AN ANALYSIS OF TSUNAMI INUNDATION IN MANDALIKA TOURISM AREA (STAGE I) CENTRAL LOMBOK, WEST NUSA TENGGARA

Similar documents
Predicting of Tsunami Inundation Area based on Propagation and Runup Numerical Model in Pacitan City

Predicting Tsunami Inundated Area and Evacuation Road Based On Local Condition Using GIS

NUMERICAL SIMULATION AS GUIDANCE IN MAKING TSUNAMI HAZARD MAP FOR LABUAN ISLAND

Originally published as:

DATA BASE DEVELOPMENT OF ETA (ESTIMATED TIME OF ARRIVAL) FOR TSUNAMI DISASTER MITIGATION AT SOUTHWESTERN CITIES OF ACEH, INDONESIA

NUMERICAL SIMULATION OF TSUNAMI PROPAGATION AND INUNDATION ALONG THE RAKHINE COAST AREAS IN MYANMAR

TSUNAMI PROPAGATION AND INUNDATION MODELINGS ALONG SOUTH-EAST COAST OF PAPUA NEW GUINEA

Technical Documentation

TSUNAMI AND EARTHQUAKE ACTIVITY IN INDONESIA *

NUMERICAL SIMULATIONS FOR TSUNAMI FORECASTING AT PADANG CITY USING OFFSHORE TSUNAMI SENSORS

New Tsunami Disaster Mitigation System considering Local Conditions of Indian Ocean Rim Regions

TSUNAMI HAZARD ASSESSMENT IN NORTHERN EGYPT USING NUMERICAL SIMULATION

LOCAL TSUNAMIS: CHALLENGES FOR PREPAREDNESS AND EARLY WARNING

Wainui Beach Management Strategy (WBMS) Summary of Existing Documents. GNS Tsunami Reports

Indian Ocean Tsunami Warning System: Example from the 12 th September 2007 Tsunami

Tsunamis and ocean waves

Integration Activities in Indonesia: The Integration of Land and Marine Spatial Data Sets as Part of Indonesian SDI Development

Tsunami Risk Mitigation Strategy for Thailand. Kjell Karlsrud Norwegian Geotechnical Institute (NGI)

VULNERABILITY FUNCTIONS FOR BUILDINGS BASED ON DAMAGE SURVEY DATA IN SRI LANKA AFTER THE 2004 INDIAN OCEAN TSUNAMI. Murao, O. 1, Nakazato, H.

Overview of Consequences of the Tsunami in Thailand and Roles and Activities of the Department of Mineral Resources after the 26 December 2004 Tsunami

Remote Sensing the Urban Landscape

What is a Tsunami? Tsu = harbor Nami = wave (Japanese terms)

INFLUENCE OF TSUNAMI INDUCED SCOURING ACTION ON FOUNDATION STABILITY OF COASTAL STRUCTURES

DEVASTATING DAMAGE DUE TO THE 2004 INDIAN OCEAN TSUNAMI AND ITS LESSONS

Outline of Guideline for Development and Utilization of Tsunami Disaster Management Map

RING 2 RING 2. Banda Aceh. Quick Bird Natural Color Image 28 December Grand Mosque. 3.3km. Destroyed Shoreline/Town. Flooded. Areas.

TSUNAMI PROPAGATION IN ARABIAN SEA AND ITS EFFECT ON DWARKA CITY OF GUJARAT, INDIA

REDUCTION OF TSUNAMI INUNDATION ENERGY BY THE MODIFICATION OF COASTAL TOPOGRAPHY BASED ON LOCAL WISDOM

SPATIAL MODELLING OF TSUNAMI INUNDATION ZONE IN THE SOUTHERN COASTAL AREA OF WEST JAVA INDONESIA

Introduction to Environmental Geology, 5e Case History: Indonesian Tsunami Indonesian Tsunami (2) Introduction Historic Tsunamis

URBAN LAND USE PLANNING BASED ON TSUNAMI DISASTER MANAGEMENT USING TSUNAMI DYNAMIC MODELING IN FLORES ISLAND-INDONESIA

Numerical Simulation of Hydrodynamic for Abrupt Bathymetry in Palu River Estuary

GEOLOGICAL HAZARD MITIGATION STRATEGY IN INDONESIA

UNIVERSITY GADJAH MADA EUBIOS YOUTH LOOKING BEYOND DISASTER (LBD5) FORUM 4-8 SEPTEMBER, Hosted by: Universitas Gadjah Mada

