Mineral Resource Management. Rod Quick Project Evaluation

Size: px
Start display at page:

Download "Mineral Resource Management. Rod Quick Project Evaluation"

Transcription

1 Mineral Resource Management Rod Quick Project Evaluation

2 Mineral resource management at New Barrick Manage the orebody from gold in the ground to value for all stakeholders only possible through ownership of the orebody MRM are empowered on the mines to own the orebody but are held accountable for the orebody understanding and estimation Responsible for resource sustainability and thus responsible for feasibility and replenishment gatekeepers to ensure reserves pass our filters We are in the consumptive business and if we do not replenish we will die Superior orebody knowledge minimizes technical risk and ensures optimised mine plans Long term planning is critical allows us to be pre-emptive and not reactive

3 Kibali a case study of getting the geology right First visit in 2006 identified significant mineralisation and alteration system with folding and plunging shoots in interesting rocks Used BIF, chert, and carbonaceous argillite markers and stratigraphic younging direction and changing orientation of bedding to model folding Pale coloured ankerite, and/or siderite, quartz, and sericite alteration is the widespread alteration assemblage. ACSA _A An overprint assemblage of texturally destructive siderite and pyrite with minor quartz. ACSA_B Disseminated magnetite within ACSA-A and B altered rocks can be used to map the extent of BIF horizons in the protolith. Principal lodes are hosted in vein and disseminated pyrite associated with the ACSA-B assemblage. Gold generally occurs as inclusions in both disseminated and vein pyrite, and small grains along the margins of pyrite. Curviplanar mineralized BIF extends: around the hinges of the folds, locally along the limbs of the folds Only rarely extends along the axial surfaces of the folds, The resulting lodes have complex shapes, but an overall northeast plunge parallel to the fold axes Understanding the controls to mineralisation led to efficient conversion of resource to reserve within 1 year we doubled the reserve from 4g/t to 4.2g/t As of Dec 2017 we have added 3.7g/t to the acquisition reserve.

4 Kibali a case study of getting the geology right Distribution of ounces per vertical meter drove the decision of shaft access Geological, resource and geotechnical model defined the mining method Understanding of rock hardness and gold deportment drove metallurgical response and process plant design Hydration and oxidation of siderite alteration explained backfill properties Defining the geometry and character of the orebody allows for infrastructure decisions that enhance value 5,800 5,700 5,600 5,500 5,400 5,300 5,200 5,100-50,000

5 Strategic filters for investment Striving to be the world s most valued gold mining business By finding, developing and owning the best assets, with the best people, to deliver sustainable returns for our owners and partners FILTERS It applies principally to gold (copper) It is located in a world class geological gold district We have the right to mine and repatriate profits It fits our values in respect to social license, political risk, environmental compliance, manage closure liability We have active management participation It enhances our strategic partnering network Tier 1 A reserve potential greater than 5 million ounces of gold and at least a 15% IRR at the long term gold price Tier 2 A reserve potential of greater than 3 million ounces of gold and least a 20% IRR at a long term gold price

6 A large pipeline of potential projects Alturas Scoping Prefeasibility Feasibility Execution/Extensions Pueblo Viejo expansion Goldrush Deep South Loulo 3 OP-UG Massawa Turquoise Ridge Ikamva Kalimva Zaldivar Expansion Norte Abierto Yalea Gara Kibali

7 Goldrush Project potential Tier 1 asset Drill program from decline will allow optimisation Orebody optimisation in indications are that infill drilling results in increase of grade and ounces Geotechnical modelling Mining method optimisation Backfill optimisation Material handling Mining Method(s) Orebody Access Feasibility (completed 4Q17) Underground only Refractory Ore Transport (to processing) Processing Initial Capital Est. Production COS per ounce ~$749 AISC 1 per ounce ~$643 Declines from Cortez Hills Operations Trucks Goldstrike Roaster ~$1.0B ~ 500K oz/yr 1. This is a non-gaap reporting measure with no standardized meaning under IFRS.

8 Massawa feasibility project Interim resource model update highlights significant shift in grade distribution within CZ orebody higher grades in the southern portion and lower grades in northern half Revised financial models support a robust project at $1,000 and current gold prices Potential exists to add resources to the mine life from extensions to existing pits, as well as advanced satellite targets which are showing economic potential Metallurgical recovery models updated and recovery model curves assigned to block model to report recoverable gold within pit optimisations Sofia North recovery optimised through addition of Aachen oxygen injection technology follow up campaign returned 2.6% higher recovery for fresh material now modelled at 85.5% Construction capital cost remains largely in line with previous estimate at $415 million Initial steps of public participation process undertaken Bambaraya (18 km) Resource Sofia (10.7km) 2.9g/t Ore reserve NPV and IRR Sensitivities to gold price Option $1 000/oz $1 200/oz $1 400/oz Base case Tina Resource Delya Main (18km) 4.8g/t Ore reserve KB & Kaviar Under evaluation Delya Strike Extents Under evaluation North Zone 4.5g/t Ore reserve Central Zone 3.4g/t Ore reserve Central Zone Extensions Under evaluation NPV $154m $414m $670m IRR 15% 29% 41%

