Obstacle Spot Checking OLS

Similar documents
Appendix A Zoning Ordinance

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

Three-Dimensional Aerial Zoning around a Lebanese Airport

the issue of for Aviation

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N2 Environmentally Sensitive Site Locations Map 81

The current status, functions, challenges and needs of South Sudan Meteorological Department (SSMD)

UNIVERSITY OF HAWAI I SYSTEM TESTIMONY

Applications. Remote Weather Station with Telephone Communications. Tripod Tower Weather Station with 4-20 ma Outputs

Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 25

D14. Volcanic Viewshafts and Height Sensitive Areas Overlay

CHAPTER 3 HELIPORT AND HELICOPTER STAGEFIELD LIGHTING SYSTEMS

METEOROLOGY PANEL (METP) WORKING GROUP- METEOROLOGICAL OPERATION GROUP (MOG) FIRST MEETING

D14. Volcanic Viewshafts and Height Sensitive Areas Overlay

Inspection of. Aerodrome Lighting Federal Aviation 1. Administration

CHAPTER 26 PLANNING AND ZONING ARTICLE XIV. AIRPORT OVERLAY ZONING

A map is a small-scale flat-surface representation of some portion of the earth s surface.

Edmonton International Airport YXD City Centre Airport

¾À 280. ESS Features Heritage. Points of Access* !( Proposed Access Point. !( Archaeological Water. Major Stream Crossing Abandoned Rail Crossing # #

Edmonton International Airport

AERODROMES PANEL (AP) VISUAL AIDS WORKING GROUP (VAWG) FIFTH MEETING. Montréal, Canada, 25 to 27 June 2008

GCAA ADVISORY CIRCULAR

Edmonton International Airport

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

Implementation Guidance of Aeronautical Meteorological Observer Competency Standards

Guidance on Aeronautical Meteorological Observer Competency Standards

Puerto de la Cruz. Urban lighting. Preserving the clarity of the Canary Islands night sky

Obstruction Lighting Guide

Wednesday, November 7, :30 a.m. EST

SOLAR PHOTOVOLTAIC ENERGY FACILITIES: ASSESSMENT OF POTENTIAL FOR IMPACT ON AVIATION. January Report No.10/344/RPS/1

Learning. Goals. Page 1 of 6. Document : V1.1

Transmission Powerlines and Your Safety

RESOLUTION NO

WWRP Implementation Plan Reporting AvRDP

Heliport solutions A safer approach. Heliport solutions for increased safety

Service Call: Rotation Bearing Deflection Test. Dial Indicator with Magnetic Base Maintenance Manual for the Unit Being Tested

New Zealand Aeronautical Charting the ArcMap Challenge. Presenter: Beryl Pimblott Explorer Graphics Ltd

WYANDOTTE MUNICIPAL SERVICES COMMUNITY WIND ENERGY PROJECT WIND RESOUCE SUMMARY

This case study also provides recommendations for future lightning protection design for existing (brownfield) substation.

1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-cur

Testimony Related to

Montréal, 7 to 18 July 2014

WORLD LEADING FAA & ICAO COMPLIANT FRANGIBLE SOLUTIONS

JAA Administrative & Guidance Material Section Five: Licensing, Part Two: Procedures

Aviation Maps: Aviation Maps: Chapter Ten. Chapter Ten. The Art of the Chart. The Art of the Chart. Page J1. The Lambert Conformal Conic Projection

Volcanic Ash Guidance Material Docs. 9766, 9691 and 9974

Use of lightning data to improve observations for aeronautical activities

Validation Chain for ATM Concepts

Establishment of Space Weather Information Service

FAA AIRFIELD LIGHTING STANDARDS UPDATE

THE HISTORY OF WEATHER OBSERVING IN CHEYENNE, WYOMING,

APPENDIX N View Impact & Shadow Analysis

The Montague Doppler Radar, An Overview

Sign Code Amendment: Illustrated Definitions. Prepared for the Monday, May 15, 2017 Planning Commission Work Session Meeting

OBSTACLE DATA AND ELECTRONIC TERRAIN ISSUES

TABLE OF CONTENTS 1.0 INTRODUCTION...

Applying GIS Data to Radar Video Maps Air Traffic Control Towers

Intermediary Report - August Prof. Dr. Olivier Francis and Prof. Dr. Tonie Van Dam

A GIS Model for Analyzing Airspace Obstructions and Safety near Airports

Montréal, 7 to 18 July 2014

AMDAR Forecast Applications. Richard Mamrosh NWS Green Bay, Wisconsin, USA

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Meteorological CLEAR BUT PRESENT DANGER

Second Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE

UNIVERSITY OF HAWAI I SYSTEM TESTIMONY

Practice Questions: Seasons #1

Deriving Meteorological Data from free-to-air Mode-S broadcasts in an Australian Context.

