Evaluating success of diamond grinding to attain project noise reduction goal via system-wide OBSI study

Similar documents
NCHRP 1 44 & Caltrans LA 138

The Sunland Park flyover ramp is set to close the week of March 19 until early summer

HPMS Rule on Collecting Pavement Condition Data. Roger Smith Sui Tan

MAY 5, Noise Barrier Presentation SE Quadrant Noyes Street and Lincoln Street NOISE BARRIER ABUTTER MEETING. Tech Environmental, Inc.

Municipal Act, 2001 Loi de 2001 sur les municipalités

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

Project 1-44 (1) Measuring Tire-Pavement Noise at the Source: Precision and Bias Statement

Appendix E FTA NOISE MODELING WORKSHEETS AND DETAILED METHODOLOGY

Transportation and Road Weather

What s New in the World of Winter Maintenance Technology. Laser Road Surface Sensor (LRSS) Functional Description

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

PILOT STUDY: PAVEMENT VISUAL CONDITION AND FRICTION AS A PERFORMANCE MEASURE FOR WINTER OPERATIONS

Assignment 4:Rail Analysis and Stopping/Passing Distances

A Driving Simulation Based Study on the Effects of. Road Marking Luminance Contrast on Driving Safety. Yong Cao, Jyh-Hone Wang

AASHTO Committee on Maintenance 2018 Annual Meeting July 25, Hurricane Irma- Preparation and Response

The last three sections of the main body of this report consist of:

Expanding the GSATS Model Area into

IWT Scenario 1 Integrated Warning Team Workshop National Weather Service Albany, NY October 31, 2014

Municipality of Grey Highlands Policy

Marking the Approach- ends. of Channelization

Weather Responsive Traffic Management. Wyoming DOT Variable Speed Limit (VSL) Project. March 2012

Monroe County: Key West and Lower Keys

Weather Responsive Traffic Management. WYDOT VSL Project. October 2011

Subject: Desert Palisades Specific Plan - Tram Way Access Sight Distance

TMC Monthly Operational Summary

FIN STABILIZER OPERATIONS TRAINING COURSE

Appendix C Final Methods and Assumptions for Forecasting Traffic Volumes

West Tennessee Construction June 14-21, 2017

Rock Scaling Recommendations Logan Creek Drive Cut Slope

Fast and Furious Rebuilding and Widening the I-90 West Corridor

SHORT NIGHTTIME WATER SHUTDOWN TO OCCUR IN EARLY HOURS OF MAY 29

Storm Surge Forecast with Shifting Forecast Tracks

Local Calibration Factors for Implementing the Highway Safety Manual in Maine

THE SAFER APPROACH TO PLOWABLE MARKERS

THE SAFER APPROACH TO PLOWABLE MARKERS

Culway Weigh-In-Motion (WIM) Compensating for Calibration Drift Preliminary Report

Septem ber 28, 2016 EL PASO, Texas

TMC Monthly Operational Summary

2010 Winter Weather Advisory

FINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX J Wind and Temperature Gradients

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update

Submitted for Presentation at the 2006 TRB Annual Meeting of the Transportation Research Board

Town of Oconomowoc Snow & Ice Control Policy

1,836 people die and 136,309 people are injured every year from icy roads in the US.

Sample Snow Services Proposal Alle Rorie 7157 E Kemper Rd Cincinnati, OH Phone: (800)

2015 Grand Forks East Grand Forks TDM

Highway Research Council

South Western Region Travel Time Monitoring Program Congestion Management Process Spring 2008 Report

20 18CEHA Fall Chloride Workshop

Xiaoguang Wang, Assistant Professor, Department of Geography, Central Michigan University Chao Liu,

Measuring and GIS Referencing of Network Level Pavement Deterioration in Post-Katrina Louisiana March 19, 2008

Appendix BAL Baltimore, Maryland 2003 Annual Report on Freeway Mobility and Reliability

