Operational Performance of LCLS Beam Instrumentation. Henrik Loos, SLAC BIW 2010, Santa Fe, NM

Similar documents
Diagnostic Systems for High Brightness Electron Injectors

Observation of Coherent Optical Transition Radiation in the LCLS Linac

Generation and characterization of ultra-short electron and x-ray x pulses

X-Ray Diagnostics Commissioning at the LCLS

Short Pulse, Low charge Operation of the LCLS. Josef Frisch for the LCLS Commissioning Team

Microbunching Workshop 2010 March 24, 2010, Frascati, Italy. Zhirong Huang

LCLS Beam Diagnostics

Femto-second FEL Generation with Very Low Charge at LCLS

LCLS Commissioning Status

FURTHER UNDERSTANDING THE LCLS INJECTOR EMITTANCE*

FIRST LASING OF THE LCLS X-RAY FEL AT 1.5 Å

SPPS: The SLAC Linac Bunch Compressor and Its Relevance to LCLS

LOLA: Past, present and future operation

FACET-II Design Update

X-band RF driven hard X-ray FELs. Yipeng Sun ICFA Workshop on Future Light Sources March 5-9, 2012

Low slice emittance preservation during bunch compression

Femtosecond X-ray Pulse Temporal Characterization in Free-Electron Lasers Using a Transverse Deflector. Abstract

S2E (Start-to-End) Simulations for PAL-FEL. Eun-San Kim

FACET-II Design, Parameters and Capabilities

H. Maesaka*, H. Ego, T. Hara, A. Higashiya, S. Inoue, S. Matsubara, T. Ohshima, K. Tamasaku, H. Tanaka, T. Tanikawa, T. Togashi, K. Togawa, H.

LCLS Accelerator Parameters and Tolerances for Low Charge Operations

Demonstration of Energy-Chirp Control in Relativistic Electron Bunches at LCLS Using a Corrugated Structure. Karl Bane, 7 April 2017,, KEK

II) Experimental Design

An Adventure in Marrying Laser Arts and Accelerator Technologies

LCLS Injector Straight Ahead Spectrometer C.Limborg-Deprey Stanford Linear Accelerator Center 8 th June 2005

Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory. Chris Melton SLAC Accelerator Operations

Diagnostic Systems for Characterizing Electron Sources at the Photo Injector Test Facility at DESY, Zeuthen site

Linac Driven Free Electron Lasers (III)

PAL LINAC UPGRADE FOR A 1-3 Å XFEL

Echo-Enabled Harmonic Generation

Investigations on the electron bunch distribution in the longitudinal phase space at a laser driven RF-electron source for the European X-FEL

ccelerator hysics and ngineering Josef Frisch Tonee Smith

LCLS Start-Up Test Plan

Free-electron laser SACLA and its basic. Yuji Otake, on behalf of the members of XFEL R&D division RIKEN SPring-8 Center

GTF Transverse and Longitudinal Emittance Data Analysis Technique * J.F. Schmerge, J.E. Clendenin, D.H. Dowell and S.M. Gierman

Linac optimisation for the New Light Source

SRF GUN CHARACTERIZATION - PHASE SPACE AND DARK CURRENT MEASUREMENTS AT ELBE*

Undulator Commissioning Spectrometer for the European XFEL

Summary of COTR Effects.

A Transverse Profile Imager for SwissFEL Rasmus Ischebeck

Excitements and Challenges for Future Light Sources Based on X-Ray FELs

Present Capabilities and Future Concepts for Intense THz from SLAC Accelerators

Excitements and Challenges for Future Light Sources Based on X-Ray FELs

Layout of the HHG seeding experiment at FLASH

LCLS Injector Prototyping at the GTF

COMMISSIONING THE LCLS INJECTOR

TTF and VUV-FEL Injector Commissioning

Flexible control of femtosecond pulse duration and separation using an emittance-spoiling foil in x-ray free-electron lasers

4 FEL Physics. Technical Synopsis

Beam Echo Effect for Generation of Short Wavelength Radiation

Juliane Rönsch Hamburg University. Investigations of the longitudinal phase space at a photo injector for the X-FEL

Time resolved transverse and longitudinal phase space measurements at the high brightness photo injector PITZ

