TSX.V: SKE/OTCQX: SKREF. October 2018

Similar documents
TSX.V: SKE/OTCQX: SKREF. September 2018

TSX.V: SKE/OTCQX: SKREF. August 2018 Appendix

TSX.V: SKE/OTCQX: SKREF. December 2018

Skeena Intersects g/t AuEq over metres at Eskay Creek

Bellhaven Announces Updated NI Mineral Resource for La Mina Project, Colombia

Queenston Announces 112% Increase in Indicated Resource (to 1.5 M oz. gold) and 16% Increase in Inferred Resource (to 0.7 M oz. gold) at Upper Beaver

A New Direction. Copper-Gold Deposit at Thor TSX.V:COL. August 11, May 2013

CAUTIONARY STATEMENT

DRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL

SALAZAR ANNOUNCES AN UPDATED RESOURCE REPORT OF 5.53 MT INDICATED AND 1.46 MT INFERRED AT ITS HIGH GRADE VMS EL DOMO DEPOSIT

Mike Cathro, Roundup Conference, January 27, 2016

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

Sept 20, 2012 TSX Venture Exchange Tier 1 Trading Symbol: OK

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

OSISKO METALS INTERSECTS 10.49% ZINC+LEAD OVER METRES AND 12.15% ZINC+LEAD OVER METRES AT PINE POINT

CROCODILE GOLD CONTINUES POSITIVE EXPLORATION RESULTS INTERSECTS HIGH GRADE GOLD AT UNION REEFS PROJECT

Goldplay President and CEO Marcio Fonseca commented

TSX.V: TR. Drilling in the Shadow of World-Class Deposits. TR: TSX.V January 2019

PRESS RELEASE NEW MINERAL RESOURCE UPDATE AT PRAIRIE CREEK MINE. Measured + Indicated and Inferred Resource Tonnages Increased

TUDOR GOLD CORP. Turning Gold Claims into Gold Mines. November, 2018 TSX-V: TUD Frankfurt: TUC.F

Coeur Mining Provides Silvertip Exploration Update

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

SilverCrest Expands Babicanora High Grade Footprint to 600 metres; New High Grade Vein Discoveries Highlight District Scale Potential

TUDOR GOLD CORP. Turning Gold Claims into Gold Mines. November, 2018 TSX-V: TUD Frankfurt: TUC.F

The Valentine Gold Camp:

NGEX ANNOUNCES COPPER GOLD DISCOVERY AT NACIMIENTOS PROJECT

Silver Coin Project British Columbia. Bulk-Tonnage Advanced-Stage Gold-Silver Deposit

New Drilling Program Commences at Mutiny s Deflector Deposit

SABINA GOLD &SILVER REPORTS COMPLETION OF DRILLING AT ECHO DEPOSIT, BACK RIVER, NUNAVUT.

July Exploring for Canadian Gold in the Rainy River District of Ontario

April Exploring for Canadian Gold in the Rainy River District of Ontario

Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.

CROCODILE GOLD INTERSECTS GRAMS PER TONNE GOLD OVER 2.05 METERS BELOW THE PROSPECT DEPOSIT AT UNION REEFS

Corporate Presentation September 2017 TSX-V: RK

SAMPLE ID SAMPLE TYPE Au (g/t) Ag (g/t) Cu (%) AuEq**(g/t)

Interval (meters) To (meters)

For Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD

January 15, 2019 BENCHMARKMETALS.COM

GOLD REACH (GRV) ANNOUNCES A 141% INCREASE IN INDICATED AND 91% INCREASE IN INFERRED RESOURCES AT SEEL

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

Rich Saddle North Au-Cu-Ag Porphyry Expands by 275m Along Strike and 250m Down-Dip

Northern Dynasty Minerals Ltd.