9 Loulo 3 scoping study Preliminary economic assessment completed with potential for expanded pit and underground project Open pit pushback forms part of existing Loulo ore reserves Drilling beneath pit focused on high grade shoot below southern section of pit within MZ2 structure Underground mineralisation 32% drilled to a level that would support inferred mineral resources 68% defined by drilling and confirms continuity of mineralisation Unclassified material included in evaluation for scoping purposes Composite metallurgical samples from 32 drill intersections returned average leach recovery of 85% L3DH g/t L3DH g/t Target Summary: L3DH g/t MZ1 L3DH g/t MZ1 Target (48 drill holes) MZ2 Target (18 drill holes) Current depletion 200m L3DH g/t MZ2 Q4 Proposed Drilling Previous Drilling Notes: Target summary from diamond drilling at the spacing shown. There are insufficient exploration results to report a resource, and it is uncertain that further exploration will result in a resource estimate. Long-section with Q3 drilling N US$ 1000/oz pit shell US$ 1500/oz pit shell L3DH g/t L3DH g/t -280m RL Q4 drill limit Gram.Metre Value <15

10 Yalea +11g/t added to the mine plan YaDH g/t TW Yalea Transfer Zone extra ounces YDH g/t TW YaDH g/t TW Long-section with Q3 drilling N YaDH g/t TW YaDH g/t TW Purple Patch Yalea Central Deep extra ounces YDH g/t TW 100m YaDH g/t TW YDH g/t TW High Priority Targets 1000m Conceptual Targets (New) 280m Conversion Shoot target Proposed ADGC Drilling 500m Proposed Exploration Drilling Conversion and Exploration Target Summary: Yalea Transfer Zone (15 drill holes) Yalea FW Panel (15 drill holes) Size: 500m strike x 100m VD Size: 1000m strike x 280m VD Wt. Av. Grade: 13.3g/t (range 5.7 to 19.9g/t) Wt. Av. Grade: 4.1g/t (range 0.14 to 8.41g/t) Av. Thickness: 11.4m (range 2.4 to 21.7m) Av. Thickness: 5.3m (range 2.5 to 11.4m) Yalea North targets Gold g/t >8g/t 4-8g/t 4 3g/t 3 2g/t 2-0.7g/t

11 Turquoise Ridge1, Minex Drilling1,2 North Zone Getchell extended to NW by 125m TS m at 16.9 g/t TS m at 11.1 g/t Footwall Pond Extension extended to W by 55m and N by 35m TS m at 18.2 g/t, 4.7m at 9.6 g/t Bass Pond East project extended to NE by 120m TS1804 A - 6.7m at 15.3 g/t TS1804B 3.8m at 13.9 g/t Deposit remains open in multiple directions further drilling planned SHAFT 2 South Zone View to the southwest SHAFT 1 SHAFT 3 FWP Extension & BPE Projects Getchell Fault Resource Conversion TS1803 TS1804 TS1802 2P Reserves 4 M&I Resource 4 North Zone TS1804A TS1804 B 1. For additional detail regarding Turquoise Ridge, see the Technical Report on the Turquoise Ridge Mine, State of Nevada, U.S.A., dated March 19, 2018, and filed on SEDAR at and EDGAR at on March 23, % Barrick owned 3. See Appendix B for additional details including assay results for the significant intercepts 4. Proven and Probable Reserves: 5.9Moz ( g/t); Measured and Indicated Resources: 1.5 Moz ( g/t). See Endnote #3

12 Kibali underground opportunities LOM design with 3000, 5000 and 9000 Lode opportunities Sessenge open pit 300koz $1000/oz design KCD Pushback 3 330koz $1000/oz design KCD open pit PB#1 North 3000 Lode up plunge extension PB#2 2g/t (100koz) UG 4.97g/t (335koz) Ave drill intersection 11.2g/t 9000 Lode up plunge extension Sessenge Link 2.61g/t (345koz) Drill holes planned Total Current Potential 2.14Moz 5000 Lode down plunge 5.82g/t (1.36Moz) New assays intersection 5.3g/t

13 Kalimva-Ikamva justifies progression to prefeasibility study Kalimva-Ikamva drill plan Average recovery of 90% from BRT in fresh Ikamva $1200/oz pit N Phase 4 (109 RC and 8 DDH) drilling in $1200/oz pit shell completed at Kalimva and Ikamva. Pit optimisations and preliminary economic assessment complete Infill drilling confirms continuity with improved average intersection widths and grades than predicted by the previous model Results return 34% increase in grade and 19% increase in tonnes to deliver a 59% increase in ounces compared to previous model in a $1000/oz optimisation pit shell $1000/oz optimisation pit shell contains 5.6Mt at 3.1g/t for 559koz defined to a sufficient level to support an inferred resource KVRC g/t from 44m incl 4.18 g/t KVRC g/t from 46m incl 20g/t KALIMVA LONG SECTION LOOKING WNW KVRC g/t from 48m incl 22.59g/t Kalimva HG potential: down plunge target KVDD g/t and 1.79g/t KVRC g/t KVRC g/t incl 28.19g/t Lithology $1200/oz pit Quartz feldspar porphyry Banded iron formation Metasediment 400m Southern high grade domain KVRC g/t from 104m 100m Northern high grade domain Kalimva long section looking WNW

