HIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT

Similar documents
For personal use only

YAMARNA GOLD PROJECT

For personal use only

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

New zones of mineralisation found close to flagship deposits at Wa Gold Project

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

More growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces

For personal use only

Resource Diamond Drilling Commences at Productora. Strong results continue from Productora central area drilling

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

High Grade Gold Intercepts at Bangaba

For personal use only

ASX and Media Release

FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE

For personal use only

Co-O MINE MINERAL RESOURCE UPDATE

DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT

For personal use only

FIVE RIGS DRILLING AT KARLAWINDA

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

For personal use only

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

Drilling Commences at Telfer West Gold Project

For personal use only

For personal use only

Diamond Drilling Extends the Netiana Lodes at Depth

EIS sponsored Diamond drilling to commence at Zanex

ASX/Media Announcement 14 July 2010

For personal use only

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

For personal use only

Disclaimer. Forward-Looking Statements. Competent Person s Statement

For personal use only

TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE

Drill testing of gold zones at Albury Heath intersect impressive quartz lodes

For personal use only

Exploration Update: RC Drilling Commenced at Lucky Strike

ASX announcement 16 May 2016

SIGNIFICANT GOLD INTERCEPTS INCLUDING AN END OF HOLE INTERCEPT OF 4.71 g/t GOLD AT THE AXFORD PROSPECT, LAKE WELLS PROJECT

EXPLORATION ACTIVITY TO RECOMMENCE AT KOURI GOLD PROJECT IN BURKINA FASO

More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso

COMPLETION OF PHASE 1 DRILLING AT TITIRIBI PROJECT IDENTIFIES ADDITIONAL SIGNIFICANT COAL INTERCEPTS

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

For personal use only

New Drilling Program Commences at Mutiny s Deflector Deposit

For personal use only

For personal use only

Quarterly Report Quarter ended 30 June 2010

For personal use only

For personal use only

24 September Best results achieved at U40 Prospect (West Arnhem JV with Cameco Australia): o 1.34% eu 3 O 8

New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso

For personal use only

A1 GOLD MINE 14 LEVEL STOCK WORKS TARGET FURTHER HIGH GRADE DRILL INTERCEPTS

GOULAMINA DRILLING AND GENERAL PROGRESS UPDATE

SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT

Caravel commences major new drilling program at Calingiri copper-molybdenum project 8,500-9,000m of RC drilling planned across multiple targets

For personal use only

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

Commencement of Targeted RC Drilling Nabarlek Project

For personal use only

For personal use only

For personal use only

The Manager Companies ASX Limited 20 Bridge Street

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

Further Extensions to the Netiana Lodes at Balogo, Burkina Faso

Chalice, Higginsville Drilling

24 October Dear Shareholders, 2014 ANNUAL REPORT

For personal use only

ASX Announcements & Media Release

For personal use only

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

ASX ANNOUNCEMENT 4 March 2019 VTEM SURVEY COMMENCED OVER LORRAINE AND ADZ PROJECT AREAS

For personal use only

Airborne EM Survey Confirms Multiple VMS Targets at Collerina

Sepola Project Area in Mali Extended

For personal use only

DIAMOND DRILLING TO COMMENCE AT WODGER AND FORREST PROSPECTS

ASX/MEDIA RELEASE 25 November EMERGENT CONFIRMS MAJOR JORC RESOURCE UPGRADE TO 561Mt FROM PREVIOUS 127Mt AT BEYONDIE IRON PROJECT

For personal use only

KINGSTON RESOURCES LIMITED

Auger Drilling Progress Report - Moktedu Trend Prospect 5km Gold Trend Confirmed Along Strike from 3.5Moz Deposit

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

Developing the +1.2Moz Pilbara Gold Project

704,000 OUNCE MIYABI GOLD PROJECT UPDATE

Ausgold awarded EIS grant for Jinkas deep drilling

ASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike

New Gold Target Identified at Leonora

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

ASX ANNOUNCEMENT 21 MARCH 2011

ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018

Ovoot Coking Coal Project (100%)

Axiom Nightflower Drilling Progress and IP Survey Results, North Queensland

P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

Hann Prospect New Gold Discovery Confirmed

Transcription:

