Bridger, Wyoming Maiden Coal JORC Inferred Resource of 910Mt

Similar documents
48% Increase in JORC Inferred Coal Resource to 2.0 Billion tonnes

JV PROJECT UPDATE JORC COAL RESOURCE

For personal use only

For personal use only

For personal use only

MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND

A summary of the review s findings for the six areas, listed in Table 1, is given below.

For personal use only

VISTA COAL PROJECT RESOURCE INCREASES BY 297.1MT TOTAL COAL RESOURCE INCREASES TO 1.37BT

For personal use only

For personal use only

KATINGAN RIA COAL RESOURCE UPGRADE

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

For personal use only

Ovoot Coking Coal Project (100%)

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

For personal use only

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

For personal use only

For personal use only

8.1Mt Maiden JORC Coal Resource estimate at Titiribi Project

Table 1 - Checklist of Assessment and Reporting Criteria (The JORC Code, 2012 Edition)

For personal use only

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

For personal use only

For personal use only

Mt Cannindah IP Data Reprocessing & 3D Geological Modelling Identifies Potential Resource Extensions

Resource upgrade at Greater Whitewash Project to 604 ppm Moly Equivalent*

For personal use only

For personal use only

New Drilling Program Commences at Mutiny s Deflector Deposit

Ausgold awarded EIS grant for Jinkas deep drilling

SESE MEASURED RESOURCE EXCEEDS 650MT COAL

GEOPHYSICAL SURVEYING COMMENCES AT ESK TROUGH

Annual Report Amended Additional Information

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

For personal use only

KURUNDI PROJECT EXPANDED TO INCLUDE PHOSPHATE

INFERRED MINERAL RESOURCE AND CONCEPTUAL EXPLORATION TARGET UPDATE Mt FORREST IRON

DRILLING COMMENCES AT ESK TROUGH

GEOPACIFIC REPORTS HIGH GOLD VALUES IN AUGER SOIL SAMPLES FROM THE QALAU AND TATAIYA PROSPECTS, RAKI RAKI PROJECT,

For personal use only

For personal use only

Significant Copper-Gold JORC Exploration Target

MOUNT DOROTHY AND ELAINE DOROTHY PROSPECTS UPDATE

For personal use only

For personal use only

For personal use only

For personal use only

FIVE RIGS DRILLING AT KARLAWINDA

SIMUKU DRILLING TO OVER 1000 METRES DEMONSTRATES SIGNIFICANTLY INCREASED TONNAGE POTENTIAL OF THE INFERRED RESOURCE

Significant New Mineralised Zone Paroo Range (RGU:100%)

2017 as at 30 June 2017 Project Tonnes HM HM SL OS HM Assemblage Tonnes HM HM SL OS HM Assemblage

Gold Exploration Update

For personal use only

For personal use only

Consolidated Tin Mines Limited

ASX announcement 16 May 2016

Helix Resources Limited A.C.N Incorporated in Western Australia

For personal use only

COMPLETION OF PHASE 1 DRILLING AT TITIRIBI PROJECT IDENTIFIES ADDITIONAL SIGNIFICANT COAL INTERCEPTS

ASX RELEASE KILLI KILLI HILLS GOLD-RARE EARTH ELEMENT PROJECT GOLD RESULTS FROM DRILLING

For personal use only

LOCHINVAR COKING COAL PROJECT. LOI-001 Raw Coal Analysis ASX RELEASE. 18 February 2013 ASX RELEASE. 11 April 2013

For personal use only

African Energy Resources Limited

NCONDEZI COAL COMPANY LTD ("Ncondezi" or the "Company") Ncondezi Project South Block Resource Update

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

For personal use only

For personal use only

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

MAIDEN URANIUM RESOURCE PROOF OF CONCEPT

For personal use only

EXPLORATION SUCCESS AT COYOTE GOLD MINE

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

COKAL CONFIRMS PREMIUM QUALITY METALLURGICAL COAL AT BUMI BARITO MINERAL PROJECT (BBM)

2018 Drilling Underway at Juruena Gold Project

Exploration targets identified to increase Browns Range Project s mine life

High Grade Gold Intersections at Harry Smith Prospect

For personal use only

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

ASX ANNOUNCEMENT 4 March 2019 VTEM SURVEY COMMENCED OVER LORRAINE AND ADZ PROJECT AREAS

For personal use only

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

More growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces

Carrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April

For personal use only

Malachite Resources Limited ABN

Savannah Resources Plc

For personal use only

High-grade Copper and Gold Discovered at Productora

BMG SECURES LOW COST OPTION TO ACQUIRE ADVANCED HEAVY MINERAL SANDS PROJECT IN AUSTRALIA

For personal use only

Victory plans gravity survey for Bonaparte after encouraging rock-chip results

Increased equity in prospective metallurgical coal projects (BBM & BBP) to 60%

For personal use only

Transcription:

