Application of mathematical and physical modeling to resolve sedimentation at Ijok intake

Similar documents
Flood map of Tupai River using combined 1D and 2D modeling

Effect of Pipeline Orientation on Scour Mechanism in Unidirectional Steady Flow

Investigation on Dynamics of Sediment and Water Flow in a Sand Trap

Factors affecting confluence scour

Laboratory Investigation of Submerged Vane Shapes Effect on River Banks Protection

LOGO Self-Cleansing of Storm Drain through Incipient Motion Design Concept and Flushing Gate

Possibility of Reducing Sedimentation at Lateral Diversion

Technical Memorandum No Sediment Model

Evaluation of Scour Depth around Bridge Piers with Various Geometrical Shapes

Ampangan, Nibong Tebal, Penang, 14300, Malaysia c Director, REDAC, Universiti Sains Malaysia, Engineering Campus, Seri Ampangan, Nibong

THE HYDRAULIC PERFORMANCE OF ORIENTED SPUR DIKE IMPLEMENTATION IN OPEN CHANNEL

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

This is a refereed journal and all articles are professionally screened and reviewed

Towards the prediction of free-forming meander formation using 3D computational fluid dynamics

Appendix O. Sediment Transport Modelling Technical Memorandum

Experimental study of scour depth in attracting Groins series

LAB-SCALE INVESTIGATION ONBAR FORMATION COORDINATES IN RIVER BASED ON FLOW AND SEDIMENT

EXAMPLES (SEDIMENT TRANSPORT) AUTUMN 2018

How to predict the sedimentological impacts of reservoir operations?

Lecture Note for Open Channel Hydraulics

Optimization of Alignment of Proposed Canal and Revetment in the old Madhumati River Using Physical Modelling: A Case Study

Technical Memorandum No

Zainab Mohamed Yusof*, Syura Fazreen Hamzah 1 & Shahabuddin Amerudin 2

Study of the rate of sediment trapping and water loss in the vortex tube structure at different placement angles

FLOOD-FLOW CHARACTERISTICS OF EQUATORIAL NATURAL RIVERS IN SARAWAK, MALAYSIA (Date received: )

Flow Field Investigation in a Rectangular Shallow Reservoir using UVP, LSPIV and numerical model

Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream

EFFECT OF STREAM-WISE SPACING OF BRIDGE PIERS ON SCOUR DEPTH

Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River

Annual transport rates at two locations on the fore-slope.

D. MATHEMATICAL MODEL AND SIMULATION

Appendix A Flood Damages in 2013

Pirai river (Bolivia)

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

Sedimentation in the Nile River

GEOMETRY EFFECT ON FLOW AND SEDIMENT DEPOSITION PATTERNS IN SHALLOW BASINS

A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE

PART 2:! FLUVIAL HYDRAULICS" HYDROEUROPE

Case Study: Hydraulic Model Study for Abandoned Channel Restoration

COMPARISON OF LABORATORY AND FIELD MEASUREMENTS OF BRIDGE PIER SCOUR

Conclusion Evaluating Methods for 3D CFD Models in Sediment Transport Computations

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

CASE STUDY NATHPA JHAKRI, INDIA

MATHEMATICAL MODELING OF FLUVIAL SEDIMENT DELIVERY, NEKA RIVER, IRAN. S.E. Kermani H. Golmaee M.Z. Ahmadi

An investigation on the impacts of density currents on the sedimentation in dam reservoirs using TCM model; case study: Maroon dam

ICHE 2014, Hamburg - Lehfeldt & Kopmann (eds) Bundesanstalt für Wasserbau ISBN

PRESSURE AND SCOURING AROUND A SPUR DIKE DURING THE SURGE PASS

Analysis of the Cause for the Collapse of a Temporary Bridge Using Numerical Simulation

U.S. Army Corps of Engineers Detroit District. Sediment Trap Assessment Saginaw River, Michigan

Evaluating methods for 3D CFD Models in sediment transport computations

State Water Survey Division SURFACE WATER SECTION

Local Scouring due to Flow Jet at Downstream of Rectangular Sharp-Crested Weirs

2. PRESENT CONDITION OF THE RESERVOIR 2.1 View of Wonogiri Reservoir (1/3)

WATER INJECTION DREDGING by L.C. van Rijn

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir

Storm Water Best Management Practice: Development of Debris Filtering Structure for Supercritical Flow