14 Organisational Flow Organizational structure enables communication flow Ownership of core competences through the entire organization EXPLORATION EVALUATION CAPITAL PROJECTS OPERATIONS

15 Appendix B Turquoise Ridge Significant Intercepts 1 Drill Results from Q Core Drill Hole 2 Azimuth Dip Interval (m) Width (m) 3 Au (g/t) TS TS TS1804A TS1804B All significant intercepts calculated as being >6 m and >7.7 g/t or >3 m and >15.5 g/t 2. Nomenclature for drillholes (i.e., TS1802) is described by TS (i.e., Turquoise Ridge Surface) followed by the year (i.e., 18 for 2018) 3. True width of intercepts are uncertain at this stage The drilling results for the Turquoise Ridge property contained in this presentation have been prepared in accordance with National Instrument Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted in an on site laboratory with Quality Assurance/Quality Control procedures performed by an independent laboratory. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the TRJV property conform to industry accepted quality control methods.

MAssAwA GOLD project 2.7Moz Randgold ResouRces

MAssAwA GOLD project 2.7Moz Randgold ResouRces MAssAWA GOLD PROJECT TOTAL RESERveS 2.7Moz 80 Randgold Resources ANNUAL REPORT 2017 The Massawa project is a grassroots exploration discovery located on the Kanoumba permit in eastern Senegal. Randgold

More information

MASSAWA GOLD PROJECT. 2.6 Moz 30 % TOTAL RESERVES RANDGOLD RESOURCES

MASSAWA GOLD PROJECT. 2.6 Moz 30 % TOTAL RESERVES RANDGOLD RESOURCES MASSAWA GOLD PROJECT TOTAL RESERVES 2.6 Moz 30 % 74 ANNUAL REPORT 2016 Massawa and Sofia are grassroots exploration discoveries located on the Kanoumba permit in eastern Senegal. The project is about 700

More information

Global Exploration. Investor Day November Rob Krcmarov. EVP Exploration and Growth

Global Exploration. Investor Day November Rob Krcmarov. EVP Exploration and Growth Global Exploration Rob Krcmarov EVP Exploration and Growth Investor Day November 2018 New Barrick 5 out of the Top 10 Tier One Gold Assets (> 500 koz; > 10 year mine life; bottom half of cost curve) 2

More information

Bass Metals records further positive drill results & progress at 3 prospects.

Bass Metals records further positive drill results & progress at 3 prospects. 16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret

More information

Cove Gold Project 2201 Discovery Update, May 2014

Cove Gold Project 2201 Discovery Update, May 2014 Proven Management Proven Gold Districts Safe Jurisdictions Cove Gold Project 2201 Discovery Update, May 2014 Symbol: Exchange: PG TSX 1-888-346-1390 DISCLAIMER: This presentation may contain "forward looking

More information

New Drilling Program Commences at Mutiny s Deflector Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern

More information

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST NEWS RELEASE 15/2018 Symbol: TSX: ME FOR IMMEDIATE RELEASE MONETA INTERCEPTS 5.30 m @ 7.63 g/t GOLD INCLUDING 0.80 m @ 22.40 g/t GOLD AND 7.13 m @ 5.06 g/t GOLD INCLUDING 1.98 m @ 12.47 g/t GOLD AT SOUTH

More information

ASX Release 29 November 2017

ASX Release 29 November 2017 Middle Island Resources Ltd ACN 142 361 608 ASX code: MDI www.middleisland.com.au ASX Release 29 November 2017 Substantial Exploration Target announced for key deposit at Sandstone gold project, WA Capital

More information

For personal use only

For personal use only UPDATE ON COCK-EYED BOB UNDERGROUND MINING INCREASING CONFIDENCE IN THE POTENTIAL FOR THREE LONG-LIFE UNDERGROUND MINES Integra Mining Limited (ASX:IGR, Integra) is pleased to report that the trial mining

More information

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST NEWS RELEASE 13/2018 Symbol: TSX: ME FOR IMMEDIATE RELEASE MONETA INTERCEPTS 25.00 m @ 2.48 g/t GOLD INCLUDING 4.50 m @ 5.00 g/t GOLD AT SOUTH WEST Toronto, Ontario September 13, 2018 - Moneta Porcupine

More information

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred

More information

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project September 24, 2018 News Release Release #15 2018 Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1) ("Monument"

More information

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver 2012-19 Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver September 26, 2012 Toronto, Ontario - QUEENSTON

More information

Barrick Gold Corporation. Value Generation through Exploration Success

Barrick Gold Corporation. Value Generation through Exploration Success Barrick Gold Corporation Value Generation through Exploration Success Canaccord Genuity World Class Discovery Day December 1, 2016 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION Certain information

