Coeur Mining Provides Exploration Update

Similar documents
Coeur Mining Provides Palmarejo and Kensington Exploration Update

Coeur Mining Provides Silvertip Exploration Update

Palmarejo and Kensington Exploration Update

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

News Release. Infill Drilling Program

Press Release Thunder Bay: August 2, 2018

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

23 January, 2018 CSE: RFR For Immediate Release. Renforth extends Parbec Gold Deposit strike 60m with gold in all 7 drillholes

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Detour Gold Reports Drilling Results from Lower Detour

Dalradian Provides Update on Norwegian Exploration Programs

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

Probe Metals Intersects 3.2 g/t Gold Over 45.5 Metres At Val-d Or East

Cove Gold Project 2201 Discovery Update, May 2014

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Strategic Phase 2 Exploration Program Launched at Island Gold High-Grade Resource Potential Identified Laterally and at Depth

INV METALS ANNOUNCES DRILL RESULTS AT LOMA LARGA AND INITIAL PROSPECTING RESULTS ON NEW REGIONAL PROPERTIES

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

CANARC RESOURCE CORP Howe Street Vancouver, BC V6C 2T6. News Release

GOLDEN MINERALS IDENTIFIES HIGH GRADE GOLD AND SILVER VEINS AT YOQUIVO

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

New Drilling Program Commences at Mutiny s Deflector Deposit

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

Highlights from the four holes announced in this news release include:

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

Northern Dynasty Minerals Ltd.

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

DRILLING NEWS. NYSE Amex: GORO 22, February. Tuesday DENVER. Company. 50 meters ahead of. La Arista. 11 meters of within, La Arista

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AND g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

V Sample from C.O.D vein 15 metres southwest of V

EXPLORATION NEWS RELEASE MAGISTRAL DISTRICT: MORE GROWTH, MORE GOLD, MORE SILVER

Interval (meters) To (meters)

IAMGOLD PROVIDES UPDATE ON ADVANCED EXPLORATION PROJECT DIAMOND DRILLING RESULTS BOTO PROJECT, SENEGAL

August 20, 2018 SBB NR SBB TSX

MINERA ALAMOS TO COMMENCE DRILLING AIMED AT EXPANDING AREAS OF DEFINED GOLD MINERALIZATION AT SANTANA/LOS VERDES PROPERTY, SONORA, MEXICO

BELO SUN INTERSECTS NEW HIGH GRADE ZONE AT GROTA SECA AND EXPANDS GRANDE DEPOSIT

CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

(416) Highlights include:

EXPLORATION NEWS RELEASE

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

A B C PAD A HIGHLIGHTS

EXCELLON ANNOUNCES LA PLATOSA EXPLORATION RESULTS: HIGH GRADES CONTINUE TO EXTEND MANTO SULPHIDES DRILL HOLE ENCOUNTERS SOURCE ENVIRONMENT INDICATORS

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

Monument Announces NOA 7/8 Drilling Program Results at Burnakura Gold Project

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

Corvus Gold Drills g/t Gold, Extends Mother Lode Sediment Hosted Gold System to at Least 450 Metres Along Strike

News Release IMPACT Silver Corp. IMPACT Silver 2011 Exploration Review and 2012 Outlook

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

NEWS RELEASE ORCA GOLD REPORTS CONTINUED SUCCESS AT GSS

CAUTIONARY STATEMENT

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

NEWS RELEASE. FOR IMMEDIATE RELEASE Shares Outstanding: 35,190,286

NEWS RELEASE November 5, 2018

- 2 - TABLE 1. INDICATED AND INFERRED GOLD AND SILVER RESOURCES. All Indicated

CHAMPION IRON REPORTS EXPLORATION RESULTS AT POWDERHORN PROJECT, NEWFOUNDLAND

Monument Announces Significant Intercepts Assay Results at NOA7_8 in Burnakura

July Exploring for Canadian Gold in the Rainy River District of Ontario

Probe Metals Intersects 1,122 g/t Gold Over 0.7 Metres in New Zone at Val-d Or East

Suite 1800 Two Bentall Centre 555 Burrard Street Vancouver, BC V7X 1M9 Tel: (604) Tel: (888) April 8, 2018 SBB NR SBB TSX

News Release. Canarc Continues to Intersect High-Grade Gold at Fondaway Canyon, Nevada, Including 3.24 Grams per Tonne Gold over 12.