I-95/I-85 INTERCHANGE ROADWAY SAFETY ASSESSMENT

2008 SEAUPG CONFERENCE-BIRMINGHAM, ALABAMA

c. Solve the system of two equations to find the speed of the boat in the water (x) and the speed of the current (y). (0.45, 0.05)

Acquisition of Multi-Function Equipment at DIA: Conditions, Factors, Considerations & Integration. Presented by Mike Carlson September 20, 2012

2016 APWA Snow Conference. Web-based GIS for Municipal Snow Operations

Active Traffic & Safety Management System for Interstate 77 in Virginia. Chris McDonald, PE VDOT Southwest Regional Operations Director

Section 3 Average Speed: Following Distance and Models of Motion

MONTGOMERY COUNTY SNOW PLAN

Freeway Work Zone Lane Capacity

Establishing Winter Standard Operating Procedures

Modulus of Rubblized Concrete from Surface Wave Testing

6-3 Rate of Change and Slope

ADAPTIVE SIGNAL CONTROL IV

Salt Reduction using Innovative

Hurricane Florence Recovery Report 4:00 PM October 31, 2018

Freeway Work Zone Lane Capacity

Appendix N Noise Study

Uncertainties in Acoustics

CHAPTER FIVE: THE LOWER MISSISSIPPI REGION AND PLAQUEMINES PARISH

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

Smoke Fog Superfog - Smoke and Fog mixture Heavy rain and wind

WINTER STORM Annex II

Winter Maintenance on Ontario s Highways

Specific Gravity and Absorption of Aggregate by Volumetric Immersion Method (Phunque Test)

Road Controlling Authorities Forum 27 th April Network resilience: update on opening the Gorge

A FIELD EXPERIMENT ON THE ACCURACY OF VISUAL ASSESSMENT OF WINTER ROAD CONDITIONS

Evaluation of NDDOT Fixed Automated Spray Technology (FAST) Systems November 24, 2009

Innovations in Road Weather. Jon Tarleton Senior Marketing Manager / Meteorologist

Public Works Operations Procedure Report FY 2016 Snow Plan

Conceptual Profile Alternative. Massachusetts Department of Transportation 4-6 December 2010

Focused Traffic Analysis for the One Lincoln Park Project

Estimating long-term noise levels from short-term noise measurements and a long term reference location

Interstate 90 Road Report Montana

Vibration Analysis of Gantry Structures

Major Hurricane Matthew Briefing Situation Overview

Snow Response in an Urban Setting

Identify the letter of the choice that best completes the statement or answers the question.

1 Client The request to draft this report was made by DELTA Light & Optics, Venlighedsvej 4, DK-2970 Hørsholm, Denmark.

Copyright 2009, August E. Evrard.

Organized Chain-Up and VSL

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

California Urban Infill Trip Generation Study. Jim Daisa, P.E.

ROAD DUST SUPPRESSSANTS RESEARCH RESULTS

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario

FIGURE 1 Example schematic of flagging model. Study Design and Results

City of Brainerd, Minnesota Snowplowing Policy

STATE OF CALIFORNIA DEPARTMENT of TRANSPORTATION

Transcription:

Evaluating success of diamond grinding to attain project noise reduction goal via system-wide OBSI study J. Eric Cox Christopher Menge TRB ADC40 Summer Meeting 2013 Santa Fe, New Mexico

Overview OBSI study for RIDOT Interstate 195 Concrete Wearing Surface Modifications (Diamond Grinding) Project Measurements Fall 2012 along I-195 at I-95 interchange near Providence RI Measured before/after diamond grinding of ALL lanes of existing mainline concrete bridge decks and on/off-ramps Project Goal reduce noise & complaints due to traffic on new transverse-tined concrete on I-195 bridges

Overview Contractor s payment bonuses / penalties based on OBSI levels after grinding target of 104 db(a) HMMH collected continuous OBSI time histories for entire study area: 8 travel lanes plus 8 ramps total of ~ 9 miles Also addressed variation in OBSI levels with temperature