More information

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written

More information

Disclaimer. Forward-Looking Statements. Competent Person s Statement

Disclaimer. Forward-Looking Statements. Competent Person s Statement Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director Resources Rising Stars, May 29-30 2018 Disclaimer Forward-Looking Statements Some statements

More information

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

More information

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development ABN 44 009 157 439 Company Announcement 22 November 2018 Level 2, 90 William St Melbourne Victoria 3000 Australia Telephone: +61 3 9605 5950 Facsimile: +61 3 9605 5999 Email: info@hawthornresources.com

More information

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura July 11, 2016 News Release Release 15-2016 Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura Vancouver, B.C., July 11, 2016, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)

More information

ALACER GOLD EXTENDS ÇÖPLER MINERALIZATION INCLUDING 4.1g/t IN DEEPEST DRILLHOLE TO DATE

ALACER GOLD EXTENDS ÇÖPLER MINERALIZATION INCLUDING 4.1g/t IN DEEPEST DRILLHOLE TO DATE ALACER GOLD EXTENDS ÇÖPLER MINERALIZATION INCLUDING 100.1m @ 4.1g/t IN DEEPEST DRILLHOLE TO DATE August 22, 2011: Alacer Gold Corp ( Alacer or the Company ) [TSX:ASR, ASX:AQG] announces ongoing results

More information

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT MEDIA RELEASE 12 April 2013 OCEANAGOLD ANNOUNCES FURTHER DRILL RESULTS AND UPDATED RESOURCE FROM BLACKWATER HIGH-GRADE GOLD PROJECT (MELBOURNE) OceanaGold Corporation (ASX: OGC, TSX: OGC, NZX: OGC) (the

More information

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE

More information

MEDIA RELEASE OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND

MEDIA RELEASE OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND MEDIA RELEASE 30 October 2018 OCEANAGOLD REPORTS ADDITIONAL HIGH-GRADE DRILL RESULTS AT WAIHI IN NEW ZEALAND (MELBOURNE) OceanaGold Corporation (TSX: OGC) (ASX: OGC) (the Company ) is pleased to announce

More information

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT. 202-930 West First Street, North Vancouver, B.C. 604.998.4175 July 31, 2014 SBB NR-14-10 SBB TSX SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT. 2014 Drilling confirms

More information

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER 122.7 METRES March 1, 2012, Toronto, Ontario, Canada: Lexam VG Gold Inc. (TSX: LEX), (FRANKFURT: VN3A), (OTCQX:

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

Red Dog Exploration Part 2. September 20, 2017 Adrian King, Head of Exploration

Red Dog Exploration Part 2. September 20, 2017 Adrian King, Head of Exploration September 20, 2017 Adrian King, Head of Exploration Forward Looking Information Both these slides and the accompanying oral presentations contain certain forward-looking statements within the meaning of

More information

ASX/Media Announcement

ASX/Media Announcement ASX/Media Announcement 25 March 2013 MAIDEN HIGH-GRADE JUDY LODE RESOURCE INDICATES POTENTIAL TO INCREASE ANDY WELL MINE LIFE 106,000 ounce high-grade resource (Indicated & Inferred) Judy South (137,000t

More information

Classification Tonnage (t) Grade Au (g/t) Grade Ag (g/t)

Classification Tonnage (t) Grade Au (g/t) Grade Ag (g/t) Table 1: 2016 Kizilcukur JORC 2012 compliant Mineral Resource estimate, based on 17 diamond and 26 RC drill holes. Gold equivalent is the sum of the gold ounces and the gold equivalent ounces of silver

More information

76,000 Ounce Gold Resource at Akoko North

76,000 Ounce Gold Resource at Akoko North 31 st March 2009 76,000 Ounce Gold Resource at Akoko North 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Scoping study (assuming toll milling) estimates $A24M

More information

Ulysses Gold Project, WA

Ulysses Gold Project, WA Ulysses Gold Project, WA Growing and developing a new high-grade Australian gold project in a Tier-1 location December 2018 Investor Luncheon Series Melbourne, Monday 10 th Sydney, Wednesday 12 th Disclaimer

More information

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE

REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE REGULUS DISCOVERS NEW GOLD-RICH, HIGH-GRADE COPPER-GOLD ZONE AT RIO GRANDE 257.2 metres with 0.53% Cu, 1.20 g/t Au, and 1.59 g/t Ag (1.19% Cu Eq or 2.39 g/t Au Eq) including 54.5 metres with 1.34% Cu,

More information

High Grade Gold Drill Results Extend Buccaneer

High Grade Gold Drill Results Extend Buccaneer ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 14 June, 2012 High Grade Gold Drill Results Extend 31 metres averaging 3.68g/t gold including 14 metres averaging 7.56g/t gold ABM Resources NL ( ABM or The Company

More information

Ulysses: Genesis of a significant new underground gold mine near Leonora, WA. Michael Fowler, Managing Director. 22 February 2018

Ulysses: Genesis of a significant new underground gold mine near Leonora, WA. Michael Fowler, Managing Director. 22 February 2018 Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director 22 February 2018 Disclaimer Forward-Looking Statements Some statements in this report regarding

