1 STOCK EXCHANGE ANNOUNCEMENT 13 November 2006 RESOURCE INCREASED BY 75 TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT Summary The Board of Gindalbie Metals Ltd (ASX Code: GBG) is pleased to announce a 75 increase in Resources on its Karara Magnetite Deposit to 1.29 billion tonnes grading 36.3 iron. The increased Resource follows the completion of over 37,000 metres of Resource Definition Drilling with the previous Inferred Resource being upgraded to an Indicated and Inferred Resource. The Indicated Resource is sufficient for the first 28 years of production based on the current design capacity of the Karara Concentrator Facility of 8 million tonnes per annum of iron concentrate. Assaying and metallurgical testwork results have also confirmed the Karara magnetite deposits premium quality with extensive Davis Tube Magnetic Separation analysis producing a concentrate grading 69 Fe, 3.9 SiO 2, 0.04 A1 2 O 3 and 0.01 P at a weight recovery of 40. Pelletizing testwork on concentrate produced from the deposit, and conducted by Metso in their North American design and test facilities, has confirmed the suitability of the concentrate for the proposed pellet making process and the high quality of the product for the Company s target blast furnace market. The Resource upgrade and concentrate testwork results are further evidence of Gindalbie s belief that the Karara project presents a source of premium quality concentrate and pellets for AnSteel, Gindalbie s 50 partner in the project, and the wider Asian steel industry. Page 1
2 Karara Magnetite Project Mineral Resources Figure1: Karara Iron Ore Project Aeromagnetic Image Exploration at the Karara Magnetite Project (Figure 1) commenced in May 2005 with the initial Inferred Resource of 737 million tonnes at 37.1 Fe, announced in March Further drilling and testwork programs have now allowed the Company to define a total Resource of 1,291 million tonnes at 36.3 Fe, of which the Indicated Resource component totals 569 million tonnes grading at 36.6 Fe (see Table 1 for Resource Summary). The Indicated Resource is sufficient for approximately 28 years of production at the design capacity of the Karara concentrator facility currently undergoing feasibility study. The upgraded Resource at Karara follows a step-out drilling program along the north extension of the deposit and infill drilling programs in the south and central areas of the initial Resource area. The latest Resource defines the magnetite rich BIF (Banded Iron Formation) unit that hosts the deposit over a strike length of 3.2 kilometres, a width of between metres and a depth of 300 metres below surface. See Figure 2 for a cross section of the Resource. The increased confidence in the estimate and proven geological continuity of the ore body will permit the development of pit optimisation, pit design and Ore Reserve calculations. This work is scheduled for completion between November 2006 and January Resource Classification Mt Fe SiO 2 Al 2 O 3 P LOI Indicated Inferred Subtotal 1, Table 1: Resource Summary In addition to the Resources defined above, the geological model remains open at depth and contains a large body of material located below the defined Resources. Refer Figure 2. Page 2
3 Figure 2: Cross Section of the Karara Ore Body Model showing drill holes and Resource Classifications This body of material is based on a number of deeper drill holes below the general level of drilling at 300 metres below surface and seeks to define the depth limitation of the mineralised BIF. This deeper drilling consisted of 8 diamond drill holes and shows the mineralisation to extend to at least 600 metres below surface. Resources are reported for the fresh rock component of the mineralisation only and exclude discrete internal sub grade and non BIF units (such as minor dolerite dykes discovered in the north extension drilling). The oxidised component of the BIF unit, which contains some areas of goethite-hematite enrichment and extends to a depth of 25 to 45 metres from surface, has been estimated separately and at this time is excluded from further consideration for the magnetite project. Fresh mineralisation extends from metres below surface to over 600 metres in depth, however, Resource estimation has been limited to a depth of 300 metres below surface. Drilling of the fresh BIF unit has been undertaken on an east-west or south east-north west oriented grid (see Figure 3) and provides a minimum drill spacing of 200 metres x 100 metres for Indicated Resources and 400 metres x 100 metres spacing for Inferred Resources. Further infill drilling is planned to increase drill density to at least 100 metre x 100 metre spacing within the southern portion of the Indicated Resource zone nominated for the first years of mine production. This drilling will provide valuable production scheduling data and a basis for Ore Reserves and pit design work. Page 3