Sediment and Water Quality in HEC-RAS. Mark Jensen

Study on Flushing Mechanism of Dam Reservoir Sedimentation and Recovery of Riffle-Pool in Downstream Reach by a Flushing Bypass Tunnel

Module 2. The Science of Surface and Ground Water. Version 2 CE IIT, Kharagpur

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology

CFD Modeling for Structure Designs in Environmental Impacts Mitigation

New computation method for flood flows and bed variations in a low-lying river with complex river systems

DYNAMICS OF FLOOD FLOWS AND BED VARIATIONS IN RIVER SECTIONS REPAIRED TO SHIP-BOTTOM SHAPED CHANNELS FROM COMPOUND CHANNLS

Storm Sewer Design [2]

Growing and decaying processes and resistance of sand waves in the vicinity of the Tone River mouth

Time dependent variation of river bed profile due to mining pit

Prediction of changes in tidal system and deltas at Nakdong estuary due to construction of Busan new port

7.3 Sediment Delivery Analysis

Sediment Extraction and Flow Structure of Vortex Settling Basin

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Earth Science Chapter 6 Section 2 Review

CASE STUDY NATHPA JHAKRI, INDIA

Transactions on Engineering Sciences vol 9, 1996 WIT Press, ISSN

Securing Manoeuverability of a Deep Draft Ship in a Sediment loaded Tidal River Berth

Calibration of CCHE2D for Sediment Simulation of Tarbela Reservoir

VARIATION OF MANNING S ROUGHNESS COEFFICIENT WITH SEEPAGE IN SAND-BED CHANNEL *Satish Patel 1 and Bimlesh Kumar 2

Lateral Inflow into High-Velocity Channels

Texas A & M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory Model Description Form

Erosion Surface Water. moving, transporting, and depositing sediment.

Numerical Simulation Of Sediment Transport And Bedmorphology Around A Hydraulic Structure On A River

Closed duct flows are full of fluid, have no free surface within, and are driven by a pressure gradient along the duct axis.

Probabilistic Evaluation of a Meandering Low-Flow Channel. February 24 th, UMSRS

Hydraulics of bendway weirs

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

Sessom Creek Sand Bar Removal HCP Task 5.4.6

Chapter Number. Sediment Transport in Kulim River, Kedah, Malaysia. Chun Kiat, Chang and Aminuddin, Ab. Ghani Universiti Sains Malaysia Malaysia

Morphological Changes of Reach Two of the Nile River

Influence of geometry shape factor on trapping and flushing efficiencies

Laboratorial investigating of the scouring extension in the range of trapezoidal and rectangular Multiple vanes to direct the flow in the rivers bends

Submarine Debris flow Project Proposal to Force August 2018/v1.02

Dealing with Sedimental Transport Over Partly Non-Erodible Bottoms

SUSTAINABLE SEDIMENT MANAGEMENT

Closed duct flows are full of fluid, have no free surface within, and are driven by a pressure gradient along the duct axis.

Decline of Lake Michigan-Huron Levels Caused by Erosion of the St. Clair River

NUMERICAL MODEL FOR MOVABLE BED AS A TOOL FOR THE SIMULATION OF THE RIVER EROSION A CASE STUDY

Geomorphological Modelling in Coastal Waters

Hydraulic Structures. Notes and Handouts

Deposition and Resuspension of Sediments in Near Bank Water Zones of the River Elbe

Sensitivity Analysis of Nonequilibrium Adaptation Parameters for Modeling Mining-Pit Migration

Transcription:

