BOTSWANA. Marula. Bushveld Complex. Rustenburg Johannesburg SOUTH AFRICA

Similar documents
FACT SHEET TWO RIVERS

impala Fact sheet TIVE VISION CREA

impala Fact sheet TIVE VISION CREA

Mimosa MSZ 6E metal ratio (%) Harare Hartley Complex. Bulawayo ZAMBIA ZIMBABWE BOTSWANA SOUTH AFRICA Pt Pd Rh Ru Ir Au

Mimosa regional locality map. Mimosa. Mimosa. Ngezi. Shurugwi. Zvishavane. North. Hill. Ngezi. South. Hill. Wedza Mine. Mtshingwe 20 21'S 20 14'S

ZAMBIA. Musengezi Complex. Harare. SMC Hartley. Complex ZIMBABWE. Great Dyke. Selukwe. Complex. Bulawayo. Wedza BOTSWANA SOUTH AFRICA

Impala. Mineral rights Impala. Impala locality map MINERAL RESOURCES AND MINERAL RESERVES

ANGLO AMERICAN PLATINUM CORPORATION LIMITED RUSTENBURG

Investment Analysts And Fund Managers Visit Union Platinum Mine. 7 May 2004

Impala. 44 / The details Mineral Resources and Mineral Reserves Implats Mineral Resource and Mineral Reserve Statement 2017

Exploration, Mineral Reserves and Mineral Resources

Mineral Resources and Mineral Reserves

ANGLO AMERICAN PLATINUM CORPORATION

ANGLO AMERICAN PLATINUM CORPORATION ANNUAL FACILITY VISIT

Facility visit. 11 October 2005

FLEXIBILITY IN ADVERSITY KEY TO SUCCESSFULLY

Mineral Resources and Mineral Reserves summary

ANGLO AMERICAN PLATINUM CORPORATION

Diversification into the exciting South Africa Platinum Industry

Twickenham Platinum Mine Presentation to Analysts

MANGANESE DISCOVERY AT KONONGO PROJECT

ANGLO AMERICAN PLATINUM CORPORATION. FACILITY VISIT: Eastern Limb

Implats is a world leader in the production of PGMs and associated base metals.

Technical Review of the Tjate Platinum Project

NEW PHASE OF RESOURCE EXTENSION AND UPGRADE DRILLING COMMENCES AT BARDOC GOLD PROJECT, WA

IMPLATS Mineral resource and mineral reserve statement Exploration review

The Manager Companies ASX Limited 20 Bridge Street

Mineral Resource and Mineral Reserve Statement 2008

Introduction. Regional geological settings

Transition Continues to Intersect Significant Platinum-rich PGM Mineralization at Sunday Lake

TriAusMin Limited LEWIS PONDS PROJECT

February, 2018 Copyright 2018

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

CHAMPION BEAR RESOURCES

Trouser Legs Mine Strong Drilling Results - including g/t Au Potential for Further Mine Development

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

Pan African Resources is a mid-tier African-focussed precious metals producer.

An ASX listed Perth-based gold explorer focused on Ghana in West Africa

For personal use only

ASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary

Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode

The application of facies classification in evaluating the Merensky Reef at Bafokeng Rasimone platinum mine, South Africa

Option agreement with Randgold set to commercialise Massigui Gold Project

Lonmin Platinum Mineral Resources and Reserves 30 September 2007

For personal use only

Bank of America Merrill Lynch Global Metals, Mining & Steel Conference May 2014 Fontainebleau Miami Beach

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

For personal use only

The Platreef Project. Ivanhoe s Platinum Mining Game-changer. By Gerick Mouton. 2 June 2016

For personal use only

For personal use only

Replacement: Material Increase to Tuzon Resource

Predicting the probability of Iron-Rich Ultramafic Pegmatite (IRUP) in the Merensky Reef at Lonmin s Karee Mine

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

24 October Dear Shareholders, 2014 ANNUAL REPORT

YANFOLILA EXPLORATION 2018

2018 Drilling Underway at Juruena Gold Project

For personal use only

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

ASX announcement 16 May 2016

North American Palladium Announces Positive Exploration Results from Lac des Iles Mine

ASX Release 3 July Update on Trial Mining at the Morning Star Gold Mine

MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY

RBPlat Annual Mineral Resources and Reserves Statement 2015

For personal use only

1 The Prospectus can be obtained on the Company s website at or on SEDAR at

IVANHOE MINES EXTENDS HUGO NORTH GEOPHYSICAL ANOMALY FOUR KILOMETRES NORTH ADDITIONAL GEOPHYSICAL TARGETS IDENTIFIED

RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season

FIRST RESULTS FROM RC DRILLING AT KONONGO

Parkin Offset Properties. Sudbury, Ontario

RBPlat Status of the Platinum Industry. GMP African Mining Jamboree 2 nd February 2013

STYLDRIFT MINE AND MASEVE CONCENTRATOR SITE VISIT 1 FEBRUARY 2019

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

GOLDEN MINERALS IDENTIFIES HIGH GRADE GOLD AND SILVER VEINS AT YOQUIVO

MANTLE MINING CORPORATION LIMITED

For personal use only

July Exploring for Canadian Gold in the Rainy River District of Ontario

For personal use only

Bass Metals records further positive drill results & progress at 3 prospects.