Study Area Providence, Rhode Island

Providence River Bridge

Diamond Grinding Before After

OBSI Instrumentation Standard vehicle mounting rig Bruel & Kjaer PULSE real-time data acquisition / analysis system Two tire-mounted pairs of phasematched sound intensity probes Meets ANSI Type I specifications System calibrated before, during, & after use Results only accurate within ~0.5 db(a) due to calibration drift

OBSI Measurement Procedures Used 2012 Toyota Camry and Standard Reference Test Tire (SRTT) Tire pressure & hardness were checked Vehicle speedometer verified to within 1 mph with GPS unit Cruise control used for uniform 60 mph vehicle test speed

OBSI Measurement Procedures Verified suitable test conditions (roadway dry, free of debris, etc.) Measurements generally conducted during early morning hours Four OBSI runs collected over all pavement throughout study area

Measurement Approach: Collect Continuous OBSI Time History Data OBSI results used to assess grinding contractor s work to determine pay adjustment factors and/or need for corrective action "Basis of Payment" section of RIDOT s Special Provision for Diamond Grinding PCC Bridge Deck and Pavement Surfaces HMMH required to determine OBSI sound levels for entire 9 miles of pavement included in grinding project Standard 440 foot roadway test length not feasible Would have required measuring over 100 individual test sections! Continuous on-site data collection and subsequent processing only feasible way to collect all OBSI data in reasonable time Results presented in 0.2 mile (1056 feet) sections as requested by RIDOT

Study Methodology Collect 4 continuous OBSI time-history runs throughout study area No error-checking or data validation performed in the field OBSI data sets were post-processed to: Time-align the four individual runs Remove unrepresentative data (expansion joints, other roadway discontinuities) Divide data set into 0.2 mile sections Perform standard error checking (PI index, Coherence, etc.) Remove further time history data, if necessary to pass checks Calculate overall OBSI results for each 0.2 mile section General accordance with AASHTO TP076 standard OBSI data also analyzed in conformance with NCHRP Report 630

Other Challenges Late-night measurements Data collection on busy urban highway was only possible in early morning hours Staying awake while driving in endless circles was no easy task Required 9 nights 12AM to 6AM for all data collection!! Accelerated start of project Grinding schedule accelerated by one month at last minute Diamond grinding commenced at same time as baseline OBSI data collection Close coordination with contractor needed to avoid conflicts and lane closure issues

Other Challenges Fast-tracked measurement & analysis schedule Out-of-state contractor s payment bonuses / penalties were determined based on OBSI levels after grinding Need for near-immediate measurements of diamond-ground pavements Quick turn around of results necessary to meet two-week billing cycle deadlines Hastened final measurements to avoid Hurricane Sandy! Allowed a determination to be made on relocating the contractor s equipment

Before Grinding Sample Results

After Grinding Sample Results

Consideration of Temperature Effects Baseline OBSI measurements conducted late September to early October Data collection following diamond grinding occurred later in October HMMH acquired after-grinding data in one area on two nights with 20 degree temperature difference to investigate change in OBSI level OBSI levels known to vary with ambient temperature by approx. -0.04 db(a) per degree Fahrenheit (inverse relationship) Estimated a difference in OBSI levels of about 0.8 db(a) Measured a difference of about 1.0 db(a) good agreement Project noise reduction goal adjusted from original after-grinding target OBSI level of 103 db(a) or below to a final target of 104 db(a) or less and at least a 4 db(a) improvement

Summary of OBSI Results BEFORE GRINDING Baseline OBSI levels varied between approximately 108 to 110 db(a) A few slightly lower results in the range of 106 to 107 db(a) AFTER GRINDING OBSI results generally fall between approximately 101 to 103 db(a) Slightly higher results of about 104 db(a) occasionally observed IMPROVEMENT OBSI levels were reduced by 4 to 8 db(a) due to the diamond grinding

Conclusions OBSI levels measured along I-195 were reduced 4 to 8 db(a) due to RIDOT Diamond Grinding Project All after-grinding OBSI results at or below 104 db(a) Grinding contractor was successful in meeting or exceeding project noise reduction goal system-wide

www.hmmh.com