Name: Date: Bell: The Sumatra Earthquake and Tsunami December 26, 2004

Geospatial application in Kiribati

EXPERIMENTAL AND NUMERICAL SIMULATION OF TSUNAMI BORE IMPACT ON A BUILDING

The Challenge of Earthquake Disaster in Indonesia. Hery Harjono Indonesian Institute of Sciences

VALIDATION OF TSUNAMI INUNDATION MODELING FOR THE 2004 SUMATRA-ANDAMAN EARTHQUAKE FOR MAKING HAZARD MAPS IN PENANG AND LANGKAWI, MALAYSIA

Interactive comment on Assessing the tsunami mitigation effectiveness of a planned Banda Aceh Outer Ring Road (BORR), Indonesia by Syamsidik et al.

LONG TERM VARIATIONS OF SIGNIFICANT WAVE HEIGHT AROUND INDONESIA SEAS

Strategic approach towards Post Tsunami Mitigation and Conservation of the Sri Lankan coastline

APPLICATON OF SEAMLESS SIMULATION OF SEISMIC RESPONSE ANALYSIS AND HIGH RESOLUTION TSUNAMI SIMULATION TO COASTAL AREA OF SENDAI

SIMULATION OF A WORST CASE TSUNAMI SCENARIO FROM THE MANILA TRENCH TO VIETNAM

Supplement of Scenario-based numerical modelling and the palaeo-historic record of tsunamis in Wallis and Futuna, Southwest Pacific

BIBLIOGRAPHIC REFERENCE

EVALUATION OF TSUNAMI EVACUATION PLANS IN PADANG, INDONESIA

Use of Geospatial data for disaster managements

SMR/ May Simulation Analyses of Tsunami caused by Chilean and Nihon-Kai Chubu Earthquakes at Nuclear Power Plant Sites in Japan

The Integration of Land and Marine Spatial Data Set As Part of Indonesian Spatial Data Infrastructure Development

CHANGES IN VIJAYAWADA CITY BY REMOTE SENSING AND GIS

Mainstream Space Technology in Implementing SFDRR - GPSTAR. Srimal Samansiri Disaster Management Centre Government of Sri Lanka

REPORT TO THE PLANNING, TRANSPORTATION AND PROTECTIVE SERVICES COMMITTEE MEETING OF JUNE 26, 2013

Risk-based land use and spatial planning

Numerical simulations for Investigation of the Coastline Erosion due to the 2004 Indian Ocean Tsunami

(energy loss is greater with longer wavelengths)

REAL-TIME TSUNAMI INUNDATION FORECAST STUDY IN CHIMBOTE CITY, PERU

Geography General Course Year 12. Selected Unit 3 syllabus content for the. Externally set task 2019

Developing fragility functions for tsunami damage estimation using the numerical model and satellite imagery

TSUNAMI INUNDATION MODELING: SENSITIVITY OF VELOCITY AND MOMENTUM FLUX TO BOTTOM FRICTION WITH APPLICATION TO BUILDING DAMAGE AT SEASIDE, OREGON

Introduction to Environmental Geology, 5e

Effect of explicitly representing buildings on tsunami inundation: a pilot study of Wellington CBD

Prevention Tsunami wall 10m high (breached by the tsunami due to land level falling by 3m)

Sentinel Asia Tsunami Working Group

History of International Training in Seismology and Earthquake Engineering at IISEE

Analysis of Land Subsidence (Land Subsidence) Affects Against Water Puddle In Semarang City

Advisors: Arcadii Grinshpan, Mathematics and Statistics Rocco Malservisi, School of Geosciences. Problem Suggested By: Rocco Malservisi

Remote Sensing and GIS Contribution to. Tsunami Risk Sites Detection. of Coastal Areas in the Mediterranean

UNITED NATIONS E/CONF.96/CRP. 5

Initiative. Country Risk Profile: papua new guinea. Better Risk Information for Smarter Investments PAPUA NEW GUINEA.

