold trend
More informationSouthern Finland Gold Project - Update
7 April 2017 Southern Finland Gold Project - Update Highlights A large Induced Polarisation (IP) geophysical survey across areas of known gold mineralisation has been completed at the Satulinmäki gold
More informationEM extends conductors at Saints nickel-cobalt project, Kalgoorlie
MINOTAUR EXPLORATION LIMITED ACN 108 483 601 ASX: MEP 22 May 2018 ASX Release EM extends conductors at Saints nickel-cobalt project, Kalgoorlie New EM conductors indicate significant extensions to Saints
More informationFor personal use only
22 December 2015 ASX Code: POZ Laverton Gold Project, WA: Phase 1 Drill Results HIGHLIGHTS 40 hole aircore drilling program for 1,619 metres completed on E38/3038 eastern targets. Assay results received:
More informationFor personal use only
28 th November 2017 Swedish Co-Cu-Ni Portfolio Secured Through Direct Licence Applications BASINGE PROJECT HIGHLIGHTS: Multiple significant diamond drilling intercepts including: o Hole A: o Hole B: o
More informationDrill Results Confirm Depth Extension at Greenewood Gold Prospect
18 October 2016 Drill Results Confirm Depth Extension at Greenewood Gold Prospect ASX CODE: TYX DIRECTORS Joseph S. Pinto Non-Executive Chairman Bruno Seneque Managing Director Nick Revell Technical Director
More informationFor personal use only
9 November 2016 Mineralisation Confirmed at Inca s Zn-Ag-Pb Cerro Rayas Project PROGRAM HIGHLIGHTS Inca completes first mapping and sampling program at its Zn-Ag-Pb Cerro Rayas Project Vilcapuquio and
More informationFor personal use only
ASX Announcement (ASX: MDS) Date: January 17 2014 High-Grade Copper Hits at Overlander North and South HIGHLIGHTS RC drilling at both Overlander North and Overlander South confirmed further high-grade
More information11 STRONG COBALT ANOMALIES DEFINED AT GOODSPRINGS COPPER COBALT PROJECT, NEVADA
ASX Release 12 April 2018 New World Cobalt Limited ABN 23 108 456 444 11 STRONG COBALT ANOMALIES DEFINED AT GOODSPRINGS COPPER COBALT PROJECT, NEVADA Strong copper cobalt anomalism confirmed over +5km
More informationFurther Visible Gold within completed Diamond Drilling Program at Redback Prospect
Australian Securities Exchange Announcement 23 March 2015 ASX Market Announcements Australian Securities Exchange 20 Bridge Street SYDNEY NSW 2000 Further Visible Gold within completed Diamond Drilling
More informationMAIDEN DRILLING COMMENCES ON NIOU PROJECT BURKINA FASO. Maiden drilling program underway at the Niou Project in Burkina Faso
ASX Announcement 3 December 2018 MAIDEN DRILLING COMMENCES ON NIOU PROJECT BURKINA FASO Highlights: Maiden drilling program underway at the Niou Project in Burkina Faso Two separate highly prospective
More informationNEW GOLD DISCOVERIES AND EXTENSIONS AT MOUNT BERGHAUS
ASX Announcement 11 January 2017 NEW GOLD DISCOVERIES AND EXTEONS AT MOUNT BERGHAUS ASX Code DEG ABN 65 094 206 292 COMPANY DIRECTORS Simon Lill Executive Chairman Davide Bosio Non-executive Director Steve
More informationKALONGWE JOINT VENTURE PROJECT, DIAMOND DRILLING UPDATE NO. 2. Diamond drilling progressing well at the Kalongwe high grade, copper-cobalt project.
MEDIA / ASX RELEASE Tuesday 18 March 2014 KALONGWE JOINT VENTURE PROJECT, DIAMOND DRILLING UPDATE NO. 2 HIGHLIGHTS Diamond drilling progressing well at the Kalongwe high grade, copper-cobalt project. A
More informationFor personal use only
19 May 2016 AVALON BUILDS LITHIUM PORTFOLIO IN FINLAND Highlights Avalon Minerals has secured interests in a portfolio of lithium projects in Finland. Avalon has lodged and had registered an Exploration
More informationCOMPLETION OF INITIAL COPPER/GOLD DRILLING PROGRAM AT MILLENIUM LARGE MINERAL SYSTEM IDENTIFIED
Chinalco Yunnan Copper Resources Limited ABN 29 070 859 522 Level 5, 10 Market Street Brisbane QLD 4000 GPO Box 216 Brisbane QLD 4001 Tel: +61 7 3212 6204 Fax: +61 7 3212 6250 ASX Release 4 December 2013
More informationASSAYS CONFIRM WIDE ZONES OF NEW MINERALISATION
ASX Release: 20 February 2019 ASSAYS CONFIRM WIDE ZONES OF NEW MINERALISATION HIGHLIGHTS: 19CARC004: 202m @ 0.31% Cu from 116m, : 18m @ 0.40% Cu from 198m 18m @ 0.45% Cu from 232m 26m @ 0.57% Cu from 310m
More informationFor personal use only
Newman Base Metal Project Positive Zinc Extraction Results at Wolf ASX/Media Release (ASX: MZN) 27 th November 2015 Marindi Metals Limited (ASX: MZN) is pleased to advise that it has received results from
More informationDrilling and geophysics to test Kurnalpi nickel targets
ASX Release 30 May 2018 Drilling and geophysics to test Kurnalpi nickel targets Two nickel targets prioritised for drill testing and EM geophysics Targets comprise an undrilled strong downhole EM conductor
More informationMajor New Lithium Target Identified at Forrestania
Major New Lithium Target Identified at Forrestania ASX/Media Release (ASX: MZN) 16 April 2018 Marindi Metals Ltd ABN 84 118 522 124 Level 3, 35 Havelock Street West Perth WA 6005 Australia Contact: Joe
More informationFor personal use only
Tian Poh Resources Limited (ABN: 46 168 910 978) ASX/Media Release 31 st July 2015 Drilling Success at Tian Poh Resources Khangailand and Mandal-Urghukh Projects Highlights: High values of gold in pyrite
More informationFigure 1: Redcap conductor anomaly shown in relation to base of dense rocks (red),planned diamond drill hole and modelled plate conductor (purple).