8 February 2016 HIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT Results further confirm Lake Wells Potash Project has potential to host a major potash resource HIGHLIGHTS Seismic survey confirms continuation of the deep palaeovalley that contains the brine hosted potash extends into the neighbouring recently secured tenements Goldphyre has the potash rights on these tenements under an agreement made late last year with successful WA prospector Mark Creasy The total length of the Goldphyre-controlled palaeovalley is now estimated at over 20km Peak palaeovalley depths surveyed across the project range from 150m 170m Deeper sediments provide additional opportunity for deeper pumping-water levels and potentially increased potash recovery And pumping from sand, which commonly occurs at the bottom of the palaeovalley sediments, facilitates drainage of the potash brine from the overlying sediments NEXT STEPS Exploration Target to be announced Q1 2016 Further drilling to commence Q1 2016 Maiden Resource on track for H1 2016 LAKE WELLS POTASH PROJECT Goldphyre Resources Limited (ASX: GPH) ( Goldphyre, the Company ) is pleased to advise that a seismic survey at its Lake Wells Potash Project in WA has increased the known length of the palaeovalley that hosts the potash mineralisation to more than 20 kilometres. The results provide more strong evidence that the Lake Wells Potash Project has the potential to host a substantial potash resource. The survey confirmed that the palaeovalley system extends well into the tenements where Goldphyre recently secured the potash rights under a deal with prospector Mark Creasy i. The transaction will see Mr Creasy s Yandal Investments Pty Ltd emerge with a 19.9% interest in Goldphyre. Confirmation of the palaeovalley s size is important because it will further underpin the calculation of an Exploration Target for the Lake Wells Potash Project, located 500km north-east of Kalgoorlie. The trunk palaeovalley and associated tributaries now measure over 20 km long, between 1-4km wide, and up to 170m deep. A palaeovalley of this scale can potentially provide significant high-grade sulphate of potash ( SOP ) mineralisation, which is hosted within the brines in the palaeovalley. The drilling program conducted at Lake Wells in July 2015 ii identified high-grade potash mineralisation both beneath the lake and the low dune areas surrounding the lake. street: 31 Ord Street, West Perth WA 6005 postal: PO Box 1941, West Perth WA 6872 t: +61 8 9322 1003 f: +61 8 9389 2199 e: info@goldphyre.com.au

The program generated wide intercepts of high-grade potash (9kg/m 3 11kg/m 3 ) to depths of 135m (down-hole), which was the depth capacity of the drill rig used. This seismic survey program, and the program completed in late 2015 iii, pave the way for clear targeting of drill holes into the deepest parts of the palaeovalley, allowing Goldphyre to assess the characteristics of the sand layers traditionally found in the bottom strata of the palaeovalley sediments (Figure 1). This coarse, unconsolidated material often has a high permeability, which facilitates drainage of the overlying hydrogeological units. Goldphyre is finalising plans to conduct another drilling program at the Lake Wells Potash Project. This program will be aimed at understanding the sand, or basal layer, found at the bottom of the palaeovalley (Figure 1). Figure 1: Goldphyre s pending RC drill program will target the deepest sections of the extensive palaeovalley, which is where the highly porous sand layers are traditionally found In addition, the Company is working to complete an Exploration Target for release during Q1 2016. Using the results of the planned drilling program, Goldphyre plans to release a maiden resource estimate in H1 2016. Goldphyre considers it important to publish resource estimates that reflect only the amount of potash that can ultimately be recovered, because this is the figure that will drive the project s production rates, capital and operating costs, and other key economics. Moreover, this approach is consistent with JORC requirements to report only resources for which there is a reasonable prospect of economic abstraction. At the same time however, to allow for resource comparison with its peers, the Company will also discuss its estimates of in-situ potash volume based on total porosity measures, which ignore true or actual extractability of the brine. Goldphyre Executive Chairman Matt Shackleton said the full set of seismic results supported the Company s view that the Lake Wells Potash Project had strong potential to host a substantial potash resource. We confirmed with our first drill program, and then with our first seismic program, that the Lake Wells Potash Project comprises a major palaeovalley of significant depth and breadth, and with high grades of potash, Mr Shackleton said. With this latest seismic program, we have extended the interpreted length of the palaeovalley significantly. It is also important to note that this work is yet to identify the end of the palaeovalley. The outstanding potential of the Lake Wells Potash Project is becoming clearer with every round of work we do. We look forward to delivering a maiden resource in the first half of 2016, a key step in achieving our target of