A new approach in tsunami-early warning 10 November 2008

Vulnerability of Flood Hazard in Selected Ayeyarwady Delta Region, Myanmar

Bathymetry Data and Models: Best Practices

The World of Geography Pre-Test/Study Guide Chapter 1 Test

Earthquake Hazards. Tsunami

Earthquake Hazards. Tsunami

Earthquake Risk in Indonesia

CHAPTER EXIT CHAPTER. Models of Earth. 3.1 Modeling the Planet. 3.2 Mapmaking and Technology. 3.3 Topographic Maps CHAPTER OUTLINE

Word Cards. 2 map. 1 geographic representation. a description or portrayal of the Earth or parts of the Earth. a visual representation of an area

Preparation for Future Earthquake and Tsunami Hazards: Lessons Learned from the 2004 Sumatra-Andaman Earthquake and the Asian Tsunami

Pacific Catastrophe Risk Assessment And Financing Initiative

Natural Disasters Spring, LECTURE #8: Earthquake Disasters: Monitoring & Mitigation. Date: 1 Feb 2018 (lecturer: Dr.

Pacific Catastrophe Risk Assessment And Financing Initiative

ESTIMATION OF LANDFORM CLASSIFICATION BASED ON LAND USE AND ITS CHANGE - Use of Object-based Classification and Altitude Data -

Coastal Vulnerability Assessment in Semarang City, Indonesia Based on Sea Level Rise and Land Subsidence Scenarios

Pacific Catastrophe Risk Assessment And Financing Initiative

KNOWLEDGE NOTE 5-1. Risk Assessment and Hazard Mapping. CLUSTER 5: Hazard and Risk Information and Decision Making. Public Disclosure Authorized

Integrated Approach to Assess the Impact of Tsunami Disaster

Risk sensitive landscape planning and design: case study of the Prince Islands, Istanbul

Monitoring Coastal Change after the Tsunami in Thailand

Status after Six Years

The Third UN-GGIM-AP Plenary Meeting. Use of Geospatial Information in Disaster and Coordination among NDMA and Relevant Organizations/Stakeholders

Development of the Kingdom of Tonga Cyclone Emergency Recovery and Management System using Geospatial Tools

STUDY ON TSUNAMIGENIC EARTHQUAKE CRITERIA FOR THE INDONESIAN TSUNAMI EARLY WARNING SYSTEM

Assessing Building Vulnerability to Tsunami Hazard in Padang. Keywords: Building vulnerability; tsunami hazard; risk analysis

Tsunami Inundation Modelling for Bay of Plenty - Executive Summary March 2013

Study of the liquefaction phenomenon due to an earthquake: case study of Urayasu city

UNDERSTANDING TSUNAMI RISK TO STRUCTURES: A CANADIAN PERSPECTIVE

STATUS OF HAZARD MAPS VULNERABILITY ASSESSMENTS AND DIGITAL MAPS

Preliminary Study of Possible Tsunami Hazards in Taiwan Region

Transcription:

International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 7, July 2018, pp. 87 95, Article ID: IJCIET_09_07_008 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=7 ISSN Print: 0976-6308 and ISSN Online: 0976-6316 IAEME Publication Scopus Indexed AN ANALYSIS OF TSUNAMI INUNDATION IN MANDALIKA TOURISM AREA (STAGE I) CENTRAL LOMBOK, WEST NUSA TENGGARA Agus Setiawan, Eko Pradjoko and Hartana Master of Civil Engineering, Post Graduate Program, University of Mataram, Indonesia ABSTRACT West Nusa Tenggara was hit by an earthquake / tsunami in August 19,1977 particularly in Lunyuk Sumbawa. This earthquake epicentrum was in 11.1 Southern Latitude (SL) 119.0 East Longitude (EL) with magnitude 7 Richter Scale, 33 km depth that hit Sumbawa, West Nusa Tenggara impacted to Kuta village area including Mandalika Tourism Area (MTA), Central Lombok. This research was conducted based on previous research accomplished by Kusuma (2014) with calculation of tsunami wave propagation time from tsunami epicentral to research point with duration 18 minutes. Research method employed in this research were bathymetric data, existing topography, topography of infrastructure development plan and Lot area data based on Detail Engineering Design (DED) Masterplan using Global Mapper application software, Comcot V 1.6, Surffer V.13 and ArcGis 10.3. Analysis of run-up of tsunami waves using 4 (four) wave height scenarios, i.e. 3.5 meters of existing condition and 3.5 meters, 5 meters, 7 meters of each condition after the development. The result of run-up of the tsunami wave in the widest 3.5 meters width occurred at minute 28 and 3.5 meters after built with the widest inundation at minute 33. Simulated run-up simulation showed differences and changes which occurred in MTA decreased by 855,617,12 m 2. The impact that occurred on the supporting village, Kuta increased by 3,278 m 2. Key words: Run Up Tsunami, Inundation, Mandalika Tourism Area. Cite this Article: Agus Setiawan, Eko Pradjoko and Hartana, An Analysis of Tsunami Inundation in Mandalika Tourism Area (Stage I) Central Lombok, West Nusa Tenggara, International Journal of Civil Engineering and Technology, 9(7), 2018, pp. 87 95. http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=7 1. INTRODUCTION Mandalika Tourism Area (MTA) is located in Lombok Island, West Nusa Tenggara, Indonesia. It's location on the southern coast is close to a subduction zone which is directly adjacent to the Indian Ocean that is identical with its potential risk of tsunami. The earthquake / Tsunami hit West Nusa Tenggara in August, 19 1977 particularly in Lunyuk Sumbawa. This http://www.iaeme.com/ijciet/index.asp 87 editor@iaeme.com