Primary author: Tymvios, Filippos (CMS - Cyprus Meteorological Service, Dpt. of Aeronautical Meteorology),

Design of an Integrated Inspection System For Detection of Explosive and Illicit Materials


Plan for operational nowcasting system implementation in Pulkovo airport (St. Petersburg, Russia)

Prime Minister s Office- Meteorological Services

A NEW WINTER Flygplatsdagen 2018 Arlanda. Bjoern Boe CAA - Norway. Luftfartstilsynet T: F:

SERIOUS INCIDENT. Aircraft Type and Registration: 2) Embraer EMB 121 Xingu F-TEZZ. Date & Time (UTC): 1 June 2010 at 1000 hrs.

Some Applications of trigonometry

An Application of the Improved Models for Risk Assessment of Runway Excursion in Korea

CITY OF STURGIS 1984 REVISED ORDINANCES TITLE 35-1

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

Costco Major Development Plan Project Moorabbin Airport. Aviation Impact Assessment

Aviation Weather. Segment Three - Concept of Operations and Requirements. Federal Aviation Administration

MANUAL ON THE GLOBAL OBSERVING SYSTEM

DIRECT STROKE LIGHTNING PROTECTION DESIGN

WIND DATA REPORT. Lynn, MA

Installation guide 862 MIT / MIR

City of Camrose Winter Road Maintenance Policy

Procedure To Be Adopted When Working on High Voltage Mechanically Switched Capacitors with Damping Network (MSCDN)

Example of Aircraft Climb and Maneuvering Performance. Dr. Antonio A. Trani Professor

WORLD AREA FORECAST SYSTEM OPERATIONS GROUP (WAFSOPSG)

Self-Testing Prevectron 2 Millenium Lightning Conductor Set-up and Installation Manual

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND

Review of optimal road surface luminance considering dazzling by headlight of the car running in the opposite direction


Available online at ScienceDirect. Reynaldo Zoro*

AWOS. Automated Weather Observing Systems COASTAL

Community Survey. 1 of What type of street lighting do you prefer? Response Percent. Response Count

ACCEPTANCE PROCEDURE FOR ROMET ROTARY METER BODIES AND/OR MECHANICAL NON-CONVERTING AND CONVERTING MODULES

Zoning Ordinance. Requirements Used Districts R1 R2 R2.6 R3 R4 R5 B1 B2 B3 B4 M1 M2 RH Density Low Low Med Med High High Gen Local CBD Local LT Hvy Ag

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK

RPMO - OZAMIS COMMUNITY AIRPORT

CHAPTER CONTENTS REFERENCES AND FURTHER READING Page

Transcription:

Obstacle Spot Checking OLS Session 2.2: Data Assessment & Analysis 5 December 2017 AERODROME SAFEGUARDING WORKSHOP (Cairo, Egypt, 4-6 December 2017) Presented by: Michelle Soliman, Aerodrome Ops Inspector General Civil Aviation Authority, United Arab Emirates

The Raw Data Calculated Fields Added: Height Above Ground and Shielded By Management Fields Added Action Required and Mitigation Applied

Filtering the Data Priorities Surface Penetrated Amount of Penetration Shielding Principles Actions Required Existing Mitigations (Restrictions)

Verification Data

The Map

The Results

Obstacle ID: 3384 Fujairah Tower 15 October 2017 Lighting Requirement: Appendix 13 13.2.9.8 a) lighting may be omitted when ii) for a circuit extensively obstructed by immovable objects procedures have been establish to ensure safety vertical clearance below prescribed flight paths Installed Lighting: Appendix 13 13.2.10.3.33 Medium Intensity Type B High Intensity Type A Flights are not permitted over this area due to established city Lighting applied from ground level in consideration of surrounding structures High Intensity Type A on top is not required but no dazzle effect reported in excess of regulation No action required Surface Penetrated: Inner Horizontal Obstacle Type: Building Ground Height: 159.45m

Obstacle ID: 3291 Millennium Fujairah Mall (Fujairah Commercial Complex) 15 October 2017 Lighting Requirement: Appendix 13 13.2.9.8 a) lighting may be omitted when ii) for a circuit extensively obstructed by immovable objects procedures have been establish to ensure safety vertical clearance below prescribed flight paths Surface Penetrated: Inner Horizontal Obstacle Type: Building Installed Lighting: Appendix 13 13.2.10.3.28 Medium Intensity Type A and C Flights are not permitted over this area due to established city Lighting applied from ground level in consideration of surrounding structures Medium intensity Type A lighting on top of tower and medium intensity Type C on corners of mall structure in excess of regulation No action required Aeronautical Study: 19 September 2012 Ground Height: 90.66m

Lighting Requirement: Appendix 13 13.2.9.7 Obstacle ID: 4932 Stadium Installed Lighting: Appendix 13 13.2.10.3.29 High and Medium Intensity Type A 15 October 2017 High and Medium intensity lighting further to aeronautical study Lighting on approach side flash simultaneously Lighting on other side is not exactly synchronised Reference: 13.2.10.3.17 High intensity obstacle lights, Type A located on an object shall flash simultaneously. Action: Follow up with stadium to review synchronisation of lighting Surface Penetrated: Approach 11 Obstacle Type: Building Aeronautical Study: 28 October 2014 Ground Height: 29.94m

