1 ASX/Media Announcement 8 October 2014 Korongou Project Exploration Update Field exploration work has re-commenced at Korongou following a two month hiatus due to the rainy season. A 20,000m auger drilling program (approximately 4,000 holes at 200m x 25m spacing) is now underway. A 284 line km Induced Polarisation (IP) and ground magnetic geophysical survey (100m x 25m spacing) is scheduled to start on 10 October Consultants have been engaged to reprocess existing aeromagnetic data and to produce a structural interpretation of Korongou. Golden Rim Resources Ltd (Golden Rim and Company, ASX: GMR) today announced it has recommenced its field exploration activities at Korongou, Burkina Faso. Auger drilling is underway and other planned exploration activities including the IP and ground magnetic surveys will commence this week. Golden Rim s Managing Director, Craig Mackay, said The Company is excited about the recommencement of work at Korongou following the rainy season. We are looking forward to following up on our previous successful auger drilling program results and to identify new gold mineralisation targets beneath the shallow soil and laterite cover Shareholders can look forward to a steady news flow from Korongou over the next three to four months. Golden Rim believes there is potential to discover a large gold deposit at Korongou beneath the shallow cover and, subject to the outcome of the auger drilling and geophysical programs, the Company is scheduling an RC drilling program to test new target areas early in the new year, Mr Mackay said. Auger Drilling The auger drilling program will comprise approximately 4,000 holes and will total around 20,000m. Two power auger rigs are being used for the program with holes initially planned on a 200m x 25m pattern. The drilling program is expected to take approximately three months to complete. Earlier this year, auger drilling outlined a substantial gold anomaly at the Banouassi Prospect under shallow laterite and soil cover. The anomaly covers an area of 1.2km x 0.2km and includes peak sample results of 2,017 ppb, 1,622 ppb, 1,616 ppb and 1,593 ppb gold (Figure 1). The anomaly extends west from the Kom Line of artisanal workings and remains open to the west. The auger sample results suggest large areas of Korongou outside the artisanal workings and under shallow cover may be gold mineralised _1
2 The new program is intended to systematically extend the bedrock geochemical coverage over a much larger portion of Korongou. Geophysical Survey A 284 line kilometre IP and ground magnetic geophysical survey (100m x 25m spacing) is scheduled to commence across selected areas of Korongou on 10 October The survey will be conducted by SAGAX Afrique and is expected to take two months to complete. The data from the geophysical survey will be integrated with the auger drilling results to delineate new gold targets for RC drill testing. Aeromagnetic Processing and Structural Interpretation The Company has engaged a consultant geophysicist to reprocess the existing aeromagnetic data over Korongou and to identify possible magnetite destruction areas (magnetic lows) that may be related to hydrothermal alteration associated with gold mineralisation. Further, the Company has also engaged a specialist geologist to carry out a structural interpretation of Korongou. Both the geophysical and structural interpretations are being conducted to assist in determining priority areas for the on-going auger drilling program. -ENDS- For further information, please contact: Craig Mackay Hayley Butcher Golden Rim Resources Golden Rim Resources Managing Director Company Secretary Page 2
3 Figure 1. Location of prospects, gold mineralised shear structures (red lines), areas of auger drilling and planned IP/ground magnetic survey area, over satellite imagery at Korongou. Page 3
4 Photograph 1. Golden Rim s auger rig in operation at Korongou. Photograph 2. Golden Rim geologists logging the drill cuttings from the auger rig. Each pile represents a down hole metre. Page 4
5 The information in this report relating to previous exploration results is extracted from the announcement Substantial Gold Anomaly Outlined at Korongou dated1 August 2014 and has been reported in accordance with the 2012 edition of the JORC Code. This announcement is available on the Company s website ( The Company confirms that it is not aware of any new information or data that materially affects the information included in this announcement. Further Company Information E: info@goldenrim.com.au W:goldenrim.com.au Capital Structure Issued Shares: 1,033,356,887 Unlisted Options: 96,000,000 Major Shareholders Aurora Minerals 9.95% Acorn Capital 8% Royal Group, Abu Dhabi 5.27% Share Registry Security Transfer Registrars Pty Ltd 770 Canning Highway APPLECROSS WA 6153 AUSTRALIA T: F: E: registrar@securitytransfer.com.au Page 5
New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso
ASX/Media Announcement 24 May 2013 New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso A new zone of high grade gold mineralisation has been discovered 1km NE along strike from
More informationNew Zone of High Grade Gold Discovered at Balogo
ASX/Media Announcement 12 November 2013 New Zone of High Grade Gold Discovered at Balogo A broad zone of high grade gold mineralisation (Panga Lodes) has been discovered 600m north of the Netiana Lodes.