GOLDEN RIDGE RESOURCES DRILLS 60.27m of 2.60 G/T AUEQ AT THE HANK PROJECT IN BC S GOLDEN TRIANGLE

Asiamet Drilling Further Extends BKM Mineralisation

IDM Mining s Underground Drilling Intersects g/t Au and g/t Ag over 6.80 Meters True Width at the Red Mountain Gold Project

CROCODILE GOLD FILES TECHNICAL REPORTS FOR FOSTERVILLE AND COSMO GOLD MINES AND PROVIDES ANNUAL GENERAL MEETING INFORMATION

Minsud to recommence resource outline diamond drilling at the Chita Valley Cu- Au-Ag-Mo Project, San Juan, Argentina

MCEWEN MINING ANNOUNCES EXPLORATION UPDATE FOR EL GALLO 1, MEXICO

Table 1: Mineral Resources at Costerfield, Inclusive of Mineral Reserves as of December 1, 2018 and December 31, 2017.

TUDOR GOLD CORP. Turning Gold Claims into Gold Mines. February, 2019 TSX-V: TUD Frankfurt: TUC.F

Forward-Looking Statements & Qualified Person

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

Underground Exploration Drilling Complete; Brucejack Mineralization Extends to the East

FALCO PACIFIC COMPLETES INITIAL MODEL FOR THE HORNE 5 GOLD/SILVER/ZINC/COPPER DEPOSIT

GOLDPLAY ANNOUNCES FURTHER SAMPLING RESULTS FROM SAN MARCIAL HISTORICAL CORE; CONFIRMS OPEN PIT TARGET NEAR SURFACE WITH gpt AgEq.

BGM ANNOUNCES MINERAL RESOURCE UPDATE AT BARKERVILLE MOUNTAIN TO SUPPORT BONANZA LEDGE OPERATIONS

NEWS RELEASE FULLER PROPERTY CONTINUES TO DELIVER GOOD RESULTS 2.53 GRAMS PER TONNE GOLD OVER METRES

Advancing Molybdenum, Graphite and Gold Projects in Canada

News Release. Infill Drilling Program

MANN SILVER-COBALT MINE. PORE: TSXV PowerOre.com

EXPLORING NEW GOLD FRONTIERS IN CANADA

A New Silver-Zinc Developer in Peru. June 2012

Assay Results Highlights (as of November 16, 2017) representing approximately 4,500 metres ( m ) of drilling:

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

DMM TSX Venture. CANADIAN OFFICE Suite Burrard Street Vancouver, B.C.. V6C 2X8.

Sabina Gold & Silver Reports 2018 Drilling has Commenced at Back River Gold Project

Fortuna Updates Reserves and Resources

BALMORAL INTERSECTS g/t GOLD OVER 7.99 METRES, BUG LAKE SOUTH, DETOUR GOLD TREND PROJECT, QUEBEC

Replacement: Material Increase to Tuzon Resource

Yellowknife Gold Project

Mineral Resource Estimate Comparison at 3 g/t Au cut-off

Highlights from the four holes announced in this news release include:

V Sample from C.O.D vein 15 metres southwest of V

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation May, 2017

A B C PAD A HIGHLIGHTS

The new sulphide mineralization lies within a 1.4 kilometer long east-west trending

Detour Gold Reports Drilling Results from Lower Detour

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

August 20, 2018 SBB NR SBB TSX

(TSXV: GPLY, OTCQB: GLYXF

NEWS RELEASE. Mountain Province Diamonds Reports Additional Kimberlite Identified in Gahcho Kué Exploration Program

NEWS RELEASE. Foran Mining Intersects High Grade Zinc at McIlvenna Bay. Results expand area of known mineralization

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. July 21, May 2013

Building Value Through Discovery

For Immediate Release MORE HIGH-GRADE GOLD AT ASCOT S GOLDEN TRIANGLE PROPERTY

Rosita Mining. Moving to Production in an Old Mining Camp With Significant Exploration Potential. March, 2017

STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE

FYRE LAKE VMS PROJECT

SHAMROCK ENTERPRISES INC. CSE Symbol - SRS

Canada Zinc Metals Announces Expanded Mineral Resource Estimate for the Cardiac Creek Deposit

Exploring for Precious and Base Metals in Sweden. Barsele Minerals Corp. (TSX.V: BME) December, 2016