Application of mathematical and physical modeling to resolve sedimentation at Ijok intake NOOR FAREEZIANNA NOOR SHAHIDAN, MSc Student, River Engineering and Urban Drainage Research Centre (REDAC), Universiti Sains Malaysia, Engineering Campus, Seri Ampangan, 14300 Nibong Tebal, Penang, Malaysia. Email: nfns09_sa0818@student.usm.my ZORKEFLEE ABU HASAN, Senior Lecturer, REDAC, Universiti Sains Malaysia, Engineering Campus, Seri Ampangan, 14300 Nibong Tebal, Penang, Malaysia. Email: redac04@eng.usm.my ABSTRACT This paper describes the usability of mathematical and physical model for simulation of sediment pattern near the Ijok Intake, Ijok River, Perak. Ijok Intake is facing sedimentation problem at the inlet that reduced the flow capacity into Ijok Canal. Therefore, CCHE2D as two-dimensional model was used to represent mathematical simulation in this paper, while physical model was designed and constructed with a 1:15 undistorted scale at REDAC physical model laboratory. The comparative study using both models was performed by running simulation without and with an intake structure. Results proved that sediments were accumulated in front of intake structure, where good agreement was obtained between mathematical and physical simulations. Moreover, analyses indicated that CCHE2D as two-dimensional model was able to predict the sediment pattern as similar as physical model. Further simulation with design work of dike structure was carried out using CCHE2D model, and result showed that proposed dike can reduce and control sediment near an intake structure. Thus, it can be concluded that, combination of physical and mathematical model can give advantages in analyzing the river sedimentation near an intake structure for design mitigation works. Keywords: Sedimentation; intake structure; mathematical model; physical model; CCHE2D; design work. 1 Introduction River intake structures are required at many irrigation land, electrical power generation, water-treatment facilities, river navigation systems and other uses. The construction of intake structures on river is intended to divert a certain amount of water from the river for several of utilizes (Dereja, 2003; Erbisti, 2005). The development of intake structure consists of various methods and techniques. In particular, the intake structure should be designed to minimize the quantity of bed-load sediment that enters the intake structure. This is important to preserve suitable flow characteristics within pump intakes, prevent clogging and fouling of traveling screens, and eliminate the need for regular maintenance dredging (Nakato and Ogden, 1998). There are several approaches in studying river hydraulics and sediment transport such as field measurements, mathematical model, physical model and combination of both models. In solving these river engineering problems, the combination all of these techniques can bring about to solve the complex process of sedimentation in river water intake (Devries et al., 1988; Schuster et al., 2009; Souza et al., 2010). Sedimentation at the Ijok Intake is a common example of the impact of sediment transport process. Partial blockage at the entrance of intake structure restricted water to flow through the Ijok Canal. Thus, the intention of this paper is to investigate the sediment pattern using both mathematical and physical model and hence the findings of this study can be applied to design of workable structures which can minimize the sedimentation problems. 2 Study area Ijok River is planned as a part of water supplement to the Kerian Irrigation Scheme (KRS) which is located in the District of Larut Matang and Selama, Perak, Peninsular Malaysia (Fig. 1). KRS was constructed in 1902 and completed in 1906. The main water supply for KRS is from Bukit Merah Reservoir (BMR) which receives most of its water from Kurau River system. Ijok River is a tributary of Kerian River system. Water from Ijok River is diverted through 4 units electric motor of screwdown gate into Ijok Intake to supplement the KRS via Ijok Canal then joining one of the tributary of Merah River before entering the BMR (Figure 1). 784