More informationBalogo Exploration Update
ASX/Media Announcement 4 October 2013 Balogo Exploration Update Field exploration work has re-commenced at Balogo, following the wet season. A 2,500m infill auger drilling program has commenced over the
More informationNew Gold Anomalies Outlined at Yako, Burkina Faso
ASX/Media Announcement 21 March 2013 New Gold Anomalies Outlined at Yako, Burkina Faso Significant new gold-in-soil anomalies identified. Highly-anomalous results with auger samples returning grades up
More informationFor personal use only
ASX/Media Announcement 16 May 2011 Major Copper-Gold Discovery at Balogo in Burkina Faso Broad high grade copper and gold intercepts obtained from reverse circulation drilling program at the Balogo Project.
More informationFurther Extensions to the Netiana Lodes at Balogo, Burkina Faso
ASX/Media Announcement 18 January 2013 Further Extensions to the Netiana Lodes at Balogo, Burkina Faso All assays from the recent diamond and reverse circulation drilling have been received. New intersections
More informationMore High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso
ASX/Media Announcement 10 July 2012 More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso New reverse circulation (RC) hole intersections include: o 12m at 20.5 g/t gold from 73m,
More informationDiamond Drilling Extends the Netiana Lodes at Depth
ASX/Media Announcement 21 December 2012 Diamond Drilling Extends the Netiana Lodes at Depth New diamond hole intersections include: o 13m at 22.0 g/t gold from 42m, including 1m at 123 g/t gold from 42m
More informationEXPLORATION ACTIVITY TO RECOMMENCE AT KOURI GOLD PROJECT IN BURKINA FASO
ASX/Media Announcement 26 April 2017 EXPLORATION ACTIVITY TO RECOMMENCE AT KOURI GOLD PROJECT IN BURKINA FASO Exploration program targeting the definition of a maiden JORC Mineral Resource by the end of
More informationEXPLORATION UPDATE. ASX/Media Announcement. Drilling at Banouassi Prospect, Kouri. 26 September Kouri Gold Project, Burkina Faso
ASX/Media Announcement 26 September 2017 EXPLORATION UPDATE Kouri Gold Project, Burkina Faso Major drilling program to commence shortly at the Banouassi Prospect comprising approximately 1,500m (12 holes)
More informationAdditional Significant Gold Intercepts Obtained in Sweden
ASX/Media Announcement 18 November 2009 Additional Significant Gold Intercepts Obtained in Sweden Golden Rim Resources Ltd (ASX: GMR, Golden Rim) today announced it had received additional significant
More informationSepola Project Area in Mali Extended
ASX Release 4 June 2009 Golden Rim Resources Ltd ABN 39 006 710 774 www.goldenrim.com.au Head Office Level 2 10 Outram Street WEST PERTH WA 6872 AUSTRALIA T: + 61 8 9481 5758 F: + 61 8 9481 5759 Exploration
More informationASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike
ACN 121 539 375 Principal Office: Level 2, 23 Ventnor Avenue West Perth 6005 Western Australia Phone: + 61894817344 Fax: + 61894817355 Email: info@westafricanresources.com Web: www.westafricanresources.com
More informationHighlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate
29 th July 2010 June December 2010 Quarterly Report Report 2008 Highlights Wa Project Kandia Prospect» RC drilling defines open ended zones of sediment hosted gold mineralisation at the site of the Kandia
More informationMINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS
1 November 2007 MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS Highlights Very high gold-in-soil sample results up to 17.3 g/t gold have been received from the Banana Creek Prospect.