CHIVAS A New Large Scale Au-Ag-Te-Cu Target

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

BARKERVILLE GOLD MINES DECEMBER CORPORATE UPDATE

MINERAL RESERVES AND MINERAL RESOURCES SUMMARY TABLE MINERAL RESERVES

Press Release Thunder Bay: August 2, 2018

Kiska Metals Corporation Project Updates

Grande Portage Resources Ltd. Corporate Presentation September, 2017

NEWS RELEASE TSX-V Ticker: SWA 23 April 2013 SWA.WT SARAMA RESOURCES EXTENDS HIGH-GRADE MINERALISATION AT MM PROSPECT IN BURKINA FASO

A New Silver-Zinc Developer in Peru. July, 2013

Transcription:

TSX.V: SKE/OTCQX: SKREF October 2018

FORWARD LOOKING STATEMENTS Certain statements made and information contained herein may constitute forward looking information and forward looking statements within the meaning of applicable Canadian and United States securities legislation, including, among other things, information with respect to this presentation. These statements and information are based on facts currently available to the Company and there is no assurance that actual results will meet management s expectations. Forwardlooking statements and information may be identified by such terms as anticipates, believes, targets, estimates, plans, expects, may, will, could or would. Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes and other matters. While the Company considers its assumptions to be reasonable as of the date hereof, forward-looking statements and information are not guarantees of future performance and readers should not place undue importance on such statements as actual events and results may differ materially from those described herein. The Company does not undertake to update any forward-looking statements or information except as may be required by applicable securities laws. The Qualified Person responsible for the technical information in this presentation is Paul Geddes P. Geo., Vice President of Exploration & Resource Development, who has approved the technical information included herein. Any reference to historical estimates and resources should not be relied upon.these are not current and a Q.P. has not done sufficient work to classify these historical estimate and Skeena Resources Limited is not treating the historical estimate as a current resource estimate. 2

SKEENA TEAM MANAGEMENT Walter Coles, Jr. President, CEO & Director: Mr. Coles has been CEO for several TSXV listed companies. Previously he was an analyst with Cadence Investment Partners and before that with UBS Investment Bank. Mr. Coles holds a B.A. in Economics from the University of Richmond. Andrew MacRitchie, CPA, CA, CFO & Corporate Secretary: Mr. MacRitchie is a Chartered Public Accountant who s held management roles in several TSXV listed mining companies over his 16-year career. Mr. MacRitchie was previously with PricewaterhouseCoopers in the tax accounting group. He is a graduate of University of British Columbia Paul Geddes, P. Geo. Vice President, Exploration & Resource Development: Mr. Geddes has more than 20 years of exploration and resource development experience. He was an instrumental member of the Rainy River Resources team prior to the Company s takeover by New Gold in 2013. Kelly Earle, B. Sc. Geol., CPIR. Vice President, Communications: Ms. Earle is an Investor Relations professional and a geologist with 9 years of experience working with junior mining companies. She received her B. Sc. Geol. from the University of British Columbia and her CPIR from the Ivey School of Business at Western University. Justin Himmelright, B. Sc., M. Eng. Vice President, Sustainability: Mr. Himmelright has over 25 years of experience in environmental management and developing social license for natural resource projects. He is a graduate of University of British Columbia. Ron Nichols, B. Sc., P. Eng. Chief Geologist: Mr. Nichols worked as a geologist for Cominco Ltd. from 1967 until 1990. During his 23 years with Cominco, Mr. Nichols led numerous advanced exploration projects throughout Canada, Greenland and South America. Ron Netolitzky: Mr. Netolitzky has been very successful in mining exploration with over 40 years of experience. Including direct association with three major gold discoveries and start ups of past producing Canadian mines: Eskay Creek, Snip and Brewery Creek. Peter Tredger: Mr. Tredger is a professional engineer with 45 years of mining industry experience. With more than 25 years experience as a public company director of several Canadian and Australian listed mining companies. J. Rupert Allan: Mr. Allan is a consulting geologist with 45 years experience in base and precious metals. He has worked extensively in northwest British Columbia and was instrumental in the development of the Brewery Creek heap leach gold mine in the Yukon. Craig Parry: Mr. Parry is a geologist and has served as CEO and President for several Australian and TSXV listed mining companies. He is currently the President & CEO of IsoEnergy Ltd., a co-founder and director of NexGen Energy Ltd and a Senior Advisor and founding-shareholder of EMR Capital. Don Siemens: DIRECTORS Mr. Siemens is an independent financial advisor with over 30 years of experience as a Chartered Accountant. Mr. Siemens currently serves as Director and Audit Committee Chair for Arizona Mining Inc., Atlantic Gold Corp., Eros Resources Corp. and Hansa Resources Ltd. Borden R. Putnam III: Mr. Putnam is a professional geologist with over 41 years of mineral industry experience, with a focus on exploration and asset evaluations. During the last 15 years Mr. Putnam has worked primarily as an analyst or advisor to several large investment funds in the US. 3

