Bushkill Creek 3 rd Street Dam Removal Analysis

Similar documents
Section 4: Model Development and Application

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

Objectives: After completing this assignment, you should be able to:

HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED

ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS

INTRODUCTION TO HEC-HMS

Workshop: Build a Basic HEC-HMS Model from Scratch

REDWOOD VALLEY SUBAREA

9. PROBABLE MAXIMUM PRECIPITATION AND PROBABLE MAXIMUM FLOOD

A GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner

Advanced /Surface Hydrology Dr. Jagadish Torlapati Fall 2017 MODULE 2 - ROUTING METHODS

INTRODUCTION TO HYDROLOGIC MODELING USING HEC-HMS

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

UPPER COSUMNES RIVER FLOOD MAPPING

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

George Mason University Department of Civil, Environmental and Infrastructure Engineering

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

Chapter 10 - Sacramento Method Examples

The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Rucker Pond. Background

ISSN Vol.03,Issue.10 May-2014, Pages:

REMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION

Determination of Urban Runoff Using ILLUDAS and GIS

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

Designing a Dam for Blockhouse Ranch. Haley Born

FORECAST-BASED OPERATIONS AT FOLSOM DAM AND LAKE

Notes: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments.

Stream Discharge and the Water Budget

Chapter 5 CALIBRATION AND VERIFICATION

NRC Workshop Probabilistic Flood Hazard Assessment (PFHA) Jan 29-31, Mel Schaefer Ph.D. P.E. MGS Engineering Consultants, Inc.

3.0 TECHNICAL FEASIBILITY

******************* Project Description ******************* File Name... NAAF Stormwater Improvement Project 11_21_2014.SPF

THE PENNSYLVANIA STATE UNIVERSITY SCHREYER HONORS COLLEGE DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING. MATT BACHMAN Spring 2012

GRAPEVINE LAKE MODELING & WATERSHED CHARACTERISTICS

A distributed runoff model for flood prediction in ungauged basins

TSEGI WASH 50% DESIGN REPORT

Lower Tuolumne River Accretion (La Grange to Modesto) Estimated daily flows ( ) for the Operations Model Don Pedro Project Relicensing

January 22, Coronado National Forest 300 West Congress Street Tucson, AZ Jim Upchurch, Forest Supervisor. Dear Mr.

Continuing Education Course #101 Drainage Design with WinTR-55

Illinois State Water Survey Division

Project Description. Project Options. End Analysis On... Apr 26, :00:00. Rainfall Details

StreamStats: Delivering Streamflow Information to the Public. By Kernell Ries

GISHydro2000: A Tool for Automated Hydrologic Analysis in Maryland. G. E. Moglen 1

Hydrologic Modeling System HEC-HMS

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

Modeling the Effects of Climate and Land Cover Change in the Stoney Brook Subbasin of the St. Louis River Watershed

APPENDIX B HYDROLOGY

Technical Memorandum No

Development of the Hydrologic Model

PECKMAN RIVER BASIN, NEW JERSEY FLOOD RISK MANAGEMENT FEASIBILITY STUDY. Hydrology Appendix. New York District

FORM A GEOGRAPHY 1114 LABORATORY FINAL EXAM Teaching Assistant SAMPLE Lab Meeting. Place all answers on the answer sheet; 2 points per question

DRAINAGE REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

CAUSES FOR CHANGE IN STREAM-CHANNEL MORPHOLOGY

Changing Hydrology under a Changing Climate for a Coastal Plain Watershed

Homework 10. Logan Dry Canyon Detention Basin Design Case Study Date: 4/14/14 Due: 4/25/14

Stormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)

2015 Fall Conditions Report

AN ASSESSMENT OF THE IMPACT OF RETENTION PONDS

4. GIS Implementation of the TxDOT Hydrology Extensions

Appendix E Guidance for Shallow Flooding Analyses and Mapping

Hydrogeology and Simulated Effects of Future Water Use and Drought in the North Fork Red River Alluvial Aquifer: Progress Report

