QUARTERLY ACTIVITIES REPORT ENDING 30 SEPTEMBER 2010 HIGHLIGHTS

Similar documents
Mineral Project Introduction Ishine International Resources Limited

High Grade Gold Results from RAB Drilling at the Central Bore Prospect

HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

Ni-Cu-Au-U TYPE AIRBORNE ANOMALIES OUTLINED

For personal use only

For personal use only

Drilling Program Commences on Iron Oxide Copper Gold Targets

ROE HILLS COBALT AND GOLD DRILLING ADVANCES

LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

QUARTERLY REPORT for the Quarter Ended 31 December Jubuk resource drilling imminent.

High Grade Gold Intercepts at Bangaba

NT RESOURCES LIMITED QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDED 30 JUNE 2010 ASX CODE: NTR

Exploration Update: RC Drilling Commenced at Lucky Strike

Encouraging drill results from Paroo Range

For personal use only

Magmatic completes acquisition of the Mt Venn Copper-Nickel-Cobalt Project in Western Australia

SUMMARY. QUARTERLY REPORT for the Quarter Ended 31 March km uranium zone with grades up to 0.03% U 3 O 8 at Lake Seabrook.

RC Drilling Confirms Zeus Gold Prospect

Victory plans gravity survey for Bonaparte after encouraging rock-chip results

Highlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate

Sipa Resources Limited

MINCOR /GOLDEN RIM FIJI JOINT VENTURE SIGNIFICANT NEW EXPLORATION RESULTS

For personal use only

For personal use only

ASX ANNOUNCEMENT 19 NOVEMBER 2015 SIGNIFICANT GOLD PROSPECT CONFIRMED AT APOLLO S SA GOLD PROJECT NEAR CHALLENGER

ATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005

Norwest successfully lists on ASX, Drilling commenced at Warriedar Gold Project

SIGNIFICANT GOLD INTERCEPTS INCLUDING AN END OF HOLE INTERCEPT OF 4.71 g/t GOLD AT THE AXFORD PROSPECT, LAKE WELLS PROJECT

Aurora Tank Gold Drilling Update

NEW COBAR-STYLE COPPER DISCOVERY IN NSW

For personal use only

For personal use only

TWO HIGH-GRADE GOLD ZONES DISCOVERED AT HERMES GOLD PROJECT

******************* *******************

New Drilling Program Commences at Mutiny s Deflector Deposit

For personal use only

For personal use only

For personal use only

Two New WA Projects Introduced into Newcrest Generation Alliance

For personal use only

The Company was admitted to the Official List on 12 November 2010 and its shares commenced trading

Drilling Commences at Telfer West Gold Project

Acquisition of Kilfoyle Project, Northern Territory

Growth Through Exploration

EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT

For personal use only

For personal use only

June 2017 Quarterly Report

For personal use only

For personal use only

ASX ANNOUNCEMENT 4 March 2019 VTEM SURVEY COMMENCED OVER LORRAINE AND ADZ PROJECT AREAS

EIS sponsored Diamond drilling to commence at Zanex

Drilling program commences on Cloncurry and Mount Isa projects

ASX RELEASE REVIEW OF GLANDORE DATA TO DEFINE DRILL PROGRAM

SPOT MARKET URANIUM OXIDE FIRMS TO US$49.25 POUND

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

Significant New Mineralised Zone Paroo Range (RGU:100%)

SILVER CITY MINERALS LIMITED ABN Silver City Minerals

For personal use only

For personal use only

New zones of mineralisation found close to flagship deposits at Wa Gold Project

APOLLO SOUTH AUSTRALIAN EXPLORATION UPDATE

For personal use only

Market Release October

For personal use only

For personal use only

CAMBRIDGE NICKEL PROSPECT EXPLORATION UPDATE. XRF analysis of reconnaissance drill holes at Cambridge has been completed