More information

EXPLORATION SUCCESS AT COYOTE GOLD MINE

EXPLORATION SUCCESS AT COYOTE GOLD MINE 19 November 2012 Jon Latto COMPANY SECRETARY Jane Bown EXECUTIVE ASSISTANT EXPLORATION SUCCESS AT COYOTE GOLD MINE COYOTE GOLD MINE HIGHLIGHTS Ongoing exploration drilling continues to return high grade

More information

HIGHLIGHTS INCLUDE: ^ Includes 466g/t Au Includes 153g/t Au + Includes 45.3g/t Au

HIGHLIGHTS INCLUDE: ^ Includes 466g/t Au Includes 153g/t Au + Includes 45.3g/t Au Atlantic Gold Announces Additional Drill Results From Resource Extension Drilling At The Cochrane Hill Gold Deposit HIGHLIGHTS INCLUDE: COCHRANE HILL GOLD DEPOSIT 11m @ 43.65 g/t Au from 227m^ 7m @ 23.69

More information

YANFOLILA EXPLORATION 2018

YANFOLILA EXPLORATION 2018 YANFOLILA EXPLORATION 2018 EXPLORATION MINERAL RESOURCES & RESERVES STRATEGY & BUDGET DEPOSITS ADDITIONAL RESOURCES THE UPSIDE EXPENDITURE 2 EXPLORATION STRATEGY YANFOLILA PRODUCTION FORECAST: HIGH GRADE,

More information

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS Magmatic Resources Ltd Level 1, 11 Lucknow Place West Perth WA 6005 Phone: +61 8 6102 2709 www.magmaticresources.com ASX / MEDIA ANNOUNCEMENT 21 August 2017 RC DRILLING TO RESUME THIS WEEK AT CARLISLE

More information

The Manager Companies ASX Limited 20 Bridge Street

The Manager Companies ASX Limited 20 Bridge Street ABN 79 106 879 690 10 July 2012 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, 1.54 Moz Gold Equivalent Maiden Gold/Copper Resource at Wonogiri The Directors

More information

CAUTIONARY STATEMENT

CAUTIONARY STATEMENT AUGUST 2018 RLG CAUTIONARY STATEMENT Some of the statements contained in this presentation are forward-looking statements. Such forward-looking statements involve known and unknown risks, uncertainties

More information

MINERAL RESOURCE AND ORE RESERVE STATEMENT AS AT 31 MARCH 2017

MINERAL RESOURCE AND ORE RESERVE STATEMENT AS AT 31 MARCH 2017 14 July 2017 ASX ANNOUNCEMENT MINERAL RESOURCE AND ORE RESERVE STATEMENT AS AT 31 MARCH 2017 HIGHLIGHTS Group Ore Reserves increased by 3% from 2.13 million ounces to 2.18 million ounces after accounting

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 16 NOVEMBER 2012 Australian Securities Exchange Code: NST Board of Directors Mr Chris Rowe Non-Executive Chairman Mr Bill Beament Managing Director Mr Michael Fotios Non-Executive Director

More information

For personal use only

For personal use only ASX RELEASE 2 August 2011 Significant Gold intersections at Chameleon Prospect Maiden 15 hole RC drilling programme (3,170 metres) completed by Scotia Gold Rights JV partner, Aphrodite Gold at the Chameleon

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

Sabina Announces More Positive Drill Results from 2012 Drilling at the Back River Gold Project, Nunavut

Sabina Announces More Positive Drill Results from 2012 Drilling at the Back River Gold Project, Nunavut 930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4 Tel: (604) 998-4175 Toll Free: (888) 648-4218 www.sabinagoldsilver.com June 4, 2012 SBB NR 12-10 SBB-T Sabina Announces More Positive Drill

More information

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) 998-4175 Tel: (888) 648-4218 www.sabinagoldsilver.com April 8, 2018 SBB NR 18-10 SBB TSX Sabina Gold & Silver continues

More information

FIVE RIGS DRILLING AT KARLAWINDA

FIVE RIGS DRILLING AT KARLAWINDA FIVE RIGS DRILLING AT KARLAWINDA Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed ASX ANNOUNCMENT 2 September 2016 Australian

More information

For personal use only

For personal use only ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non

More information

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH

KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH KIRKLAND LAKE GOLD EXPANDS NEW HIGH-GRADE ZONE BELOW TAYLOR MINE, REPORTS MINERALIZED EXTENSIONS ALONG STRIKE AND AT DEPTH New gold zone intersected 500 metres ( m ) below existing mining and mine infrastructure

More information

For personal use only

For personal use only ASX/ MEDIA RELEASE 28/03/ 2012 Exciting developments for GBM Gold at its Wedderburn Resource Project Highlights of this announcement: Details Exciting results from recent Diamond drill programme at Gowks

More information

Massawa Site Visit January 2018

Massawa Site Visit January 2018 Massawa Site Visit January 2018 Randgold Resources project location SENEGAL Teranga N Yatela Sadiola MALI Kanoumba Permits Area (km²) Expiry Date Mining Code Kanoumba 606 21 May 2019 2003 Dalema 224 6

