DESCRIPTION OF A HYDROLOGIC DATASET. Department of Environmental Sciences, Wageningen University and. Research Center. Wageningen, The Netherlands

Similar documents
Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC

HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED

Impacts of climate change on flooding in the river Meuse

)UDQFR54XHQWLQ(DQG'tD]'HOJDGR&

GIS in Water Resources Midterm Exam Fall 2016 There are four questions on this exam. Please do all four. They are not all of equal weight.

4. THE HBV MODEL APPLICATION TO THE KASARI CATCHMENT

Watershed Delineation in GIS Environment Rasheed Saleem Abed Lecturer, Remote Sensing Centre, University of Mosul, Iraq

MODULE 7 LECTURE NOTES 5 DRAINAGE PATTERN AND CATCHMENT AREA DELINEATION

July, International SWAT Conference & Workshops

CE 394K.3 GIS in Water Resources Midterm Quiz Fall There are 5 questions on this exam. Please do all 5. They are of equal credit.

Climate Change Impact Assessment on Long Term Water Budget for Maitland Catchment in Southern Ontario

Hydrologic Modelling of the Upper Malaprabha Catchment using ArcView SWAT

Digital Elevation Models. Using elevation data in raster format in a GIS

GIS in Water Resources Midterm Exam Fall 2012 There are five questions on this exam. Please do all five.

GIS in Water Resources Midterm Exam Fall 2008 There are 4 questions on this exam. Please do all 4.

Stream Discharge and the Water Budget

SPATIAL AND TEMPORAL ANALYSIS OF THE DEGRADATION OF NATURAL RESOURCES IN RIVER LIKODRA WATERSHED

REDWOOD VALLEY SUBAREA

Climate also has a large influence on how local ecosystems have evolved and how we interact with them.

PRELIMINARY ASSESSMENT OF SURFACE WATER RESOURCES - A STUDY FROM DEDURU OYA BASIN OF SRI LANKA

Using Morphometric models and Open Source Software to locate Flood prone areas A guide to pilot Implementation

Analyzing spatial and temporal variation of water balance components in La Vi catchment, Binh Dinh province, Vietnam

Basin characteristics

GIS in Water Resources. Fall Homework #1

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed

Model Integration - How WEPP inputs are calculated from GIS data. ( ArcGIS,TOPAZ, Topwepp)

Watershed Analysis of the Blue Ridge Mountains in Northwestern Virginia

A GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner

Table 1 - Infiltration Rates

International Journal of Advance Engineering and Research Development

Evaluation of gvsig and SEXTANTE Tools for Hydrological Analysis Schröder Dietrich a, Mudogah Hildah b and Franz David b

Parameterization using ArcView GIS in medium and large watershed modelling

Geostatistical Analysis of Rainfall Temperature and Evaporation Data of Owerri for Ten Years

Soil Erosion Calculation using Remote Sensing and GIS in Río Grande de Arecibo Watershed, Puerto Rico

Disentangling Impacts of Climate & Land Use Changes on the Quantity & Quality of River Flows in Southern Ontario

Lab 1: Importing Data, Rectification, Datums, Projections, and Coordinate Systems

Promoting Rainwater Harvesting in Caribbean Small Island Developing States Water Availability Mapping for Grenada Preliminary findings

Italian experience with the interpretation of FOCUS surface water scenarios from a regulatory point of view

APPLICATIONS OF DOWNSCALING: HYDROLOGY AND WATER RESOURCES EXAMPLES

Hydrology and Floodplain Analysis, Chapter 10

ENGRG Introduction to GIS

A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake

Development and Land Use Change in the Central Potomac River Watershed. Rebecca Posa. GIS for Water Resources, Fall 2014 University of Texas

CHAPTER VII FULLY DISTRIBUTED RAINFALL-RUNOFF MODEL USING GIS

I&CLC2000 in support to new policy initiatives (INSPIRE, GMES,..)

Application of SWAT for the modelling of sediment yield at Pong reservoir, India

The 2 nd Annual Gobeshona Conference Future Changes of Flash Flood in the North East Region of Bangladesh using HEC-HMS Modeling

Amitava Saha Research scholar IIT, Roorkee India

ENGRG Introduction to GIS

Impact of DEM Resolution on Topographic Indices and Hydrological Modelling Results

A distributed runoff model for flood prediction in ungauged basins

Building a European-wide hydrological model

2007: The Netherlands in a drought again (2 May 2007)

GIS in Water Resources Midterm Quiz Fall There are 5 questions on this exam. Please do all 5. They are of equal credit.