Beam Dynamics. Gennady Stupakov. DOE High Energy Physics Review June 2-4, 2004

INVESTIGATIONS OF THE DISTRIBUTION IN VERY SHORT ELECTRON BUNCHES LONGITUDINAL CHARGE

LCLS Undulators Present Status and Future Upgrades

REVIEW OF DIAGNOSTICS FOR NEXT GENERATION LINEAR ACCELERATORS

LCLS Status and Micro-Bunching Workshop at LBNL. Torsten Limberg

Injector Experimental Progress

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

Particle Beam Diagnostics

ThomX Machine Advisory Committee. (LAL Orsay, March ) Ring Beam Dynamics

LCLS-II Beam Stay-Clear

Fast Simulation of FEL Linacs with Collective Effects. M. Dohlus FLS 2018

Characterization of an 800 nm SASE FEL at Saturation

LCLS-II Conceptual Design Review. 6 Accelerator

Parameter selection and longitudinal phase space simulation for a single stage X-band FEL driver at 250 MeV

Linac Based Photon Sources: XFELS. Coherence Properties. J. B. Hastings. Stanford Linear Accelerator Center

R&D experiments at BNL to address the associated issues in the Cascading HGHG scheme

Expected properties of the radiation from VUV-FEL / femtosecond mode of operation / E.L. Saldin, E.A. Schneidmiller, M.V. Yurkov

VELA/CLARA as Advanced Accelerator Studies Test-bed at Daresbury Lab.

DESIGN STUDY OF LCLS CHIRP-CONTROL WITH A CORRUGATED STRUCTURE

Vertical Polarization Option for LCLS-II. Abstract

Two-Stage Chirped-Beam SASE-FEL for High Power Femtosecond X-Ray Pulse Generation

CSR Benchmark Test-Case Results

LCLS-II SCRF start-to-end simulations and global optimization as of September Abstract

Diagnostics at the MAX IV 3 GeV storage ring during commissioning. PPT-mall 2. Åke Andersson On behalf of the MAX IV team

Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)

OPTIMIZATION OF COMPENSATION CHICANES IN THE LCLS-II BEAM DELIVERY SYSTEM

CONCEPTUAL STUDY OF A SELF-SEEDING SCHEME AT FLASH2

Beam Diagnostics for Low Energy Proton and H - Accelerators. Vic Scarpine Fermilab 2012 BIW April 16-19, 2012

SwissFEL INJECTOR DESIGN: AN AUTOMATIC PROCEDURE

Longitudinal Measurements at the SLAC Gun Test Facility*

WG2 on ERL light sources CHESS & LEPP

Novel diagnostics and beam phase space recovery

Update on and the Issue of Circularly-Polarized On-Axis Harmonics

Beam Physics at SLAC. Yunhai Cai Beam Physics Department Head. July 8, 2008 SLAC Annual Program Review Page 1

Ultra-Short Low Charge Operation at FLASH and the European XFEL

Femto second X ray Pulse Generation by Electron Beam Slicing. F. Willeke, L.H. Yu, NSLSII, BNL, Upton, NY 11973, USA

Part V Undulators for Free Electron Lasers

Opportunities and Challenges for X

Experimental Measurements of the ORION Photoinjector Drive Laser Oscillator Subsystem

Low energy high brilliance beam characterization

Overview on the longitudinal diagnostics for ERLs

A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac

Towards a Low Emittance X-ray FEL at PSI

Simulations of the IR/THz source at PITZ (SASE FEL and CTR)

MEASURING AND CONTROLLING ENERGY SPREAD IN CEBAF

2.6 Electron transport lines

Machine design and electron beam control of a single-pass linac for free electron laser Di Mitri, Simone

4GLS Status. Susan L Smith ASTeC Daresbury Laboratory

Transcription:

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Operational Performance of LCLS Beam Instrumentation Henrik Loos, SLAC BIW 21, Santa Fe, NM BIW 21 1 1 Henrik Loos