4 Figure 3: All drill hole locations, Resource Model boundaries draped over Magnetic Image Davis Tube Recovery and Concentrate Grade In addition to the whole rock Resource Model discussed above, RSG Global has also developed a Concentrate Model based on the 35 drill holes containing 1,580 Davis Tube Recovery (DTR) and concentrate assays available at this time. See Figure 4 for DTR drill hole locations. As the Davis Tube testwork results are at a lower density than the whole rock assay data, the confidence level in the DTR and concentrate grade estimate is lower than for the Resource Model grade estimate. The results to date indicate a high quality concentrate can be produced from within the Resource model area. The DTR samples are 4 metre composite samples taken from generally 400 metres x 100 metres spaced drill holes and cover the Resource area as shown in Figure 4. Page 4
5 Assay results of the DTR concentrate are summarised in Table 3. Figure 4: Davis Tube Recovery drill hole locations and Resource model boundaries draped over Magnetic Image Zone DTR Fe SiO 2 Al 2 O 3 P LOI Ca MgO S Indicated Resource Area Inferred Resource Area Subtotal Table 3: Davis Tube Recovery within the Indicated Resource Zone Page 5
6 Further DTR tests are in progress on 200 metre x 100 metre drill holes and are planned for on infill drilling to provide a higher density of assay and recovery data and allow an increased level of confidence to be applied to the Concentrate Model. Resource Drilling Program Details The total Resource definition drilling at the Karara deposit used in this estimate is 37,289 metres consisting of: o o 20,317 metres of Reverse Circulation Drilling 16,966 metres of Diamond Drilling (HQ 63mm diameter). Diamond drilling consists of a number of lines of diamond drill holes with generally 60 metre deep precollars and a number of diamond tails from RC holes where the hole depth exceeded the capacity of the RC drill rig. Part of the Diamond Drilling consisted of NQ (53mm) diamond cores that were drilled to penetrate the deepest parts of the ore body between 300 metres and 600 metres deep. The Resource estimate was based on: o o 17,555 Whole Rock assays generally of 2 metre composite 1,580 DTR assays generally of 4 metre composite QA/QC Techniques Used to Support the Resource Estimation and Interpretation. To ensure sample integrity, all RC drilling has utilised face-sampling hammer techniques. Core recovery in diamond holes has been uniformly 100 The RC rig supervisors monitor the RC sample delivery system to ensure representative sample recovery. The rigs are fitted with a two tiered cyclone splitter providing both primary and secondary samples of about 3 kg every two metres. Comparisons of duplicate sample assay results indicate consistently good sample repeatability. Head grade assay quality control checks were performed routinely via regular repeat assays. Drill hole collar locations are surveyed by an on site surveyor. Drill hole orientation and dip is measured using down hole gyroscope. Bulk density is derived from diamond core determinations and down hole density measurements. Mineral Resource Estimating Techniques The grade estimation techniques employed for the Resource was Ordinary Kriging after Variography and search neighbourhood analysis. A thorough explanation of the detailed techniques employed is attached in the Karara Magnetite Project-Mineral Resource Report notes by RSG Global. For more information please contact: Mr George Jones or Mr Darren Gordon Executive Chairman Chief Financial Officer Ph: Fax: Page 6
7
8
For personal use only
FeOre Limited 62/F, Thee Center 99 Queens Road Central Hong Kong Tel: +8522 3960 6518 www.feore.com ASX ANNOUNCEMENT 14 th February 2013 UPDATED MINERAL RESOURCE ESTIMATE FeOre Limited (ASX: FEO) is pleased
More informationMount Gibson Iron Limited ABN
Mount Gibson Iron Limited ABN 87 008 670 817 Level 1, 2 Kings Park Road West Perth 6005, Western Australia PO Box 55, West Perth WA 6872 Telephone: 61-8-9426-7500 Facsimile: 61-8-9485 2305 E-mail: admin@mtgibsoniron.com.au
More informationASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT
ASX/MEDIA RELEASE 25 November 2009 ASX Codes: EMG, EMGO EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT Beyondie now comprises; Inferred Mineral Resource
More information60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.