More information

KIRKLAND LAKE GOLD IDENTIFIES POTENTIAL NEW SOURCE OF GOLD PRODUCTION IN NORTHERN TERRITORY OF AUSTRALIA

KIRKLAND LAKE GOLD IDENTIFIES POTENTIAL NEW SOURCE OF GOLD PRODUCTION IN NORTHERN TERRITORY OF AUSTRALIA KIRKLAND LAKE GOLD IDENTIFIES POTENTIAL NEW SOURCE OF GOLD PRODUCTION IN NORTHERN TERRITORY OF AUSTRALIA High-grade visible-gold bearing mineralization extended to approximately 1,000 metres ( m ) below

More information

Where Exploration Intersects Discovery

Where Exploration Intersects Discovery Phase III Step Out Drilling Extends Gold Mineralization to 0.5 km Along Trend at Pamlico Project, Nevada VANCOUVER, BRITISH COLUMBIA, July 10, 2018 (, US: NRGOF, Frankfurt: X6C) Newrange Gold Corp. ("Newrange"

More information

Marathon s Valentine Lake Property: An Emerging Gold Camp in Eastern Canada

Marathon s Valentine Lake Property: An Emerging Gold Camp in Eastern Canada Marathon s Valentine Lake Property: An Emerging Gold Camp in Eastern Canada Sherry Dunsworth, V.P. Exploration March 3, 2015 Forward Looking Information CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION

More information

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY

NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24% AND 48% RESPECTIVELY Orca Gold Inc., 2000-885 West Georgia St., Vancouver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE ORCA GOLD INDICATED AND INFERRED RESOURCES AT BLOCK 14 INCREASE BY 24%

More information

For personal use only

For personal use only ASX Release 2 February 2012 ENCOURAGING DIAMOND DRILLING RESULTS CONTINUE AT THE FEKOLA PROJECT Papillon Resources Limited ( Papillon or the Company ) is pleased to release the assay results from two additional

More information

The Emerging Wilcherry Gold Camp

The Emerging Wilcherry Gold Camp >gold >exploration >development The Emerging Wilcherry Gold Camp Presentation to South Australian Exploration and Mining Conference Adelaide Convention Centre, Adelaide 7 December 2018 1 Cautionary & Competent

More information

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY February 5, 2018, Toronto, Ontario Troilus Gold Corp. (TSX- V: TLG) ( Troilus or the Company ) is pleased to announce the commencement

More information

MORE HIGH-GRADE GOLD INTERSECTIONS FROM CITADEL S SHAYBAN PROJECT, SAUDI ARABIA

MORE HIGH-GRADE GOLD INTERSECTIONS FROM CITADEL S SHAYBAN PROJECT, SAUDI ARABIA Citadel Resource Group Limited ASX Release 7th July 2009 MORE HIGH-GRADE GOLD INTERSECTIONS FROM CITADEL S SHAYBAN PROJECT, SAUDI ARABIA Highlights: LATEST RC IN-FILL AND EXTENSIONAL DRILLING CONTINUES

More information

RESOURCE INCREASED BY 75% TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT

RESOURCE INCREASED BY 75% TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT STOCK EXCHANGE ANNOUNCEMENT 13 November 2006 RESOURCE INCREASED BY 75 TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT Summary The Board of Gindalbie Metals Ltd (ASX Code: GBG) is pleased

More information

The McPhillamys Gold Deposit, Discovery History & Geology. Presenter: Tara French

The McPhillamys Gold Deposit, Discovery History & Geology. Presenter: Tara French The McPhillamys Gold Deposit, Discovery History & Geology. Presenter: Tara French Forward-Looking Statements This presentation contains forward-looking statements. without limitation: Estimates of future

More information

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. 30 April 2008 60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. Perilya Limited (ASX: PEM) is pleased to announce a 60% increase in the mineral resource estimate for the

More information

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP Toachi Mining Inc. Intersects 13.91 m grading 3.51 g/t Au, 64.24 g/t Ag, 0.59% Cu, 4.11% Zn and 0.85% Pb at the Gold-Rich La Plata VMS Project in Ecuador Toronto, Ontario October 11, 2017 Toachi Mining

More information

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET

ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET PRESS RELEASE ASANKO GOLD ANNOUNCES ENCOURAGING INITIAL DRILL RESULTS FROM NEW EXPLORATION TARGET Highlights: Highly encouraging results from new near-mine exploration target, Akwasiso 10,000 metres of

More information

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH

KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH KIRKLAND LAKE GOLD INTERSECTS NEW MINERALIZATION AT TAYLOR MINE, CONTINUES TO EXTEND PORPHYRY DEPOSITS TO DEPTH Drilling identifies gold-bearing quartz veins at multiple locations up to 1.8 km east of

More information

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL TSX: IMG NYSE: IAG NEWS RELEASE IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL TORONTO, July 20, 2015 IAMGOLD Corporation ( IAMGOLD or the Company

More information

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts

October 2017 Investor Presentation. Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts October 2017 Investor Presentation Moving to the next level: cash-flow, exploration and growth in WA s premier gold districts 2 Disclaimer Forward-Looking Statements Some statements in this report regarding