An Analysis of Tsunami Inundation in Mandalika Tourism Area (Stage I) Central Lombok, West Nusa Tenggara earthquake epicentral was in 11.1 Southern Latitude (SL) 119.0 East Longitude (EL) with magnitude 7 Richter Scale, 33 km depth and it impacted to Kuta village area including MTA. A research on the analysis of Tsunami inundation is aimed at identifying the impact and extent of run-up area in the Mandalika Tourism Area (MTA) and the impact on Kuta as the supporting area of MTA. This run-up analysis used 4 wave height scenarios, i.e. 3.5 meters of existing condition and 3.5 meters, 5 meters, 7 meters of each condition after the development plan. Each scenario is analyzed and evaluated using Comcot V 1.6, Surffer V.13 and ArcGis 10.3 applications for determining the boundary of the study site, simulating the run-up time of the tsunami wave and analyzing the puddle pool data on KPM spatial layout. The basis of analysis and evaluation is the time of tsunami waves to the shore, the deepest and widest pools. This study aims at discovering the prediction of tsunami wave travel time, run up altitude, inundation depth and to know the impact of tsunami inundation on MTA land use and Kuta village as a supporting village. 2. LITERATURE REVIEW Pradjoko et.al, (2015) conducted a post-tsunami survey in Kuta Village Lombok related to the distribution of tsunami water increases on spatial conditions using GPS technology to identify elevations and rising positions of tsunami water. Based on the field survey, it revealed that water rose about 1.5 meters with a position almost close to each other. The simulation results showed that the tsunami wave propagation time is about 20-30 minutes. The resulting increase in depth of water was received as compared to the results of a 1.6 m field survey and a tsunami rise of 300-800 m from the coastline. In this research, simulation analysis used existing data and there was no development in MTA. Kusuma (2014) accomplished an analysis of tsunami hazard by simulating the 1977 tsunami incident. This study is used as a reference to determine tsunami prone areas. The tsunami incidence data as well as the depth of the 1977 tsunami run-up were obtained from interviews with victims. By stating the time of tsunami wave spreading from earthquake source to the research point was 18 minutes, the result of simulation was concluded. 3. RESEARCH METHODOLOGY 3.1. Data Collection dan Simulation Raster digital data collection; satellite images, aerial photographs and vector data; existing topography and conditions after development. Satellite image and aerial photography data are intended as existing information medium, while topographic data provides elevation information as the basis for analysis, evaluation and calculation of inundation areas. The process of analyzing the contour / topographic elevation data in this study employed the Multigrid Coupled Tsunami Model (COMCOT) V 1.6, using shallow wave theory in Cartesian coordinate system when the depth is smaller than the wavelength. The tsunami modeling program (COMCOT) V 1.6 is able to simulate waves of run-up, run-up, and rundown in coastal areas. The wave propagation equation is presented in Eq.1-Eq.3 as follows: + { + }= 0 (1) + { } + { } + gh + F x = 0 (2) + { }+ { +gh + F y = 0 (3) http://www.iaeme.com/ijciet/index.asp 88 editor@iaeme.com