30 April 2008 60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. Perilya Limited (ASX: PEM) is pleased to announce a 60% increase in the mineral resource estimate for the
More informationInitial Gold Resource at Sissingue Tengrela Project (Ivory Coast)
ASX/MEDIA RELEASE 27 November 2008 Highlights Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast) Indicated and Inferred resources total 970,000 ounces at 1.9 using 1 cut-off (15.7 million
More informationASX/Media Announcement
ASX/Media Announcement 25 March 2013 MAIDEN HIGH-GRADE JUDY LODE RESOURCE INDICATES POTENTIAL TO INCREASE ANDY WELL MINE LIFE 106,000 ounce high-grade resource (Indicated & Inferred) Judy South (137,000t
More informationNew Drilling Program Commences at Mutiny s Deflector Deposit
New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern
More informationHelix Resources Limited A.C.N Incorporated in Western Australia
Helix Resources Limited A.C.N. 009 138 738 Incorporated in Western Australia 3 rd June 2008 Australian Stock Exchange Limited Via Electronic Lodgement Dear Sirs INITIAL INFERRED RESOURCE ESTIMATE OF 112
More informationPEAK HILL IRON PROJECT MAIDEN DSO INFERRED MINERAL RESOURCE
ASX ANNOUNCEMENT 26 June 2012 PEAK HILL IRON PROJECT MAIDEN DSO INFERRED MINERAL RESOURCE Highlights: Maiden Inferred DSO Mineral Resource of 11.5Mt grading 58.55% Fe estimated at the Telecom Hill East
More informationDeep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia
ASX Announcement ASX Code: DYL 29 October 2010 Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia HIGHLIGHTS Deep Yellow received a Mineral Resource estimate for the INCA uranium
More informationFor personal use only
ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non
More informationExploration targets identified to increase Browns Range Project s mine life
Exploration targets identified to increase Browns Range Project s mine life Highlights Exploration Target estimate demonstrates the potential for very significant increases in Total Mineral Resource at
More informationINFERRED MINERAL RESOURCE AND CONCEPTUAL EXPLORATION TARGET UPDATE Mt FORREST IRON
PRINCIPAL OFFICE Level 2, 25 Richardson Street, West Perth WA 6005 PO Box 92, West Perth WA 6872 T +61 8 9485 2600 F +61 8 9485 2500 www.mindax.com.au ABN 28 106 866 442 Statement to ASX Limited 31 March
More informationFor personal use only
30 May 2012 Potential 500 to 800 million tonne magnetite target zone( * see note below) identified from geophysical data modelling of HELITEM survey at Gabanintha. ASX [YRR]. Web page: www.yellowrock.com.au
More informationHIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT
The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width
More informationHaoma Mining NL DALTONS-MT WEBBER DEPOSIT; UPGRADE TO INDICATED RESOURCE CATEGORY FOR MAIN SOUTHERN ZONE
September 8, 2010 Company Announcements Office Australian Stock Exchange Level 45, South Tower, Rialto 525 Collins Street MELBOURNE, VIC 3000 Dear Sir, Haoma Mining NL A.B.N 12 008 676 177 Registered Office
More informationLATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT
ASX ANNOUNCEMENT 8 March 2011 LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT New true-width intercepts along strike from Katanning Deposit include: o BSRC0050-10m
More informationQUARTERLY REPORT for the Quarter Ended 31 December Jubuk resource drilling imminent.