MCEWEN MINING BLACK FOX EXPLORATION NEWS

Probe Metals Discovers New High Grade Gold Zone on Val-d Or East Project: Intersects 12.6 g/t Gold Over 7.3 Metres

Dalradian Intersects 2.48 metres Grading g/t Gold and 4.87 metres Grading 8.35 g/t Gold With Infill Drilling at Curraghinalt

KIRKLAND LAKE GOLD EXTENDS HIGH-GRADE GOLD MINERALIZATION AT MACASSA, NEW GOLD SYSTEM DISCOVERED AT DEPTH

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

June 4, 2014 News Release Valley of the Kings Exploration Program Underway; Project Update

New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

MONETA INTERCEPTS g/t GOLD INCLUDING g/t GOLD AT SOUTH WEST

IAMGOLD ANNOUNCES RESULTS FROM THE WESTWOOD-MOOSHLA EXPLORATION PROJECT

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

INFILL DRILLING EXPANDS MINERALIZATION IN HIGH-GRADE GOLD-COPPER CORE AT SOUTHWEST DISCOVERY ZONE TURQUOISE HILL PROJECT, MONGOLIA

Plateau Extends Falchani East Lithium Deposit Community Agreements Executed and Three Drill Rigs Active at Falchani West

555 Burrard Street, Suite 375, Vancouver, B.C. V7X 1M June 13, 2017 SBB NR SBB TSX

Yellowknife Gold Project

Prophecy: Pacamayo, Paca North and El Abra Return Anomalous Silver, Zinc, Lead and Antimony Assay Results

BELO SUN RELEASES RESULTS FROM 65 DRILL HOLES FURTHER EXTENDING THE OURO VERDE DEPOSIT ALONG STRIKE NORTHWEST AND DOWN DIP

IAMGOLD REPORTS HIGH-GRADE DRILL INTERSECTIONS FROM ITS 2017 DRILLING PROGRAM ON THE DIAKHA DEPOSIT, SIRIBAYA PROJECT IN MALI

North American Palladium Provides Update on Lac des Iles Exploration Program

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

MEDIA RELEASE OCEANAGOLD ANNOUNCES FURTHER DOWN DIP EXTENSIONS OF MINERALISATION AT PANEL 2: FRASERS UNDERGROUND MINE

Transcription:

NEWS RELEASE Coeur Mining Provides Exploration Update Chicago, Illinois October 10, 2016 Coeur Mining, Inc. ( Coeur or the Company ) (NYSE: CDE) today provided an update on its expanded exploration initiatives at three of its five operating mines. The focus of the Company s exploration program continues to be upgrading existing, higher-grade resources to reserves and the discovery of new, higher-grade resources located near existing infrastructure that have the potential to further grow the Company s production and cash flow, reduce unit costs, and extend expected mine lives. The Company expects to invest a total of $30-$34 million in exploration during 2016, including $14-$16 million for expensed exploration and $16-$18 million for capitalized exploration. This represents an 82% increase over 2015 exploration spending. Of the $30-$34 million expanded exploration budget, approximately 85% is expected to be allocated to drilling at or near the Company s existing operations and nearly 75% is expected to be invested at the Company s Palmarejo underground silver-gold mine in Mexico, its Kensington underground gold mine in Alaska, and its Rochester open-pit silver-gold mine in Nevada. Select highlights from the drilling results at Palmarejo, Kensington and Rochester are included below. For a complete table of all drill results at Palmarejo, Kensington and Rochester during the applicable periods identified in this press release, please refer to the following link: (http://investors.coeur.com/interactive/lookandfeel/4349317/exploration_update_release_appendix.pdf) PALMAREJO HIGHLIGHTS: Exploration efforts have focused on definition drilling to aid in mine planning at the Independencia underground deposit and on upgrading existing high-grade inferred resources at the Guadalupe underground deposit, which are located approximately 800 meters apart and remain open at depth and along strike. o Highlights include a recent intercept at the center of Independencia that returned 14.4 feet (4.39 meters, m, true thickness) of 84.1 ounces per ton ( oz/t ) silver (2,883 grams per tonne, g/t ) and 1.14 oz/t gold (39.1 g/t). The same hole also intersected a second vein that returned 6.9 feet (2.1 m) of 23.7 oz/t (811 g/t) silver and 0.30 oz/t gold (10.3 g/t). o At Guadalupe, highlights include an intercept within mining Block C of 16.4 feet (5.0 m) (true o thickness) averaging 15.2 oz/t silver (520 g/t) and 1.35 oz/t gold (46.3 g/t). The average reserve grades at Palmarejo at year-end 2015 were 4.94 oz/t silver (169 g/t) and 0.076 oz/t gold (2.61 g/t). In the corridor zone between Independencia and Guadalupe, drilling has focused on resource definition of the Los Bancos and Nación-Dana veins and on gaps between the two structures. Both of these zones are near the new decline accessing Independencia and could be more easily developed. Drilling will soon commence on the La Bavisa deposit, which is located approximately 1,300 feet (~400 m) northeast of Independencia and was part of the Paramount Gold & Silver land package that was acquired by Coeur in 2015.

KENSINGTON HIGHLIGHTS: After years of being underexplored following a lengthy permitting process and the Company s focus on first bringing stability and consistency to Kensington s operations, the mine s exploration program is now generating high-grade results from the Kensington Main deposit in addition to making a new discovery in 2015 of the Jualin high-grade deposit. Both areas represent expected near-term high-grade ore sources, which are expected to drive higher future production and cash flow at lower unit costs. One notable hole from the Zone 41 gap target in the Kensington Main deposit returned 12.2 feet (3.7 m) of 1.21 oz/t gold (41.5 g/t) (see Hole #K16-0910-258-X02 in the table below). In the Zone 12 target, one hole intercepted 20.5 feet (6.2 m) of 0.37 oz/t gold (12.7 g/t). Underground drilling at Jualin has also been accelerated following recent underground access to exploration targets. An initial reserve from Jualin #4 one of five known veins is expected at year-end. The current resource at Jualin #4 is 179,000 ounces of gold at a grade of 0.619 oz/t gold (21.2 g/t). The average reserve grade at Kensington at year-end 2015 was 0.198 oz/t gold (6.79 g/t). ROCHESTER HIGHLIGHTS: Exploration efforts have focused on in-fill and expansion drilling of the higher-grade East Rochester expansion to support a revised economic analysis at year-end 2016 (see February 29, 2016 news release for full update on East Rochester). o Of particular note was an intercept from the 2016 drill program of 150 feet (45.6 m) at 4.13 oz/t silver (142 g/t) and 0.013 oz/t gold (0.45 g/t) (see hole ROCR16-1027 in the table below), which are approximately eight times Rochester s current reserve grades. Another hole returned 400 feet (121.9 m) of 1.2 oz/t silver (41.1 g/t) and 0.007 oz/t gold (0.24 g/t) (see hole ROCR16-1018 in the table below). o Infill drilling was also completed at West Rochester, the results of which are expected to be included in Coeur s year-end 2016 reserve statement. Near-mine exploration remains a key pillar of our returns-driven growth strategy, said Mitchell J. Krebs, Coeur s President and Chief Executive Officer. Prioritizing our drilling efforts in and around our operations where we have existing people, permits, and processing infrastructure offers a higher probability of success and a quicker payback on these investments. Our success-based exploration philosophy, which prioritizes targeting higher grades and rewards tight integration with our operations teams, is generating strong results that we believe will have a positive impact on the Company s future production profile, mine lives, and cash flow. Palmarejo, Mexico From late March to August 2016: At Independencia, a total of 84 core holes have been completed, five from surface focused on resource expansion and 79 from underground focused on infill drilling, for a total of 61,411 feet (18,723 m). At Guadalupe, a total of 44 core holes have been completed, focused on resource infill drilling, for a total 27,273 feet (8,313 m) from underground drill stations. At Los Bancos, a total of 13 core holes have been completed, focused on resource infill drilling for a total of 8,294 feet (2,528 m) from surface drill stations. By contrast, in 2015: At Independencia, a total of six holes were drilled from surface for 11,618 feet (3,542 m). At Guadalupe a total of 25 holes were drilled from surface for 37,818 feet (11,530 m). No underground drilling was conducted as the underground drill stations were not set up until late 2015.