NEW DISCOVERIES AT THE RED OCTOBER MINE

JUBILEE PLATINUM plc. April Colin Bird Chief Executive Officer.

For personal use only

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

RESOURCE INCREASED BY 75% TO 1.29 BILLION TONNES FOR GINDALBIE S KARARA MAGNETITE PROJECT

Mundo Minerals Limited

WHAT IS MINERAL EXPLORATION?

Companion Volume Conference May 2016

MAssAwA GOLD project 2.7Moz Randgold ResouRces

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

For personal use only

For personal use only

INVESTOR SITE VISIT MAGARENG MINE - 10 NOVEMBER

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

Introduction. Tianshan Goldfields Limited (ASX:TGF) is earning a controlling interest in the Gold Mountain Project in North West China.

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

Transition Hits 42.9 metres Grading 3.43 g/t PGM at Sunday Lake

ROSE OF DENMARK MINE RE-DEVELOPMENT COMMENCES

SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA

ASX Release. 14 th September Corporate Update Divestment of Gold, Copper and Nickel Projects

DORAY SIGNS LANDMARK EXPLORATION FARM-IN AGREEMENT WITH ILUKA RESOURCES IN SOUTH AUSTRALIA

Transcription:

FACT SHEET MARULA

N BOTSWANA Bushveld Complex Marula Rustenburg Johannesburg SOUTH AFRICA Marula is 73% owned by Implats and is one of the first operations to have been developed on the relatively under-exploited eastern limb of the Bushveld Complex in South Africa. It is located in the Limpopo Province, some 35 kilometres north-west of Burgersfort. In FY2016 the operation produced 77 100 ounces of refined platinum. The operation comprises two decline shaft systems and a concentrator plant. 2

GEOLOGY Marula holds two contiguous mining rights and a prospecting right covering 5 494 hectares across the farms Winaarshoek and Clapham, and portions of the farms Driekop, Forest Hill and Hackney. Marula also has a royalty agreement with Modikwa which allows limited mining on an area adjacent to the Driekop shaft. Both the Merensky and the underlying UG2 reefs are present and sub-outcrop in the Marula mining right area. The reefs dip generally in a west-southwest direction at 12 to 14 degrees with a vertical separation of some 400 metres between them. While one prominent dyke and a dunite pipe are present, there is minimal faulting on the property. Merensky UG2 UG2 Category Mineral resources (inclusive reporting) as at 30 June 2016 Tonnes (Mt) Width (cm) 4E Grade (g/t) 6E Grade (g/t) Platinum (Moz) measured 34.3 100 4.26 4.56 2.7 indicated 7.9 100 4.24 4.54 0.6 inferred 9.7 100 4.17 4.46 0.7 measured 33.3 57 8.65 10.17 4.0 indicated 13.6 62 8.89 10.45 1.7 inferred 7.7 60 9.07 10.67 1.0 Total 106.5 6.56 7.50 10.8 Mineral reserves as at 30 June 2016 Category Tonnes (Mt) Width (cm) 4E Grade (g/t) 6E Grade (g/t) Platinum (Moz) proved 4.2 133 4.18 4.91 0.2 probable 22.2 132 3.93 4.62 1.2 Total 26.4 3.97 4.67 1.5 3

MARULA MERENSKY Pt Pd 6E MARULA UG2 Pt Pd 6E 100 100 50 50 Width (cm) 0-50 -100-150 Width (cm) 0-50 -100-200 -150 250 01 3 6 9 2 Grade (g/t) Pyroxenite Pegmatoid Chromitite -200 01 5 10 5 Grade (g/t) Pyroxenite Pegmatoid Anorthosite/norite Chromitite MINING Current mining activities target the UG2 reef only which is accessed via two decline shaft systems. Driekop Shaft uses a hybrid mining method, while at Clapham Shaft, both hybrid and conventional mining methods are currently being used. In the hybrid sections, all main development is done on reef, and stoping is carried out through conventional single-sided breast mining from a centre gully. The stoping width averages 1.4 metres. For the conventional operation, the footwall drives are developed on strike approximately 25 metres below the reef horizon with crosscut breakaways about 220 metres apart. Development is undertaken with drill rigs and dump trucks. Stope face drilling is done with hand held pneumatic rock drill with air legs. The optimisation of Marula s existing infrastructure over the past few years will provide the necessary foundation for the mine to reach a targeted output of 90 000 ounces of platinum in 2017. 120 100 Koz Pt in concentrate 80 60 40 LoM I LoM II LoM III 20 0 2017 2036 4