QUARTERLY REPORT for the Quarter Ended 31 December 2010 HIGHLIGHTS Magnetic Resources NL ABN 34 121 370 232 IRON ORE ASX Codes: MAU and MAUCA Level 2, 16 Ord Street West Perth WA 6005 T +61 8 9226 1777
More informationCENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE
29 August 2011 CENTAURUS EXPANDS JAMBREIRO STUDY WORK AS A RESULT OF EXCELLENT RESULTS IN SOUTH EAST EXTENSION ZONE Outstanding drill results extend scope of Mining Study for Jambreiro Iron Ore Project,
More informationDrilling Program Commences on Iron Oxide Copper Gold Targets
3 June 2008 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 ABN 42 082 593 235 Electronic delivery No of pages: 6 Drilling
More informationASX ANNOUNCEMENT 21 MARCH 2011
ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights
More informationFor personal use only
WOWO GAP PROJECT Resource Mining Corporation Limited (ASX:RMI) 13 December 2011 Outstanding Exploration and Resource Estimation Results at Wowo Gap Nickel Laterite Project Mineral Resource up 52% from:
More informationASX Announcements & Media Release
ASX Announcements & Media Release October 15, 2010 Fast Facts ASX Code: RNS Shares on issue: 62.2 million Cash at bank: $5 million (Sept 2010) Board & Management Rick Hart, Chairman Justin Tremain, Managing
More informationVendetta Mining Intersects Meters of 11.91% Pb+Zn from Zone 5 at the Pegmont Lead-Zinc Deposit
FOR IMMEDIATE RELEASE November 30 th, 2016 (VTT2016 NR # 9) Vendetta Mining Intersects 14.77 Meters of 11.91 Pb+Zn from Zone 5 at the Pegmont Lead-Zinc Deposit Vancouver, BC November 30 th, 2016 Vendetta
More informationNorwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project
ASX ANNOUNCEMENT 4 December 2018 ASX: NWM Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project Norwest Minerals listed on the ASX 29 th November following its successful $6.6
More informationASX:LEG 18 July 2011 ASX Announcement DRILL ASSAYS UPGRADE IRON RESULTS. Drill assays from Melombo North confirm encouraging iron grades and
ASX:LEG 18 July 2011 ASX Announcement DRILL ASSAYS UPGRADE IRON RESULTS Drill assays from Melombo North confirm encouraging iron grades and thicknesses. Iron grades higher than previously reported. Early
More informationMAJOR RESOURCE BOOST FOR QUEENSLAND NICKEL PROJECT
ASX RELEASE January, MAJOR RESOURCE BOOST FOR QUEENSLAND NICKEL PROJECT First resource estimate for rd NORNICO deposit Total combined total resource % higher A maiden resource of. million tonnes has been
More informationExploration Update: RC Drilling Commenced at Lucky Strike
L efroy ASX Announcement LEFROY EXPLORATION LIMITED Western Australian Focused Gold Explorer ASX Code: LEX Shares on Issue: 64.5m Current Share Price: 17c Market Capitalisation: $11m Board of Directors
More informationResource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent*
Resource upgrade at Greater Whitewash Project to 242mt @ 604 Moly Equivalent* 240% increase in tonnage Date: Monday 30 May, 2011 ASX: AQR Share Price: $0.40 Shares on issue: 145,022,440 Market Capitalisation:
More informationFor personal use only
AURIUM RESOURCES LIMITED ACN: 123 821 929 15 Colin Street West Perth WA 6005 Telephone: (08) 6460 0250 Facsimile: (08) 6460 0254 info@aurium.com.au 19 March 2012 Highlights: Peak Hill Iron Project Telecom
More informationNew High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential
ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential
More informationFor personal use only
ASX ANNOUNCEMENT 16 th January 2012 BLACKHAM CONFIRMS MATILDA RESOURCES Blackham completes review of existing Matilda Project Resources 601,000oz inferred resources contained within 6 deposits Includes
More informationMAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES
ASX ANNOUNCEMENT ASX CODE: MMX 3 September 2009 MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL 400-1000 MILLION TONNES Murchison Metals Limited (Murchison) is
More informationFIVE RIGS DRILLING AT KARLAWINDA
FIVE RIGS DRILLING AT KARLAWINDA Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed ASX ANNOUNCMENT 2 September 2016 Australian
More informationMalachite Resources Limited ABN
Malachite Resources Limited ABN 86 075 63 268 ASX Announcement ASX Code: MAR 27 October 20 NEW DRILLING RESULTS AT LORENA SUPPORT COMMENCEMENT OF MINING FEASIBILITY STUDY Malachite Resources Limited (
More informationCaravel commences major new drilling program at Calingiri copper-molybdenum project 8,500-9,000m of RC drilling planned across multiple targets