13 Watershed Delineation & Modeling

Introduction to HEC-GeoHMS. Watershed boundary delineation. Assembling Hydrologic Modeling System

Drought News August 2014

Geo-spatial Analysis for Prediction of River Floods

Designing a Dam for Blockhouse Ranch. Haley Born

4. GIS Implementation of the TxDOT Hydrology Extensions

Climate Change Impact Assessment on Indian Water Resources. Ashvin Gosain, Sandhya Rao, Debajit Basu Ray

Overview of Data for CREST Model

Evaluation of gvsig and SEXTANTE Tools for Hydrological Analysis

Effect of land use/land cover changes on runoff in a river basin: a case study

Drought Monitoring with Hydrological Modelling

SUB CATCHMENT AREA DELINEATION BY POUR POINT IN BATU PAHAT DISTRICT

January 25, Summary

Terrestrial pyrogenic carbon export to fluvial ecosystems: lessons learned from the White Nile watershed of East Africa

Inter-linkage case study in Pakistan

Assessing the ability of the HEC-HMS rainfall-runoff model to simulate streamflow across Sweden

Modeling the Effects of Climate and Land Cover Change in the Stoney Brook Subbasin of the St. Louis River Watershed

FOREST FIRE HAZARD MODEL DEFINITION FOR LOCAL LAND USE (TUSCANY REGION)

Modeling of a River Basin Using SWAT Model and SUFI-2

Thailand 8. Tonle Sap. Map of River

Remote Sensing and GIS Applications for Hilly Watersheds SUBASHISA DUTTA DEPARTMENT OF CIVIL ENGINEERING IIT GUWAHATI

Jackson County 2013 Weather Data

Supplementary Materials for

Delineation of Watersheds

GLACIER AND SNOWMELT MODELLING USING SWAT: GANGA BASIN CASE STUDY. INRM Consultants Pvt. Ltd.

CATCHMENT DESCRIPTION. Little River Catchment Management Plan Stage I Report Climate 4.0

AMMA-ALMIP-MEM project soil moisture & μwaves Tb

JRC MARS Bulletin Crop monitoring in Europe January 2019

MARMOT CREEK BASIN: MANAGING FORESTS FOR WATER

Technical Note: Hydrology of the Lukanga Swamp, Zambia

Geographic Information Systems Tools for Collecting and Accessing Arctic Bathymetry: International Bathymetric Chart of the Arctic Ocean

Hydrological modelling of the Lena River using SWIM

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece

Rong Jiang. Map of River. Table of Basic Data. China 14. Serial No. : China-14

2015 Fall Conditions Report

GAMINGRE 8/1/ of 7

Environmental Impact Assessment Land Use and Land Cover CISMHE 7.1 INTRODUCTION

LESSON HEC-HMS

Technical Note: Hydrology of the Lake Chilwa wetland, Malawi

Flood Inundation Mapping under different climate change scenarios in the upper Indus River Basin, Pakistan

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

GIS Geographic Information System

Watershed Modeling With DEMs

JRC MARS Bulletin Crop monitoring in Europe. January 2017 Minor frost damages so far. Improved hardening of winter cereals in central Europe

2. PHYSICAL SETTING FINAL GROUNDWATER MANAGEMENT PLAN. 2.1 Topography. 2.2 Climate

Appendix A Calibration Memos

Transcription:

DESCRIPTION OF A HYDROLOGIC DATASET FOR THE BRISY SUBCATCHMENT R. T. Oosterho? and C. Paniconi y? Department of Environmental Sciences, Wageningen University and Research Center Wageningen, The Netherlands y Center for Advanced Studies, Research and Development in Sardinia (CRS4) Cagliari, Italy June, 2001

Figure 1: Location of Brisy. 1 Introduction This report describes the dataset for the Brisy subcatchment in southeastern Belgium, which is a subcatchment of the Ourthe catchment, itself a subcatchment of the Meuse river basin. The data preparation, organization, and processing steps undertaken for both the Meuse basin and the Brisy subcatchment will be detailed. 2 Brisy subcatchment Near the northwestern border of Luxembourg runs the Ourthe Orientale from east to west. From south to north runs the Ourthe Occidentale, a watershed of the Meuse basin (Figure 1). Where they meet, near the town of Engreux, they form the Ourthe which ows northwards and eventually drains into the river Meuse. Approximately 10{15 kilometers east of the point where the Ourthe Orientale meets the Ourthe Occidentale, near the town of Brisy, ows the river Brisy from north to south into the Ourthe Orientale. The Brisy subcatchment (Figures 2 and 3) encompasses an area of 4.64 square kilometers (maximum length: 2.85 km from east to west and 3.27 km from north to south). The subcatchment contains shallow slopes in the north and steeper slopes in the south, towards the outlet of the catchment (see Figure 4). Figure 5 is a map of the land cover of the Brisy subcatchment. The part indicated as 2

Figure 2: The Brisy subcatchment. x 10 4 480 3.1 460 3.05 440 3 2.95 420 2.9 400 2.85 380 2.8 4.85 4.9 4.95 5 5.05 5.1 5.15 5.2 x 10 4 360 Figure 3: 30 x 30 m 2 resolution DEM of the Brisy subcatchment, top view. 3