More information

NEW DISCOVERIES AT THE RED OCTOBER MINE

NEW DISCOVERIES AT THE RED OCTOBER MINE 23 July 2013 ASX & MEDIA RELEASE NEW DISCOVERIES AT THE RED OCTOBER MINE The Directors of Saracen Mineral Holdings Limited (the Company ) are pleased to provide an update on the Red October underground

More information

BUREY GOLD LIMITED Level 2, Suite Oxford Street Mt Hawthorn WA 6016 Australia

BUREY GOLD LIMITED Level 2, Suite Oxford Street Mt Hawthorn WA 6016 Australia BUREY GOLD LIMITED Level 2, Suite 9 389 Oxford Street Mt Hawthorn WA 6016 Australia P. +61 8 9381 2299 F. +61 8 9380 6761 A.B.N. 14 113 517 203 19 May 2016 Commencement of RC drill programme at Burey s

More information

ASX Announcement ASX Code: MAR 10 April 2018

ASX Announcement ASX Code: MAR 10 April 2018 ASX Announcement ASX Code: MAR 10 April 2018 Significant Exploration Results - Lorena Gold Project Drill hole LMR110 increases the potential for a resource extension at depth HIGHLIGHTS: Drillhole LMR108

More information

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG

Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Further High Grade Gold Mineralisation Intersected in Bonanza Zones at Mt Kare Gold/Silver Deposit PNG Excellent Results Received for the Six BZ Holes Highest grade intercepted was 1 metre at 58 g/t gold

More information

it AUSIMM COBAR MINING SEMINAR

it AUSIMM COBAR MINING SEMINAR Straits Resources Limited it AUSIMM COBAR MINING SEMINAR Brownfields Exploration at Girilambone: Understanding the Mineralised Systems August 2010 Phil Shields / Phil Jones LOCATION TRITTON OPERATIONS

More information

For personal use only

For personal use only ASX/Media Release 27 July 2017 DIAMOND DRILLING COMMENCES TO TEST DOWN-DIP AND NORTHERN EXTENSIONS OF HIGH-GRADE RESOURCE AT ROTHSAY GOLD PROJECT Multiple new regional exploration targets also identified

More information

Detour Gold Reports Drilling Results from Lower Detour

Detour Gold Reports Drilling Results from Lower Detour December 17, 2015 NEWS RELEASE Detour Gold Reports Drilling Results from Lower Detour Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) reports final results from its 2015 summer drilling

More information

PROJECT DETAILS August 2014

PROJECT DETAILS August 2014 PROJECT DETAILS August 2014 Executive Summary InterGroup Mining Pty Ltd has a major gold exploration project located in North Queensland, Australia, in an underexplored high gold bearing district, west

More information

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS National Stock Exchange of Australia Company Announcements Level 2, 117 Scott Street Newcastle NSW 2300 25 th January 2013 STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS 100m

More information

Tameapa Regional Geology

Tameapa Regional Geology Tameapa Project 1 Tameapa Regional Geology History San Francisco Mines of Mexico Ltd. (San Francisco), which completed an exploration program, including six drill holes (1,157 m) between 1956 and 1959.

More information

Uncovering The Riches of the Abitibi Greenstone Belt of Canada

Uncovering The Riches of the Abitibi Greenstone Belt of Canada 1 TSX.V: ALZ June 2016 Uncovering The Riches of the Abitibi Greenstone Belt of Canada The Haultain Gold Discovery The Abitibi Greenstone Belt & Gold 170+ million oz of gold produced to date from more than

More information

LATEST RESULTS FROM RC DRILLING

LATEST RESULTS FROM RC DRILLING ASX Release Tuesday 6 July 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 LATEST RESULTS FROM RC DRILLING Signature Metals Limited

More information

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp TORONTO, ON October 8, 2014 - Marathon Gold Corporation ( Marathon or

More information

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast)

Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast) ASX/MEDIA RELEASE 27 November 2008 Highlights Initial Gold Resource at Sissingue Tengrela Project (Ivory Coast) Indicated and Inferred resources total 970,000 ounces at 1.9 using 1 cut-off (15.7 million

More information

InZinc Intersects 6.8m of 16.5% Zinc Focuses on Western Expansion of High Grades at West Desert Project

InZinc Intersects 6.8m of 16.5% Zinc Focuses on Western Expansion of High Grades at West Desert Project InZinc Mining Ltd. 912 1112 West Pender Street P.O. Box 48268, Station Bentall Centre Vancouver, BC Canada V7X 1A2 1.604.687.7211 info@inzincmining.com inzincmining.com TSX-V: IZN August 27, 2018 News

More information

Developing the +1.2Moz Pilbara Gold Project

Developing the +1.2Moz Pilbara Gold Project Developing the +1.2Moz Pilbara Gold Project ASX Announcement 20 November 2017 ASX Code DEG FRA Code WKN 633879 Resource infill and extension drilling has commenced at the Toweranna Prospect ABN 65 094