3 rd International Conference on Managing Rivers in the 21 st Century: Sustainable Solutions for Global Crisis of Flooding, Pollution and Water Scarcity Figure 1 Location map of the study reach on the Ijok Intake at district of Larut Matang, Perak, Peninsular Malaysia 3 Model design and setup 3.1 Physical Model Figure 2(a) 3-dimensional view of model layout The phases in the execution of river physical modeling study are composed of: (1) determination of the model scale; (2) design and construction of model systems; and (3) model simulations. A 1:15 undistorted scale model (the horizontal scale is equal to the vertical scale) was chosen. This scale was sufficient to cover the selected study area and allowed greater flexibility in the selection of other modeling parameter. The model is constructed with available space of 10 m (length) x 5 m (width). The overall size of physical model is 8.5 m (length) x 3.5 m (width) in a scale of 1:15. River model was constructed with brick masonry sprayed with waterproof to ensure that the model does none leak. The model was fitted with recirculation water system, stilling basin, adjustable valve, adjustable over spill weir, measuring weir and settling basin. The construction of model topographies occurred after all the model layout was complete constructed. The base of model topographies was layered with 0.2 m thick of concrete. After coating the concrete layer of the model s channel bottom with a waterproof, the riverbed was compacted with 0.1 m thick of sand. The fine sand was used as sediment material with a downscale of prototype grain size which approximately within the range of 0.33 mm 0.075 mm. This sand gave good modeling correspondence with the characteristics of the material in the natural channel. Intake structure is located on the left bank of river in front of canal and made by using transparent plastic material. An intake structure was designed as non-fix and non-erodible structure with dimension of 48 cm (length) x 25 cm (width) x 13 cm (height) and facilitated with four controller gate with an opening of 12 cm each. A schematic of the constructed model layout is illustrated in Figure 2. Figure 2(b) View of physical model and intake structure 3.2 Mathematical Model The software package of Center for Computational Hydroscience and Engineering (CCHE2D) was applied in this study. CCHE2D is a finite element based depthintegrate two-dimensional designed for simulating turbulent, free surface flow in open channels, sediment transport, channel morphological change, bank erosion, and water quality evaluation which have been developed by National Centre for Computational Hydroscience and Engineering, School of Engineering, University of Mississipi (Jia and Wang, 1998; Zhang, 2006). The CCHE2D mathematical modelling is an integrated system which consists of a mesh generator (CCHE2D Mesh Generator) and Graphical User Interface (CCHE2D-GUI) as given in Table 1. The processes involved in generate mesh to construct geometrical layout of CCHE2D model is shown in Figure 3. The capability and performance of CCHE2D mathematical modelling in evaluation of hydraulics and sediment transport in river has been assess by National Centre for Computational Hydroscience and Engineering (Jia and Wang, 1998). Other studies that used CCHE2D mathematical model (Mohamed Yusof, 2009; Abu Hasan et al., 2010; Abu Hasan et al., 2011) showed that CCHE2D was capable to simulate flow behaviour (specific discharge, shear stresses, velocity magnitude and distribution) and sediment transport (sediment transport rate, grain size distribution, bed and bank changes). 785

Table 1 CCHE2D Package CCHE2D Package Purpose Input CCHE2D Mesh Generator Generate mesh to construct geometrical Topography data layout (Figure 2) Bed elevation data CCHE2D-GUI Initial and boundary condition Discharge/hydrograph data Model parameter Stage/rating curve data Run simulation Sediment data Visualization results (a) River Layout in AutoCAD Format (b) River Layout in TIN Format (c) CCHE2D Geometric Data Figure 3 Preparation of Geometry Data 4 Results and discussion Simulations of physical model and CCHE2D were performed without and with an intake structure conditions. Each simulation was run for discharge of Q = 0.0116 m 3 /s in the physical model which representing Q = 10.11 m 3 /s in CCHE2D model. The run time was carried out for 3 hours duration in the physical model and 11 hours in CCHE2D. The simulation was performed to duplicate the normal flow of real condition. At the end of simulation, the analyses are focusing on the comparison of Froude number, bed changes, flow and sediment pattern at the vicinity of intake structure. Certain analysis results can be represented quantitatively, while other result such as sediment pattern was analyzed by visual observation. 4.1 Froude number In design of open channel flow hydraulic models, gravity effects are predominant. Therefore the model was scaled to adhere to Froude number, Fr similitude (Peakall et al, 1996; Gill and Pugh, 2009) as following: (1) = 1 (2) (3) Where subscript m representing mathematical model; subscript p is physical model; subscript r is ratio between mathematical and physical model; V is velocity; g is gravity acceleration; and d is water depth. Froude numbers were calculated at four stations (XS1, XS2, XS3 and XS4) to evaluate the similarity values between physical model and CCHE2D. Based on Table 2, Froude number ratio, Fr r gave good similarity, where the ratios are approaching 1. The nearness of these values suggests that Froude number similarity is achieved. 786