Drilling will continue for the remainder of 2016 both underground and on surface at Independencia and Guadalupe with an estimated budget of $5.4 million for the year on expansion of resources and about $6.8 million on infill drilling. Drilling will mainly focus on Independencia for the remainder of 2016 with three drill stations currently active underground and one on surface (a second is being prepared on surface), with one drill station currently active at Guadalupe. By contrast, in 2015, $4.7 million was spent on resource expansion and $2.1 million in resource infill drilling and conversion to reserves. The recent focus of Palmarejo s drill program has been to expand the deeper portions of the Guadalupe and Independencia deposits as well as further define the Los Bancos and La Nación-Dana veins, which are located between Guadalupe and Independencia. There are currently six active drill rigs, four of which are being used for both Guadalupe and Independencia underground drilling, and two surface drill rigs that are drilling the northern extension of Independencia vein and the gap between the Los Bancos and Nación veins. Two additional drill rigs are set to begin drilling the Nación-Dana veins and the new La Bavisa vein, located 1,300 feet (~400 meters) east-northeast of Independencia, this quarter, which will bring the total number of active drills at Palmarejo to eight. Palmarejo s strongest exploration results are from the central portion of the Independencia deposit along the border of Independencia Este ( East ) and Oeste ( West ). As underground development at Independencia progresses, additional exploration stations are expected to become accessible and will allow for further potential resource conversion and expansion at depth.

Drilling at Guadalupe is currently focused on testing the southern portion of mining block C and northern mining block D. Plans are underway to drill near the South Portal as development progresses and offers access to this area of the deposit. Future underground exploration stations will focus on expanding blocks C and D at depth as well as potential resource conversion and expansion to the south.

Highlights from Independencia Drilling (March-August 2016) Mineralized Interval (feet) Assays (oz/short ton) Hole From To Length Estimated Thickness Silver Gold DC3-IND-0010 313.6 321.0 7.4 6.9 55.78 0.58 DC3-IND-0018 277.1 283.5 6.4 5.6 39.53 0.37 DC3-IND-0021 472.4 479.8 7.4 6.9 27.20 0.29 DC3-IND-0022 707.8 724.2 16.4 4.9 61.20 0.91 DC3-IND-0025 421.2 435.2 14.0 11.8 49.88 0.55 DC3-IND-0025 438.5 443.4 4.9 4.3 37.90 0.38 DC3-IND-0025 483.0 487.4 4.4 3.9 32.22 0.33 DC3-IND-0027 492.1 504.7 12.6 11.5 96.43 1.31 DC3-IND-0029 419.0 426.5 7.5 6.9 23.66 0.30 DC3-IND-0029 433.1 449.1 16.1 14.4 84.13 1.15 DC3-IND-0039 526.5 531.3 4.8 4.3 119.53 4.01 DC3-IND-0044 595.9 601.0 5.1 4.9 25.60 0.97 DC3-IND-0047 693.6 697.5 3.9 3.6 27.55 0.22 DC3-ICA-0058 216.5 224.2 7.7 6.2 32.84 0.29 DC3-ICA-0058 275.6 280.5 4.9 3.9 58.31 0.90 DC3-ICA-0067 345.3 355.5 10.2 9.5 42.77 1.35