ASX / Media Announcement 23 January 2013 Level 12, 301 Coronation Drive, Milton QLD 4064 Australia PO Box 2118, Toowong DC QLD 4066 Australia phone + 61 (0) 7 3337 9944 fax + 61 (0) 7 3337 9945 www.carbonenergy.com.au Carbon Energy Limited ABN 56 057 552 137 Carbon Energy (Operations) PtyLtd ABN 61 105 176 967 Bridger, Wyoming Maiden Coal JORC Inferred Resource of 910Mt Carbon Energy (ASX: CNX, OTCQX: CNXAY) today announced a maiden Coal JORC Inferred Resource of 910 Million tonnes (Mt)at the Company s tenements in Bridger, Wyoming in the United States of America (see Annexure A for the Executive Summary of the Competent Person statement). Carbon Energy has the rights to explore these coal tenements, which cover 113km 2 of land, as part of an agreement with Anadarko Land Corporation. The Bridger prospect is located in the Green River Basin on the northeast flank of the Rock Springs Uplift. The drill hole data for the project comprised 213 holes and includes rock type and lithological descriptions, and seam correlation. This initial statement, completed as part of geological and resource modelling for the area. Previous exploration targets had been estimated at 500Mt across all tenements in Wyoming. The Company s, Bridger, Wyoming tenements are ideally located close to existing natural gas andco2 infrastructure. Acting Chief Executive Officer Morné Engelbrecht said that the Bridger, Wyoming Maiden Resource represented a large resource for future Underground Coal Gasification, but that the current challenging gas market in the United States does not support the commercial exploitation of these tenements in the near to medium term. ENDS For and on behalf of the Board Morné Engelbrecht Acting Chief Executive Officer For more information please contact Andrew Crook on +61 419 788 431 or refer to our website atwww.carbonenergy.com.au

Annexure A Executive Summary Competent Person statement: www.carbonenergy.com.au 2

Geological and Modelling Report Bridger Project, Wyoming (T22N98W) BRIDGER PROJECT, WYOMING (T22N98W) Carbon Energy Geological and Modelling Report January 2013 14 16 Ross St, Newstead, QLD 4006 Phone: (07) 3851 7400 Fax: (07) 3851 7499

Geological and Modelling Report Bridger Project, Wyoming (T22N98W) Executive Summary Carbon Energy (CNX) commissioned GeoConsult Pty Ltd in October 2012 to develop a geological model and conduct a UCG Resource Estimation for the Bridger Project, Wyoming. The Project is located 50km northeast of the township of Rock Springs in southern Wyoming, USA and comprises 27 blocks within 21/22 north and 98/99 west township regions. Carbon Energy acquired coal rights through an agreement with Anadarko Land Corporation. This agreement means that Carbon Energy has the rights to explore over 113km 2 of land owned by Anadarko. The Bridger Prospect is located in the Green River Basin on the northeast flank of the Rock Springs Uplift. Sub bituminous coal within the Paleocene Fort Union Formation makes up much of the surface bedrock over the eastern flank of the uplift. The Coaly interval within the Fort Union Formation is more than 60m thick with the main seams averaging 4 6m. The coal seams have been grouped into seven seam packages within the project area named, in stratigraphically descending order; O, M, B, G, H, K and L. Some of these packages split into two or more plies (Sliwa, R., 2012). The drillhole data for the project comprised 213 holes and includes rock type and lithological descriptions, and seam correlations. The coal and sandstone intervals for the wells have been picked from wireline geophysics. Work on the data up to 2011 was initially conducted by Norwest Corporation. In 2012 Renate Sliwa refined the seam coding in Kingdom and included additional hole data available since 2011. GeoConsult then continued work on the dataset in a Vulcan resource model. Wireline geophysical logs were present for most holes and comprised 19 holes with density logs, 30 holes with sonic, 58 holes with gamma logs, 95 holes with SP logs and 100 holes with resistivity. Geology maps of the Bridger project show numerous faults associated with the Rock Springs Uplift. It is interpreted that it appears likely these could continue into the south of the project area with greater than 30m throw (Sliwa, 14 16 Ross St, Newstead, QLD 4006 Phone: (07) 3851 7400 Fax: (07) 3851 7499

