Craig Honkomp PE, PS, LEED AP Sportsworks Field Design - The Kleingers Group Ohio

Similar documents
FROST HEAVE. GROUND FREEZING and FROST HEAVE

U-Shaped Sediment Traps

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

CHAPTER FIVE 5.0 STABILITY OF CUT SLOPES IN THE STUDY AREA. them limited by a thick canopy of vegetation and steep slope angles.

How Can DOT Operations and Maintenance Prepare for Extreme Weather Events?

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

Materials. Use materials meeting the following.

CLIMATE READY BOSTON. Climate Projections Consensus ADAPTED FROM THE BOSTON RESEARCH ADVISORY GROUP REPORT MAY 2016

PEACE REGION (PEACE RIVER- HIGH LEVEL AREA) GEOHAZARD ASSESSMENT CALL-OUT PH56: EMBANKMENT FAILURE ON HWY 35:08 SOUTHWEST OF MEIKLE RIVER CROSSING

Crows Landing Naval Base Easement

Coarse Sediment Traps

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

Climate change in the U.S. Northeast

PRELIMINARY ENGINEERING REPORT FOR SANITARY SEWER COLLECTION SYSTEM OSKALOOSA, IOWA 2017

Check Sheet Only FOR PPI s

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP


TABLE OF CONTENTS LIST OF TABLES. Page

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Comparison of core sampling and visual inspection for assessment of sewer pipe condition

Compare and Contrast

CONSTRUCTION EXIT SEDIMENT BARRIER

An Introduction to Field Explorations for Foundations

Construction Exits Vibration grids

Ambient Weather WS-228TBH 9" Brushed Aluminum Traditional Barometer with Temperature and Humidity, Radiant Blue User Manual

Specifications Whitcomb Elementary School Demolition January 15, 2016

Ecosystems Chapter 4. What is an Ecosystem? Section 4-1

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

Yoshinori KAWAMURA, Oriental Consultants Global Co., Ltd.

Woodford County Erosion Prevention Plan and Permit. Application #

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

Living with Thermal Expansion and Contraction

The Pennsylvania Observer

1 PROJECT BACKGROUND. August 14, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

Impact of Existing Pavement on Jointed Plain Concrete Overlay Design and Performance

Use of Infrared Thermography for Building Inspection

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

Ambient Weather DHR70B-BRASS Handheld Fishing Barometer User Manual

Lesson Overview. Climate. Lesson Overview. 4.1 Climate

MANUAL TT-220 TT-220

FRED BURR DAM FEASIBILITY STUDY

Retrofit Dowel Bars In Jointed Concrete Pavement - Long Term Performance and Best Practices

Pavement Preservation Strategy Selection

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Between 6 am to 4 pm the next day approximately 7.5 inches fell. Chesapeake Bay Bridge Tunnel NOAA Tide Gage

What is GIS? Introduction to data. Introduction to data modeling

Ambient Weather WS-GL026 Porthole Collection Weather Center with Thermometer, Hygrometer, Barometer User Manual

PUMP PERFORMANCE MEASUREMENTS Jacques Chaurette p. eng. April 2003

Overview of a Changing Climate in Rhode Island

Chapter 11: Clock Dials Project Clock: Dial

What the Science Tells Us & How Practitioners Can Use the Science

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

Limited Visual Dam Safety Inspections OA Oahu Reservoir No Oahu, Hawaii

Prepared By: John Blair Sean Donahue Celeste Hoffman Kimberly Klinkers Megan Slater

January 17, 2008 File:

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Monitoring on Subsidence Claims. John Parvin Subsidence Claims Manager

Go to the following website:

APPENDIX B DISTRESSES

CONTROLLING FACTORS BASIC ISSUES SAFETY IN OPENCAST MINING WITH SPECIAL REFERENCE TO SLOPE STABILITY

February 18, 2003 File: NORTH CENTRAL REGION LANDSLIDE ASSESSMENT HWY 43:16 WHITECOURT EAST HILL (NC1) 2002 ANNUAL INSPECTION REPORT

Rock & Aggregate Drop Inlet Protection

General. High Winds. High winds are a common hazard in the UAE.