Linac Coherent Light Source at SLAC X-FEL based on last 1-km of existing linac 1.5-15 Å Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Existing 1/3 Linac (1 km) (with modifications) New e Transfer Line (34 m) Injector (35º) at 2-km point X-ray Transport Line (2 m) Undulator (13 m) Near Experiment Hall BIW 21 Far Experiment Hall 2 2 2 Henrik Loos

gun L TCAV L1S heater 3 wires 3 OTR DL1 135 MeV L1X BC1 25 MeV LCLS Layout 2 Transverse RF cavities (135 MeV & 5 GeV) 18 BPMs and 13 toroids Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM 3 wires 2 OTR σ z1 σ L2-linac z2 BC2 4.3 GeV 7 YAG screens (at E 135 MeV, one at 14 GeV) 13 OTR screens at E 135 MeV 3 OTR TCAV3 5. GeV 17 wire scanners (each with x & y wires) CSR/CER pyroelectric bunch length monitors at BC1 & BC2 5 beam phase monitors (2856 51 MHz) 4 wire scanners L3-linac BSY 14 GeV Gun spectrometer line + injector spectrometer line old screen µ wall 5 wire scanners DL2 14 GeV vert. dump undulator 14 GeV YAG screens OTR screens Wire scanners Phase monitors BIW 21 3 3 Henrik Loos

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Strip Line BPM Performance Strip line BPMs 6+ new ones for LCLS, 8+ upgraded from SLC with new electronics Continuous calibration with test pulse between beam triggers Two variable attenuators for charge range 5 pc several nc Beam synchronous data acquisition system at 12 Hz Noise level measurement Measure beam orbits at ~15 BPMs for 5 shots in main linac through undulator SVD eigenvalues to determine orbit jitter and intrinsic BPM noise level Average value for strip-line 3.5 μm, for RF cavity 25 nm at 25 pc Noise at 2 pc ~1 times higher Noise rms (µm) Noise rms (µm) 6 4 2 3 25 pc Strip Line BPM σ = 3 μm Stripline BPM RF BPM RF BPM σ = 3 nm 2 Strip Line BPM σ = 25 μm 1 2 pc RF BPM σ = 2 μm 5 1 15 Position (m) BIW 21 4 4 Henrik Loos

Undulator RF Cavity BPMs Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Few micron beam orbit straightness in undulator required for FEL operation Sub-micron resolution met with RF cavity BPM design 11.4 GHz dipole cavity Reference cavity for normalization Calibration with beam signals Move supporting girder of undulator Induce known orbit oscillation upstream of undulator BIW 21 5 5 Henrik Loos

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Beam Based Undulator Alignment Measure undulator orbit at energies from 4.3 13 GeV Fit yields quad + BPM offsets Apply correction to get dispersion free orbit After several iterations, average orbit rms few μm Mainly incoming orbit jitter BFW In/Out Corr Beam Undulator Quad RF BPM Scan Girder Movers Girder y Pos (µm) x Pos (µm) 1-1 -2 2 1-1 4.3 GeV, σ = x 7.3 um 7. GeV, σ x = 4. um 9.25 GeV, σ x = 3.7 um 13.64 GeV, σ = x 3.8 um 4.3 GeV, σ = y 5.3 um 7. GeV, σ = y 4. um 9.25 GeV, σ = y 6.8 um 13.64 GeV, σ = y 3.1 um 155 16 165 17 z (m) BIW 21 6 6 Henrik Loos

Wire Scanner Performance Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Wire card with x, y, 45 wires 2 4 μm tungsten wires Stepper motor driven in open loop, LVDT readback Fast ion chambers + PMTs for beam loss detection Synchronous acquisition of beam orbit, wire position and PMT signal Beam jitter correction Use beam jitter to sample beam size with fixed wire Wire in DL2 with orbit jitter > beam size 15 xmean =.12±.1 mm xrms = 41.9± 4.4 µm 1 5 15 xmean =.11±. mm xrms = 3.8±.63 µm 1 5 Raw Jitter corrected -3-2 -1 1 2 3 WIRE:LTU1:246 Position (µm) BIW 21 7 7 Henrik Loos

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Wire Scanner Emittance Measurement Emittance measured with 4 wires at 45 phase advance 4 Accurate beam size 2 measurement for good beta matching Beam Size (µm) Beam Size (µm) 4 2 Emittance upstream of undulator E = 13.634 GeV Q =.249±.1 nc γε x = 1.14±.1 µm ξ x = 1.4±. γε y = 1.5±.1 µm ξ y = 1.±. -4-2 2 4 6 8 Position (m) Norm. Angle Norm. Angle 1-1 1-1 -1 1 Norm. Position BIW 21 8 8 Henrik Loos

OTR/YAG Profile Monitors Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Common design 1 μm YAG crystal 1 μm OTR foil (Al) Fixed magnification 5 mm telecentric lens ~1 2 mm FOV 1 um resolution (OTR) CCD Camera Mega pixel 12 bit Insertable filters OD1 + OD2 Total system dynamic range > 1 5 Actuator Screen Optics Box BIW 21 9 9 Henrik Loos