SUSTAINABLE DEVELOPMENT Marula UG2 6E metal ratio (%) 3.8 1.0 11.2 37.2 8.1 Marula Merensky 6E metal ratio (%) 0.9 7.1 5.5 2.7 29.6 38.7 METALLURGY 54.2 Pt Pd Rh Ru Ir Au Pt Pd Rh Ru Ir Au Marula has a concentrator plant where initial processing is done. Concentrate is transported by road to Impala Platinum s Mineral Processes in Rustenburg in terms of a life-of-mine offtake agreement with Impala Refining Services (IRS). Marula focuses on addressing those social, economic and environmental issues that are seen as having a material impact on the long-term success of the business, the sustainability of the economy, the environment and the communities in which we operate or that are important to key stakeholders. The pursuit of sustainable development and zero harm are seen as competitive imperatives. Marula is determined to maximise the benefits of the mine for its local communities and the social investment strategy focuses on addressing the urgent needs identified in these areas. Preference is given to local contractors and suppliers of goods and services. Makgoma Chrome is a joint venture that assists local communities with the extraction and marketing of chrome from tailings. 5

HISTORY Platinum was first discovered in the area by renowned explorer Hans Merensky on the nearby farm Maandagshoek (now Modikwa Platinum) in the 1920 s. In June 1998 Implats entered into an arrangement to acquire the Winnaarshoek property from Platexco, a Canadian based company. The mineral rights to portions of the adjacent farms of Clapham and Forest Hill and a sub-lease to Driekop were subsequently acquired from Anglo Platinum in exchange for Hendriksplaats (part of Modikwa Platinum) so consolidating the Marula mine area. The exploration programme was then expanded and some 750 surface boreholes were drilled. The establishment and development of the mine, requiring considerable investment from Implats in both infrastructure and environmental protection measures, commenced in October 2002. BLACK ECONOMIC EMPOWERMENT 6 Black economic empowerment forms a key component of the Marula operation and our partners together own 27% of the company. Each of the following parties hold a 9% stake in the business: The Marula Community Trust ensuring sustainable benefit flows to the local community over the life of the mine and beyond; Tubatse Platinum, a broad based HDSA empowerment consortium from local business; and Mmakau Mining, an established mining entity. Implats, as the largest stakeholder, brings technical, managerial, financial and operational expertise to the mine.

marula key statistics MARULA KEY STATISTICS FY2016 FY2015 FY2014 FY2013 FY2012 Production Tonnes milled ex mine ('000t) 1703 1 662 1 794 1 628 1 579 Headgrade (6E) (g/t) 4.25 4.19 4.19 4.19 4.18 Platinum in concentrate production ('000oz) 77.7 73.6 78.5 71.7 69.1 PGM in concentrate production ('000oz) 204.6 193.3 206.4 188.3 182.2 Labour efficiency Centares per employee costed** (m 2 /man/annum) 51 51 54 52 51 Tonnes milled per employee costed** (t/man/annum) 371 398 440 428 470 Cost Cost of sales (Rm) (2 076) (1 856) (1 803) (1 620) (1 277) On-mine operations (Rm) (1 669) (1 469) (1 371) (1 249) (984) Processing operations (Rm) (206) (193) (188) (161) (155) Other (Rm) (201) (194) (244) (210) (138) Total cost (Rm) 1 875 1 662 1559 1410 1139 (US$m) 130 146 150 160 147 Unit costs (R/t) 1 101 1 000 869 866 721 per tonne milled (US$/t) 76 88 84 98 93 per platinum ounce (R/oz) 24 131 22 582 19 860 19 665 16 483 in concentrate (US$/oz) 1 673 1 978 1 915 2 230 2 129 Financial ratios Gross margin ex mine (%) (23.7) (13.4) (0.7) (15.4) (6.7) Capital expenditure (Rm) 89 145 159 125 223 (US$m) 6 13 15 14 29 Safety LTIFR (pmmhw + ) 9.56 18.20 18.91 13.97 19.02 FIFR (pmmhw + ) 0.111 0.130 Labour complement Own employees (no) 3 565 3 568 3 411 3 175 2 982 Contractors (no) 1 235 811 893 843 726 ** Total employees excluding capital project employees + Per million man hours worked 7

CONTACT DETAILS HEAD OFFICE 2 Fricker Road, Illovo, 2196 Private Bag X18, Northlands, 2116 Tel: +27 (11) 731 9000 Fax: +27 (11) 731 9254 E-mail: investor@implats.co.za www.implats.co.za Group Executive: Corporate Relations Johan Theron Tel: +27 (11) 731 9013 E-mail: johan.theron@implats.co.za Group Corporate Relations Manager Alice Lourens Tel: +27 (11) 731 9033 E-mail: alice.lourens@implats.co.za NOVEMBER 2016