For personal use only

For personal use only

ASX ANNOUNCEMENT FURTHER EXPLORATION SUCCESS AT NULLAGINE

For personal use only

ASX RELEASE ACTIVITY UPDATE SPARGOVILLE PROJECT WA MINING AND EXPLORATION

KalNorth Secures Nickel Rights at Grey Dam

For personal use only

Condor Blanco Mines Limited (Code: CDB) Company Presentation Devil s Creek Tenement E70/4529

Additional significant gold and copper intercepts obtained in Sweden

MAIDEN URANIUM RESOURCE PROOF OF CONCEPT

New High Grade Lode Discovered at Wagtail South

ASX Announcement. FLEM survey underway at Henrietta Cobalt Nickel Prospect, Tasmania ASX: AX8 HIGHLIGHTS. Market Data. Board and Management.

ASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011

For personal use only

AGM Presentation 6 November 2012

JUNE 2008 QUARTERLY REPORT 23 July 2008 HIGHLIGHTS OVERVIEW

Airborne EM Survey Confirms Multiple VMS Targets at Collerina

ASX Announcements & Media Release

ASX / MEDIA RELEASE 6 MAY MILE SILVER-LEAD-ZINC DISCOVERY; HIGH GRADE SILVER-GOLD IN ROCK CHIPS AT RUBY SILVER

MT PLEASANT AUGER GEOCHEM RESULTS OUTLINE A NEW GOLD ZONE TO THE NORTH-EAST OF FIDELATAS PROSPECT HIGHLIGHTS

ACQUISITION OF THE MCCLEERY COPPER-COBALT PROJECT, CANADA

A review of the large Red Dragon prospect was completed following the 2011 field season, the

RC DRILLING TO RESUME THIS WEEK AT CARLISLE REEFS

Queen Victoria Rock Project, WA Spargos Prospect Nickel

Hits of up to 123gpt show Chesterfield emerging as a high grade gold project

For personal use only

UPDATE ON DRILLING TO BE CONDUCTED AT AURORA TANK GOLD PROJECT

Lake Resources N L, Quarterly Report, January - March 2013 LAKE RESOURCES NL QUARTERLY REPORT JANUARY MARCH 2013

Significant Copper-Gold JORC Exploration Target

For personal use only

MARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts

Transcription:

Date: 29 th October 2010 QUARTERLY ACTIVITIES REPORT ENDING 30 SEPTEMBER 2010 HIGHLIGHTS Encouraging nickel results received for the Falcon Bridge Project. Second round of drilling at Falcon Bridge Project completed. Mt Watson VTEM survey results processed and have highlighted significant drill targets. Boomarra ground gravity results have been modeled and highlighted significant anomalies for drill testing. 100% owned exploration tenements in application in WA and SA has increased to 22 with a total area of over 9,000km 2. Target minerals include iron, gold, nickel, copper, lead, zinc, uranium and mineral sands. Negotiations with potential strategic Chinese partners are in progress. Figure 1 Ishine Project Locations T: +61 8 6142 5088 F: +61 8 9200 5638 Web: www.ishineresources.com Email: admin@ishineresources.com Page 1