HURRICANE MARIA PUERTO RICO ASSESSMENT FOUR & SIX MONTHS POST LANDFALL. January & March 2018

Abiotic Factors. Biotic Factors

Weathering, Erosion, Deposition

Battling Segregation Using Pave IR System

Earth s Structure and Natural Processes Practice Test

Construction Exits Rock pads

INTRODUCTION TO PAVEMENT STRUCTURES

Field Notes for the Mauna Loa North Slope Field Trip

CCR Rule Annual Inspection Report (cont.) 2

SILT FENCE EFFECTIVENESS

Climate Change and Stormwater. Daniel Brown, Research Associate, GLISA

Flexible Pavement Design

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

Appendix A Landslide Probability Classification Chart

Cold Weather Preparation

THE SAFER APPROACH TO PLOWABLE MARKERS

FLUXA-CONTROL: AN AUTOMATED MONITORING OF FLUORESCENT PARTICLES IN MAGNETIC PARTICLE TESTING

Name Class Date. 2. What is the average weather condition in an area over a long period of time called? a. winter b. temperature c. climate d.

Chapter 11 10/30/2013. Mass Wasting. Introduction. Factors That Influence Mass Wasting. Introduction. Factors That Influence Mass Wasting

Paradise Island Condominium Balance Sheet January 31, Assets Current Assets Operating Cash 3, Total Cash Assets 3,442.

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/11/2013 BUILDING SURVEY DATE

City of Camrose Winter Road Maintenance Policy

Looking after Lyme Regis

Spheres of Life. Ecology. Chapter 52. Impact of Ecology as a Science. Ecology. Biotic Factors Competitors Predators / Parasites Food sources

Instream Sediment Control Systems

1. Wind turbines are designed to operate within specified design criteria. Often the operating environment extends beyond these limits and causes

Earth s Heat Budget. What causes the seasons? Seasons

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

Monthly Long Range Weather Commentary Issued: SEPTEMBER 19, 2015 Steven A. Root, CCM, Chief Analytics Officer, Sr. VP, sales

Transcription:

1 ANALYZING EXISTING ASPHALT FOR NEW SURFACE APPLICATIONS Craig Honkomp PE, PS, LEED AP Sportsworks Field Design - The Kleingers Group Ohio Eric Q. Roise, ASLA, MCPPO, Athletic & Recreation Design Studio BSC Group, Connecticut, Massachusetts, Rhode Island

2 MEET OUR PRESENTERS CRAIG HONKOMP P E, P S, L E E D A P S p o r t w o r ks F i e l d D e s i g n T h e K l e i n g e rs Gro u p O h i o ERIC Q. ROISE A S L A, M C P P O At h l e t i c & Re c re at i o n D e s i g n S t u d i o B S C G ro u p C o n n e c t i c u t, M a s s a c h u s e tt s, R h o d e I s l a n d

3 ANALYSIS GROUPS THE INVESTIGATION

4 VISIBLE CUES S T R U C T U R A L Surface Cracking, Heaving, Rutting, Asphalt quality, Delamination Edges D R A I N A G E Puddles, Bird Baths, Surrounding areas, flooding S T A I N I N G A N D C L E A N L I N E S S

5 UNSEEN CUES S T R U C T U R A L Base Construction D R A I N A G E Underdrainage, Utilities T E S T I N G Destructive / Non-Destructive I N V E S T I G A T I V E Season and conditions installed. Previous Construction Process.