Highlights from Guadalupe Drilling (March-August 2016) Mineralized Interval (feet) Assays (oz/short ton) Hole From To Length Estimated Thickness Silver Gold DC3-GPE-0001 322.2 340.8 18.6 15.4 4.53 0.31 DC3-GPE-0001 498.7 505.2 6.5 5.2 0.57 0.13 DC3-GPE-0003 305.8 326.7 20.8 12.8 9.47 0.46 DC3-GPE-0004 257.2 288.8 31.6 22.0 8.23 0.43 DC3-GPE-0005 364.8 382.4 17.7 16.4 15.16 1.35 DC3-GPE-0007 370.4 380.6 10.2 8.5 8.03 1.18 DC3-GPE-0009 425.5 434.6 9.1 6.6 52.59 4.37 DC3-GPE-0011 175.4 189.0 13.6 12.5 7.98 0.45 DC3-GPE-0011 408.5 416.7 8.2 7.5 4.06 0.16 DC3-GPE-0012 97.8 110.6 12.8 12.8 4.15 0.05 DC3-GPE-0013 35.7 39.8 4.1 3.3 5.16 0.04 DC3-GPE-0014 295.9 304.7 8.9 5.2 5.70 0.32 DC3-GPE-0015 40.8 43.2 2.4 2.3 7.43 0.08 DC3-GPE-0018 273.1 283.8 10.7 7.2 5.68 0.19 DC3-GPE-0019 283.5 317.9 34.4 14.4 5.93 0.13 DC3-GPE-0022 281.7 316.6 34.9 28.9 3.71 0.20 DC3-GPE-0022 466.2 488.7 22.5 18.4 3.39 0.08 DC3-GPE-0022 496.4 499.0 2.6 2.3 13.38 0.39 DC3-GPE-0023 41.6 45.1 3.5 3.0 5.25 0.06 DC3-GPE-0023 100.7 103.8 3.1 2.6 5.07 0.09 DC3-GPE-0023 212.4 216.2 3.8 3.0 6.53 0.10 DC3-GPE-0023 320.5 329.2 8.7 6.9 6.46 0.32 DC3-GPE-0025 119.8 126.1 6.4 5.9 8.94 0.28 DC3-GPE-0026 322.5 332.0 9.5 5.6 68.19 2.47 DC3-GPE-0030 607.0 611.9 4.9 2.6 13.64 0.17 DC3-GPE-0031 380.2 389.6 9.4 6.2 8.40 0.22 DC3-GPE-0034 283.6 297.9 14.3 10.2 6.62 0.16 DC3-GPE-0037 347.4 373.9 26.4 24.3 3.31 0.22 DC3-GPE-0037 390.6 399.1 8.5 7.9 6.56 11.23

Kensington, Alaska Kensington s exploration program continues to focus on potential resource conversion and expansion within the Kensington Main orebody, the nearby Raven vein, and the high-grade Jualin deposit. Drilling at Kensington Main is currently being conducted at four zones lower Block M and zones 41, 44, and 12 with a focus on the potential expansion of the Kensington resource down-dip and to the south of the current resource model. In addition, drilling at Raven has targeted the down-plunge extension of a high-grade oreshoot. A total of 31,586 feet (9,627 m) has been drilled in resource infill with potential to convert to reserve total budgeted 60,000 feet (18,288 m) with a projected budget for 2016 of $4.6 million. A total of 16,712 feet (5,094 m) has been drilled underground in resource expansion in 2016 total budgeted 25,000 (7,620 m) feet with a projected budget for 2016 of $4.65 million. By comparison, in 2015 $2.6 million was spent on resource expansion and $1.4 million on resource infill and conversion to reserves.