1. ENCOURAGING DRILLING RESULTS FROM FALCON BRIDGE JV NICKEL PROJECT During the June Quarter Ishine s maiden drilling program included a total of 72 aircore holes for 3,459m across six east-west traverses at the Falcon Bridge Project 80km north of Laverton. Assays were received during the quarter and confirmed the ultramafic host rock was present, beneath transported cover, and up to 800m thick. It also highlighted several zones of interest anomalous in nickel, copper and MgO. Encouraging results included: 23m @ 0.41% Ni and 262ppm Cu from 51m in drill hole FBAC004 33m @ 0.58% Ni and 125ppm Cu from 30m in drill hole FBAC017 39m @ 0.41% Ni and 170ppm Cu from 36m in drill hole FBAC058 3m @ 0.55% Ni and 280ppm Cu from 36m in drill hole FBAC041 Aircore drill hole intersections with greater than 0.4% Ni are tabulated below. Hole ID Easting Northing RL Dip Azimuth Depth From To Interval Nickel % Cu (ppm) FBAC004 443000 6914300 500-60 90 74 51 74 23 0.41% 262 FBAC005 442900 6914300 500-60 90 44 27 39 12 0.44% 109 FBAC012 442500 6914600 500-90 0 46 27 42 15 0.43% 39 FBAC016 442900 6914600 500-60 90 53 33 53 20 0.57% 26 FBAC017 443000 6914600 500-60 90 63 30 63 33 0.58% 125 FBAC023 442600 6914844 500-90 0 63 54 57 3 0.41% 14 FBAC033 442600 6915200 500-60 90 57 45 51 6 0.40% 23 FBAC041 443300 6915700 500-60 90 64 36 39 3 0.55% 280 FBAC042 443200 6915700 500-60 90 42 30 42 12 0.44% 58 FBAC048 442600 6915700 500-90 0 38 33 36 6 0.51% 30 FBAC049 442500 6915700 500-90 0 45 36 45 6 0.42% 34 FBAC053 443000 6915900 500-60 90 38 33 38 5 0.53% 33 FBAC058 443050 6914600 500-60 90 83 36 75 39 0.41% 170 FBAC064 442450 6915700 500-60 90 59 51 57 6 0.63% 45 FBAC068 443250 6915700 500-60 90 51 36 51 15 0.69% 56 FBAC072 442650 6915200 500-60 90 37 33 37 4 0.51% 55 Table 1 Significant Aircore intercepts >0.4% Ni In order to follow up these anomalous results, Ishine proposed and executed a round of RC drilling which included eight holes for 1,199m. These holes were designed to test the more interesting results beneath the base of weathering and, where possible, test along the interpreted basal contact position. Results from this program are pending and are expected during the next quarter. T: +61 8 6142 5088 F: +61 8 9200 5638 Web: www.ishineresources.com Email: admin@ishineresources.com Page 2

Aircore Drilling Collars Proposed RC Collars Figure 2 Falcon Bridge Aircore and RC collar positions over TMI image. 2. DRILLING TARGETS IDENTIFIED FROM MT WATSON VTEM During the reporting quarter, Ishine received the results of data processing and geophysical modelling from the Mt Watson VTEM survey flown recently. The results indicate significant zones of conductivity along strike of the Mt Watson mineralisation (8.01mt @ 0.9% Cu) within the Surprise Creek sediments. A number of high to low order anomalies were generated from this survey, several of which will be drilled next quarter. Presently a heritage survey is underway and drilling is anticipated for early November over three of the strongest anomalies shown in Figure 3 and Figure 4. T: +61 8 6142 5088 F: +61 8 9200 5638 Web: www.ishineresources.com Email: admin@ishineresources.com Page 3

Figure 3 Strong anomalies from VTEM at the Mt Watson JV project T: +61 8 6142 5088 F: +61 8 9200 5638 Web: www.ishineresources.com Email: admin@ishineresources.com Page 4

Figure 4 Drilling targets defined from strong VTEM anomalies at the Mt Watson JV project 3. GRAVITY ANOMALY FOUND FOR THE BOOMARRA PROJECT During the quarter, Ishine received the results of modelling of the gravity survey which was carried out in May. The detailed survey included 1,555 stations and has been effective in generating several drill targets associated with coincident or nearby areas of magnetic anomalism. Heritage clearances are currently underway prior to a drilling program scheduled for next quarter. T: +61 8 6142 5088 F: +61 8 9200 5638 Web: www.ishineresources.com Email: admin@ishineresources.com Page 5

Figure 5 Gravity survey stations defined over magnetic anomalies in Boomarra JV project Figure 6 Boomarra Gravity anomalies overlapping with magnetic anomalies T: +61 8 6142 5088 F: +61 8 9200 5638 Web: www.ishineresources.com Email: admin@ishineresources.com Page 6