More informationFor personal use only
ASX/Media Announcement 16 July 2015 Initial Exploration Target Defined for Korongou Further zones of significant bedrock gold mineralisation discovered in Phase 3 RC drilling within the Guitorga auger
More informationASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011
4 July 2011 ASX Announcement New economic gold results confirm Dave East as an exciting new discovery Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com
More informationRC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season
29 th October 2010 September December Quarterly 2010 Quarterly Report 2008 Report Highlights RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season Major drill programs
More informationNorwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project
ASX ANNOUNCEMENT 4 December 2018 ASX: NWM Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project Norwest Minerals listed on the ASX 29 th November following its successful $6.6
More information» Mineralisation up to 45m wide and open along strike and down dip. Infill and extensional drilling completed. Results awaited.
11th April 2011 March December 2011 Quarterly Quarterly Report Report 2008 Highlights Significant New Gold Discovery along Kandia Trend» RC drilling has confirmed persistent bedrock gold mineralisation
More informationAuger Drilling Progress Report - Meguet Trend Prospect Multiple Highly Anomalous Gold Discoveries within 8km Mineralised Corridor
ACN 121 539 375 Principal Office: Level 2, 23 Ventnor Avenue West Perth 6005 Western Australia Phone: + 61894817344 Fax: + 61894817355 Email: info@westafricanresources.com Web: www.westafricanresources.com
More information$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre
ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce
More information704,000 OUNCE MIYABI GOLD PROJECT UPDATE
704,000 OUNCE MIYABI GOLD PROJECT UPDATE ASX/ RELEASE 21 April 2016 ASX code RVY Board of Directors: Geoff Gilmour Managing Director Greg Cunnold Technical Director Graeme Clatworthy Non-Executive Director
More informationAuger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit
ACN 121 539 375 Principal Office: Level 2, 23 Ventnor Avenue West Perth 6005 Western Australia Phone: + 61894817344 Fax: + 61894817355 Email: info@westafricanresources.com Web: www.westafricanresources.com
More informationFor personal use only
17 December 2012 ASX ANNOUNCEMENT Mining at Zeta Pit ASX/BSE: DML MARKET CAPITALISATION Shares on Issue 487m Share Price A$1.62 Market Cap A$789m Cash (7 Dec) US$72.8m Debt (7 Dec) US$205m ABN 29 104 924
More informationFor personal use only
18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand
More informationNew Drilling Program Commences at Mutiny s Deflector Deposit
New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern
More informationDrilling program commences on Cloncurry and Mount Isa projects
1P P May UASX/Media Announcement st 2009 Drilling program commences on Cloncurry and Mount Isa projects Key Points 1,700 metres reverse circulation drilling program over two prospects on untested geochemical,
More informationFor personal use only
ASX ANNOUNCEMENT 8 June 2016 Aeromagnetic Interpretation Identifies Pinnacles Targets ASX: NXM Capital Structure Shares on Issue 70.4 million Unlisted Options 3.5 million Corporate Directory Mr Paul Boyatzis
More informationFor personal use only
ASX Announcement 15 March 2017 HIGHLIGHTS Drill contractors have been engaged with drilling to commence April 2017 pending access approvals Two mineralised lodes within the oxide volcanogenic massive sulphide
More informationHigh Grade Gold Intercepts at Bangaba
20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com
More informationCORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.
16 March 2018 Company Announcement Officer ASX Limited 20 Bridge Street SYDNEY NSW 2000 Highlights CORPORATE UPDATE Inaugural Bowdens Reserve Statement due early April. Feasibility Study being finalised
More informationFor personal use only
15 October 2010 ASX/Media Release 17 July 2012 Paste Fill Approval and New Drilling Program at Dargues Reef Initial focus on high priority near-mine gold targets Approval received for use of paste-fill
More informationDrilling Commences at Telfer West Gold Project
Level 7, 600 Murray Street West Perth WA 6005 PO Box 273 West Perth WA 6872 P 08 9486 9455 F 08 6210 1578 www.enrl.com.au 17 November 2016 ASX : ENR Company Announcements Office Australian Securities Exchange
More informationASX Release. 16 December 2010 LIMITED. EXPLORATION UPDATE Highlights
ASX Release EXPLORATION UPDATE Highlights Bonsiega Joint Venture tenements minimum expenditure commitment met by 30 November 2010 Commencement of power auger bedrock drilling program at Fouli Prospect
More informationASX Announcement. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX: AX8 HIGHLIGHTS. Market Data. Board and Management.
FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX Announcement Market Data ASX Code: AX8 Shares on Issue: 47,620,000 Board and Management Grant Mooney Non-Executive Chairman Andrew
More informationFor personal use only
ASX and Media Release 22 June 2018 CÁRMENES COBALT-COPPER PROJECT SPAIN DRILLING APPROVALS GRANTED AND NEW HIGH- PRIORITY TARGETS GENERATED NEAR PROFUNDA COBALT-COPPER MINE ACN 143 042 022 Suite 1, 6 Richardson
More informationBURACOPPIN EXPLORATION UPDATE
BURACOPPIN EXPLORATION UPDATE Exploration program underway at Burracoppin Gold Project in WA 6 December 2018 Airborne EM survey completed over E70/4688 Grant of adjoining E70/5154 significantly increases
More informationFor personal use only
ASX:LEG 10 July 2014 Fraser Range Aeromagnetic Survey Identifies Targets Seven priority targets considered prospective for nickel-copper Targets interpreted to relate to intrusive mafic/ultramafic bodies
More informationFor personal use only
ASX Announcement 23 May 2014 DORAY FARMS IN TO EXCITING NEW GOLD PROJECT Doray to explore highly prospective Horse Well Gold Project in north-eastern Goldfields through Joint Venture with Alloy Resources
More informationFor personal use only
ASX ANNOUNCEMENT 23 May 2017 KAIROS SET TO COMMENCE NEXT PHASE OF GOLD DRILLING AT ROE HILLS AHEAD OF SCHEDULE Highlights: 5,000m aircore/rc drilling campaign to begin immediately following current cobalt
More informationHIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT
8 February 2016 HIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT Results further confirm Lake Wells Potash Project has potential to host a major potash resource
More informationMOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE
ASX/Media Announcement 20 th September 2010 MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE MT DOROTHY: Phase 2 diamond drilling to commence. ELAINE DOROTHY New copper zone discovered and to be drilled.
More informationNEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA
28 NOVEMBER 2018 ASX/MEDIA RELEASE NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA Drilling underway targeting high-grade underground extensions of Zoroastrian
More informationFor personal use only
31 Ord Street, West Perth WA 6005 PO Box 1941, West Perth WA 6872 +61 8 9322 1003 australianpotash.com.au ABN 58 149 390 394 5 September 2017 EXPLORATION UPDATE AHEAD OF GOLD DRILLING YAMARNA GOLD PROJECT
More informationASX Announcement AUGER DRILLING ACCELERATED WITH FOUR RIGS ON SITE
Level 5 56 Pitt Street Sydney NSW 2000, Auralia Tel: +61 2 8823 3100 Fax: +61 2 9252 8466 ABN: 53 121 582 607 21 November 2016 AUGER DRILLING ACCELERATED WITH FOUR RIGS ON SITE Summary Ø Planned 40,000m
More informationFIVE RIGS DRILLING AT KARLAWINDA
FIVE RIGS DRILLING AT KARLAWINDA Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed ASX ANNOUNCMENT 2 September 2016 Australian
More informationHIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT
The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width
More informationCANYON TO ACQUIRE TWO GOLD PROJECTS IN BURKINA FASO Highlights
Canyon Resources Limited ACN 140 087 261 Suite 2 Ground Floor 10 Outram Street West Perth WA 6005 ASX RELEASE 2 September 2010 CANYON TO ACQUIRE TWO GOLD PROJECTS IN BURKINA FASO Highlights Canyon has
More informationSignificant New Gold Discovery along Kandia Trend
9 th March 2011 ASX Announcement Significant New Gold Discovery along Kandia Trend RC drilling has confirmed persistent bedrock gold mineralisation over 2.5km of strike along Kandia Trend Results include
More informationGEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,
20 June 2008 Companies Announcement Office Via Electronic Lodgement GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT, Fiji. (Geopacific
More informationSTEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE
November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE
More informationFor personal use only
22 April 2013 Drilling to commence at Majada, Copper-Gold Prospect, Chile. Red Gum Resources Limited (ASX: RGX, Red Gum or the Company ) is pleased to announce that drilling of its Majada Copper-Gold Prospect,