3 rd International Conference on Managing Rivers in the 21 st Century: Sustainable Solutions for Global Crisis of Flooding, Pollution and Water Scarcity Table 2 Assessment of Froude number between physical model and CCHE2D Froude number, Fr Location Without structure With structure CCHE2D Physical model Fr r CCHE2D Physical model Fr r XS1 0.432 0.475 0.909 0.421 0.495 0.851 XS2 0.431 0.492 0.876 0.442 0.51 0.867 XS3 0.519 0.706 0.735 0.479 0.625 0.767 XS4 0.262 0.377 0.695 0.155 0.227 0.683 4.2 Flow pattern Flow analysis was conducted to determine the capability of intake structure to convey water into canal for one hour interval of three hours simulation as shown in Table 3. Over most parts of the study reach showed that, water flowing from upstream into the canal is gradually decreased compared to water flowing towards the river downstream. Both physical model and CCHE2D proved that, for each simulation, sediment started to accumulate in front of intake structure which can give effect to convey water through the downstream canal. 4.3 Sediment pattern Sediment patterns were measured by visual observation after running 3 hours of simulation in the physical model which representing 11 hours in CCHE2D model. Several images were taken particularly at vicinity of intake structure for physical model results to permit comparison with CCHE2D output. In CCHE2D model results, red colour indicates sedimentation occurred while blue colour indicates erosion occurred along the study reach. First simulation was conducted without an intake structure. Based on Figure 4, bed river at upstream section started to change due to scour effect. Illustration by using both models showed that bank erosion occurred at the right section and after the weir. Meanwhile, sediments started to accumulate in front of intake structure with high concentration of deposition. Second simulation was run with an intake structure gates are fully opened as shown in Figure 5. Based on this observation, most of river upstream sections undergone scour and erosion occurred after the weir part at the river downstream. Sediments were deposited in front of intake structure and small amount of sediment materials passes through gate 2 into canal downstream. Moreover, sedimentation was also noted to accumulate at the canal area. 4.3.1 Bed changes Feature analyses of bed changes were carried out at location of 0.5 m in the physical model which representing 7.5 m in CCHE2D model in front of intake structure. According to Figure 6, bed changes and sediment pattern of the CCHE2D output comply with the physical model. Based on the simulations, CCHE2D and physical model proved that at the left side of section, depositions were occurred and most of the middle and right sections undergone scour. However, based on comparative results, CCHE2D predict more bed changes compared with physical model and the value for each measurement are nearly equated. The deposited sediments for both CCHE2D and physical model would be about 3.15% and 5.04% over the initial bed level. Table 3 Evaluation of Q in and Q out Test Case Model Type Time Q in Q out (m3/s) (hour) (m3/s) River downstream Canal downstream Without structure CCHE2D 1 10.11 6.197 4.425 2 10.11 6.504 4.313 3 10.11 6.673 3.57 Physical 1 10.11 6.540 3.625 2 10.11 6.606 3.575 3 10.11 6.800 3.575 With structure CCHE2D 1 10.11 6.280 2.730 2 10.11 6.940 2.610 3 10.11 7.345 2.415 Physical 1 10.11 5.991 2.796 2 10.11 6.154 2.561 3 10.11 6.348 2.427 787

Figure 4 Comparison of sediment pattern for simulation without intake structure Figure 5 Comparison of sediment pattern for simulation with intake structure (a) Without structure (b) With structure Figure 6 Comparative illustrations of bed changes between physical model and CCHE2D 5 Proposed dike structure Location of sedimentation has been identified by using both physical model and CCHE2D. The accumulations of sediments in front of intake structure need to be control in order to maintain the efficiency of conveying water through canal. Therefore, dike structure is needed to resolve these problems. The design of dike structure was carried out by using CCHE2D model. The CCHE2D model can help the engineers at least in preliminary design of new structures in a way that will be cost-effective and sustainable. One of the suitable is by constructing dike. Three approach of simulations by using additional dike were conducted. The first simulation was locating a 90 0 angle dike in front of intake structure. The second simulation was done by locating the L-shape dike in front of the intake structure. The third simulation was carried out by combination of both designs where, 90 0 angle dike was located in front of intake structure and L-shape dike was located at immediately downstream of the junction. Based on Figure 7(a), simulation with constructed 90 0 angle dike was unable to resolve the sedimentation problem. Simulation using L-shape dike (Figure 7(b)) shows that sediment can be control from accumulating in front of intake structure, but most of the sedimentation occurs at the section of the downstream river. Simulation by using combination of both dikes shape (Figure 7(c)) shows reduction accumulation of sediments in front of intake structure. From the simulation results, it can be noted that proposed dikes can assist to control and divert the sediments from entering the intake structure. 6 Conclusions Simulation by using mathematical and physical models proved that sediments were accumulated in front of Ijok Intake and reduced the capability of water to flow through Ijok Canal. The mathematical model results can be acceptable as CCHE2D can predict bed changes, flow and sediment behavior effectively even if as twodimensional results. Moreover CCHE2D was able to achieve Froude similarity with the ratio between outputs and physical model are approaching 1. Utilization of mathematical model is often cheaper than 788