Coeur has accelerated exploration of the high-grade Jualin deposit following the development of a new exploration station and completing three drill holes targeting the potential upgrade and expansion of the Jualin resource. Surface drilling twinning historic Jualin drill holes began in August with a total of 4,074 feet (1,241.8 m) completed. The surface drill program has six holes for a total of 11,000 feet (~3,350 m) budgeted. A surface, winter drilling program focused on potential expansion of Jualin Vein #4 will begin once the twinning program is completed this fall; this will be the focus of the remainder of the 2016 budget. Vein #4 remains open at depth and extends about 1,000 feet (~305 m) to the south; Vein #5 sits 300 feet (~90 m) below Vein #5 and has similar grade-thicknesses to Vein #4 in 5 out of 6 holes drilled to this depth.

Highlights from Kensington Main, Jualin Vein #4 and Raven Vein Drilling (2016) Mineralized Interval (feet) Hole From To Length Estimated Thickness Gold Assays (oz/short ton) K15-0445-211-X01 295.0 310.4 15.4 10.1 1.66 including 307.3 310.4 3.1 2.0 5.37 K15-0445-222-X06 230.0 246.6 16.6 16.5 0.55 including 242.2 246.6 4.4 4.4 1.43 265.8 275.0 9.2 9.1 1.19 including 269.5 271.6 2.1 2.1 2.73 K15-0445-211-X04 232.5 240.0 7.5 7.4 2.07 K15-0445-222-X02 282.0 300.0 18.0 14.6 0.98 including 285.4 289.0 3.6 2.9 2.98 including 290.0 292.2 2.2 1.8 1.81 K15-0520-178-X06 191.0 206.0 15.0 12.2 0.90 including 201.0 206.0 5.0 4.1 1.41 K16-1170-102-X01 235.0 237.5 2.5 2.5 2.69 419.5 427.0 7.5 7.5 0.57 482.0 502.5 20.5 20.5 0.37 including 496.0 499.0 3.0 3.0 0.75 including 499.0 502.5 3.5 3.5 0.58 541.7 547.0 5.3 5.3 1.23 K16-0910-258-X02 67.5 71.3 3.8 2.3 7.47 113.0 133.0 20.0 12.2 1.21 K16-1170-112-X03 508.5 513.2 4.7 4.5 2.56 K16-1170-073-X04 633.0 638.0 5.0 4.9 0.83 K16-1170-112-X04 582.9 591.2 8.4 7.5 1.27 including 585.0 587.6 2.6 2.3 3.08 Raven Vein R16-0820-224-X03 492.3 494.3 2.0 1.5 1.485

Rochester, Nevada Rochester s exploration program has prioritized both in-fill and expansion drilling of the higher-grade East Rochester deposit. A total of 67,760 feet (20,653 m) have been drilled in 79 holes through the end of August 2016 and focused on resource infill and conversion to reserves. A total of 7,060 feet (2,152 m) in seven holes have been completed in resource expansion drilling. Drilling in the existing pit, focused mostly in the West Rochester area, has been conducted to evaluate the potential for additional resource conversion as well as for the discovery of new adjacent mineralized structures. For the remainder of 2016, drilling will focus on the South Pit for both expansion and conversion of resources to reserves. Rochester s 2016 exploration budget includes $1.25 million for expansion drilling and $3.66 million for resource infill/conversion drilling. By comparison, in 2015 Rochester spent $1.32 million on expansion drilling and $1.60 million on resource infill/conversion drilling. Priorities for 2017 will include additional in-fill and expansion drilling in those areas expected to be permitted as part of the next planned expansion at Rochester, called POA 11. Additional drilling will be allocated to offset drilling of some of the higher grade mineralized faults encountered and modeled in the 2016 program.