YAG Screen Performance Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM YAG screens at low energy in injector High sensitivity for low charge beam Image cathode emission on YAG at 15 pc 4 CCD Counts x 1 6 4.2 4 3.8 3.6 3.4 3.2 3 2.8 Correlation Plot 14-Nov-28 2:26:46 YAGS:IN2:921:TMIT 1 1.5 2 2.5 3 3.5 4 4.5 5 Electron density (1/µm 2 ) x 1 4 y (mm) 2-2 -4-2 2 4 6 8 x (mm) BIW 21 1 Saturation limits beam size 13 μm at 25 pc Beam size significantly smaller at most locations 1 Henrik Loos

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM OTR Low Charge Slice Emittance Individual Slice Fit Lower limit on OTR slice emittance ~1pC Q E σ z I γε x = 2 pc = 135 MeV = 4 μm = 5 A =.14 μm Norm. Emittance ( µm).6.5.4.3.2.1 Emittance Current Laser Spot Ø.6 mm -3-2 -1 1 2 3 Time (ps) BIW 21 11 11 11 Henrik Loos

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM OTR Screen Coherent Effects Linear OTR response in injector Coherence effects after bend magnets Factor 2 change in OTR size for % change in beam size Highly compressed beam light intensity x1 5 Distribution fractured or ring shaped Horizontal Beam Size ( µm) 1 8 6 4 2 OTRS:LI21:291:XRMS Q = 25 pc 1.2 1.4 1.6 1.8 11 11.2 Quadrupole Strength (kg) OTR12 L L1X gun L1S wire scanner DL1 BC1 L 135 MeV 25 MeV BIW 21 12 12 Henrik Loos

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM YAG Screens for High Energy Beam Coherent effects visible on dump OTR foil Recently replaced with YAG crystal YAG fluorescence 1 3 higher than OTR from crystal Small crystal tilt to steer COTR away from camera COTR speckle pattern gone in YAG image Tolerable energy loss in dump area, but concern elsewhere y (mm) Profile Monitor OTRS:DMP1:695 8-Dec-29 13:58:5-2 -4 y (mm) Profile Monitor OTRS:DMP1:695 16-Apr-21 15:27:25-2 -4-6 YAG crystal in main dump -6-8 OTR foil in main dump -6-4 -2 2 4 x (mm) -8-1 -6-4 -2 2 4 x (mm) BIW 21 13 13 Henrik Loos

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Transverse Deflector Cavity RF Cavity Screen e S-band 2.44 m V(t) RF streak σ y V > 2 MV f RF = 2856 MHz E S = 13.6 GeV σ z β d ψ 9 β s σ 2 y k ev 2 2 RF = σ y + βd βsσ z sin ψ cosφ Es 2 from 196 s Map time axis onto transverse coordinate Simple calibration by scan of cavity phase BIW 21 14 14 Henrik Loos

YAGS2 RF deflector ON Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Injector Longitudinal Phase Space energy time Laser OFF σ E /E < 12 kev YAGS2 Dec. 1, 28 YAGS2 Laser heater effect on slice energy spread can be studied Laser: 4 µj σ E /E 45 kev Timing between heater laser & electron beam adjusted Laser: 23 µj σ E /E 12 kev BIW 21 15 15 Henrik Loos

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Bunch Length with Wire Scanner PMT Signal (Counts) PMT Signal (Counts) 4 3 2 1-3 -2-1 1 2 3 4 3 2 1 Bunch length as small as 3.5 μm rms measured for 25 pc beam Double-horn structure of undercompressed beams visible BPM noise too large for jitter correction at 2 pc and ~1 μm bunch length BIW 21 zrms = 382.5±38.2 µm zrms = 23±. µm Corrected Jitter uncorrected -3-2 -1 1 2 3 z Position (µm) 16 Bunch length (um) BC2 4.3 GeV 18 16 14 12 1 8 6 4 σ z2 TCAV3 5. GeV Wire Scanner Correlation Plot 22-Nov-29 14:27:54 WIRE:LI28:144:BLEN L3-linac BSY 14 GeV Bunch Length vs. Compression 3.5 μm 2-34 -33-32 -31-3 -29-28 -27-26 L2 chirp voltage (MeV) 16 Henrik Loos