4 PROPERTY LOCATIONS BC S GOLDEN TRIANGLE

INFRASTRUCTURE IN THE GOLDEN TRIANGLE Excellent access to power & infrastructure: Highway 37 paved north from Smithers New 287 kv power line Forrest Kerr & McLymont Creek Power Station within 17 km of Snip Volcano Creek Power Station within 10 km of Eskay Creek Red Chris mine 25 km east of GJ Opening of year-round ocean port facilities in Stewart 5

ESKAY CREEK Remnants of the Eskay Creek Mine, July 2018 Option to Acquire secured in December 2017 from Barrick Produced 3.3 million ounces of gold & 160 million ounces of silver at average grades of 45 g/t Au & 2,224 g/t Ag from 1994 to 2008 2.2 million tonnes of ore mined with cut-off grades ranging from 12-15 g/t AuEq for mill ore and 30 g/t AuEq for direct shipping ore Historical database containing 7,881 drill holes totaling 706,904 metres (surface & underground) Maiden NI 43-101 Resource Estimate released Sept. 2018 5,000 m surface drilling planned for 2018 6

ESKAY CREEK 2018 RESOURCES (LOOKING EAST) 21A 22 HW NEX 109 PUMPHOUSE 21E 21B 21C 21C Grade Contained Ounces Tonnes AuEq Au Ag AuEq Au Ag (000) g/t g/t g/t oz (000) oz (000) oz (000) Indicated Mineral Resources Pit Constrained 1,088 5.9 4.9 72 207 173 2,533 Underground 2,513 10.1 7.2 215 814 582 17,340 Total Indicated 3,601 8.8 6.5 172 1,020 755 19,873 Inferred Mineral Resources Pit Constrained 4,261 4.3 3.3 72 589 458 9,805 Underground 812 10 7.2 214 261 187 5,590 Total Inferred 5,073 5.2 4.0 94 850 645 15,395 Pit constrained resources are quoted at a 1.0 g/t AuEQ cut-off. Underground resources are quoted at a 5.5 g/t AuEQ cut-off. AuEQ = Au (g/t) + {Ag (g/t) /75] Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources estimated will be converted into mineral reserves. Resources are reported in-situ and undiluted for both pit constrained and underground scenarios and are considered to have reasonable prospects for economic extraction. In accordance with NI 43-101 recommendations, the number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects. 7

ESKAY CREEK PREVIOUS MINING 2018 Resources Historical Stopes & Development Drillhole Mercury >200 ppm 21A 21E 21E 21B 21C 21BE NEX 109 21C 21C Mill Recoveries Au% Ag% 21B 84 96 HW Upper 80 91 HW Lower 79 91 NEX Contact 92 96 NEX FW 69 87 21C 81 88 Pumphouse 73 96 21E 74 93 WTZ 86 90 Averages 80 92 8

ESKAY CREEK 2018 21A SURFACE RESULTS OBLIQUE VIEW 21A 21E PUMPHOUSE 21B ZONE 21B 21C 21A SECTION PLANE 21C Historical Stopes & Development 2018 Resource 9

10 ESKAY CREEK 2018 21A SURFACE RESULTS

SNIP GOLD PROJECT Underground drilling at Snip hole UG17-001 100% owned (acquired from Barrick July 2017) Produced 1.1 million ounces of gold at average grade of 27.5 g/t from 1991 to 1999 280,000 m of historical surface & underground drilling 8,435 m underground development 25,413 m drilled by Skeena from surface & underground to date 9,583 m Phase II underground/surface drill program recently completed 11