Fenhe (Fen He) Map of River. Table of Basic Data. China 10

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226


Development and Land Use Change in the Central Potomac River Watershed. Rebecca Posa. GIS for Water Resources, Fall 2014 University of Texas

Predictive Model of Rainfall-Runoff: A Case Study of the Sanaga Basin at Bamendjin Watershed in Cameroon

Study 16.5 Probable Maximum Flood (PMF)

Study 16.5 Probable Maximum Flood (PMF)

Near Real-Time Runoff Estimation Using Spatially Distributed Radar Rainfall Data. Jennifer Hadley 22 April 2003

Civil Engineering 394K: Topic 3 Geographic Information Systems (GIS) in Water Resources Engineering FALL 2014

MODULE 8 LECTURE NOTES 2 REMOTE SENSING APPLICATIONS IN RAINFALL-RUNOFF MODELLING

Hydrologic Modeling System HEC-HMS

!"#$%&&'()*+#$%(,-./0*)%(!

Valenciano Reservoir Safe Yield Study. Prepared by: CSA Architects & Engineers, LLP

Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah

LESSON HEC-HMS

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

Floodplain modeling. Ovidius University of Constanta (P4) Romania & Technological Educational Institute of Serres, Greece

Hydrologic Modelling of the Upper Malaprabha Catchment using ArcView SWAT

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

The 2 nd Annual Gobeshona Conference Future Changes of Flash Flood in the North East Region of Bangladesh using HEC-HMS Modeling

This site will utilize an infiltration berm to manage the two-year/24-hour volume increase.

Hydrologic Conditions in the Delaware River Basin

Watershed concepts for community environmental planning

The Geometric and Hydraulic Simulation of Detention Dams by Integrating HEC-HMS and GIS (Case Study: Neka River Drainage Basin)

MARMOT CREEK BASIN: MANAGING FORESTS FOR WATER

URBAN WATERSHED RUNOFF MODELING USING GEOSPATIAL TECHNIQUES

Pennypack Creek Watershed Act 167 Study

Appendix C. Questionnaire Summary of Responses Geographic Information Systems

Modeling of a River Basin Using SWAT Model and SUFI-2

CE394k.3 - ArcGIS in Water Resources Term Project Update, Fall 2012

Appendix D. Model Setup, Calibration, and Validation

Rong Jiang. Map of River. Table of Basic Data. China 14. Serial No. : China-14

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

Lecture 14: Floods. Key Questions

July, International SWAT Conference & Workshops

Pompton Lakes Dam Downstream Effects of the Floodgate Facility. Joseph Ruggeri Brian Cahill Michael Mak Andy Bonner

Transcription:

Bushkill Creek 3 rd Street Dam Removal Analysis HEC HMS Runoff and Routing Model Stephen Beavan, Melanie DeFazio, David Gold, Peter Mara and Dan Moran CE 421: Hydrology Fall 2010 December 15, 2010

Contents 1. Objectives and Tasks... 2 2. Site Description... 2 3. Methods... 4 3.1 Sub basin Modeling... 5 3.1.1 NRCS Curve Numbers... 6 3.1.2 Time of Concentration... 7 3.1.3 Baseflow... 8 3.2 Reach Modeling... 8 3.3 Reservoir Modeling... 9 4. Results and Discussion... 13 4.1 Results... 13 4.2 Limitations... 15 5. References... 17 Appendices Appendix A Curve Number Tables Appendix B Time of Concentration Data Appendix C Baseflow Calculations for Bushkill Creek Appendix D Reach K Value Calculations Appendix E Flood Stage Areas for 3 rd St. Dam Appendix F Stage Discharge Table Spreadsheet Calculations Appendix G HEC HMS Results 1