More informationFURTHER DISCOVERY KM COPPER PROJECT
FURTHER DISCOVERY KM COPPER PROJECT ASX Release 24 October 2011 VOYAGER RESOURCES LIMITED ACN 076 390 451 Level 1 / 33 Richardson Street WEST PERTH stralia Tel: +61 8 9200 6264 Fax: +61 8 9200 4469 Contact:
More informationAlligator prepares to drill its advanced TCC4 uranium prospect - 21 August 2018
Alligator prepares to drill its advanced TCC4 uranium prospect - 21 August 2018 Highlights Alligator preparations for its inaugural drilling program on its most advanced uranium prospect at TCC4 in the
More informationFor personal use only
ASX ANNOUNCEMENT By e-lodgement 7th April 2017 Ground Magnetics Highlights Targets on 20km Gold Anomaly, Korhogo Project Cote d Ivoire (, the Company) is pleased to report first geophysical images have
More informationFor personal use only
Alloy Regains Control of the Horse Well Gold Project ASX Release 29 January 2018 Capital Structure ABN 20 109 361 195 ASX Code AYR Issued Shares 1,266,993,360 Unlisted Options 29,000,000 Corporate Directory
More informationHampton Hill Mining NL
Hampton Hill Mining NL Second Floor, 9 Havelock Street West Perth WA 6005 Mailing Address: PO Box 689 West Perth WA 6872 ABN 60 606 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email:
More informationFor personal use only
Derosa Project Update - Burkina Faso 20th March 2013 Highlights The Bompela artisanal area continues to increase in potential with an open pit now being excavated by artisanal gold miners. A new active
More informationNorthern Mining Limited 2012 Annual General Meeting Presentation
NORTHERN MINING LIMITED Northern Mining Limited 2012 Annual General Meeting Presentation www.northernmining.com.au 23 November 2012 NORTHERN MINING LIMITED DISCLAIMER This presentation has been prepared
More informationEXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT
The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 20 September 2010 EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT Boddington South Gold
More information******************* *******************
This announcement lifts the trading halt requested by the Company on the 13 September 2012 Announcement to the Australian Securities Exchange Monday 17 September 2012 COMPANY UPDATE PARTIALLY UNDERWRITTEN
More informationNew zones of mineralisation found close to flagship deposits at Wa Gold Project
New zones of mineralisation found close to flagship deposits at Wa Project ASX / Media Release ASX Code AZM Tuesday 6 th July 2010 Aircore drilling program commences at Kjersti prospect RC drilling continues
More informationRichard Poulden, Executive Chairman of Wishbone Gold said:
Wishbone Gold Plc / Index: AIM / Epic: WSBN / Sector: Natural Resources 17 July 2013 Wishbone Gold Plc ( Wishbone Gold or the Company ) Positive Exploration Update on Hanging Valley Prospect, Wishbone
More informationStrong gold values at Drake s Seimana Gold Project in Guinea
ASX Announcement 30 July 2012 Strong gold values at Drake s Seimana Gold Project in Guinea Major regional soil & termite mound geochemical programme completed at Seimana, Guinea Many strong gold anomalies
More informationFor personal use only
MEDIA RELEASE 12 April 2017 CITADEL PROJECT RIO TINTO FUNDED 2017 EXPLORATION PROGRAMME Highlights Proposed Rio Tinto Exploration Pty Limited ( Rio Tinto ) funded Exploration Programme for 2017 calendar
More informationFor personal use only
MEDIA RELEASE 18 February 2019 ANTIPA TO COMMENCE MAJOR GREENFIELDS EXPLORATION PROGRAMME ON ITS 100% OWNED PATERSON PROVINCE TENEMENTS Highlights Commencement of a 20,000m drilling programme in early
More informationQuarterly Activities Report
Quarterly Activities Report For the period ended 30 September 2014 Golden Rim Resources Ltd (ASX: GMR) is active in West Africa, with a pipeline of gold projects covering over 5,000km 2 in the highly prospective
More informationDrilling Program Commences on Iron Oxide Copper Gold Targets