3 rd International Conference on Managing Rivers in the 21 st Century: Sustainable Solutions for Global Crisis of Flooding, Pollution and Water Scarcity equivalent physical model and suitable in design of workable structure. Further analysis was conducted by using CCHE2D model to examine the effectiveness of dikes to minimize the sedimentation problem at the study reach. Based on the results, it can be conclude that construction of dike can be useful because it can reduce and control the sediment in river water intake. The satisfactory agreement was attained between mathematical and physical model results show that they are useful tools for analysis and prediction of sedimentation near an intake structure. Thus, it is suggested to be used a combination of a mathematical and physical model for sophisticated river engineering tasks. (a) 90 0 angle dike (b) L-shape dike (c) 90 0 angle and L-shape dikes Figure 7 Sediment pattern after proposed dike Acknowledgments The authors gratefully acknowledge Universiti Sains Malaysia for funding the research through grant number 1001/PREDAC/8022018, 1001/PREDAC/8033057 and 304/PREDAC/6035271. References 1. Abu Hasan, Z., Noor Shahidan, N.F. and Idrus, M.F. (2010). Sediment Pattern Analysis at Ijok Intake using CCHE2D, World Engineering Congress 2010 (WEC 2010) on Engineering and Technology for Global Stability and Security, Kuching, Sarawak, 2 nd 5 th August. P. 15-19. 2. Abu Hasan, Z., Lee, K.H., Azamathulla, H.M. and Ab. Ghani, A. (2011). Flow Simulation for Lake Harapan using CCHE2D- a Case Study, International Journal of Modelling and Simulation. Vol. 31, No. 1, p. 1 5. 3. Dereje, H. (2003). River Intake Structures and Conveyance Systems, Workshop paper presented at the NBCBN-RE workshop held in Addis Ababa, Ethiopia. 4. Devries, J.J., ASCE, M. and Hartman, W. (1988) Sediment modeling for the Sacramento River Diversion to the Peripheral Canal. Proceedings of the International Symposium, 9 th 11 th August, California. P. 463 474. 5. Erbisti, P.C.F. (2005). Design of Hydraulic Gate, Netherland: A.A. Balkema Publication. 6. Gill, T.M. and Pugh, C.A. (2009). Sediment Transport Similitude for Scaled Physical Hydraulic Modelling, 33 rd IAHR Congress, 9 th 14 th August, Vancouver, British Columbia, Canada. 7. Jia, Y. and Wang, S.S.Y. (1998). Capability Assessment of CCHE2D in Channel Flow Simulations. 8. Mohamed Yusof, N. (2009). Modelling of Sedimentation Pattern in Bukit Merah Reservoir. Master of Science in Civil Engineering Thesis, Universiti Sains Malaysia, Penang. 9. Nakato, T. And Ogden, F.L. (1998). Sediment Control at Water Intakes along Sand-Bed Rivers, Journal of Hydraulic Engineering, Vol. 124, No. 6, p. 589 596. 10. Peakall, J., Ashworth, P. and Best, J. (1996). Physical Modelling in Fluvial Geomorphology: Principles, Applications and Unresolved Issues, Proceedings of the 27 th Binghamton Symposium, in Geomorphology, 27 th 29 th September, UK. P. 221 253. 11. Schuster, G., Jugovic, C. J. And Nachtnebel, H.P. (2009). Application of Hydrodynamic numeric models on complex sediment trasnport processes. International Symposium on Water Management and Hydraulic Engineering, 1 st 5 th September, Macedonia. P. 88. 789

12. Souza, L.B.S., Schulz, H.E., Villela, S.M. and Gulliver, J.S. (2010). Experimental Study and Numerical Simulation of Sediment Transport in a Shallow Reservoir, Journal of Applied Fluid Mechanics, Vol. 3, No. 2, p. 9-21. 13. Zhang, Y. (2006). CCHE-GUI-Graphical Users Interface for NCCH model user s Manual-Version 3.0. National Center for Computational Hydroscience and Engineering. Technical Report No. NCCHE-TR-2006-03. 790