SNIP MINE - GOLD GRADE DISTRIBUTION LOOKING NORTH SNIP MINE HISTORIC PRODUCTION (1991-1999): SECTION 4660E SECTION 4980E ZONE TONNES GRADE (G/T) OUNCES TWIN WEST 9,668 18.10 5,625 MISC 16,585 16.01 8,537 130 VEIN 26,582 19.90 17,006 FOOTWALL 67,712 28.31 61,630 HANGINGWALL 89,288 26.86 77,100 150 VEIN 277,926 25.41 227,012 TWIN 762,437 28.95 709,601 TOTALS 1,250,198 27.53 1,106,511 Twin Zone Eastern Twin Twin West Underground Development Historical Stopes Drillhole Composites >5.0 g/t Au over 2.0 metres 12

SNIP 200 FOOTWALL - SECTION 4660E SKE 2016 Drillhole 16.24 g/t Au 13.50 m 13

14 SNIP EASTERN TWIN ZONE - SECTION 4980E

SNIP EASTERN TWIN ZONE CONTINUITY EASTERN TWIN ZONE MINERALIZATION 15

SNIP PROPERTY SCALE EXPLORATION POTENTIAL HISTORIC GOLD IN SOIL ANOMALY >100 ppb DRILLHOLE COMPOSITES >2.0 G/T AU OVER 1.0 METRE DRILL INTERCEPT G/T AU / METRE 16

SNIP EXPLORATION POTENTIAL DEVELOPED TWIN ZONE FOOTPRINT: 200 M STRIKE 400 M DIP 17

SKEENA 2018 OBJECTIVES SNIP 9,583 metres underground/surface drilling completed Exploratory drill step-outs, delineation and infill drilling Identify additional tonnage potential Historical data validation Maiden NI 43-101 Resource estimate expected 2019 ESKAY CREEK 5,000 metres surface drilling 21A, 21C & 22 Zones Upgrade Inferred resources to Indicated Geotechnical assessment Metallurgical optimizations Maiden NI 43-101 Resource estimate released September 2018 18

SKEENA CAPITAL STRUCTURE Capital Structure Current Shares Outstanding 90,328,548 Market Capitalization (CAD$0.57) $51.5 Million 52 Week High $0.80 52 Week Low $0.37 Warrants (exp. July 2019 June 2020) 19,058,703 Options (exp. November 2019 January 2023) 7,452,444 Shares Fully Diluted 116,839,695 All figures as of Sept. 12, 2018. Share Price TSX.V: SKE Sept. 12, 2017 to Sept. 12, 2018 19

APPENDIX Eskay Creek Resource Estimate & GJ PEA Results 20

2018 ESKAY CREEK RESOURCES (PLAN VIEW) 21E GRADE CONTAINED OUNCES TONNES AUEQ AU AG AUEQ AU AG (000) G/T G/T G/T OZ (000) OZ (000) OZ (000) INDICATED MINERAL RESOURCES PIT CONSTRAINED 1,088 5.9 4.9 72 207 173 2,533 UNDERGROUND 2,513 10.1 7.2 215 814 582 17,340 TOTAL INDICATED 3,601 8.8 6.5 172 1,020 755 19,873 INFERRED MINERAL RESOURCES PIT CONSTRAINED 4,261 4.3 3.3 72 589 458 9,805 UNDERGROUND 812 10 7.2 214 261 187 5,590 TOTAL INFERRED 5,073 5.2 4.0 94 850 645 15,395 NEX 21BE 21B 21A 21C 21C 21C 22 21