4. NEW EXPLORATION LICENCE APPLIED The Company continued its effort in securing 100% owned exploration tenements through aggressive search for quality ground in Australia. Eight new exploration licence applications were lodged during the report period to the Western Australian Department of Mines and Petroleum and the South Australian Department of Primary Industry and Resources. By the end of September 2010, the Company has secured twenty-two 100% owned exploration licences in application with a total area of over 9,000km 2. Target minerals cover iron, gold, nickel, copper, lead, zinc, uranium and mineral sands etc. The size, location and target minerals in each of the exploration tenements applied are presented in Table 2 below. Table 2 Ishine's New Exploration Tenements Applied before 30 September 2010 State Tenement Number Date Applied Size, km 2 Locality Target Minerals E38/2435 9-Apr-10 71 Laverton Ni, Au E70/3880 15-Apr-10 225 Narembeen Au E77/1786 19-Apr-10 225 Merredin, Narembeen and Yilgarn Fe E80/4448 18-May-10 496 Halls Creek Zinc, Lead WA 3,542km 2 E04/2031 18-May-10 261 Derby Copper, Lead, Zinc E80/4450 14-Jun-10 132 Halls Creek Ni, Cu, Co E37/1073 24-Jun-10 106 Laverton Ni, Au E39/1582 24-Jun-10 90 Laverton Ni, Au E37/1074 24-Jun10 84 Laverton Ni, Au E69/2810 24Jun10 644 Gunbarrel Cu, Ni E69/2811 24-Jun-10 631 Gunbarrel Cu, Ni E69/2812 24-Jun-10 451 Gunbarrel Cu, Ni E80/4478 21-Sep-10 126 Halls Creek Ni, Cu, Co SA 5,527 km 2 E196/10 28-Jun-10 699 Tarlina Cu, Ni, Pb, Zinc, Mineral Sand EL197/10 29-Jun-10 648 Tarlina Cu, Ni, Pb, Zinc, Mineral Sand EL198/10 1-Jul-10 218 Ooldea Range Cu, Ni, Pb, Zinc, Mineral Sand EL234/10 28-Jul-10 340 Mulga Wells Au, Co, U EL239/10 4-Aug-10 992 Mulgaria U EL252/10 18-Aug-10 218 Willouran Ranges U EL259/10 25-Aug-10 969 Willouran Ranges U EL260/10 25-Aug-10 690 Willouran Ranges U EL261/10 25-Aug-10 753 Willouran Ranges U Summary 21 Tenements 9,062 WA and SA Fe, Cu, Ni, Au, Pb, Zn, Co, U, Mineral Sand T: +61 8 6142 5088 F: +61 8 9200 5638 Web: www.ishineresources.com Email: admin@ishineresources.com Page 7

5. NEGOTIATION WITH POTENTIAL STRATEGIC PARTNERS The Company has been in vigorous discussions with potential strategic Chinese partners for long term growth and in a preparation for undertaking mineral exploration over large area of tenements under application. The Company also continued its effort in searching for and evaluating advanced exploration projects for possible acquisition. Caigen Wang Managing Director -END- The information in this announcement that relates to Exploration Progress has been prepared by Mr Martin Dormer, who is a member of the Australian Institute of Mining and Metallurgy, and a full time employee of Ishine International Resources Ltd. Mr Dormer has sufficient relevant experience in the techniques being reported and styles of mineralisation and types of deposit under consideration, and in the activity he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code), and consents to the inclusion of the information in the form and context in which it appears. For further information please contact: Caigen Wang Managing Director Martin Dormer Chief Geologist T: +61 8 6142 5088 T: +61 8 6142 5088 cwang@ishineresources.com mdormer@ishineresources.com T: +61 8 6142 5088 F: +61 8 9200 5638 Web: www.ishineresources.com Email: admin@ishineresources.com Page 8