500 (m) 480 460 440 420 400 380 360 4.85 3.15 3.1 3.05 3 x 10 4 2.95 2.9 2.85 4.9 4.95 5 2.8 5.05 (m) 5.1 5.15 2.75 x 10 4 5.2 (m) Figure 4: 30 x 30 m 2 resolution DEM of the Brisy subcatchment. 4

Figure 5: Land cover of the Brisy subcatchment. Table 1: Soil texture of the Brisy subcatchment in percentages of sand, silt and clay. Topsoil Subsoil Sand 33.9 6.6 Silt 47.0 46.4 Clay 19.1 47.0 \discontinuous urban fabric" is the town of Brisy. Besides the town of Brisy and a few parts covered with forest, most of the catchment is covered with pastures and elds. The soil of the catchment is approximately 3.0 m thick. The texture of the topsoil diers somewhat from the texture of the subsoil. Table 1 gives the percentages of sand, silt and clay in the topsoil and the subsoil. 3 Data preparation 3.1 JRC dataset The data for the Brisy subcatchment was extracted from 2 datasets of the Meuse basin (Ourthe and Geer watersheds) prepared by the Joint Research Center (JRC) in Ispra, Italy 5

and by the Royal Meteorological Institute (KMI) in Brussels, Belgium. DEM data The original data for the DEM is provided by the Belgian National Geographic Institute in geographic projection (datum wgs84) with a resolution (lat. lon.) of 1" 1" below 50 N (2 maps, 15" 15" block) and of 2" 2" above 50 N (18 maps, 15" 15" block). Blocks have been resampled to 30 30 meter grid and merged to a single map. Land cover data Original data from CORINE database provided by European Topic Centre at Satellus AB, Kiruna - Sweden, in Lambert Azimuthal projection with a resolution of 250 m. Soil depth Original data is provided by European Soil Bureau, Joint Research Centre, Ispra - Italy, in Lambert Azimuthal projection at a scale of 1:1,000,000. Soil texture for top- and subsoil Original data is provided by European Soil Bureau, Joint Research Center, ISP - Italy, in Lambert Azimuth projection at the scale of 1:1,000,000. 3.1.1 GIS processing All data is provided in ArcView / ArcInfo ASCII raster les. Using the function SSTIDRIS the data is imported into the IDRISI geographic information system (GIS). This function uses the row and column structure of the ASCII le as a direct analogue of the row and column structure of an image. SSTIDRIS reads the ASCII le and converts it into an IDRISI image. Further GIS processing is done in IDRISI. To avoid problems due to local depressions in the DEM (pits) the function PIT REMOVAL is applied to the DEM. The purpose of this module is to create an adjusted \depressionless" DEM (Figure 6) in which the cells contained in depressions are raised to the lowest elevation value on the rim of the depression. Each cell in the depressionless DEM will then be part of a monotonically decreasing path of cells leading to an edge of the image. A path is composed of cells that are adjacent horizontally, vertically, or diagonally in the raster grid and that steadily decrease in value. From the DEM a map of the drainage network is created using the function RUNOFF. RUNOFF calculates the accumulation of rainfall units per pixel as if one unit of rainfall was dropped on every location. Using the RECLASS module, a threshold value of 511 is applied to the output to produce the drainage network (Figure 7). To identify the subcatchment the function WATERSHED is applied to the DEM. WATER- SHED identies watersheds from a raster surface image. A seed image is provided with the seed located in the stream right before the Brisy enters the Ourthe Orientale. Working from this map of the Brisy subcatchment, maps of land cover, soil depth, and soil texture are created for the catchment using the IMAGE CALCULATOR in IDRISI. 6

Figure 6: 30 x 30 resolution DEM of the Ourthe Catchment (depitted). Figure 7: Drainage network (detail) of the Ourthe catchment. 7

25 Daily Rainfall and Daily Etp 1993 Daily Rainfall Daily Etp 20 15 10 mm 5 0 5 10 Feb Mar Apr May Jun Jul Aug Sep Oct Figure 8: Daily rainfall and potential daily evapotranspiration for a selected 240-day period. According to the JRC dataset, soil depth and soil texture is fairly homogeneous over the Brisy subcatchment. 3.2 KMI dataset The KMI dataset contains meteorological data recorded at several stations on the Ourthe and Geer watersheds. For this study data of rainfall and evapotranspiration for the meteo station in St. Hubert is used. This station is located 15 to 20 kilometers southwest of the Brisy subcatchment. For the period 1968 to 1997 les containing daily rainfall (mm/day) and (potential) daily evapotranspiration (mm/day) are provided. Plots of rainfall (mm/10 days) and potential evapotranspiration (mm/10 days) are created. From these plots an 8-month period from February to October 1993 (240 days) is selected (Figure 8). To get the net atmospheric ux needed for input to hydrological models the potential daily evapotranspiration is subtracted from the daily rainfall and converted to m/hour. Acknowlegments This work has been supported in part by the European Commission (contract EVK1-CT-1999-00022), by the Italian Ministry of the University (project ISR8, C11-B), and by the Sardinia Regional Authorities. 8