2018 ESKAY CREEK PIT CONSTRAINED RESOURCES (1.0 G/T AUEQ CUT-OFF) TOTAL INDICATED INFERRED TOTAL INFERRED GRADE CONTAINED OUNCES TONNES AUEQ AU AG AUEQ AU AG ZONE (000) G/T G/T G/T OZ (000) OZ (000) OZ (000) 21A 21A 22 1,088 2,809 1,452 4,261 5.9 4.9 72 207 173 4.6 3.8 63 418 342 3.7 2.5 89 171 116 4.3 3.3 72 589 458 2,533 5,653 4,151 9,805 Pit constrained resources are quoted at a 1.0 g/t AuEQ cut-off. AuEQ = Au (g/t) + {Ag (g/t) /75] Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources estimated will be converted into mineral reserves. Resources are reported in-situ and undiluted for both pit constrained and underground scenarios and are considered to have reasonable prospects for economic extraction. In accordance with NI 43-101 recommendations, the number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects. 22

2018 ESKAY CREEK UNDERGROUND RESOURCES (5.5 G/T AUEQ CUT-OFF) GRADE CONTAINED OUNCES TONNES AUEQ AU AG AUEQ AU AG ZONE (000) G/T G/T G/T OZ (000) OZ (000) OZ (000) 21C 674 9.6 7.5 154 207 163 3,335 21B 338 12.1 8.6 263 132 94 2,855 21BE 246 10.1 6.8 247 80 53 1,954 INDICATED 21E 41 10.8 6.3 337 14 8 441 HW 522 10.2 6.2 295 171 105 4,957 NEX 510 9.6 6.8 209 158 112 3,432 PUMPHOUSE 72 7.9 6.1 140 18 14 323 109 111 9.5 9.4 12 34 34 42 TOTAL INDICATED 2,513 10.1 7.2 215 814 582 17,340 21C 44 7.2 6.7 38 10 10 55 21B 262 10.5 7.8 206 89 66 1,738 21BE 114 15.3 9.5 431 56 35 1,573 INFERRED 21E 53 8.5 4.6 292 14 8 495 HW 87 8.4 5.0 256 24 14 718 NEX 220 8.5 6.8 130 61 48 922 PUMPHOUSE 30 7.8 6.6 92 8 6 88 109 2 7.4 7.3 8 0.4 0.4 0.4 TOTAL INFERRED 812 10.0 7.2 214 261 187 5,590 Underground resources are quoted at a 5.5 g/t AuEQ cut-off. AuEQ = Au (g/t) + {Ag (g/t) /75] Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources estimated will be converted into mineral reserves. Resources are reported in-situ and undiluted for both pit constrained and underground scenarios and are considered to have reasonable prospects for economic extraction. In accordance with NI 43-101 recommendations, the number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects. 23

2018 ESKAY CREEK RESOURCE AUEQ CUT-OFF SENSITIVITIES INDICATED PIT CONSTRAINED UNDERGROUND INFERRED PIT CONSTRAINED UNDERGROUND GRADE CONTAINED OUNCES CUTOFF GRADE TONNES AUEQ AU AG AUEQ AU AG G/T (000) G/T G/T G/T OZ (000) OZ (000) OZ (000) > 0.75 1,167 5.6 4.7 68 209 175 2,568 > 1.00 1,088 5.9 4.9 72 207 173 2,533 > 1.25 1,005 6.3 5.3 77 204 171 2,482 > 4.00 4,008 8.1 5.9 162 1,038 758 20,878 > 4.50 3,414 8.7 6.3 181 957 693 19,872 > 5.00 2,923 9.4 6.8 198 883 635 18,576 > 5.50 2,513 10.1 7.2 215 814 582 17,339 > 6.00 2,171 10.7 7.7 232 750 534 16,192 > 0.75 4,866 3.9 3 64 606 473 10,026 > 1.00 4,261 4.3 3.3 72 589 458 9,805 > 1.25 3,731 4.8 3.7 79 570 443 9,519 > 4.00 1,682 7.4 5.4 142 398 291 7,702 > 4.50 1,262 8.2 6 166 333 243 6,736 > 5.00 1,004 9.1 6.6 189 294 212 6,115 > 5.50 812 10 7.2 214 261 187 5,590 > 6.00 661 11 7.8 242 233 165 5,133 Pit constrained resources are quoted at a 1.0 g/t AuEQ cut-off. Underground resources are quoted at a 5.5 g/t AuEQ cut-off. AuEQ = Au (g/t) + {Ag (g/t) /75] Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources estimated will be converted into mineral reserves. Resources are reported in-situ and undiluted for both pit constrained and underground scenarios and are considered to have reasonable prospects for economic extraction. In accordance with NI 43-101 recommendations, the number of metric tonnes was rounded to the nearest thousand. Any discrepancies in the totals are due to rounding effects. 24