FOR IMMEDIATE RELEASE: 14 JANUARY, 2015 CVV ASX Shares Outstanding: 727m Caravel commences major new drilling program at Calingiri copper-molybdenum project 8,500-9,000m of RC drilling planned across multiple
More informationKalman Mineral Resource Update
10 September 2008 The Manager Company Announcements Office stralian Stock Exchange Via Online Electronic Lodgement Kalman Mineral source Update The Directors are pleased to announce an updated mineral
More informationFIVE RIGS DRILLING AT KARLAWINDA
FIVE RIGS DRILLING AT KARLAWINDA Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed ASX ANNOUNCMENT 26 August 2016 Australian
More informationVendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project
FOR IMMEDIATE RELEASE August 24 th, 2017 (VTT2017 NR # 9) Vendetta Reports Additional High Grade Drilling Results from Zones 2 and 3 at Pegmont Lead-Zinc Project Vancouver, BC August 24 th, 2017 Vendetta
More informationFURTHER DRILLING SUCCESS AT BARLEE GOLD PROSPECT
FURTHER DRILLING SUCCESS AT BARLEE GOLD PROSPECT ASX RELEASE Stock Exchange ASX: BCN BCNOA BCNO Contact Details Level 2, 46 Ord Street West Perth, WA 6005 PO Box 140 West Perth, WA 6872 Tel: +61 8 9476
More informationHIGHLIGHTS. Drilling intersects wt% recovered DTR concentrate grading 69.8% Fe, including 27 metres in excess of 21% DTR.
DISCOVERY OF LARGE TONNAG E-POTENTIAL MAGNETITE MINERALISA TION FROM HAWSONS IRON PROJECT DRI LLING HIGHLIGHTS Excellent Davis Tube Recovery (DTR) concentrate chemistry reported in drill samples average
More informationHighlights. 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY
9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY Managing Director Simon Noon Directors Richard Monti (Chairman) Peter Harold (Non-exec.) Andrew Parker (Non-exec.) Company
More informationTrouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development
ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com
More informationOption agreement with Randgold set to commercialise Massigui Gold Project
ASX Announcement 4 November 2016 Option agreement with Randgold set to commercialise Massigui Gold Project Option agreement with the Morila mine-operator provides potential low risk and low cost processing
More informationD N HARLEY MANAGING DIRECTOR Attachment: Amended Consultant Report on MG 14 Mineral Resource Estimation.
ABN 32 090 603 642 ASX RELEASE 11 June 2013 AMENDED 2012 JORC REPORT TO ACCOMPANY 6 JUNE 2013 COMPANY UPDATE Following its review of the Company s announcement of 6 June 2013, ASX requested some modifications
More information76,000 Ounce Gold Resource at Akoko North
31 st March 2009 76,000 Ounce Gold Resource at Akoko North 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Scoping study (assuming toll milling) estimates $A24M
More informationWAFM s South Sanaga license in coastal Cameroon
For immediate release 21 October 2014 West African Minerals Corporation ("WAFM" or the "Company") WAFM s South Sanaga license in coastal Cameroon Reconnaissance drilling intersects multiple magnetite gneiss
More informationMundo Minerals Limited
Mundo Minerals Limited Stock Exchange Announcement 10 September 2007 Spectacular RAB Drilling Results From Tocantins 1 metre intersection averaging 242.2 g/t from 6 metres below surface. Further enhances
More informationHits of up to 123gpt show Chesterfield emerging as a high grade gold project
ASX ANNOUNCEMENT 22 August 2013 General Mining Corporation ABN: 95 125 721 075 Hits of up to 123gpt show Chesterfield emerging as a high grade gold project Prospects are ideally located close to existing
More informationMore High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso
ASX/Media Announcement 10 July 2012 More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso New reverse circulation (RC) hole intersections include: o 12m at 20.5 g/t gold from 73m,
More informationNews Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY
June 29, 2007 ASX & TSX: WSA News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY The Board of Western Areas is pleased to announce that the
More information10 BILLION TONNES TOTAL RESOURCES ACHIEVED FROM MAJOR MAIDEN RESOURCE ESTIMATE FOR WESTERN HUB
23 March 2011 The Companies Officer ASX Limited 2 The Esplanade Perth WA 6000 Dear Sir 10 BILLION TONNES TOTAL RESOURCES ACHIEVED FROM MAJOR MAIDEN RESOURCE ESTIMATE FOR WESTERN HUB A substantial increase
More informationP ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT
2 September 2013 ASX Release ASX Code: CXX P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT Highlights Project is on schedule, with completion of the preliminary economic assessment study on target for Quarter
More informationCarrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April
OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred
More informationCo-O MINE MINERAL RESOURCE UPDATE
MEDUSA MINING LIMITED ABN: 60 099 377 849 Unit 7, 11 Preston Street Como WA 6152 PO Box 860 Canning Bridge WA 6153 Telephone: +618-9367 0601 Facsimile: +618-9367 0602 Email: admin@medusamining.com.au Internet:
More informationFor personal use only
Tuesday, 1 March 2011 Companies Announcement Office Australian Securities Exchange Limited Level 6, 20 Bridge Street Sydney NSW 2000 Via E-lodgement Re-commencement of Fe Resource definition drilling at
More informationInferred Resource Estimate of the Muster Dam Magnetite Fe Deposit
Mutooroo Magnetite Project Inferred Resource Estimate of the Muster Dam Magnetite Fe Deposit 2 nd December 2011 Andrew Burtt, Project Geologist 8 th SA Exploration and Mining Conference Adelaide, SA Maiden
More informationWingina Well Gold Resource Update - 4.1g/t in high grade lodes
ASX Announcement 28 October 2016 ASX Code DEG Wingina Well Gold Resource Update - 144,000oz @ 4.1g/t in high grade lodes ABN 65 094 206 292 COMPANY DIRECTORS Simon Lill Executive Chairman Davide Bosio
More informationConsolidated Tin Mines Limited
Snapshot: Current CSD Share Price: $0.060 Current LME Tin Price: $22,950 Key Points Detailed information at www.csdtin.com.au Additional Tin Resource Acquired at Jeannie River Additional 13,440 tonne tin
More informationHigh Grade Gold Intercepts at Bangaba
20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com
More informationMineral Resource for Pilbara Iron Ore Project increased to more than 900 Mt Pilbara Iron Ore Project (PIOP), Western Australia
ASX ANNOUNCEMENT 14 November 2011 Mineral Resource for Pilbara Iron Ore Project increased to more than 900 Mt Pilbara Iron Ore Project (PIOP), Western Australia highlights Further 23% increase to 917 Mt
More information$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre
ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce
More informationFurther High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG
Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Excellent Results Received for the Six BZ Holes Highest grade intercepted was 1 metre at 58 g/t gold
More informationVendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling
FOR IMMEDIATE RELEASE July 25 th, 2017 (VTT2017 NR # 7) Vendetta Reports Initial Results from 2017 Pegmont Program with High Grade Zone 3 Step Out Drilling Vancouver, BC July 25 th, 2017 - Vendetta Mining
More informationHIGH GRADE GOLD FROM RC DRILLING AT BARLEE
HIGH GRADE GOLD FROM RC DRILLING AT BARLEE 11th March 2008 ASX Release Issued Capital 34.2 million shares 16.6 million listed options 6 million unlisted options Share Price 10 cents Market Capitalisation
More informationAuger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor
ACN 121 539 375 Principal Office: Level 2, 23 Ventnor Avenue West Perth 6005 Western Australia Phone: + 61894817344 Fax: + 61894817355 Email: info@westafricanresources.com Web: www.westafricanresources.com
More informationCOARSE GRAINED MAGNETITE DISCOVERED NORTH OF YORK
ASX Release ASX code: MAU 27 April 2012 Level 2, 16 Ord St West Perth WA 6005 PO Box 1388 West Perth WA 6872 Telephone 08 9226 1777 Facsimile 08 9485 2840 info@magres.com.au www.magres.com.au ABN 34 121
More informationMARKET UPDATE ON URANIUM AND GOLD PROJECTS
ASX Announcement 1 March 2011 MARKET UPDATE ON URANIUM AND GOLD PROJECTS HIGHLIGHTS 5,000 metre drilling programme to commence at Rio Puerco uranium project within the next two weeks. Drilling to commence
More informationFor personal use only
ASX Release 2 February 2012 ENCOURAGING DIAMOND DRILLING RESULTS CONTINUE AT THE FEKOLA PROJECT Papillon Resources Limited ( Papillon or the Company ) is pleased to release the assay results from two additional
More informationMarket Release October
Market Release October 21 2009 Extremely High-grade Molybdenite Zone Christened Little Wizard High-Value JORC Resource Defined Near Merlin Decline Drilling Extends New High-grade Molybdenum Discovery at
More informationGOLDSTONE RESOURCES LIMITED ( GoldStone or the Company ) Update on exploration of the Akrokerri licence area, Ghana
11 November 2016 GOLDSTONE RESOURCES LIMITED ( GoldStone or the Company ) Update on exploration of the Akrokerri licence area, Ghana GoldStone Resources Limited (AIM: GRL), the West and Central Africa
More informationBass Metals records further positive drill results & progress at 3 prospects.