Agus Setiawan, Eko Pradjoko and Hartana Clarification of symbols: η = water level elevation (m) P = h.u = water volume flux x axis (m2 / sec) Q = h.v = water volume flux y (m2 / sec) g = acceleration of gravity (m2 / sec) h = water depth (m) H = h + η = total water depth (m) F x = bottom friction in x direction F y = bottom friction in y direction To analyze COMCOT v 1.6 this study used the simulation process data as follows: The total duration intended to discover in the simulation results in seconds, using a value of 1800 seconds (30 minutes). The time interval of the simulation results intended to be viewed in seconds, using 60 seconds (1 minute). The process of run-up and tsunami wave analysis using SURFER v.13 by making the following grid boundaries are described as follows: Ix is the total number of grid x (west to east), this data is equated to the value at the time of the grid making that is 643 grid. Jy is the total number of grid y (south to north), this data is equated to the value at the time of grid making that is 824 grid. The boundary and grid making process at research point with SURFER v.13 application using Universal Transverse Mercator coordinate (UTM) with reference coordinate result are described as follows: On the smallest X-axis value : 419370.2706 On the largest X-axis value : 425786.7106 On the smallest Y-axis value : 9011419.513 On the largest Y-axis : 9019651.187 The Use of Global Mapper is required to overlay maps according to the binding points used in spatial analysis applications on MTA. The use of ArcGIS is intended to process the calculation of the extent data on the MTA Lot to run up and inundation of the tsunami. MTA masterplan spatial data is required for the analysis and evaluation of the tsunami inundation on the overall development of the area in stage I consisting of : Data of Lot of MTA based on Detail Engineering Design (DED) Masterplan The infrastructure data includes: road ROW / DMJ (road owned area) 90, 60, 45, 30 and 15 meters, utilities and landscape. Data of buildings (hotels, villas, residential and other supporting buildings) http://www.iaeme.com/ijciet/index.asp 89 editor@iaeme.com

An Analysis of Tsunami Inundation in Mandalika Tourism Area (Stage I) Central Lombok, West Nusa Tenggara (a) Figure 1 (a) Map of Masterplan Mandalika Stage-1 and (b) initial contour map for analysis and calculation of tsunami run-up. In the process of analysis, calculation, and simulation of inundation are conducted on the use of COMCOT v. 1.6 and SURFER v.13, while the analysis and evaluation of area calculations used ArcGis v.10.3 with 3 (three) time variations and 4 (four) depth variations. 3.2. Analysis of Tsunami Run Up In analyzing tsunami run up, this study used the limitation of 3 variations of run-up time of the tsunami wave, at each 3.5 meter wave height of existing condition, 3.5 meters development to know the run up data gap, the extent and depth of inundation. Additional variations of wave height 5 meters and 7 meters development in this research is intended to know the condition of run up and inundation in MTA and supporting village, 3 variations of time explained as follows: When tsunami run up wave reach the beach and start to enter the mainland. When the run-up has entered the mainland with the highest depth of inundation (deepest) at a particular location. When run up reached the maximum widest inundation and the flow has not shown back towards the coast. On each time variation and wave height with 4 variations of inundation depth were used for the analysis and calculation of run-up of the tsunami inundation within the MTA and the location of the supporting village. The time scenario of this study refers to Kusuma's previous research (2014) in which the duration of the analysis result from the source of the earthquake in 1977 to the starting point of the research is 18 minutes will be added by the results of simulation of run-up wave simulation in line with the duration of the study, as shown in Figure 2 as follows: (b) http://www.iaeme.com/ijciet/index.asp 90 editor@iaeme.com

Agus Setiawan, Eko Pradjoko and Hartana Figure 2 Illustration of tsunami wave in MTA as the location of this research 4. RESULTS & DISCUSSION Based on analysis and evaluation of research with high scenario of tsunami wave 3.5 meter existing condition, result of run-up process of tsunami wave simulation and analysis of inundation data, the result can be shown in Figure 3 and Figure 4 below. Figure 3 Tsunami wave height illustration 3.5 meters existing condition Figure 4 Results of run-up and inundation simulation process with wave height 3.5 meters of existing condition Based on analysis and evaluation of research with the scenario of the height of tsunami wave 3.5 meters under the condition of development in MTA, the results of run-up process of tsunami wave simulation and analysis of inundation data are shown in Fig 5-Fig 6 as follows: http://www.iaeme.com/ijciet/index.asp 91 editor@iaeme.com