1. Objectives and Tasks To determine the effect of removing the 3 rd Street Dam on peak flows in the Bushkill Creek, a model of the Bushkill Creek Watershed and the 3 rd Street Dam was created using HEC HMS (ACOE, 2001). In order to use this program, it was first necessary to complete extensive work within ArcGIS and AutoCAD. 1.1 Objective The goal of this report is to determine the difference in peak outflows, with and without the presence of the dam, for various design storm hydrographs. 1.2 Tasks Delineate the Bushkill Creek Watershed, divide into sub basins Determine the land cover, soil type and time of concentration within each sub basin Determine the stage storage relationship at the 3 rd Street Dam, as well as the stagedischarge relationship Develop an accurate estimation of the Bushkill Creek s base flow using data from nearby watersheds Develop a HEC HMS model of the watershed, reaches and reservoir Rout storm hydrographs with and without the dam 2. Site Description The Bushkill Creek Watershed encompasses an area of almost eighty square miles. The watershed and its corresponding topography can be seen in Figure 1. 2

FIGURE 1 BUSHKILL CREEK WATERSHED (DIGITAL TOPO MAPS) The 3 rd Street Dam, owned by Lafayette College, is adjacent to the College s downtown arts campus. The surrounding area includes scattered woods, but primarily consists of paved streets and buildings. Lafayette s main campus sits on the hill above the Bushkill Creek and drains directly into the creek. Figure 2 shows the area directly upstream of the dam. FIGURE 2 LAND UPSTREAM OF 3RD STREET DAM 3

Figure 3 and Figure 4 show the dam under both baseflow and stormflow conditions, respectively. FIGURE 3 DAM UNDER BASEFLOW CONDITIONS (LYONS, C.) FIGURE 4 DAM UNDER STORMFLOW CONDITIONS (BRANDES, D.) 3. Methods Using HEC HMS, storm routing hydrographs were developed for the Bushkill Creek at the site of the 3 rd Street Dam. HEC HMS creates a basin model which consists of a system of interconnected sub basins, reaches, junctions and reservoirs (ACOE, 2001). This basin model was paired with meteorological data to simulate runoff for the 2 yr through 100 yr storms. 4

3.1 Sub basin Modeling ArcGIS was used in the preliminary stages of the project to develop inputs for the HEC HMS sub basin models. These inputs include curve number, time of concentration and area. To obtain these values, it was first necessary to divide the Bushkill Creek Watershed into subbasins. Based on smaller tributaries throughout the Bushkill Creek Watershed, eight sub basins were delineated. The sub basins and their given names are shown Figure 5 below. The Belfast, Forks, and Easton sub basins contain reaches of the Bushkill Creek, which were also critical for the HEC HMS model. The HEC HMS model basin containing both the sub basins and reaches are shown in Figure 6. FIGURE 5 SUB BASINS WITHIN THE BUSHKILL CREEK WATERSHED (NOT TO SCALE) 5

FIGURE 6 HEC HMS REPRESENTATION OF THE BUSHKILL CREEK WATERSHED 3.1.1 NRCS Curve Numbers Runoff curve number (NRCS, 1986) depends on land cover and soil type. Within each sub basin, the corresponding land usage (LCI NLCD, 2001) and soil type (LVPC) were determined. In several cases, the specific land usage of a sub watershed was distributed over multiple soil classifications. The most dominant soil throughout the watershed was used to determine the inputs for the curve number calculations, except for Nazareth and Forks. For these watersheds, the percentages of B and C soils were almost equal, so it was necessary to distinguish the land 6