GJ PORPHYRY PROJECT 43,500 hectare gold-copper porphyry, 25 km west of Red Chris GT Gold Tatogga Project PEA released April 2017*: Robust economics Updated mineral resource estimate Excellent proximity to power & infrastructure Conventional open-pit mining with low strip ratios Excellent exploration potential remains with numerous targets identified *See April 20, 2017 Skeena news release for more details (Proposed) 25

GJ PEA ECONOMIC SUMMARY CAD$216 million initial Capex Parameter Base Case Upside Case 1 Upside Case 2 Metal Price: Copper (US$/lb) 2.75 3.00 3.25 Gold (US$/oz) 1,250 1,300 1,350 Silver (US$/oz) 17.75 20.00 22.50 Economic Results (Pre-Tax) NPV 8% (CAD$ millions) $546.18 $699.62 $853.86 IRR 26.6% 31.0% 35.3% Payback (years) 3.81 3.19 2.71 Economic Results (After-Tax) NPV 8% (CAD$ millions) $314.09 $412.99 $512.35 IRR 20.6% 23.9% 27.1% Payback (years) 4.21 3.68 3.26 US$0.75=CAD$1.00 26

GJ PEA PROJECT STATISTICS Planned Life-of-Mine: 25 years Production Total Plant Throughput 213.74 Mt Proportion in Indicated Mineral Resource Category Average Strip Ratios Average Grades (Spectrum Pit ROM material) Average Grades (Donnelly Pit ROM material) Life of Project, Average Metallurgical Recoveries Payable Metal Spectrum Pit Donnelly Pit Spectrum Pit Donnelly Pit Gold Silver Copper Gold Silver Copper Gold Silver Copper Gold Silver Copper 79% 96% 0.52 0.86 0.96 g/t Au 3.24 g/t Ag 0.13% Cu 0.32 g/t Au 1.97 g/t Ag 0.28% Cu 72.3% 57.1% 89.2% 1.62 Moz 7.54 Moz 998.99 Mlb 27

SPECTRUM-GJ UPDATED RESOURCE ESTIMATE Substantial defined resources available for project expansion (less than 20% of Spectrum Inferred tonnage planned for extraction) Excellent exploration potential; numerous high-grade, polymetallic vein, breccia and stockwork occurrences remain on property Spectrum Central Zone* @ 0.40 g/t AuEq cut-off Average Grades Contained Metal Category Million Tonnes Au (g/t) Ag (g/t) Cu (%) Gold (Moz) Silver (Moz) Copper (Mlb) Indicated 31.2 0.94 2.6 0.10 0.94 2.64 67.7 Inferred 29.8 0.47 1.4 0.12 0.45 1.34 76.4 GJ Donnelly Deposit* @ 0.15% CuEq cut-off Average Grades Contained Metal Category Million Tonnes Au (g/t) Ag (g/t) Cu (%) Gold (Moz) Silver (Moz) Copper (Mlb) 28 Indicated 215.2 0.31 1.9 0.26 2.14 13.03 1,235.4 Inferred 28.3 0.31 1.8 0.14 0.28 1.64 85.1 *Resource calculations completed by David G. Thomas, P.Geo. See April 20, 2017 Skeena news release for more details. Metal prices of US$1,250/oz Au, US$2.75/lb Cu and US$17.75/oz Ag were used along with metallurgical recovery rates of 73% for Au, 90% for Cu and 50% for Ag. Mineral resources which are not mineral reserves have not demonstrated economic viability. There is no certainty that all or any part of the mineral resources will be converted to mineral reserves.

www.skeenaresources.com TSX.V: SKE / OTCQX: SKREF Kelly Earle, Vice President Communications info@skeenaresources.com +1 604 684 8725 Suite # 650-1021 West Hastings Street Vancouver, BC V6E 0C3 Canada 29