An Analysis of Tsunami Inundation in Mandalika Tourism Area (Stage I) Central Lombok, West Nusa Tenggara Figure 5 Tsunami wave height illustration 3.5 meters under Development conditions Figure 6 Results of run-up and inundation simulation with wave height 3.5 meters under development conditions The impacts of run-up of tsunami waves occurring in MTA are presented as follows: The minimum inundation area occurs at simulated wave height of 3.5 meters under condition in which the development and pilling up based on the elevation of the plan, with the extent of the inundation of 1,789,765.12 m2 (31.70%). The maximum inundation area occurs at simulated wave height of 7 meters under condition in which the development and pilling up based on the elevation of the plan, with the extent of the inundation of 3,274,025,83 m2 (40.93%). Details as shown in Table 1 below: Table 1 Recapitulation of run-up and tsunami inundation analyzes in MTA http://www.iaeme.com/ijciet/index.asp 92 editor@iaeme.com

Agus Setiawan, Eko Pradjoko and Hartana Figure 7 Diagram of Inundation on MTA The impacts of run-up of tsunami waves that occurred in Kuta Village are described as follows: The largest tsunami run-up run in the simulation of 7 meters 27 minutes waves with area: 352.384.56 m2 with a depth of 0.1 to 1 meter. The smallest tsunami run-up occurs in the 3.5-meter wave simulation after built on 27 minutes with an area of: 8,612.35 m2 with a depth of 1-1.5 meters. The tsunami run up inundation occurred in simulation of 7 meter development wave height 27 minutes min by 2-4 meters depth with 72,034.11 m2 area. Total area of the largest inundation run-up of tsunami waves that inundated the area of Kuta village outside MTA was 665,748.43 m2 with depths ranging from 0.1-4.0 meters occurred at 7 meters wave height development 27 minutes. Different area between existing condition and development on wave 3.5 meter: 3.278 m2. Table 2 Recapitulation of tsunami run-up results in Kuta Village Figure 8 Diagram of Inundation in Kuta Village http://www.iaeme.com/ijciet/index.asp 93 editor@iaeme.com

An Analysis of Tsunami Inundation in Mandalika Tourism Area (Stage I) Central Lombok, West Nusa Tenggara 5. CONCLUSIONS Referring to the results of the research and simulation analysis of run-up of tsunami wave with 3.5 meter wave height of existing condition, 3.5 development, 5 meter development and 7 meter development, it can be concluded as follows: The tsunami run up wave in MTA Wave 3.5 meters under existing condition Wave 3.5 meters under development condition Wave 5 meters under development condition Wave 7 meters under development condition : 2,645,382,24 m2 : 1.789.765,12 m2 : 2,535,997,04 m2 : 3,274,025,83 m2 Based on the result of simulation analysis of run-up of tsunami inundation in the existing condition 3.5 meter wave scenario and 3.5 meter under development, it can be concluded that there is a difference of area or decrease of 855,617.12 m2. The tsunami run up wave in Kuta Village Wave 3.5 meter under existing condition Wave 3.5 meter under development condition Wave 5 meter under development condition Wave 7 meter under development condition : 256.516,74 m2 : 259.794,74 m2 : 567.454,01 m2 : 665.748,43 m2 Based upon the result of simulation analysis of run-up of tsunami wave in existing condition 3.5 meter wave scenario and 3.5 meter development, it can be claimed that there is difference of area of 3.278 m2 and there is an increase of extent in wave 3.5 under development condition. ACKNOWLEDGEMENT The authors would like to thank the Indonesian Tourism Development Company (ITDC) for supporting this research. An Analysis of Tsunami Inundation in Mandalika Tourism Area (Stage I) Central Lombok,West Nusa Tenggara. REFERENCES [1] Bita Enarcon J.V. Egis International Indonesia. (2015) Detail Plan Masterplan Mandalika Resort - Lombok. [2] Steel, S. (2012) Land Planning in Regional Development - Spatial Approach & Its Application. CV Publisher. Andi Offset. [3] Brune, S., Ladage, L., Babeyko, Y, A., Muller, C., Kopp, H., Sobolev, V, S. (2009) Submarine Landslides at the Eastern Sunda Margin: Observations and Tsunami Impact Assessment, Natural Hazards, 54, 2, 547-562, DOI: 10.1007 / s11069-009 - 9487-8. [4] Djunaedi, A. (2015) Introduction to Regional and City Planning, Jogjakarta; Publisher Gadjah Mada University Press. [5] FEMA. (2012) in the Enercon J.V. Final Report Egis International Indonesia, 2015, Detail Plan Masterplan Mandalika Resort - Lombok. http://www.iaeme.com/ijciet/index.asp 94 editor@iaeme.com