Geological and Modelling Report Bridger Project, Wyoming (T22N98W) 2012 and McCord, 1984). The current spacing of drillholes has not allowed for mapping of any faults within the Bridger Project Area. Seismic data in the area was reviewed by Zapata with no significant faulting identified. Coal quality was sourced from the Norwest Report which utilised coal quality information from McCord in Rightmire et al 1984. The coal quality from the Fort Union Coal at Bridger Mine (target for the Bridger Project) was reported as; 20.5% moisture, 9.7% ash, 29.1% volatile matter, 40.7% fixed carbon, 0.47% Sulphur and 21,700 kj/kg heating value (Norwest Report, 2011). The current dataset is insufficient for mine planning purposes but does allow an estimation of the deposits coal quality to a low level of confidence. A coal resource estimation has been carried out over the Bridger Project Area in accordance with the JORC code. A Resource checklist, specifying the status of the geological data, geological database and model, resource limits and limitations and estimation procedures is attached in Appendix A. Inferred Resources were based on points of observation less than 4km apart and not exceeding 1km past the last data point, constrained by a depth range of between 200m to 1000m, and a minimum seam thickness of 4m. 910Mt of Inferred Resources were established in the Bridger Project over 4 coal seams (O, BU, GU, L). The results of the resource estimation are summarised in the table below. Estimate Polygon Seam Project Thickness (m) Table Coal Resource Estimation Table 4m Minimum Thickness *Nb. Exploration Targets met all requirements for an Inferred Resource, however; includes blocks not held by Carbon Energy at the time of reporting. To include a block within the Exploration Target it had to be fully enclosed on all sides by blocks held by Carbon Energy. Targets are conceptual in nature. Depth (m) Area (km2) Volume (m3) Inferred Resource POLY_O_4M_INF O 2298 4.59 420 606 33.3 153,000,000 229 Inferred Resource POLY_BU_4M_INF BU 2298 4.36 565 813 35.0 152,000,000 229 Inferred Resource POLY_GU_4M_ INF GU 2298 6.75 587 879 34.2 230,000,000 346 Inferred Resource POLY_L_4M_INF L 2298 6.19 822 968 11.4 70,700,000 106 Total Inferred Resources Exploration Target* POLY_O_4M_TAR O 2298 4.62 438 564 13.7 64,200,000 96 Exploration Target* POLY_BU_4M_TAR BU 2298 4.48 584 784 19.9 89,500,000 134 Exploration Target* POLY_GU_4M_TAR GU 2298 6.79 620 836 15.5 105,000,000 158 Exploration Target* POLY_L_4M_TAR L 2298 6.78 822 935 3.5 23,400,000 35 Total Exploration Target Tonnage (Mt) 910 423 The information in this statement that relates to in situ coal resources potential is based on information compiled by GeoConsult Pty Ltd and Adrian Buck and reviewed by Warwick Smyth, who is a member of the Australasian Institute of Mining and Metallurgy (CP) Geology; and the Australian Institute of Geoscientists. Warwick Smyth is a qualified geologist (BSc Geol, Grad Dip AF&I, MAusIMM (CP), MGSA, MAIG), and a Principal Consultant for GeoConsult Pty. Ltd. and has over 20 years experience which is relevant to the style of mineralisation, the type of deposit under consideration and to the activity which has been undertaken to qualify as a Competent Person as defined by the 2004 edition of the Australian Code for Reporting of Coal Resources. Warwick Smyth of GeoConsult Pty Ltd has no material interest or entitlement, direct or indirect, in the securities of Carbon Energy or the Projects. GeoConsult has been commissioned to provide geological services to Carbon Energy since early 2012. Fees for the preparation of this report are on a time and materials basis. Warwick Smyth and GeoConsult Pty Ltd consent to the use of this statement and references to it and extracts from it, in the form and context in which they are included. Apart from the above, neither the whole nor any part of the statement document, nor references thereto, may be included in, or with, or attached to any document, circular, resolution, letter or statement without the prior written consent of Warwick Smyth or GeoConsult Pty Ltd. Dated this 22 nd day of January, 2013 Signature of Qualified Person 14 16 Ross St, Newstead, QLD 4006 Phone: (07) 3851 7400 Fax: (07) 3851 7499

About Carbon Energy Carbon energy specialises in underground coal gasification (UCG). Our proprietary keyseam technology is the key to unlocking new energy sources, transforming stranded, deep coal resources into high-value fuels with lower carbon emissions. Carbon Energy s complete end-to-end UCG services deliver world-class gas projects from initial project assessment through to commercial project development, operations, site decommissioning and rehabilitation. Carbon Energy achieved Proof of Concept of its technology following 10 years of research with Australia s premier scientific research agency, the Commonwealth Scientific and Industrial Research organisation (CSIRO), 5 years of in-field trials and over $100 million investment in technology development. By successfully proving our keyseam technology, we have earned a reputation for delivering consistent, high quality product gas which can be used to produce power, fertilisers and pipeline quality gas. keyseam maximises resource efficiency, extracting up to 20 times more energy from the same resource than coal seam gas (CSG), whilst minimising surface disturbance and preserving groundwater quality. Carbon Energy also has previously announced two wholly-owned assets in southeast Queensland s Surat Basin: 1.4 billion tonnes 1 of coal JORC Inferred Resource which is part of a4 to 8 billion tonnes of coal Exploration target; and 743PJ 2 of Certified 2P syngas reserves. The Company is headquartered in Brisbane, Australia, listed on the Australian securities Exchange (ASX) as CNX and is quoted on the OTCQX International Exchange as CNXAY in the united states. Carbon Energy has UCG projects in Australia, China, Chile, Turkey and the United States. 1 See CNX ASX/Media Announcement 10 September 2012. CNX is not aware of any new information that would materially affect the Resources stated. 2 See CNX ASX/Media Announcement 8 December 2009. CNX is not aware of any new information that would materially affect the Reserves stated. www.carbonenergy.com.au 3