usage within each soil type and weight the corresponding inputs accordingly. The land use layer used was based off data from the year 2000 and did not account for population growth and development since that time. From population data for Bushkill municipalities, it was found that the only significant population growth had occurred in Forks Township, which had experienced a 52.7% growth in population from 2000 to 2005. In order to account for this, the developed area in the Forks sub watershed was increased by 52.7%. This area was subtracted from cultivated crops, Forks most prominent land cover. Using the NRCS TR 55 Curve Numbers, the relative curve number for each watershed was calculated. The assumptions and full curve number tables can be seen in Appendix A. The higher curve numbers reflect the amount of developed land in each watershed. Although some sub basins have less developed land, C type soils will typically produce larger curve numbers. The distribution of various land cover and soil types within the Bushkill Creek Watershed can also be seen in Appendix A. DISCUSS POPULATION GROWTH 3.1.2 Time of Concentration The time of concentration is the time that is required for water falling on the most remote part of the watershed to reach the outlet point of the watershed. Time of concentration can be calculated using the SCS lag method (Mays, 2005).. 1. 1900. Where: L = length of watershed S = Y = slope of watershed It was necessary to determine the slope and length of each sub basin and reach to ultimately find the time of concentration. The lengths were determined by tracing polylines along flow channels in ArcGIS. Sub basin slopes were also determined using ArcGIS. Both of these measurements were based on a 10 m digital elevation model (DEM) (USGS, 2010). 7

The results of the time of concentration calculations can be found in Appendix B. 3.1.3 Baseflow The baseflow, an important input into the HEC HMS watershed model, was estimated using data from USGS stream gauges on three nearby rivers; Jordan Creek, Monocacy Creek and Little Lehigh Creek. Mean monthly baseflow data was found on the USGS website. First the flows were scaled to the Bushkill Creek watershed area. Then the three baseflows were weighted based on their watershed characteristics. The three watershed characteristics that influenced the weighting were: the percent carbonate bedrock, percent urban area and percent forested area. These characteristic values can be found in Appendix C. The percent urban area and percent forested area for the Bushkill Creek were calculated using the land use data in ArcGIS, while the percent carbonate bedrock was determined using geological data in ArcGIS. Both sets of data were from the Lehigh Valley Planning Commission. For each of the creeks, besides the Jordan Creek, the percent carbonate was the highest percentage out of the three relevant characteristics. A weight of 0.5 was given to the Little Lehigh Creek because its percent carbonate was closest to that of the Bushkill Creek, while a weight of 0.4 was given to the Monocacy Creek. Since the percent carbonate of the Jordan Creek was drastically different than the Bushkill Creek, a weighting of 0.1 was assigned. Using these weights and the scaled baseflows, a weighted average monthly baseflow was found. A table illustrating the weighting of each creek can be found in Appendix C, along with estimated monthly baseflow of the Bushkill Creek. 3.2 Reach Modeling The sub basins in the HEC HMS model are connected by a series of reaches. As the flow moves down a reach, the peak flow of the storm s hydrograph is reduced and delayed. The amount that the peak is diminished and delayed is called channel routing. The river reaches were 8

routed using the Muskingum method. This method requires a K value which is estimated by the travel time through the reach, K L/V. The velocity in the channel was estimated using Manning s equation: Where: V = velocity n = Manning s n value R h = the hydraulic radius S = the Slope in ft/ft. 1.49.. Uniform flow was assumed for this equation. The Manning s n value was estimated at 0.04 for each reach (Mays, 2005). The Hydraulic Radius, R h, was estimated using Google Earth maps and assuming the river channel to be trapezoidal. The slopes of reaches were calculated using elevations from USGS topographical maps, as they were found to be more accurate than the DEM. A table of resulting K values can be found in Appendix D. The Muskingum method also requires a weighting factor x, which was given its typical value of 0.2. 3.3 Reservoir Modeling 3.3.1 Stage Area Relationship The 3 rd Street Dam storage was modeled using the stage area relationship determined in AutoCAD from the survey results. The four largest upstream dams, Lions Park Dam, Crayola Dam, Rockwood Pigments and Easton Public Works Dam appeared to be of similar size to the 3 rd Street Dam, and since no stage storage and outflow data were available, the sizing data of 9

the 3 rd Street Dam was used throughout. The location of these dams can be seen below in Figure 7. FIGURE 7: LOCATION OF UPSTREAM DAMS Survey points surrounding the dam were found from the Bushkill Creek Survey Report, Nov 2010 ; contour lines from these points were created using AutoCAD Civil 3D to develop the stage area relationship. The contours can be seen below in Figure 8. FIGURE 8 CONTOURS OF FLOOD STAGES AT DAM LOCATION 10