16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret
More informationFor personal use only
ASX & MEDIA RELEASE Positive Scoping Study Results for Mount Alexander Magnetite Iron Project. ASX CODE: ZNC Activities Mt Alexander Iron Project Earaheedy Manganese Snake Well Base Metals Details as at
More informationMINERAL RESOURCE AND ORE RESERVE STATEMENT AS AT 31 MARCH 2017
14 July 2017 ASX ANNOUNCEMENT MINERAL RESOURCE AND ORE RESERVE STATEMENT AS AT 31 MARCH 2017 HIGHLIGHTS Group Ore Reserves increased by 3% from 2.13 million ounces to 2.18 million ounces after accounting
More informationFor personal use only
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 28 NOVEMBER 2012 DRILLING UPDATE MABILO PROJECT The Directors of Sierra Mining Limited ( Sierra ) are pleased to announce further results from reconnaissance
More informationINFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA
For Immediate Release November 18, 2002 INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA 110 METRES GRADING 4.08 G/T GOLD
More informationBUNDARRA RESOURCE UPDATE
t Friday 15 April 2011 Company Announcement ASX ANNOUNCEMENT ASX CODE: TMX, TMXOA CAPITAL STRUCTURE TMX - Shares on Issue 217.98m TMXOA - Options on Issue 18.24m - Unlisted Options 56.81m DIRECTORS & KEY
More informationDeveloping the +1.2Moz Pilbara Gold Project
Developing the +1.2Moz Pilbara Gold Project ASX Announcement 20 November 2017 ASX Code DEG FRA Code WKN 633879 Resource infill and extension drilling has commenced at the Toweranna Prospect ABN 65 094
More informationClassification Tonnage (t) Grade Au (g/t) Grade Ag (g/t)
Table 1: 2016 Kizilcukur JORC 2012 compliant Mineral Resource estimate, based on 17 diamond and 26 RC drill holes. Gold equivalent is the sum of the gold ounces and the gold equivalent ounces of silver
More informationFor personal use only
18 April 2013 ASX CODE: KAS OUR PRIME COMMODITY IS TIN HIGHLIGHTS Drilling Confirms Continuity & Grade at Achmmach Drilling on sections 3130mE, 3170mE and 3290mE has successfully confirmed position, continuity
More informationRESOURCE UPDATES ADD OVER 125,000 INFERRED OUNCES TO COOLGARDIE GOLD PROJECT
ASX Release 28 th July 2009 RESOURCE UPDATES ADD OVER 125,000 INFERRED OUNCES TO COOLGARDIE GOLD PROJECT Highlights Resource modelling at the Empress/Alicia, Hillside, Big Blow and Happy Jack deposits
More informationFURTHER DISCOVERY KM COPPER PROJECT
FURTHER DISCOVERY KM COPPER PROJECT ASX Release 24 October 2011 VOYAGER RESOURCES LIMITED ACN 076 390 451 Level 1 / 33 Richardson Street WEST PERTH stralia Tel: +61 8 9200 6264 Fax: +61 8 9200 4469 Contact:
More informationFor personal use only
NOWA NOWA RESOURCE UPGRADE ASX Code: EFE ASX Code: EFE Issued Capital: Issued Capital: 91,835,926 Share Price at Market Capitalisation at Directors Cash Glenn on Goodacre hand at Greg De Ross Directors
More informationCORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.