3 June 2008 Manager Company Announcements Company Announcements Office Australian Stock Exchange Limited Level 10, 20 Bond Street SYDNEY NSW 2000 ABN 42 082 593 235 Electronic delivery No of pages: 6 Drilling
More informationQuarterly Report For the period ended 30 th September 2011
31 October 2011 ASX Announcement Quarterly Report For the period ended 30 th September 2011 Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08)9481 7939 w www.predictivediscovery.com
More informationASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT
ASX/MEDIA RELEASE 25 November 2009 ASX Codes: EMG, EMGO EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT Beyondie now comprises; Inferred Mineral Resource
More informationFor personal use only
ASX ANNOUNCEMENT By e-lodgement 30 October 2012 QUARTERLY ACTIVITIES REPORT SEPTEMBER 2012 Apollo Consolidated Limited (ASX: AOP, Company) is pleased to provide an update on activities for the quarter
More informationHits of up to 123gpt show Chesterfield emerging as a high grade gold project
ASX ANNOUNCEMENT 22 August 2013 General Mining Corporation ABN: 95 125 721 075 Hits of up to 123gpt show Chesterfield emerging as a high grade gold project Prospects are ideally located close to existing
More informationEXTENSIVE GOLD TREND DISCOVERED AT THE BASAWA GOLD PROJECT, LIBERIA
Suite 9, 5 Centro Ave, Subiaco WA 6008 P.O. Box 457, West Perth, WA 6872, Australia Ph+61 8 9286 3045 Fax: +61 8 9226 2027 info@birimiangold.com ABN 11 113 931 105 11 April 2012 The Company Announcements
More informationATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005
ABN 63 110 396 168 FOR THE PERIOD ENDED 31 About Atlas Gold Limited The Company has four projects at varying stages of exploration located at Farrel Well, Pardoo, Mt Minnie and Pearana in the Pilbara region,
More informationThe Company was admitted to the Official List on 12 November 2010 and its shares commenced trading
ASX ANNOUNCEMENT ST GEORGE MINING LIMITED ASX: SGQ ACN 139 308 973 Level 1, 115 Cambridge Street PO Box 1305, West Leederville WA 6007 www.stgeorgemining.com.au Phone +618 9322 6600 Facsimile +618 9322
More informationFor personal use only
12 September 2012 ASX RELEASE ASX Code: WAC FIRST PASS FIELD WORK COMPLETED AT PERU IOCG TARGETS Site visits and reconnaissance sampling has been completed at the Yauca and Chaparra Iron Oxide Copper Gold
More informationGold Exploration Update
ASX Announcement 26 October 2009 Gold Exploration Update The Directors of D Aguilar Gold Limited (ASX Code: DGR) are pleased to provide the following update on the Rannes and Clermont gold exploration
More informationMt Carrington Porphyry Copper Exploration Program Commencement of Electrical Geophysics
ASX and Media Release: 11 November 2014 ASX Code: WRM Mt Carrington Porphyry Copper Exploration Program Commencement of Electrical Geophysics White Rock Minerals Ltd (White Rock) announces it will shortly
More informationHigh Grade Gold Unearthed at Kouri
ASX/Media Announcement 12 November 2018 High Grade Gold Unearthed at Kouri Highlights: Trenching Trenching in the Mineral Resource area has exposed significant new gold mineralisation located immediately
More informationFor personal use only
DIRECTORS Mr Martin Blakeman Executive Chairman Mr Winton Willesee Non-Executive Director Mr Eric de Mori Non-Executive Director COMPANY SECRETARY Mr Winton Willesee ASX Release 28 August 2012 Newera Commences
More informationACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA
ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA HIGHLIGHTS New claims staked covering ~9km 2 to secure a 100% interest in the McCleery Copper-Cobalt Project in the Yukon Territory, Canada ABN
More informationGold Discovery at Tasiast South in Mauritania. May 2012
. Gold Discovery at Tasiast South in Mauritania May 2012 Company interests Corporate profile ASX Code: Share price:* DRK 19c Shares on issue: 82.5M Market capitalisation: Cash position: A$16.5M A$6.18M
More informationMT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT HIGHLIGHTS
MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT ASX RELEASE 21 MARCH 2011 HIGHLIGHTS Recently completed auger soil geochemistry program has defined a 130m