The contours were drawn at every half foot. The elevation of the dam is 170 feet; thus, the areas from elevations of 170 ft to 180.5 ft were considered. However, these areas did not represent the actual flood stage areas, because west of the dam, there are several islands that need to be included in the area calculations. If the water elevation was below the highest elevation of the islands, then the areas of the islands were subtracted from the contour areas. These flood stage areas were used in the HEC HMS model of the watershed s reservoir. The final flood stage area relationship can be found in Appendix E. After preliminary runs of the HEC HMS model, we found that it was necessary to delineate additional higher flood stage areas due to the water level rising higher than initially expected. Using the contours shape file from the LVPC GIS database, contours and flood stage areas at 185 ft, 190 ft, 195 ft, and 200 ft were added. 3.3.2 Dam Discharge Modeling An elevation discharge table was needed as the second input to HEC HMS reservoir model. Historically the dam had a raceway on the north side that is about 5 feet above the top of the dam. Today this raceway is filled in with concrete. Whenever the creek floods, water flows over the raceway and the slope further up the bank of the creek, which is covered in rip rap. The picture previously shown in Figure 3 was taken while standing on the raceway during baseflow conditions. Figure 4 shows water flowing over the raceway. In extreme floods, water may flow over the paved areas in the floodplain as well. A table showing the height of water over the dam (h) vs. flow over the dam (Q) was needed to properly model how water would exit the reservoir. As shown in Figure 9, the cross section of the dam was split into 4 sections: 11

FIGURE 9 3 RD STREET DAM CROSS SECTION Section 2, which is the dam itself, was treated as a weir using the equation, Where: Weir coefficient (C w ) = 4 h = height of water above the dam Length of the weir (L w ) = 52 feet Q C hl w 2/3 w The other sections were treated as open channels, so flow was determined using Manning s equation: 1.49 Q AR S n 2/3 1/2 h Where n = manning coefficient of roughness (weighted by percent wetted perimeter of a certain material) A = cross sectional area of flow (ft 2 ) R = A/P (hydraulic radius where P = wetted perimeter) S = slope (A value of 0.00365 ft/ft was used, which is the average slope of the lowest reach of creek) The flow from each section was summed to get the full flow for each elevation. The spreadsheets used to make these calculations can be found in Appendix F. 12

4. Results and Limitations 4.1 Results Table 1 summarizes the results from the HEC HMS model, while Appendix G includes hydrographs for the 2, 10, 25, 50, and 100 year storms with storage plots for each storm, along with an example of a raw output from HEC HMS. TABLE 1 HEC HMS MODEL PEAK FLOW RESULTS * *Level pond routing assumptions built into HEC HMS routing model are violated at highest flows due to negligible detention storage Our results show very little change in peak flows with removal of the dam. This leads to the conclusion that the dam does not provide enough storage to have a significant effect on the flooding. This finding is supported by the estimated storage volume calculation in Technical Release 55, Urban Hydrology for Small Watersheds. According to NRCS TR 55, the ratio of outflow to inflow of a detention basin (q o /q i ) is related to the ratio of storage volume to total runoff volume (V s /V r ) by the relationship shown in Figure 10. 13