Agus Setiawan, Eko Pradjoko and Hartana [6] Gare, M. (2001) Reflection Mitigation of Tectonic Deafness and Indonesian Tsunami, Flores Earthquake Case. Bandung; Ars Group Publisher. [7] Hashemi, M., Alesheikh, A, A., (2015) Developing An Agent Based Simulation Model for Earthquakes in the Context of SDI. Department of Geospatial Information System, K.N. Toosi University of Technology. [8] Jazuardi, M. (2015) Planning of Tsunami Tragedy Lane and Places in Kuta Village of Central Lombok. Thesis Bachelor Degree, Department of Civil Engineering University of Mataram, Mataram. [9] Kusuma, T. (2014) Planning of Tsunami Prone Map in Coastal Area of Kuta Lombok Tengah. Thesis Bachelor Degree, Department of Civil Engineering University of Mataram, Mataram. [10] Mueck, M (DLR). and Spahn, H (GIZ IS)., (2013) Tsunami Hazard Maps for Lombok. [11] Mas, E., Suppasri, A., Imamura, F., Koshimura, S., (2012) Agent-based Simulation of the 2011 Great East Japan Earthquake / Tsunami Evacuation: An Integrated Model of Tsunami Inundation and evacuation. International Research Institute of Disaster Science, Tohoku University, Japan. [12] Pradjoko, E., Kusuma, T., Setyandito, O., Suroso, A. and Harianto, B. (2015) 'Tsunami Run-up Assessment of 1977 Sumba Earthquake in Kuta, Central of Lombok, Indonesia' 2nd International Seminar on Ocean and Costal Engineering, Environment and Natura Disaster Management, ISOCEEN 2014, Procedia Earth and Planetary Science 14 (2015) 9-16. [13] Prahasta, E. (2009) Geographic Information System. Bandung; Publisher Informatics [14] Regulation of the Minister of Public Works No. 06 / PRT / M / 2007. (2007) General Guidelines for Building and Environmental Plan. Jakarta. [14] Regulation of the Minister of Public Works, 40 / PRT / M / 2007. (2007) Applied Module of Spatial Planning Guidelines for Coastal Reclamation Area. Jakarta. [15] Regulation of the Minister of Public Works, 20 / PRT / M / 2011. (2011) Guidelines for Preparation of Spatial Detail Plan and District / City Zoning Regulations. Jakarta. [16] Prihantoro, D. (2014) Tsunami Evacuation Plan Using Vertical Shelter in Cilacap Village, Cilacap District, South Cilacap District. Journal of Masters, School of Architecture, Planning and Development of ITB, Bandung. [17] Sumaatmadja. (1998) in Prahasta, E. (2009) Geographic Information System. Bandung; Publisher Informatika Bandung. Triatmodjo, B. (1999) Coast Engineering. Jogjakarta; Offset Beta Publisher. [18] Wahyuni, U. (2007) The Risk of Tsunami Hazard in the Southern Coastal Area of West Lombok Island. Thesis Bachelor Degree, Department of Civil Engineering University of Mataram, Mataram. [19] Wijentunge, JJ. and Wang, X. (2008) 'Indian Ocean Tsunami on 26 December 2004; Numbering Modeling of Inundation in Three Cities on The South Coast of Sri Lanka '. Journal of Earthquake and Tsunami, Volume 2. No.2, p. 133-155. [20] W.Hoppe, Michael, (2010) Knowledge of Risk. Jakarta ; German-Indonesian Publisher Cooperation for a Tsunami Early Warning Systems (GITEWS) Capacity Building in Local Communities. [21] B. M. Kemal, Yosritzal and Y. B. Aulia, Evaluation of tsunami evacuation plans in Padang, Indonesia, International Journal of Civil Engineering and Technology, 8(10), 2017, pp. 773 780 http://www.iaeme.com/ijciet/index.asp 95 editor@iaeme.com