Obstacle ID: 4936 Flag Pole 15 October 2017 Lighting Requirement: Appendix 13 13.2.9.8 Marking Requirement: Appendix 13 13.2.9.8 c) marking may be omitted when lighted by high intensity obstacle lights by day Installed Lighting: Appendix 13 13.2.10.3.29 High Intensity Type A High intensity lighting on top of flag pole Marking not required No action required Surface Penetrated: Inner Horizontal Obstacle Type: Flag Pole Aeronautical Study: 1 June 2015 Ground Height: 121.05m

Obstacle ID: 4422 and 4423 Masts 15 October 2017 Lighting Requirement: Appendix 13 13.2.9.7 Marking Requirement: Appendix 13 13.2.9.7 Installed Lighting: Appendix 13 13.2.10.3.29 High Intensity Type A Obstacle 4422 is critical and shields other objects Marking and lighting observed at distance No action required Surface Penetrated: Approach 11 Obstacle Type: Mast Ground Height: 112.81m

Obstacle ID: 4258 Pylon Overhead Cable Marking: Appendix 13 13.2.9.11 15 October 2017 Obstacle Lighting Requirement: Appendix 13 13.2.9.5 Obstacle Marking Requirement: Appendix 13 13.2.9.5 Installed Lighting: Appendix 13 13.2.10.3.26 Medium Intensity Type B Obstacle is lit and marked as required Overhead wire is marked No action required Surface Penetrated: Take Off 29 Obstacle Type: Pylon & Overhead Wires Ground Height: 59.34m

Obstacle ID: 2029 Ultra Tech Star Cement Installed Lighting: Est. 45m to 150m above Ground Level Appendix 13 13.2.10.3.26 Medium Intensity Type B Obstacle is well lit and visible Lighting does not flash simultaneously Lighting Requirement: Appendix 13 13.2.9.10 should be marked and/or lighted if an aeronautical study indicates 17 October 2017 Reference: 13.2.10.3.17.medium intensity obstacle lights, Types A and B located on an object shall flash simultaneously. Action: Follow up regarding synchronisation of flashing lights Surface Penetrated: Conical Obstacle Type: Building

Obstacle ID: 2023 Pan Emirates Cement Lighting Requirement: Appendix 13 13.2.9.10 should be marked and/or lighted if an aeronautical study indicates Facility is closed no lighting observed 17 October 2017 Action: Assess facility in relation to flight procedures, elevations and surrounding area and confirm whether some lighting is required or not Surface Penetrated: Conical Obstacle Type: Building

Obstacle ID: 1203 Du Comms Tower Dibba Road 17 October 2017 Installed Lighting: Est. <45m above Ground Level Appendix 13 13.2.10.3.20 Low Intensity Type A or B (fixed red) Lighting was not serviceable Marking observed Not Action: Contact Du and arrange for necessary maintenance Surface Penetrated: Inner Horizontal Obstacle Type: Comms Mast

Obstacle ID: 1202 Etisalat Comms Tower Dibba Road 17 October 2017 Installed Lighting: Est. 45m to 150m above Ground Level Appendix 13 13.2.10.3.26 Medium Intensity Type B (flashing red) Top Low Intensity Type B (fixed red) Intermediate Level Lighting Low and Medium Intensity Type B observed at night Marking observed Surface Penetrated: Inner Horizontal Obstacle Type: Comms Mast

Obstacle ID: ID 2987 (LOCAL) Comms Tower Airport Road near Julphar Pharmaceuticals 17 October 2017 Installed Lighting: Est. 45m to 150m above Ground Level Appendix 13 13.2.10.3.26 Medium Intensity Type C (fixed red) Lighting Medium Intensity Type C observed at night Marking observed Obstacle not included on survey data Action: Has been added to OMRK verification checking to included in next survey Surface Penetrated: Not included on May 2017 Survey Obstacle Type: Comms Mast

Obstacle ID: 2031 Comms Towers at Army Camp Lighting Requirement: Appendix 13 13.2.9.10 should be marked and/or lighted if an aeronautical study indicates 17 October 2017 Action: Verify survey Installed Lighting: Est. <45m above Ground Level Appendix 13 13.2.10.3.20 Low Intensity Type A or B (fixed red) Est. 45m 150m above Ground Level Appendix 13 13.2.10.3.26 Medium Intensity Type B (flashing red) Lighting smaller mast Low Intensity Type A or B observed at night Lighting larger mast Medium Intensity Type B observed at night Marking observed on both towers from a distance Only one of the comms towers appears to be included in the survey data Lighting applied from ground level in consideration of surrounding structures Surface Penetrated: Conical Obstacle Type: Comms Mast

Obstacle ID: 2032 Comms Tower RAK Bank 17 October 2017 Action: Review requirement for marking Installed Lighting: Est. <45m above Ground Level Appendix 13 13.2.10.3.20 Low Intensity Type A or B (fixed red) Lighting Requirement: Appendix 13 13.2.9.10 should be marked and/or lighted if an aeronautical study indicates Lighting observed No marking is observed Surface Penetrated: Conical Obstacle Type: Comms Mast

The Final Report (GCAA)