FIGURE 10 APPROXIMATE DETENTION BASIN ROUTING FOR RAINFALL TYPES I, IA, II AND III (NRCS, 1986) The actual ratio of storage volume to total runoff for the 3 rd Street Dam is 0.0010 for the 2 year return period. This ratio is so diminutive that it does not appear on the graph above. The smallest storage volume to runoff volume ratio to appear on the graph is 0.18 (for Type II storms as in the Lehigh Valley). Using the actual runoff volume generated by this watershed for the 2 year storm, the storage volume would have to be over 100 times higher (a value of 765 ac ft) to reach a value on the chart above. These calculations can be seen below for the 2 year design storm. : V V.18 : V 4250.6 ac ft : V 765 ac ft.. % These calculations support the findings that dam removal will have no significant effect on the peak discharge of the creek. 14

4.2 Limitations While our results show that the dam has negligible effect on the peak flows, some assumptions had to be made during our work. LVPC recently developed a HEC HMS model of the Bushkill Creek for 1990 land use data, which yielded lower peak flow values than what was predicted by our model. The difference between these values may be due to difference in CN values as the flows from our model are based on higher adjusted CN values. To determine the magnitude of this error, the HEC HMS model was adjusted to give the same output as the LVPC 2 year storm. This resulted in a ratio of storage volume to total runoff of 0.0017, which is higher than the ratio of 0.0010 determined by our model, but is still much too low to result in a significant reduction in peak flows. Some assumptions were necessary to calculate the different curve numbers for the land use data. The curve numbers used were subjectively scaled to account for the provided GIS land use layer, which was later discovered to be out of date. The amount of development and impervious surface area within the watershed has changed significantly within the past twenty years. Channel widths, side slopes and depths were estimated based on aerial views provided by Google Earth. The side slopes and depths were assumed to be consistent throughout the entire creek. These estimates might have led to inaccurate K values. Also, the n values were based on basic knowledge of the Bushkill Creek and may not reflect the actual conditions. The properties of the other dams on the creek were assumed to be equal to those of the 3 rd Street Dam, because site specific data was not available. The stage discharge table for the 3 rd St. Dam may have had some inaccuracies in its modeling. Exact dimensions, slopes and materials were not available without more extensive field work, so some assumptions were made. 15

Never the less, none of these factors are likely to change the overall conclusions of the modeling, that the 3 rd St. Dam has a negligible impact on peak flows in the Bushkill Creek. 16

5. References Free Printable Topo Maps Instant Access to Topographic Maps. Web. 10 Dec. 2010. <http://www.digital topo maps.com/>. LVPC (2009). Lehigh and Northampton Counties Digital Geographic Data Disc. (CD ROM), LVPC, Allentown, PA. Mays, Larry W. (2005). Water Resources Engineering, 1 st Ed., Wiley, New Jersey NRCS, (1986). Technical Release 55. Urban Hydrology for Small Watersheds, Washington D.C. The USGS Land Cover Institute (LCI). National Land Cover Dataset. 10 Dec. 2010. <http://landcover.usgs.gov/>. U.S. Geological Survey. Nazareth Quadrangle, Pennsylvania. 1:24,000. 7.5 Minute Series. Washington D.C.: USGS, 1992. U.S. Geological Survey. Easton Quadrangle, Pennsylvania. 1:24,000. 7.5 Minute Series. Washington D.C.: USGS, 1994. USGS (2010). Seamless Data Warehouse. USGS, < http://seamless.usgs.gov/> (Oct. 27, 2010). U.S. Geological Survey. Wind Gap Quadrangle, Pennsylvania. 1:24,000. 7.5 Minute Series. Washington D.C.: USGS, 1997. US Army Corps of Engineers (ACOE) (2001). Hydrologic Modeling System HEC HMS, Version 2.1. Galaxy Runtime Components by Visix Software, Inc. 17