More informationFor personal use only
7 December 2017 ASX Announcement Kooline Lead Silver Project Expansion Highlights: HOA - Kooline Expansion Surefire consolidates tenement holding to cover whole of the Kooline Lead/Silver field. New Licence
More informationFor personal use only
ASX/Media Announcement 24 October 2016 Magneto-Telluric (MT) Survey Suggests Significant Extensions to the Mineralisation at Paguanta Summary Golden Rim has completed a 12 line-km Magneto-Telluric (MT)
More informationFor personal use only
BOARD OF DIRECTORS Mr Oscar Aamodt Non-Executive Chairman Ms Sofia Bianchi Non-Executive Director Mr Lindsay Dudfield Non-Executive Director Mr Anthony Ho Non-Executive Director ISSUED CAPITAL SHARES 156,852,955
More informationASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM
ASX RELEASE 4 April 2007 REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM The Directors of Hemisphere Resources Limited ( Hemisphere or the Company ) are pleased to announce that a review has been conducted
More informationFor personal use only
CLASSIC CONTINUES HUNT FOR HIGH GRADE GOLD WITH COMMENCEMENT OF RC DRILLING PROGRAM Highlights: ~3000m of RC drilling underway at Kat Gap, Lady Lila, Lady Magdalene and Van Uden West Assay results expected
More informationROE HILLS COBALT AND GOLD DRILLING ADVANCES
ASX ANNOUNCEMENT 22 June 2017 ROE HILLS COBALT AND GOLD DRILLING ADVANCES Aircore drilling completed to test ROE-1 cobalt prospect with assays awaited; RC drilling now underway targeting three high-priority
More informationDeveloping the +1.2Moz Pilbara Gold Project
Developing the +1.2Moz Pilbara Gold Project ASX Announcement 20 November 2017 ASX Code DEG FRA Code WKN 633879 Resource infill and extension drilling has commenced at the Toweranna Prospect ABN 65 094
More informationKINGSTON RESOURCES LIMITED
KINGSTON RESOURCES LIMITED ASX:KSN ACN 009 148 529 9 April 2015 Company Announcements Office Australian Securities Exchange Six Mile Hill Exploration Update - April 2015 Highlights: Detailed 3D gravity
More informationKouri Mineral Resource Exploration Update
ASX/Media Announcement 24 May 2018 Highlights: Kouri Mineral Resource Exploration Update Exploration Strategy Exploration continues at Kouri, focusing on expanding the maiden 1 million ounce gold Indicated
More informationROX DEFINES STRONG IP ANOMALIES AT PHA LUANG
ASX/MEDIA RELEASE ROX DEFINES STRONG IP ANOMALIES AT PHA LUANG Rox Resources (ASX: RXL, Rox ) has completed Induced Polarisation ( IP ) surveys at its Pha Luang zinc project in Laos. The survey was conducted
More informationCompletion of Orinoco s Maiden Antena - Xupé Diamond Drilling Campaign
ASX/Media Release 24 August 2018 Completion of Orinoco s Maiden Antena - Xupé Diamond Drilling Campaign Excellent results achieved from the recently completed maiden drilling campaign at Antena Xupé prospect
More informationGOULAMINA DRILLING AND GENERAL PROGRESS UPDATE
21 November 2017 GOULAMINA DRILLING AND GENERAL PROGRESS UPDATE HIGHLIGHTS RC drilling at Danaya and Yando completed. RC drilling at Danaya intersects very wide (>117m) spodumene bearing pegmatite zone.
More informationAirborne EM Survey Confirms Multiple VMS Targets at Collerina
ASX Announcement 2 February 2017 Airborne EM Survey Confirms Multiple VMS Targets at Collerina A 600 line kilometre VTEM Max helicopter borne geophysics survey has been completed over the 25 kilometres
More informationNew High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential
ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential
More informationSipa Resources Limited
30 October 2012 Sipa Resources Limited ABN 26 009 448 980 September Quarter 2012 Quarterly ASX Report HIGHLIGHTS The September Quarter, and through October, has seen a very high level of drilling and geophysical
More informationDECEMBER QUARTERLY REPORT
DECEMBER QUARTERLY REPORT Resource Mining Corporation Limited ( RMC ) For the period ended 31 st December 2011 HIGHLIGHTS: Resource Mining Corporation Limited ABN: 97 008 045 083 Updated Mineral Resource
More information