commencing a low capital operation supplying Australian farmers with a product they currently import 100 percent of from costly overseas suppliers. TECHNICAL DISCUSSION A second passive seismic survey was completed on the LWE playa lake area, which adjoins the Goldphyre tenure (Figure 2). The survey work consisted of 208 stations recorded by Tromino 3G units with processing completed by Perth based Resource Potentials iv. The passive seismic survey was aimed at mapping interpreted depth of transported cover, the form of the interpreted palaeovalley system extending westwards and if possible, highlight the thalweg, or basal section of the palaeovalley that may likely comprise significant palaeochannel coarse-grained quartz sand and grit. The success of the survey to vector in on the deepest section of the palaeovalley in order to assist deep drill targeting for potash brine has been achieved. The generated survey data was good quality and with calibration against existing drill holes with known depths to basement (Figure 2), interpretive work has successfully delineated an approximately east-west trending palaeovalley that extends westwards from the GPH tenure and splits into two significant palaeovalleys that trend to the north and south (Figure 3). The nominal section line spacing was approximately 1,200m with station centres at 100m-200m. The peak H/V (Horizontal/Vertical) frequencies show a good correlation coefficient and also show reasonable shear wave velocity in the palaeovalley fill. It is important too that the outer traverses (T08, T11: Figure 3) also show an interpreted, well-developed deep (~100m) palaeovalley profile, indicating the palaeovalley system extends further northward and southward on the LWE tenure. Based on all the traverses from the two seismic surveys combined, the interpreted palaeovalley length inclusive of the north and south branches on the LWE tenure is approximately 20km. The seismic modelling on some sections indicates depths of up to 150m-170m (Figures 4 9) for the base of the palaeochannel are likely. Several aircore (AC) holes completed by Goldphyre in the July 2015 drill program reached considerable depths (up to 141m, the extent of the drilling rig s depth capacity) but did not penetrate through the transported sediments to basement. The latest results with interpreted depth ranges and clear trend directions over an extensive area of the playa lake system will be instrumental in targeting the basal palaeochannel sand potential for the upcoming drill program.

Figure 2: A second seismic program has been conducted on the LWE tenure contiguous and to the west of GPH s ground over which GPH has been granted potash rights Figure 3: Extensive, deep palaeochannel with interpreted sand trend

Figure 4: Line 6 Figure 5: Line 7 Figure 6: Line 8

Figure 7: Line 9 Figure 8: Line 10 Figure 9: Line 11 CONTACT Matt Shackleton Brenton Siggs Executive Chairman Technical Director e: m.shackleton@goldphyre.com.au e: b.siggs@goldphyre.com.au m: +61 (0)438 319 841 m: +61 (0)427 075 225 Media:

Paul Armstrong/Nicholas Read Read Corporate t: +61 (8) 9388 1474

Competent Person s Statement The information in this report that relates to Exploration results, Mineral Resources or Ore Reserves is based on information compiled by Brenton Siggs who is a member of the Australasian Institute of Geoscientists. Brenton Siggs is contracted to the Company through Reefus Geology Services and is a Non- Executive Director (Exploration Manager) of Goldphyre Resources Limited. Brenton Siggs has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity currently being undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Brenton Siggs consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. Mr Siggs is a shareholder and director of Goldphyre WA Pty Ltd, a company that holds ordinary shares and options in the capital of Goldphyre Resources Limited (Goldphyre Resources Limited, Annual Report 2014). The information in this release that relates to Geophysical Results is based on information compiled by Dr Jayson Meyers who is a Fellow of the Australian Institute of Geoscientists. Dr Meyers is a consultant to Goldphyre Resources Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Meyers consents to the inclusion in this report of the matters based on information provided by him and in the form and context in which it appears. Forward Looking Statements Disclaimer This announcement contains forward-looking statements that involve a number of risks and uncertainties. These forward-looking statements are expressed in good faith and believed to have a reasonable basis. These statements reflect current expectations, intentions or strategies regarding the future and assumptions based on currently available information. Should one or more of the risks or uncertainties materialise, or should underlying assumptions prove incorrect, actual results may vary from the expectations, intentions and strategies described in this announcement. No obligation is assumed to update forward looking statements if these beliefs, opinions and estimates should change or to reflect other future developments. i Refer to ASX announcement 2 December 2015 Goldphyre Triples Lake Wells Potash Project Area. That announcement contains the relevant statements, data and consents referred to in this announcement. Apart from that which is disclosed in this document, Goldphyre Resources Limited, its directors, officers and agents, are not aware of any new information that materially affects the information contained in the 2 December 2015 announcement. ii Refer to ASX announcement 26 August 2015 Lake Wells Potash Drilling Results. That announcement contains the relevant statements, data and consents referred to in this announcement. Apart from that which is disclosed in this document, and in the ASX announcement 15 October 2015 Quarterly Activities Report, Goldphyre Resources Limited, its directors, officers and agents, are not aware of any new information that materially affects the information contained in the 26 August 2015 announcement. iii Refer to ASX announcement 15 December 2015 Seismic Survey Defines Extensive, Deep Palaeovalley. That announcement contains the relevant statements, data and consents referred to in this announcement. Apart from that which is disclosed in this document, Goldphyre Resources Limited, its directors, officers and agents, are not aware of any new information that materially affects the information contained in the 15 December 2015 announcement. ivovers, M., 2016. Processing and Modelling of Tromino passive seismic survey data from Lake Wells, WA. Resources Potentials, Northbridge, Perth. Consultant report prepared for Goldphyre Resources Limited.