Appendix A Curve Number Inputs 18

19

20

21

22

Appendix B Time of Concentration Data TABLE B.1: TIME OF CONCENTRATION CALCULATIONS INPUTS Little Bushkill Zucksville Nazareth Belfast Forks Easton Upper Main Stem State Park Length (ft) 57020 26162 41501 39509 26390 44765 49985 36243 Slope (deg) 1.64 0.75 0.78 1.41 1.14 1.33 1.38 1.37 Slope (%) 2.86 1.31 1.36 2.46 1.99 2.32 2.41 2.39 CN 76.19 69.69 71.13 76.81 70.31 71.23 74.31 72.78 S 3.125 4.349 4.059 3.019 4.223 4.039 3.457 3.740 T c (hr) 5.35 5.09 6.94 4.23 4.09 5.63 5.54 4.49 23

Appendix C Baseflow Calculations TABLE C.1: CREEK CHARACTERISTICS Little Lehigh Creek Jordan Creek Monocacy Creek Bushkill Creek Area (sq. mi) 80.8 75.8 44.5 79.1 % Forested 33 34 19 22.2 % Urban Area 11.0 3.7 12.0 14.2 % Carbonate 63.0 11.0 69.0 62.0 Weight 0.5 0.1 0.4 TABLE C.2: AREA SCALED BASEFLOW BY MONTH LOCAL USGS GAGED STREAMS (ALL FLOWS IN CFS) Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Little Lehigh 111 121 138 146 119 105 90 78 79 76 81 104 Jordan scaled 156.5 62.6 219.1 176.3 120.0 90.8 58.4 57.4 73.0 77.2 116.8 163.8 Monocacy Scaled 106.6 117.3 135.1 133.3 103.1 94.2 80.0 72.9 76.4 76.4 83.5 104.8 Average 124.7 100.3 164.0 151.9 114.0 96.6 76.1 69.4 76.1 76.5 93.8 124.2 Weighted average 113.8 113.7 144.9 143.9 112.7 99.3 82.8 73.9 77.4 76.3 85.6 110.3 24

250 Monthly Baseflows 200 Baseflow (cfs) 150 100 50 0 0 1 2 3 4 5 6 7 8 9 10 11 12 Month Little Lehigh Jordan scaled Monocacy Scaled Estimated Bushkill FIGURE C 1: BASEFLOWS BY MONTH 25

Appendix D K Calculations TABLE D.1: MUSKINGUM K VALUE CALCULATIONS Reach Length (ft) n Rh (ft) S V (ft/s) V (ft/hr) K (HR) n (sub reaches) 1 26296 0.04 3 0.005363553 5.695395 20503.42069 1.282518 2.565035406 2 13626.0 0.0 3.0 0.004669896 5.3 19131.7 0.7 1.4 3 3738.0 0.0 3.0 0.002942750 4.2 15187.2 0.2 0.5 4 6535.0 0.0 3.0 0.003825555 4.8 17316.0 0.4 0.8 5 4669.0 0.0 3.0 0.002998501 4.3 15330.4 0.3 0.6 6 9279.0 0.0 3.0 0.004634120 5.3 19058.3 0.5 1.0 7 2368.0 0.0 3.0 0.002956081 4.2 15221.5 0.2 0.3 TABLE D.2: REACH SLOPES Belfast Forks Easton Slope (%) 0.525 0.418 0.376 26

Appendix E Flood Stage Areas for 3 rd St. Dam TABLE F.1: FLOOD STAGE AREAS 27

APPENDIX G: HEC-HMS RESULTS Project: Bushkill Simulation Run: 2 year new dam Reservoir: 3rd Street Dam Start of Run: 21Nov2010, 00:00 Basin Model: Bushkill Creek End of Run: 24Nov2010, 00:00 Meteorologic Model: 2yrSCS Compute Time: 13Dec2010, 14:30:24 Control Specifications: 2yr Volume Units: IN Computed Results Peak Inflow : 4113.0 (CFS) Date/Time of Peak Inflow : 21Nov2010, 20:30 Peak Outflow : 4109.4 (CFS) Date/Time of Peak Outflow : 21Nov2010, 20:30 Total Inflow : 1.00 (IN) Peak Storage : 4.4 (AC FT) Total Outflow : 1.00 (IN) Peak Elevation : 6.1 (FT)