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Pulse Stealing Bunch Length Scan Trigger TCAV at 1 Hz to steal diagnostic bunch 5 fs phase jitter 1 μm orbit jitter Place wire off beam axis, TCAV kicks beam there Signal (1 3 cts) 1 5 1 5 1 σ y = 6.2±. µm σ y = 44.±. µm σ y = 61.3±. µm -9-9 Off + 9 9 6 5 Beam Size (µm) 5 4 3 2 1 σ y = 43.98± 2.76 µm σ z = 5.8±.755 µm cal = 7.235±.633 µm/µm -9 9 TCAV3 Phase (Degree) 3 4 5 6 7 8 9 WIRE:LI28:444 Position (µm) Use 3 positions.5 mm apart Let jitter sample profile Insufficient jitter when TCAV off BIW 21 17 17 Henrik Loos

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Relative Bunch Length Monitor Single shot non-interceptive bunch length diagnostics Coherent edge radiation from chicane bend Broadband pyroelectric detector for far infrared Wavelengths 1 mm 2 μm Detector Signal (1 5 cts) 8 6 4 2 Pyro-Detector Signal Fit Function 1 2 3 4 5 Bunch Length (µm) Mesh Filter Paraboloid Beam Splitter Pyro Detector Beam Edge Radiation Detector calibration with absolute measurement from TCAV Empirical fit of signal to (σ z ) 4/3 Use fit to calculate peak current BIW 21 18 18 Henrik Loos

X-Ray Diagnostics in FEE Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Courtesy R. Bionta, LLNL BIW 21 19 19 Henrik Loos

Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM X-Ray Energy Measurements FEL Energy Loss (MeV) 1 8 6 4 2 Energy Loss Gas Detector -6-4 -2 2 4 6 XCOR:UND1:18 (G-m) Determine X-ray beam energy from electron beam loss due to lasing Compare energy in main dump with energy upstream of undulator Also loss from wake fields in undulator vacuum chamber and spontaneous emission Kick orbit to suppress lasing as base line Absolute measurement to calibrate others BIW 21 2 2 Henrik Loos

Gas Detectors Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Part of gas attenuator system located between differential pumping stations N 2 gas at.1 2 Torr Pressure depends on X- ray wavelength X-rays create Auger e -, trapped in magnetic field Generate secondary e -, and N 2 fluorescence, detect with PMTs GDET:FEE1:241:ENRC Energy Loss (MeV) 1 8 6 4 2 slope= 1.2+-.1 offset=.2+-.1 MeV 2 4 6 8 1 BPM Energy Loss (MeV) Signal saturates at too much pressure Calibrate with energy loss scan Routinely done when X- ray wavelength changed BIW 21 21 21 Henrik Loos

X-Ray YAG Screens Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM y (mm) 8 6 4 2-2 Dump area X-Ray YAG Screen Direct imager cooled 16 bit CCD Measure X-ray beam size Use intensity for FEL gain length -4-6 -8-1 -5 5 1 x (mm).5 FEE Direct Imager Main X-ray beam with diffraction pattern from C-wire at last undulator Spontaneous background with shadow from undulator vacuum chamber Visible light CER ring from dump bend y (mm) -.5-1 -1.5-4 -3.5-3 -2.5-2 -1.5 x (mm) BIW 21 22 22 Henrik Loos

Summary Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM Diagnostics meets all requirements necessary for successful FEL operation Highly integrated into EPICS control system High level Matlab applications to automate measurements COTR issue of profile monitors offset by use of wire scanners New 2D diagnostics needed for time resolved emittance measurements for compressed bunches Sub-micron bunch length in 2 pc mode poses diagnostics challenge, new methods being discussed Single shot X-ray spectrum measurement soon available X-ray pulse length measurement in development BIW 21 23 23 Henrik Loos

Acknowledgements Editor's Note: PDF version of slides from Beam Instrumentation Workshop 21, Santa Fe, NM LCLS Commissioning Team R. Akre A. Brachmann R. Coffee F.-J. Decker Y. Ding D. Dowell S. Edstrom P. Emma A. Fisher J. Frisch S. Gilevich G. Hays Ph. Hering Z. Huang R. Iverson H. Loos M. Messerschmidt A. Miahnahri S. Moeller H.-D. Nuhn D. Ratner J. Rzepiela T. Smith P. Stephan H. Tompkins J. Turner J. Welch W. White J. Wu G. Yocky BIW 21 24 24 Henrik Loos