Highlights from East Rochester Drilling (February-August 2016) Mineralized Interval (feet) Assays (oz/short ton) Hole From To Length Silver Gold EP15-002 70 710 640 0.80 0.004 ROCR16-1001 140 260 120 1.12 0.007 ROCR16-1014 310 560 250 0.76 0.009 ROCR16-1018 250 650 400 1.20 0.007 ROCR16-1024 380 480 100 1.12 0.005 ROCR16-1025 210 680 470 1.21 0.004 ROCR16-1026 200 500 300 1.02 0.004 ROCR16-1027 550 700 150 4.13 0.013 ROCR16-1028 210 300 90 2.15 0.006 ROCR16-1030 360 670 310 0.77 0.002 ROCR16-1034 770 920 150 2.99 0.012 ROCR16-1040 410 660 250 1.74 0.005 ROCR16-1042 440 660 220 2.06 0.007 ROCR16-1049 450 630 180 1.06 0.027 ROCR16-1062 320 490 170 1.77 0.004

About Coeur Coeur Mining is a well-diversified, growing precious metals producer with five precious metals mines in the Americas employing approximately 2,000 people. Coeur produces from its wholly owned operations: the Palmarejo silver-gold complex in Mexico, the Rochester silver-gold mine in Nevada, the Kensington gold mine in Alaska, the Wharf gold mine in South Dakota, and the San Bartolomé silver mine in Bolivia. The Company also has a non-operating interest in the Endeavor mine in Australia as well as a royalty interest in Ecuador. In addition, the Company has two silver-gold exploration stage projects the La Preciosa project in Mexico and the Joaquin project in Argentina. Coeur conducts ongoing exploration activities in Alaska, Nevada, South Dakota and Mexico. Cautionary Statements This news release contains forward-looking statements within the meaning of securities legislation in the United States and Canada, including statements regarding exploration and development efforts, exploration expenditures, drill results, production, growth, reduced unit costs, extended mine lives, investments, cash flow, future projects and mine expansion plans, and resource delineation, expansion and upgrade or conversion. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause Coeur's actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, the risks and hazards inherent in the mining business (including risks inherent in developing large-scale mining projects, environmental hazards, industrial accidents, weather or geologically related conditions), changes in the market prices of gold and silver and a sustained lower price environment, the uncertainties inherent in Coeur's production, exploratory and developmental activities, including risks relating to permitting and regulatory delays, ground conditions, grade variability, any future labor disputes or work stoppages (including those involving third parties), the uncertainties inherent in the estimation of gold and silver reserves and resources, changes that could result from Coeur's future acquisition of new mining properties or businesses, the loss of access to any third-party smelter to which Coeur markets silver and gold, the effects of environmental and other governmental regulations, the risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries, Coeur's ability to raise additional financing necessary to conduct its business, make payments or refinance its debt, as well as other uncertainties and risk factors set out in filings made from time to time with the United States Securities and Exchange Commission, and the Canadian securities regulators, including, without limitation, Coeur's most recent reports on Forms 10-K and 10-Q. Actual results, developments and timetables could vary significantly from the estimates presented. Readers are cautioned not to put undue reliance on forward-looking statements. Coeur disclaims any intent or obligation to update publicly such forward-looking statements, whether as a result of new information, future events or otherwise. Additionally, Coeur undertakes no obligation to comment on analyses, expectations or statements made by third parties in respect of Coeur, its financial or operating results or its securities. Dana Willis, Coeur's Director, Resource Geology and a qualified person under Canadian National Instrument 43-101, supervised the preparation of the scientific and technical information concerning Coeur's mineral projects in this news release. For a description of the key assumptions, parameters and methods used to estimate mineral reserves and resources, as well as data verification procedures and a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, socio-political, marketing or other relevant factors, Canadian investors should refer to the Technical Reports for each of Coeur's properties as filed on SEDAR at www.sedar.com. For Additional Information Courtney R. B. Lynn, Vice President, Investor Relations and Treasurer (312) 489-5837 Rebecca Hussey, Manager, Investor Relations (312) 489-5827 www.coeur.com