NON-ASPHALT 6 CONSIDERATIONS S T R U C T U R A L C O N S T R A I N T S : Fencing, Walls, Curbs, Adjacent Structures A G E : Age of Asphalt R E G I O N : Warm Region Locations, Temperate Region Applications S U R F A C E T O B E I N S T A L L E D : Tennis, Track, Basketball W E A T H E R C O N D I T I O N S / S E A S O N :

7 F I R S T A N D E A S I E S T T O D I A G N O S E VISIBLE CUES Don t Settle With The First Diagnosis Typically multiple I ssues Some Seasonal Considerations Heaving M ay Not Show Up In Summer Months ( Drainage I ssues Don t Show Up In A Drought)

STRUCTURAL 8 CUES S U R F A C E C R A C K I N G : Asphalt Contraction, Age Cracking, Planarity, Asphalt Quality And Age H E A V I N G & S I N K I N G, R U T T I N G : Alligator Cracking, Pattern Cracking: Elevation Changes : Base Issues, Water, Voids, Organics Asphalt Quality; Poor cold Joints, Edge Conditions, Shoulder Failure, Delamination Between Courses, Pull Cracking

C R A C K I N G 9

A L I G A T O R C R A C K I N G 10

H E A V I N G 11

R U T T I N G 12

P L A N A R I T Y 13

DRAINAGE 14 CUES Puddling, Bird Baths, Surface Delamination, Staining Cleanliness: Staining, Bond Breaker Stains, Asphalt Curing, Fat Spots, Excess Tack Coat, Leaves, Dust, Tracking, Surface roughness

P U D D L I N G / B I R D B A T H S 15

16 S U R F A C E D E L A M I N A T I O N

17 C L E A N L I N E S S ( F a t S p o t s )

UNSEEN 18 CUES Trenching Patterns, Irrigation Patterns, Staining Patterns Previous History: Previous Construction Plans Plugged outlets, Under Maintained Drains, Damaged Drainage Pipe Subsequent Improvements Original Installation: Cold Weather?, Rain?, Time Between Courses?, Inexperienced Installer?

S T A I N I N G 19

20 U N S E E N C U E S Plugged outlets, Under Maintained Drains, Damaged Drainage Pipe

21 U N S E E N C U E S Structural: Old Construction Details

22 U N S E E N C U E S Testing: Destructive Testing Asphalt Cores Or Cuts. Test Pits Geotechnical Testing- base Material Drainage Cleaning And Camera Inspection

23 U N S E E N C U E S Investigative: Season And Conditions Installed. Previous Construction Process. Previous Installers Experience.

24 U N S E E N C U E S Owner/ User Inter views: It Puddles When? Where? They Built It How? Have You Ever Cleaned Out The Drainage?

NON-ASPHALT 25 CONSIDERATIONS Structural Constraints: Fencing, Walls, Curbs, Trees, Adjacent Structure Fencing: Condition, Footings, Locations, Handwork Around Poles Walls, Condition, Life Expectancy Replacement Or Repair Implications Utilities: Watermains, Easements. Maintenance Access; Over Surfaces?, Onto Surfaces? Age: Where Is Asphalt In Its Lifecycle? Is It Worth It? Region: Warm Region Locations, Temperate Region Applications Surface To Be Installed. Tennis, Track, Basketball, Tennis & Basketball, Less Expensive, Shorter Life Cycle, More Cracking Track Surfacing, More Expensive, Longer Life Cycle, Less Apt to Show Cracking

26 N O N - A S P H A L T C O N S I D E R A T I O N S Utilities: Watermains, Easements, Maintenance Access, Over Surfaces?, Onto Surfaces?

27 N O N - A S P H A L T C O N S I D E R A T I O N S Age: Where Is Asphalt In Its Lifecycle? Is It Worth It?

28 N O N - A S P H A L T C O N S I D E R A T I O N S Region: Warm Region Locations, Temperate Region Applications

29 N O N - A S P H A L T C O N S I D E R A T I O N S Surface To Be Installed. Tennis, Track, Basketball, Tennis & Basketball, Less Expensive, Shorter Life Cycle, More Cracking Track Surfacing, More Expensive, Longer Life Cycle, Less Apt to Show Cracking

30 N O N - A S P H A L T C O N S I D E R A T I O N S Weather Conditions/ Season

31 N O N - A S P H A L T C O N S I D E R A T I O N S Saw Cutting- Control Of Cracking Locations To Saw Cut Or Not To Saw Cut?

32 T H A N K Y O U F O R Y O U R T I M E Q U E S T I O N S?