ASX Announcement - 14 September 2015 ASX Code: BOA Drilling scheduled for Redcap EM target at Symons Hill Project, Fraser Range Highlights Detailed gravity survey confirms Redcap target as coincident high
More informationSECOND FORTUNE COMMENCEMENT OF MINE DEVELOPMENT
14 November 2017 SECOND FORTUNE COMMENCEMENT OF MINE DEVELOPMENT Mining contractor mobilised on 12 November and is commencing portal development Infill drilling into first of planned mining levels confirms
More informationVTEM Survey Identifies Priority Drill Targets
26 October 2016 ASX ANNOUNCEMENT ASX: ASN Company Announcements Office Australian Securities Exchange Limited VTEM Survey Identifies Priority Drill Targets Highlights: Results from the VTEM Supermax aerial
More informationFor personal use only
5 June 2015 ASX Code: COY FINAL FURTHER HIGH GRADE COPPER RESULTS IN SURFACE FLOAT SAMPLES AT NAKRU Mineral explorer Coppermoly Limited (Coppermoly and the Company) is pleased to announce final assay results
More informationFor personal use only
Sulphide Mineralisation Intersected in Fraser Range Gabbro Diamond Drilling has intersected disseminated sulphides dominated by pyrrhotite and chalcopyrite (copper sulphide) within a Fraser Range Complex
More informationSATULINMAKI HIGH GRADE GOLD PROJECT - DRILLING COMMENCED
6 September 2016 Highlights SATULINMAKI HIGH GRADE GOLD PROJECT - DRILLING COMMENCED Drilling has commenced on hole SMDD001 at the Satulinmäki gold prospect. The drilling program will test targets within
More informationSignificant Gold Anomaly Identified at 100% owned Davies Bore Gold Prospect
ASX Announcement 7 April 2016 Significant Gold Anomaly Identified at 100% owned Davies Bore Gold Prospect HIGHLIGHTS 1km long significant gold anomaly identified 3km from Regis Resources Rosemont Mine
More informationFor personal use only
New Cascade drill results and Ulanzi drill update 1 October 2015 Highlights Assays from the next two Cascade drill holes continue returning excellent intervals: o 98m@ 8.92% TGC including 40m@ 10.18% from
More informationFor personal use only
18 June 2014 Fraser Range East and Dingo Range Update Newexco has completed the first stage Moving Loop Electro Magnetic Survey (MLEM) at the Dingo Range Project and the Fraser Range East Project. Preliminary
More informationFor personal use only
19 April 2018 ASX ANNOUNCEMENT For personal use only ASX: ASN, ASNOB Anson Stakes 3 Blocks of Claims South of Lithium Rich Wells Highlights: Cloud Claims (64 claims) 2km east of Roberts Rupture o Claims
More informationFor personal use only
7 March 2017 Key Highlights MORABISI PROGRAM YIELDING RESULTS Initial Phase 1 work program progressing well at the Turesi Ridge & Base Camp sites. Multiple samples submitted to MS Analytical Solutions
More informationSpargoville Resource Definition Drilling Delivers Further High Grade Gold Results
ASX Announcement 25 August 2016 Spargoville Resource Definition Drilling Delivers Further High Grade Gold Results HIGHLIGHTS Significant, shallow gold intersections reported in several holes including
More informationNEW RESULTS FROM BOUNDIALI NORTH REVEAL THREE ZONES OF STRONG GOLD-IN-SOIL ANOMALIES
11 March 2019 NEW RESULTS FROM BOUNDIALI NORTH REVEAL THREE ZONES OF STRONG GOLD-IN-SOIL ANOMALIES HIGHLIGHTS The Predictive/Toro Gold Joint Venture is advancing its highly prospective Boundiali Project
More informationDe Grey Mining Ltd A.B.N
De Grey Mining Ltd A.B.N. 65 094 206 292 21 March 2016 ASX/MEDIA RELEASE Tantalum and Lithium Potential at Turner River Highlights Tantalum and Lithium potential highlighted at Turner River Sampling programmes
More informationFor personal use only
ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 23 March 2016 Geophysical Survey Results Enhance Bumblebee Prospect ABM Resources NL ( ABM or the Company ) is pleased to announce that results have been received
More informationKHARMAGTAI JORC TABLE 1
SECTION 1 - SAMPLING TECHNIQUES AND DATA (Criteria in this section apply to all succeeding sections). Sampling techniques Nature and quality of sampling. Include reference to measures taken to ensure sample
More information