More information

AGM Presentation 12 November 2013

AGM Presentation 12 November 2013 AGM Presentation 12 November 2013 Disclaimer Exploration Results and Mineral Resources The information in this report that relates to Exploration Results, Exploration Targets, Mineral Resources or Ore

More information

Update on Dargues Gold Mine and future exploration plans Mining NSW Conference

Update on Dargues Gold Mine and future exploration plans Mining NSW Conference Update on Dargues Gold Mine and future exploration plans Mining NSW Conference 27 August 2014 Unity Mining Limited Disclaimer This presentation has been prepared by Unity Mining Limited ( Company ). The

More information

Evaluation of Mineral Resource risk at a high grade underground gold mine

Evaluation of Mineral Resource risk at a high grade underground gold mine Evaluation of Mineral Resource risk at a high grade underground gold mine Presented by: Aaron Meakin Manager Corporate Services CSA Global 21 August 2015 Project Background Beaconsfield Gold Mine, Tasmania

More information

Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda

Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda April 11, 2016 News Release Release 10-2016 Monument Announces Significant Intercepts Assay Results at Buffalo Reef/Felda Vancouver, B.C., April 11, 2016, Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)

More information

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

MARKET UPDATE ON URANIUM AND GOLD PROJECTS ASX Announcement 1 March 2011 MARKET UPDATE ON URANIUM AND GOLD PROJECTS HIGHLIGHTS 5,000 metre drilling programme to commence at Rio Puerco uranium project within the next two weeks. Drilling to commence

More information

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME

FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME ASX ANNOUNCEMENT 28 March 2013 FOCUS MINERALS REPORTS ENCOURAGING FIRST ROUND RESULTS FROM COOLGARDIE NEAR MILL PROGRAMME Focus Minerals Ltd. (ASX: FML) is pleased to announce the first round of results

More information

Fortuna Updates Reserves and Resources

Fortuna Updates Reserves and Resources Fortuna Updates Reserves and Resources Vancouver, February 22, 2018-- Fortuna Silver Mines, Inc. (NYSE: FSM) (TSX: FVI) is pleased to report updated Mineral Reserve and Mineral Resource estimates as of

More information

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Continues to Expand Gold Zones At Val-d Or East NEWS RELEASE 02/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742 Highlights: Probe Metals Continues to Expand Gold Zones At Val-d Or East New Beliveau Deposit resource expansion drilling to the West returned

More information

TriAusMin Limited LEWIS PONDS PROJECT

TriAusMin Limited LEWIS PONDS PROJECT TriAusMin Limited LEWIS PONDS PROJECT TSX: TOR November 2010 ASX: TRO Disclaimer The Information contained in this presentation has been prepared using the information available to TriAusMin at the time

More information

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project IDM Mining s Underground Drilling Intersects 18.70 g/t Au and 66.85 g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project November 22 nd, 2016, Vancouver, BC IDM Mining Ltd. (TSX.V:IDM) (

More information

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine North American Palladium Announces Positive Exploration Results from Lac des Iles Mine Toronto, Ontario, October 24, 2017 North American Palladium Ltd. ( NAP or the Company ) (TSX: PDL) (OTC PINK: PALDF)

More information

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL ASX ANNOUNCEMENT 16 SEPTEMBER 2011 Phillips River Mining NL ABN 61 004 287 790 Unit 46/328 Albany Highway VICTORIA PARK WA 6100 T: 08 6250 4600 F: 08 6250 4699 info@phillipsriver.com.au CONTACT Jason Stirbinskis

More information

PDAC - EXPLORATION BREAKFAST

PDAC - EXPLORATION BREAKFAST PDAC - EXPLORATION BREAKFAST MARCH 5, 2018 Registration & Breakfast 7:00 am Exploration Presentation 7:30 am FORWARD LOOKING STATEMENTS This presentation contains forward-looking information, within the

More information

Form F3 MATERIAL CHANGE REPORT

Form F3 MATERIAL CHANGE REPORT Form 51-102F3 MATERIAL CHANGE REPORT Item 1. Item 2. Item 3. Item 4. Item 5. Name and Address of Reporting Issuer Northern Superior Resources Inc. 1351C Kelly Lake Road, Unit 7 Sudbury, Ontario, Canada

More information

Atico Mining Provides Exploration Update

Atico Mining Provides Exploration Update Atico Mining Provides Exploration Update Vancouver, July 11, 2018 -- Atico Mining Corporation (TSX.V: ATY OTC: ATCMF)( Atico or the Company ) is pleased to announce the completion of two IP-DAS surveys

More information

Coeur Mining Provides Exploration Update

Coeur Mining Provides Exploration Update NEWS RELEASE Coeur Mining Provides Exploration Update Chicago, Illinois October 10, 2016 Coeur Mining, Inc. ( Coeur or the Company ) (NYSE: CDE) today provided an update on its expanded exploration initiatives

More information

Q1 update 31 March Exploration Activities

Q1 update 31 March Exploration Activities Q1 update 31 March 2016 Exploration Activities This quarter we report results from drilling on 12 targets across the portfolio as the brownfields work on our orebodies and satellites identifies a range

More information