16 March 2018 Company Announcement Officer ASX Limited 20 Bridge Street SYDNEY NSW 2000 Highlights CORPORATE UPDATE Inaugural Bowdens Reserve Statement due early April. Feasibility Study being finalised
More informationMARCH 2010 QUARTERLY REPORT
MARCH 2010 QUARTERLY REPORT ASX Release HIGHLIGHTS Friday 30 April 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill
More informationHigh Grade Gold Drill Results Extend Buccaneer
ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 14 June, 2012 High Grade Gold Drill Results Extend 31 metres averaging 3.68g/t gold including 14 metres averaging 7.56g/t gold ABM Resources NL ( ABM or The Company
More information("WAFM" or the "Company") WAFM reports discovery of two new zones of iron mineralisation in coastal regions of Cameroon and Sierra Leone
West African Mineral Exploration update for Cameroon and Sierra Leone RNS Number : 5533N West African Minerals Corporation 29 July 2014 For immediate release 29 July 2014 West African Minerals Corporation
More informationFor personal use only
18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand
More informationASX Announcement. Resource Update at Gabanintha Vanadium. Highlights:
ASX Announcement Resource Update at Gabanintha Vanadium Highlights: Total Mineral Resource updated to 183.6Mt at 0.76% vanadium pentoxide (V 2O 5) from massive and disseminated zones consisting of: Measured
More informationNEW COBAR-STYLE COPPER DISCOVERY IN NSW
ASX / MEDIA RELEASE 2 AUGUST 2011 NEW COBAR-STYLE COPPER DISCOVERY IN NSW Broad zone of copper-polymetallic mineralisation intersected at 4-Mile prospect Highlights: Wide zone of copper-silver-gold-lead-zinc
More informationDECEMBER QUARTERLY REPORT
DECEMBER QUARTERLY REPORT Resource Mining Corporation Limited ( RMC ) For the period ended 31 st December 2011 HIGHLIGHTS: Resource Mining Corporation Limited ABN: 97 008 045 083 Updated Mineral Resource
More informationRemaining assay results Tisová Co Au Cu Project Czech Republic
8 January 2018 Market Announcements Platform ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 Remaining assay results Tisová Co Au Cu Project Czech Republic Auroch Minerals Limited (Auroch
More informationKing of the Hills Gold Project, Leonora, to commence production in Q2 2011
King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher
More informationThe Manager Companies ASX Limited 20 Bridge Street
ABN 79 106 879 690 10 July 2012 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, 1.54 Moz Gold Equivalent Maiden Gold/Copper Resource at Wonogiri The Directors
More informationFor personal use only
ASX ANNOUNCEMENT ASX: QNL 31 October 2011 ACTIVITIES REPORT FOR QUARTER ENDED 30 SEPTEMBER 2011 Victory Bore Vanadium Project - 100% The Company announced on October 7 the commencement of a scoping study
More informationFIRST RESULTS FROM RC DRILLING AT KONONGO
ASX Release Monday 29 March 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 FIRST RESULTS FROM RC DRILLING AT KONONGO Signature
More informationCROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT
65 Queen Street West CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT July 6, 2011 Crocodile Gold Corp. (TSX:CRK) (OTCQX:CROCF) (Frankfurt:XGC) (
More informationOposura Scoping Study Nearing Completion
20 AUGUST 2018 KEY POINTS: Oposura Scoping Study Nearing Completion Mining study with open pit optimisations and underground mine designs completed High grade massive sulphide mineralisation occurs near
More informationFor personal use only
6 February 2012 Australian Securities Exchange Exchange Centre 20 Bridge Street Sydney NSW 2000 SIGNIFICANT MAIDEN JORC COMPLIANT RESOURCE FOR EUCLA WEST MINERAL SANDS PROJECT Forge Resources Ltd (ASX:FRG,
More informationFor personal use only
ACN 092 471 513 27 December 2017 ASX Release HIGH GRADE OPEN-PIT GOLD CONFIRMED AT EMPIRE S PENNY S FIND GOLD MINE Further in-pit high grade gold has been confirmed by gold miner, Empire Resources Ltd