Reservoir "3rd Street Dam" Results for Run "2 year new dam" Storage (AC-FT) 4.0 3.0 2.0 1.0 0.0 7.00 6.22 5.44 4.67 3.89 3.11 2.33 1.56 0.78 0.00 Elev (FT) 4,000 3,000 Flow (CFS) 2,000 1,000 00:00 12:00 00:00 12:00 00:00 12:00 00:00 21Nov2010 22Nov2010 23Nov2010 Run:2 year new dam Element:3RD STREET DAM Result:Storage Run:2 year new dam Element:3RD STREET DAM Result:Pool Elevation Run:2 year new dam Element:3RD STREET DAM Result:Outflow Run:2 year new dam Element:3RD STREET DAM Result:Combined Inflow

Reservoir "3rd Street Dam" Results for Run "10 year new dam" 14 12.00 12 10.29 Storage (AC-FT) 10 8 6 4 2 8.57 6.86 5.14 3.43 1.71 Elev (FT) 10,000 8,000 Flow (CFS) 6,000 4,000 2,000 0 00:00 12:00 00:00 12:00 00:00 12:00 00:00 21Nov2010 22Nov2010 23Nov2010 Run:10 YEAR NEW DAM Element:3RD STREET DAM Result:Storage Run:10 YEAR NEW DAM Element:3RD STREET DAM Result:Pool Elevation Run:10 YEAR NEW DAM Element:3RD STREET DAM Result:Outflow Run:10 YEAR NEW DAM Element:3RD STREET DAM Result:Combined Inflow

Storage (AC-FT) Flow (CFS) 16 12 8 4 0 14,000 12,000 10,000 8,000 6,000 4,000 2,000 Reservoir "3rd Street Dam" Results for Run "25 year new dam" 0 00:00 12:00 00:00 12:00 00:00 12:00 00:00 21Nov2010 22Nov2010 23Nov2010 14.00 12.44 10.89 9.33 7.78 6.22 4.67 3.11 1.56 0.00 Elev (FT) Run:25 YEAR NEW DAM Element:3RD STREET DAM Result:Storage Run:25 YEAR NEW DAM Element:3RD STREET DAM Result:Pool Elevation Run:25 YEAR NEW DAM Element:3RD STREET DAM Result:Outflow Run:25 YEAR NEW DAM Element:3RD STREET DAM Result:Combined Inflow

Reservoir "3rd Street Dam" Results for Run "50 year new dam" Storage (AC-FT) 20 15 10 5 11.67 8.75 5.83 2.92 Elev (FT) 0 0.00 16,000 12,000 Flow (CFS) 8,000 4,000 00:00 12:00 00:00 12:00 00:00 12:00 00:00 21Nov2010 22Nov2010 23Nov2010 Run:50 YEAR NEW DAM Element:3RD STREET DAM Result:Storage Run:50 YEAR NEW DAM Element:3RD STREET DAM Result:Pool Elevation Run:50 YEAR NEW DAM Element:3RD STREET DAM Result:Outflow Run:50 YEAR NEW DAM Element:3RD STREET DAM Result:Combined Inflow

35 30 Reservoir "3rd Street Dam" Results for Run "100 year new dam" 16.00 13.71 Storage (AC-FT) 25 20 15 10 11.43 9.14 6.86 4.57 Elev (FT) 5 0 2.29 0.00 20,000 15,000 Flow (CFS) 10,000 5,000 0 00:00 12:00 00:00 12:00 00:00 12:00 00:00 21Nov2010 22Nov2010 23Nov2010 Run:100 YEAR NEW DAM Element:3RD STREET DAM Result:Storage Run:100 YEAR NEW DAM Element:3RD STREET DAM Result:Outflow Run:100 YEAR NEW DAM Element:3RD STREET DAM Result:Pool Elevation Run:100 YEAR NEW DAM Element:3RD STREET DAM Result:Combined Inflow